781
7-155SECTION 781 – RAILROAD CROSSING MATERIALS
781.01PRECAST CONCRETE GRADE CROSSING SYSTEMS . Precast concrete grade crossing
systems shall consist of concrete, bar reinforcement, steel angle, rubber rail seal, fasteners, hardware, and all other components required for the system. Systems shall be one of the systems listed on the Agency’s Approved Products List .
781.02RUBBER RAIL SEAL . Rubber rail seal shall be a single high quality, homogenous elastomeric
compound that is ultraviolet , ozone, weathering, and chemical resistant. The compound shall not permanently deform under loading and shall be f ree of porosity, defects, and dimensional irregularities. Seals shall be designed for the use between the field and gage sides of the rail and the adjacent pavement. The seal shall provide vibration dampening and protection from thermal expansion and contr action and shall allow for normal rail deflection without transferring force to the roadway pavement. Seals shall be in accordance with the Americans with Disabilities Act.
781.03AUTOMATIC HIGHWAY CROSSING WARNING SYSTEM (AHCWS)
between the train detection unit and the flasher crossing warning lamps.
relay base and installed in the relay rack.
the flasher crossing warning lamps. Alternate flashing lamp and bell outputs shall energize no more than 1.0 second after control inputs a re de -energized.
no more than 1.0 seconds after the control unit is energized.
normal conditions.
781 7-156 e. Means shall be provided to manually energize either side of the flashing lamp circuit continuously, with the other side off, for lamp voltage adjustment under actual operating conditions. If provided, de -energizing control input (on approach of a train) shall flash one or both sets of lamps to provide warning indication and override manual control.
additional lights exceeding the 20 -amp limit.
ohms to maintain warning device drive in a clear condition. Control input resistance shall be 25 0 ohms to 1,000 ohms. Control input voltage of less than 3.0 volts DC shall result in activation of the crossing warning devices. Multiple vital and gated control inputs shall be provided integrally or as an accessory.
warning devices:
volts DC to operate the nominal 10 -volt DC signal lamps with a load rating as specified by the manufact urer.
which shall provide a minimum of 12.0 volts DC to operate the nominal 10 -volt DC gate arm tip lamps with load rating specified by the manufacturer.
mechanical type crossing warning bells, and a minimum of 0.25 amps at a minimum of 11.0 volts DC to operate electronic type bells.
properly, the highway crossing warning device, in response to control input signals, shall have a fallback mode that shall assure the following minimum operating capabilities when the control input signal is de -energized:
with either flashing or steady energy.
system.
781 7-157 (b) Motion Sensor Track Circuits . The motion sensor system shall be microprocessor -based and shall meet the following minimum requirements:
modules, and compatible with the types of track circuits currently used for control of adjacent or overlapping crossing warning systems within the limits of this Contract. No motion sensor system frequencies shall be selected that will preclude the u se of former GE Transportation (now Alstom Signaling) Electrocode or Alstom Signaling Genra kode track circuits, or future 91 -2/3 Hz to 100 Hz cab signaling, unless otherwise approved by the Engineer.
furnished and installed as a complete redundant solid -state system. Redundancy shall be achieved by adding backup modules to the system. Motion sensor system equipment shall have a high degree of immunity to adjacent high tension AC power lines or AC or DC propulsion systems and its operation shall not be affected by electromagnetic or inductive interference from such sources. Equipment layout design shall be such as to mitigate interference from other equipment or appara tus installed within the same instrument housing.
up and diagnose the system with a standard web browser. This shall be done locally or through a standard IP netw ork. The motion sensor system shall be provided with two ethernet connections that can operate at 10 Mbps or 100 Mbps. These interfaces shall auto -negotiate with the connected network device for speed selection and auto -detect whether the connecting cable is a cross -over cable or is a straight connection. Motion sensor system equipment shall have provisions for expansion to wireless crossing control and prediction capabilities.
Hz.
