Site Construction & Earthwork (02000-02999)

02231Site Clearing and Grubbing

UT · 2026 Standard SpecificationsRev. September 14, 2023Book pages 272273View official source ↗

Part 1 — General

1.1 Section Includes

A.Removal and disposal of vegetation, stumps, debris , and other materials within the designated areas shown.

1.2 RELATED SECTIONS Not Used

1.3 REFERENCES Not Used

1.4 Definitions

A.Clear – Removal and disposal of trees 20 inch or less in circumference (measured at a point 2 ft above existing ground) , stumps, logs, limbs, sticks, vegetation, debris, and other material on the natural ground surface.
B.Grub – Removal and disposal of roots, buried logs, debris, and organic matter to 2 ft below natural ground surface.

1.5 Submittals

A.Copies of disposal permits , agreements , or both , for information.
B.Request to dispose of material resulting from clearing and grubbing operations inside the Right -of-Way, for review .

Part 2 — PRODUCTS Not Used

Part 3 — Execution

3.1 Preparation

A.Verify with the Engineer the vegetation or objects to be removed.
B.Before clearing and grubbing, v erify the appropriate temporary environmental controls have been installed .

3.2 Vegetation and Debris Removal

A.Clear and grub areas as shown or necessary to complete project work , including the following:
1.Areas where fill material will be placed
2.Areas to be regraded
B.Roots, and non- perishable solid objects may remain in cleared areas where the top of embankment is:
1.2 ft or more above the cleared ground.
C.Completely remove stumps and roots where a structure is to be constructed, piles are to be driven, or unsuitable material is to be removed.

3.3 Disposal

A.Outside of the R ight-of-Way
1.According to prevailing laws including environmental laws, ordinances, regulations, and rules .
B.Inside the R ight-of-Way
1.Use material to widen embankments and flatten embankment side slopes as authorized by the Engineer or bury material at locations specified by or authorized by the Engineer .
a.Cover disposed material with at least 2 ft of earth and grade to drain properly .
2.Reduce wood to chips a maximum of ½ inch thick for mulching cut and fill slopes. a. Bury or uniformly distribute chips on the ground surface or mix with the underlying earth so the mixtures will not sustain burning.

3.4 Protection

A.Land monuments, property markers, or official datum points
1.Protect until their removal is necessary .
2.Reference for re- establishment before removing.
B.Protect trees from damage to roots and branches if they are designated to remain.
C.Protect other vegetation and objects designated to remain.
Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 272273 of 1,331.