ITS CABINET
PART 1 GENERAL
1.1SECTION INCLUDES
A.Installation of pedestal-mounted cabinet and foundation.
B.Installation of pole-mounted cabinet and concrete service pad.
1.2RELATED SECTIONS
A.Section 02776: Concrete Flatwork
B.Section 03055: Portland Cement Concrete
C.Section 03152: Concrete Joint Control
D.Section 03310: Structural Concrete
E.Section 13553: ITS Conduit
F.Section 13554: Underground Junction Box
G.Section 16530: Electrical Power
1.3REFERENCES
A.International Code Council Evaluation Service (ICC-ES)
B.National Electrical Manufacturers Association (NEMA)
C.National Electrical Code (NEC)
1.4DEFINITIONS Not Used
1.5SUBMITTALS
A.Wedge anchor manufacturer’s technical data sheets with ICC-ES
Evaluation Report and installation instructions for review.
ITS Cabinet
PART 2 PRODUCTS
2.1STATE FURNISHED EQUIPMENT
A.ITS Cabinet
1.Pedestal-Mounted Cabinet
2.Pole-Mounted Cabinet with mounting brackets
2.2CONCRETE
A.Foundation Concrete – Class AA(AE). Refer to Section 03055.
2.3BOLTS, NUTS, AND HARDWARE
A.Provide wedge type expansion anchor bolts which have current ICC-ES
evaluation report for cabinet mounts.
1.Provide anchor bolts with 5/8 inch diameter.
2.Embed in concrete at least 4 inch.
3.Provide at least 1 inch projected length above the concrete.
4.Use washers sized to secure strong connection between the
anchor and cabinet.
B.Stainless steel, galvanized, or zinc plated bolts, nuts, washers, and
hardware
C.Non-self-locking nuts
D.Nipples, elbows, and grommets necessary for wiring.
2.4CONDUIT
A.Refer to Section 13553.
2.5UNDERGROUND JUNCTION BOX
A.Refer to Section 13554.
2.6EXPANSION JOINT MATERIAL
A.Preformed expansion joint filler. Refer to AT Series Standard Drawings
and Section 03152.
2.7ELECTRICAL POWER
A.Refer to Section 16530.
ITS Cabinet
2.8CONDUCTORS
A.Refer to Section 16530.
PART 3 EXECUTION
3.1PREPARATION
A.Contact the Engineer at least 30 calendar days before State furnished
cabinets are needed to schedule pick up of the items.
B.Load and transport State furnished materials.
3.2GENERAL
A.Verify maintenance equipment has full access to the site.
B.Comply with NEC for electrical connections.
C.Restore area to the original condition or as shown after construction is
completed.
3.3CABINET FOUNDATION
A.Verify conduit placement and foundation dimensions before foundation
construction.
B.Conduit
1.Install conduits centered at top of cabinet foundation within a 17
inch x 17 inch square.
2.Provide at least 1-inch spacing between conduits.
3.Extend conduit 2 inch above top of cabinet foundation.
4.Locate conduit at least 3 inch from concrete surface.
5.Refer to AT Series Standard Drawings for number and size of
conduits used between the cabinet and adjacent junction boxes.
6.Seal conduits at both ends until cable installation.
a.Install bushings on conduit ends before cable installation.
b.Install 2 inch of duct seal in empty conduits.
C.Cast foundation in place as shown on AT Series Standard Drawings.
1.Place cabinet foundation parallel to the roadway.
ITS Cabinet
D.Cabinet Foundation Surfaces
1.Ordinary Surface Finish. Refer to Section 03310.
2.Chamfer around top surface perimeter.
3.Level top surface before cabinet installation.
E.Drill holes for anchor bolts and install according to manufacturer’s
instructions.
F.Place preformed expansion joint filler at concrete joints.
3.4PEDESTAL-MOUNTED CABINET
A.Install pedestal-mounted cabinets so the vented door that accesses the
front face of the control equipment is closest to the Type II-PC junction box and downstream of traffic. Refer to AT Series Standard Drawings.
1.Securely fasten the cabinet onto the concrete foundation.
2.Verify that both cabinet doors can fully open and close after the
cabinet has been installed on the foundation.
B.Caulk between base of cabinet and top of foundation to form a watertight
seal.
1.Provide a watertight seal that does not degrade the NEMA 3R
enclosure rating.
2.Refer to NEMA Standards Publication 250 for ratings of the
enclosure for all conduit fittings and chases to adjoining enclosures.
C.Isolate dissimilar metals from one another where applicable.
D.Make power connections as shown.
1.Isolate the neutral bus from the cabinet and equipment ground.
2.Terminate the neutral bus at the neutral lug attached to the
electrical service pedestal.
3.5POLE-MOUNTED ITS CABINET
A.Install pole-mounted cabinets so the vented door opens downstream of
traffic.
1.Use stainless steel bands. Refer to AT Series Drawings.
B.Drill holes and install nipples in pole at each site.
1.Touch-up damaged galvanized surfaces with zinc rich paint both
within the hole and around the hole.
ITS Cabinet
C.Arrange all equipment installed in the cabinet in a neat and orderly fashion
on shelf or on DIN rail mount.
D.Connect power as specified in the contract and comply with the NEC.
3.6CONCRETE SERVICE PAD
A.Refer to Section 02776.
1.Construct as shown in the AT Series Standard Drawings.
2.Class B(AE) concrete or better may be used.
3.7UNDERGROUND JUNCTION BOX
A.Install junction boxes as shown in AT Series Standard Drawings. Refer to
3.8CONDUCTORS
A.Refer to Section 16530.
B.Bond the grounding conductor from the cabinet ground bus to the ground
rod in the Type II junction box.
C.Terminate all terminal connections by a mechanical (spade) connector.
D.Identify and label all field terminals and cables.
3.9ELECTRICAL POWER FROM SOURCE
A.Refer to Section 16530.
END OF SECTION
ITS Cabinet
Utah revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.
Source: Utah Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 1237–1241 of 1,331.
View official source ↗