781 7-158 (5) The motion sensor system shall activate the AHCWS devices without a delay exceeding 500 milliseconds with a train occupying any portion of the island circuit. The island circuit shall be defined by the distance between transmit and receive track connections to the rails. The island circuit shall be an independent AC circuit with a method of randomized modulation using frequencies of 4.0 kHz, 4.4 kHz, 4.9 kHz, 5.4 kHz, 5.9 kHz, 6.4 kHz, 7.1 kHz, 7.7 kHz, or 8.0 kHz. Internal circuit logic shall be so designed that a momentary shunt applied to the island circuit while the approach is occupied shall not allow the crossing warning system to cease operation (clear).
circuitry.
of 9.5 volts DC to 16.5 volts DC and shall be provided with complete internal and external surge suppression equipment for rail and battery connections for single -track usage. Each output driver shall be capable of energizing a 12 -volt DC relay with a resistance of 500 ohms.
in a master/slave configuration. Turning off a slave unit shall not affect the operation of the master or other slave units.
the local display unit or web graphic user interface that is accessible via a laptop computer which shall display all necessary microprocessor statuses and allow for configuration.
personnel shall be provided. Verification shall take place before an application program is selected or vital safety adjustments to the setup parameters can be made.
sudden shunt in the ap proach without the presence of a train.
unsafe warning time for the AHCWS equipment.
illuminated to indicate the current status of related circuits. These shall include the status of the system, track circuits, inputs, and outputs.
781 7-159 (14) Track termination shunts, including wide or narrow band, shall be furnished in accorda nce with the manufacturer’s standard. All shunts shall be NBS -1 type. Adjustable loss of shunt protection shall be provided. The means of adjustment for warning loss-of-shunt time shall be such that once set it cannot inadvertently be changed by maintenance personnel.
limits of the approach and activate the warning devices. If, after the system has activated the warning devices, the train ceases approaching or r ecedes from the crossing, the system shall deactivate the warning devices within a pre -determined time.
frequency on each track monitored and shall operate properly w ithout the need of any external relays to prevent tail ring (ring -off). Tail rings, ring -bys, and short warning times will not be acceptable.
motion -sensing mode.
to achieve the designated times shown on the Plans. Advanced traffic preemption shall be provided by a separate output of the motion sensor.
of any component part, a minimum of 20 seconds warning time will be provided.
requires the unit to be set up in a bi -directional manner, shall be furnished in accordance with the manufacturer’s standard.
frequency assigned to that application , or to 0 Hz. All other local parameters shall default to the parameters set for that application, or to the most restrictive state.
systems, the Contractor shal l design and furnish a means of bypassing the insulated joints using coupling devices as recommended by the motion sensor system manufacturer to ensure complete approach distance required for the designed warning time. The motion sensor unit shall be capa ble of remote activation when insulated joints located within the crossing approaches cannot be bypassed.
781 7-160 (23) Lightning and surge protection shall be to the manufacturer’s standard.
crossing approach length with joints located in the approach and remote activation being used. The internal crossing recorder shall be capable of maintaining such functions as date and time, average train speed, actual warning time, and diagnostic and supervisory
information.
The recorder shall be capable of recording and storing data for a minimum of 400 train
moves. The data shall be displayed on a digital readout and be transferable to a laptop
computer or master recording device via a serial or ethernet connector. All recorded events
shall be capable of being printed trackside and in the office.
shown on the Plans. The flashing light signal layout shall be equipped with a standard
railroad crossing sign, ENS sign, flashing light units and, where required, bells, as specified
herein.
and shall also conform to the AREMA C&S Manual, Part 3.2.5, AREMA C&S Manual Part
3.2.35 and the AREMA C&S Manual Part 3.2.50.
single-direction flashing light signals as indicated on the Plans. In accordance with the
MUTCD and the AREMA C&S Manual, 30-inch spacing is required. Additional mounting
hardware may be required in some instances.
atmospheric conditions or by changes in temperature as defined by Class B in the AREMA
C&S Manual, Part 11.5.1. A protective finish shall be applied to housings made of
materials susceptible to corrosion, weathering, degradation from ultraviolet rays, or other
elements identified in Class B in the AREMA C&S Manual, Part 11.5.1. The housing shall
be equipped with a door with front access, hinged at one side with a weatherproof seal. A
ventilation opening shall be provided at the bottom of the housing and covered with brass,
or copper, wire screen. A sidelight shall be provided on both sides of the lamp housing
complete with gasket, lens, and retainer.
781
feet tall, of aluminum construction, and complete with pinnacle cap and aluminum split
base junction box. A pinnacle cap will not be required when bell is used.
