6-45 SECTIO N 613 – STON E FILL AND RIPRAP
613.0 1 DESCRIPTION . This work shall consist of furnishing and placing protective material s.
613.0 2 MATERIALS . Materials shall meet the requirements of the following subsection s:
Sand Borrow and Cushion ................................ ................................ ......................... 703.03 Stone for Riprap, Heavy Type ................................ ................................ ................... 706.03(a) Stone for Riprap, Light Type ................................ ................................ ..................... 706.03(b) Stone Fill, Type I ................................ ................................ ................................ .......706.04(a) Stone Fill, Type II ................................ ................................ ................................ ......706.04(b) Stone Fill, Type III ................................ ................................ ................................ .....706.04(c) Stone Fill, Type IV ................................ ................................ ................................ ....706.04(d) E-Stone Fill, Type I ................................ ................................ ................................ ....706.05(a) E-Stone Fill, Type II ................................ ................................ ................................ ..706.05(b) E-Stone Fill, Type III ................................ ................................ ................................ .706.05(c) E-Stone Fill, Type IV ................................ ................................ ................................ .706.05(d) E-Stone fill shall be of the type specified on the Plans, supplemented with material excavated from the channel or the tailings of a topsoil screening operation. Bed material shall be approved by the Engineer and the Vermont Agency of Natural Resources prior to use . Similar sized river sediment is an acceptable alternative as is a mixture of angular material and river sediment.
613.0 3 PREPARATION . The areas to be protected shall be constructed and graded to the lines shown on
the Plans or as directed by the Engineer and, if a fill area, shall be compacted . All slope s shall be maintained to the neat lines shown on the Plans prior to the placing of filter or bedding material , stone fill, or riprap.
613.0 4 Placing .
613.0 5 METHO D OF MEASUREMENT . The quantities of E-Stone Fill, Stone Fill , and Riprap of the
type specified to be measured for payment will be the number of cubic yards of the material specified installed in the complete and accepted work , measured within the limits shown on the Plans or as directed by the Engineer.
613.0 6 BASIS OF PAYMENT . The accepted quanti ties of E-Stone Fill, Stone Fill , and Riprap of the type
specified will be paid for at the Contract unit price per cubic yard . Payment will be full compensation for furnishing, transporting, mixing, and placing the specified material and for furnishing all labor, tools, equipment , and incidentals necessary to complete the work . Excavation required for placing stone fill, riprap, and the gravel filter or bedding material will be paid for at the Contract unit price per cubic yard for the same type of excavation removed directly above the face of the protective material s, except tha t when no other type of excavation has been removed, excavation will be paid for under an appropriate excavation pay item. Unless otherwise shown on the Plans, the filter blanket will be paid for under Gravel Filter for Slope Stabilization. 6-47 Payment wil l be made under: Pay Item Pay Unit 613.0601 E -Stone Fill, Type I ................................ ................................ ................... Cubic Yard 613.0602 E -Stone Fill, Type II ................................ ................................ ................. Cubic Yard 613.0603 E -Stone Fill, Type III ................................ ................................ ................ Cubic Yard 613.0604 E -Stone Fill, Type IV ................................ ................................ ................ Cubic Yard
613.10 01 Stone Fill, Type I ................................ ................................ ...................... Cubic Yard
613.1 002 Stone Fill, Type II ................................ ................................ ..................... Cubic Yard
613.1 003 Stone Fill, Type III ................................ ................................ .................... Cubic Yard
613.1 004 Stone Fill, Type IV ................................ ................................ ................... Cubic Yard
613.15 10 Riprap, Light Type ................................ ................................ .................... Cubic Yard
613.1 520 Riprap, Heavy Type ................................ ................................ .................. Cubic Yard
6-48SECTIO N 614 – STREA M DIVERSIO N AND IN-WATE R SEDIMEN T ISOLATIO N MEASURES
614.0 1 DESCRIPTION . This work shall consist of implementing adequate control measures to protect
the flow of water through the construction site using temporary stream relocation or in -water sediment isolation measures . This shall include designing, furnishing, installing, maintaining, and removing the control measures, as well as erosion prevention and sediment control, channel m aintenance, and debris removal in accordance with these specifications.
614.0 2 MATERIALS . Materials shall meet the requirements of the following subsections:
Stone Fill ................................ ................................ ................................ .................... 706.04 Geotextile for Roadbed Separator ................................ ................................ .............. 720.02 Geotextile Under Stone Fill ................................ ................................ ....................... 720.04 Geotextile for Filter Curtain ................................ ................................ ....................... 720.06 Other materials which effectively separate sediment or pollutants from waters of the state, as defined in the Vermont Water Quality Standards , may be used. These shall be detailed on the EPSC plan and are subject to approv al.
614.0 3 Temporar Y Relocatio N of Stream .