B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
Site Construction & Earthwork (02000-02999)

02611Diversi on Box Gate and Frame

UT · 2026 Standard SpecificationsRev. November 18, 2021Book pages 374375View official source ↗

Diversion Box Gate and Frame DIVERSION BOX GATE AND FRAME

Part 1 — General

1.1 Section Includes

A.Materials and procedures for constructing gate and frame for hand slide gates or for screw gates and frames according to the DB Series Standard Drawings .

1.2 RELATED SECTIONS Not Used

1.3 References

A.AASHTO M 111: Zinc (Hot -Dip Galvanized) Coatings on Iron and Steel Products
B.ASTM A 36: Carbon Structural Steel
C.ASTM A 307: Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
D.ASTM A 575: Steel Bars, Carbon, Merchant Quality, M -Grades
E.ASTM D 2000: Rubber Products in Automotive Applications

1.4 DEFINITIONS Not Used

1.5 Submittals

A.Shop drawings for review . Include at least the following:
1.Diversion box screw gate and frame
2.Installation procedures
3.Fabrication methods Diversion Box Gate and Frame

Part 2 — Products

2.1 Blades and Metal Frames for Hand- Slide Gates

A.Zinc coated steel. Refer to and c omply with AASHTO M 111 .

2.2 Frame and Flush Bottom Closure

A.Carbon steel for frame and flush bottom according to ASTM A 36.
B.Galvanizing frame and flush bottom according to AASHTO M 111.
C.Galvanized fastener according to ASTM A 307.
D.Threaded carbon steel according to ASTM A 575.
E.Rubber seal for flush bottom according to ASTM D 2000, Grade AA 625 or BC 610 to 615.

Part 3 — Execution

3.1 Installation

A.Hand- Slide Gate – Install according to the DB Series Standard D rawings .
B.Install the screw gate and frame according to the authorized shop drawings so the gate opens and closes smoothly.
Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 374375 of 1,331.