The Contractor shall verify that the crossing masts supplied are of sufficient height to
maintain the recommended minimum clearances with the multiple light configurations
shown on the Plans and the multiple signs specified in this subsection.
A strip of white Type III or Type V retroreflective material, as specified in ASTM D4956,
and not less than two inches in width, shall be used on each mast for the full length of the
front and back of the mast, from the crossbuck sign or number of tracks sign to the junction
box base.
shall have either a clear or red lens. White LED sidelights shall be included. Any
gasket or similar sealing provisions shall be made of a material in accordance with
the AREMA C&S Manual, Part 15.2.10.
to 158ºF in accordance with the AREMA C&S Manual, Part 11.5.1. It shall be
protected against dust and moisture intrusion in accordance with the requirements
of ANSI/NEMA 250, Type 4.
in accordance with the AREMA C&S Manual, Part 11.5.1, and the lens shall be UV
stabilized.
aluminum. The bell shall conform to the AREMA C&S Manual, Part 3.2.61. Normal
operating voltage shall be 10 volts DC.
with AREMA C&S Manual, Part 3.2.50.
retroreflective sheeting on flat sheet aluminum with the words “RAILROAD CROSSING”
in black letters, and a 5-inch reflective stripe on the rear, in accordance with the MUTCD.
781
guidelines in the AREMA C&S Manual, Part 3.2.5.
assembly shall be of the type indicated on the Plans.
mph with a maximum horizontal deflection of 3° 15ʹ, and be capable of supporting a
500-pound load at the end of the arm.
shall be equipped with handrails on both sides and shall be a minimum of 20 inches wide,
constructed of expanded metal to provide good footing and prevent ice or snow build up.
The handrails shall consist of a top handrail 36 inches above the walkway and an
intermediate handrail 18 inches above the walkway.
shall be a single mast structure for arm lengths up to 26 feet and double mast for arms over
26 feet. A pole mounted junction box shall be furnished with provisions for terminating all
cable wires on terminals conforming to the AREMA C&S Manual. The junction box shall
be equipped with a gasket and front door provided with a means for being secured by an
approved padlock.
standard railroad crossing sign, flashing light signal units, crossarms, visors, backgrounds
and, where required, bells. Where the Plans do not require a bell, the cantilever mast shall
have a pinnacle and multiple track signs where appropriate.
clamps and a mast mounted support bracket.
with gate arm operation.
the gate arm from coming in contact with cantilever arm mounted flashing lights.
781
AREMA C&S Manual, Part 3.2.10. Conversion brackets shall not exceed 36 inches in
length from centerline of mast to centerline of gate.
Part 3.2.21. The design shall allow the gate to assume a vertical position.
effect associated with long gates. Buffer legs shall be of the type specified on the Plans.
gate mechanism, gate keepers, gate arm, counterweights, LED gate arm lights, high-wind
brackets, mast mounted flashing light units, railroad crossing signs, extension brackets for
signs, and, where required, bells. Where the Plans do not require a bell, the signal mast
shall have a pinnacle and number of tracks signs, together with all necessary hardware as
specified herein, in accordance with the AREMA C&S Manual, Part 3.2.15, and as shown
on the Plans.
aluminum pipe, 16 feet long and include a cast aluminum double split base junction box.
Junction boxes shall be provided with terminals conforming to the AREMA C&S Manual,
gaskets, and provisions for padlocking both sides. All special gate hardware for cantilever
supported gates shall be ordered with the cantilever assembly as manufactured by the
cantilever supplier.
plastic laminate and shall be fastened to the inside of mechanism cover. Binding posts,
nuts, washers, and insulators shall conform to the AREMA C&S Manual, Part 14.1.11.
mechanism shall include a nominal 115 volt AC heater element to prevent the formation
of frost on controller contacts.
781
Manual, Part 3.2.20 or the AREMA C&S Manual, Part 3.2.24. The striping shall consist
of 16-inch alternate reflectorized red and white stripe on both sides of the arm. The arm
shall be constructed of non-conductive fiberglass and be designed to ensure reasonable
durability and rigidity to prevent undue sway or whipping. The clearance between the gate
arm and any fixed portion of the assembly shall be a minimum of two inches.
of the centerline of the roadway, but in no case less than 90% of the roadway width, and
provide a minimum clearance of two feet from overhead wire and cable. All gates over 30
feet in length shall be equipped with buffer legs to minimize the sagging effect associated
with long gates. Buffer legs shall be of the type specified on the Plans.
devices shall be as specified in the AREMA C&S Manual, Part 3.2.22.
equipped with self-restoring gate arm devices. The self-restoring gate arm devices shall be
as specified in the AREMA C&S Manual, Part 3.2.23. The gate arm devices shall be of the
type specified on the Plans.
shall be provided in accordance with the AREMA C&S Manual, Part 3.2.40. Gate arm
lights shall be adjustable to permit focusing of lights at gate installations parallel to the
tracks but not perpendicular to the roadway.
support shall provide a base upon which the gate mechanism rests and shall support the
weight of the mechanism when it is necessary to swing the mechanism and gate for repairs.
Mechanism support shall be of the type specified on the Plans. The mechanism support
shall be complete for mounting on a 5-inch pipe.
Part 3.2.51.
access to the gate assemblies and rear of the gate mechanisms.
781
sides and rear of platform. Railings shall be a minimum of 45 inches in height.
of the gate or obstructs the flashing lights.
aluminum floor and access to underground and aerial cable knockout entrances behind the
main terminal rack. The top and sides shall be fully lined with fire insulating material
complying with a flame spread of 0-20 and a fire rating of 7 in accordance with ASTM E84.
Roof and floor ventilation openings for the size of the shelter shall be provided. Hoist bars
shall be provided to facilitate the movement of the shelter.
In each door, there shall be a minimum of two ventilating openings covered with fine mesh
stainless steel, copper, or bronze screening. The exterior of the ventilated openings shall
be hooded to minimize the entrance of precipitation. The interior of the ventilation opening
shall be equipped with a sliding steel plate to allow the adjustment of airflow. Each door
shall be hinged and gasketed so that they will provide a dustproof and weatherproof seal.
Doors shall be provided with cast iron handles connected to a three-point locking device
which will ensure that the door cannot be locked until it is in the fully closed position.
Doors shall be provided with a two-position retaining device to secure the door when open.
be equipped with bronze hinge pins and shall be lubricated by the manufacturer before the
shelter is shipped.
for all passages and sides and operated from a switch conveniently placed near the entrance
door. A minimum of three ground fault circuit interrupter (GFCI) convenience outlets
(duplex receptacles) shall be provided in each wall about 36 inches from the floor. A GFCI
receptacle shall be provided near each door.
781
volts AC and fused separately shall be provided in the shelter or case. The fan, if side
mounted, shall be of the centrifugal type, sized to mount through a standard aerial cable
outlet knockout. The thermostat that activates the fan control shall be adjustable with an
on control operable between 65°F and 75°F.
volts AC and fused separately shall be provided in the shelter.
dimensions of this bus shall be 8 inches × 8 inches × 1/2-inch. The bus shall be located on
the lower left section of the terminal board and as near the cable entrance as possible. A
minimum of twelve 3/8-inch holes shall be drilled and tapped in the bus and twelve 3/8-
inch × 1/2-inch long hex head bronze studs with one washer each shall be furnished.
apparatus installed within the same instrument housing.
furnished and shall be sized to fit the shelter. Equipment racks shall include all necessary
supports for wire and equipment.
The wires shall be attached to the removable contacts using solderless connections. Unless
otherwise approved by the Engineer, or proven by type acceptance testing, the plug-board
shall be designed so that the removable contact will have a direct connection with the
contact and coil prongs. The plug-boards shall be in accordance with the applicable
sections of the AREMA C&S Manual, Part 6.2.2. All wires shall be of sufficient length to
permit them to be moved to any contact on the same relay. The plug-boards for vital relays
shall be equipped with a registration plate to prevent relays of the wrong type, contact
arrangement, or operating characteristics from being inserted.
AHCWS shelter or case, the Contractor shall group the rows of racks and the
instruments thereon so that similar types of equipment or functions of a similar
nature will be together.
781
than 1 foot from the floor of the room. The overall height of the rack shall not
exceed 7-1/3 feet.
electronic track circuits, grade crossing predictors, motion sensors, or related solid-
state equipment. Shelves shall be mounted such that equipment is not more than 6
feet nor less than 1 foot from the floor. Shelves shall be provided with rubber
matting in accordance with these specifications.
rack or panel.
on the rack or panel.
shall indicate the nomenclature of the relay.
specified herein. This tag shall indicate the relay contact number assigned to the
wire.
as specified herein.
mounted on a standard equipment rack where required.
entrance facilities of the shelter. The Contractor shall determine the physical size
of the terminal boards necessary to meet the requirements of the Contract.
781
with the AREMA C&S Manual, Part 14.1.6.
posts or lightning arresters, in line with the working conductors of any one cable.
clearance between adjacent resistors.
of shelter and shall be made of 3/4-inch Type AB exterior grade plywood securely fastened
to the walls in such a manner to permit mounting of battery charging equipment,
transformers, terminals, fuses, etc.
design and size for the batteries supplied by the Contractor. Alternative designs of
polyethylene may be submitted for consideration. Unless otherwise approved, the design
shall provide for batteries to be mounted on battery racks having a single tier.
externally grounding the case shall be provided. Perforations of the shelter will not be
permitted. The internal ground bus arrangement shall be as specified in Subsection
(f)(9)
provisions of the AREMA C&S Manual, unless otherwise specified herein.
No. 16 AWG 19-strand flexible wire shall be used for all circuits, except that No. 10 AWG,
or larger, flexible stranded shall be used for signal lighting, track connections to the main
terminal board and rectifier bus circuits. No. 6 AWG shall be used for battery connections.
Wiring for lights, fan control, switch and convenience outlets shall be insulated No. 12
AWG, flexible, THHN wire installed in EMT. Wiring for the wall-mounted heater shall be
insulated No. 10 AWG, flexible, THHN wire installed in EMT.
Solderless terminals, for stranded wire, shall be as specified in Subsection 781.03(j)(13).
Solid terminal connectors shall be used for all short terminal jumpers.
781
raceway. The raceway shall be of a polycarbonate, low smoke type with a solid snap-on
cover and flexible side walls. The side walls shall be of finger type construction allowing
for insertion and removal of wire runs with terminations attached. Sizes shall be determined
by the manufacturer. Fill capacity shall not exceed 40%.
manufacturer’s standard.
AREMA C&S Manual, Part 1.5.10. The finish color shall be aluminum. The steel
bottom of the shelter shall be treated with a corrosion resistant undercoating.
light, above the manual control box, on the highway crossing side of each AHCWS
shelter. The circuit control for this light shall include contacts of the power-off
relay. The light shall be lit when the power is on.
polycarbonate lens, with a gasket or seal, shall be installed to weatherproof the hole.
behind the lens.
drawings.
the roadway side of the shelter as indicated on the Plans.
781
hinged and gasketed door to provide a dustproof and weatherproof seal.
to provide a weatherproof seal between the back of the MC box and the side of the
shelter. A pipe nipple with locknuts and bushings, or similar approved means, shall
be provided between the inside of the shelter and the inside rear of the MC box to
house and protect the flexible internal wiring between the shelter and the terminals
on the control switch within the MC box.
be provided.
test record booklet.
“Manual Control”.
tags, as specified in Subsection 781.03(j)(14). These tags shall indicate the
nomenclature of the wire.
location. The event recorder shall be of the type specified on the Plans.
and report activities associated with signal equipment operation.
recorder which through user defined application logic can interpret the stored
information.
contact closures and analog information such as relay battery voltage, gate battery
voltage, and AC lamp voltage.
781
networked with expansion modules via RS485 to scale to larger I/O intensive
applications.
menus and fast access to stored data and system functions. The user interface shall
be accessed using a built-in display and keypad or remotely through the
communication options.
sources and shall process outputs to battery backed up memory for storage with a
date and time stamp.
recorder design and operation.
ranges for field installed equipment.
indicator. The indicator shall light when the respective port is energized.
printer and modem to download from memory. Event recorders shall be
capable of storing up to 24,000,000 events and equipped with a minimum
of four relay outputs front-back-heel contacts used for general-purpose
control interface.
isolated ground.
enclosure with wiring connections protected from accidental contact when passing
by.
781
volt AC, 100 amp, 24 circuit panelboards. The capacity rating for each panel board
shall be sized by the Contractor for the projected loads and shall be rated for not
less than 100 amps. Panel boards shall contain 25% spare circuit breaker spaces.
Two double pole circuit breakers shall be provided for future use, in addition to the
25% spare circuit breaker spaces. Circuit breakers provided shall be of the thermal
magnetic, molded case type, sized by the Contractor in accordance with the
approved power calculations.
each crossing location to replace the existing service. The Contractor shall
obtain all permits, licenses and agreements with the supplying power
company and be responsible for coordination with the power company and
railroad and all user installation costs that the power company requires.
Conductor sizes and cable makeup shall be detailed for application of the
Contractor’s final design. The sizing of the conductors shall allow no more
than a 5% voltage drop between the power source and the load under
maximum calculated load conditions.
applicable state and local ordinances pertaining to electrical power
installations and the National Electrical Code.
AC, three-wire feed from the meter service to the utility tapping point.
and rear.
in EMT conduit. Wire sizes, EMT conduit, and liquid tight flexible conduit shall
be sized in accordance with the National Electrical Code. Wiring for lights and
convenience outlets shall be a minimum of No. 14 AWG, flexible, THHN wire
installed in EMT.
781
an average compressive strength of 5,000 psi and be in accordance with the applicable
drawing section of the AREMA C&S Manual, Part 14 for the type of precast foundation
required. Precast concrete foundations shall be steel reinforced. Reinforcing steel shall be
in accordance with the AREMA C&S Manual, Part 14.4 and shall be not less than one inch
from any outside surface.
the AREMA C&S Manual, Part 15.3.1. Bolts, nuts, and threads shall be in accordance with
the AREMA C&S Manual, Part 14.6.20.
Plain washers shall be in accordance with the AREMA C&S Manual, Part 14.6.21. Steel
shall be in accordance with the AREMA C&S Manual, Part 15.1.4, Section 1.
signs. Signs shall be in accordance with MUTCD requirements.
meet the requirements of ANSI/NEMA IM 60000, Type FR-4 and meet or exceed
the Class 2 requirements of IPC-A-610F. Cards shall have sufficient thickness to
permit easy insertion and removal and shall be physically keyed to protect against
incorrect interchange. Circuits shall be formed by etching. Conductor material shall
be copper and shall be protected from exposure to air.
or plug-in unit is removed while the equipment is energized shall be clearly marked
or labeled with a warning note and means provided to remove power to the PC
cards.
changes or modifications to wiring or components on printed circuit cards will not
be allowed.
781
thickness of 0.000050 inches.
apparatus from the effects of short circuits or overloads.
interruption and shall protect the electrical equipment and circuits from short-term
and long-term overloads.
be furnished. All fuses shall be centrally located on the power distribution panel
and power racks.
installation and service conditions to assure a positive contact between the clips and
fuse.
more than one manufacturer and shall be used within the published specifications for such
number. All diodes shall be of the silicon type.
accordance with the AREMA C&S Manual, Part 14.2.15. Resistors for electronic circuits
shall be in accordance with the applicable requirements of the AREMA C&S Manual, Part
11.5.1.
accordance with the AREMA C&S Manual, Part 14.2.20. Reactors for electronic equipment
shall be in accordance with the applicable requirements of the AREMA C&S Manual, Part
11.5.1.
requirements of the AREMA C&S Manual, Part 11.5.1.
the applicable requirements of the AREMA C&S Manual, Part 14.1.15.
781
supervisory control circuits, shall be in accordance with the AREMA C&S Manual, Part
14.1.10.
instrument shelters used to terminate 55.0 volt or greater AC or DC circuits shall be
provided with a protective insulator. The type of insulator shall be individual for each
terminal post and shall be fire-resistant.
three or four post porcelain or other approved types of bases and shall be in accordance
with the AREMA C&S Manual, Part 14.1.9.
14.1.1, or as specified herein.
terminals shall be submitted for approval.
points where the wires are to be terminated on terminal binding posts.
No. 16 and No. 14 AWG stranded wires.
No. 12 through No. 10 AWG insulated wires.
other stranded vital circuit No. 20 through No. 16 AWG insulated wires
having a maximum diameter of 0.200 inches.
781
studs and 1/4 inch studs for non-vital circuit No. 22 AWG though No. 16
AWG insulated stranded wires having a maximum diameter of 0.125
inches.
The Contractor shall be responsible for ensuring that the proper terminals are
selected based on wire gauge and stud size.
that the flexibility of the conductor will not be destroyed and the possibility of
breakage at the terminal will be reduced to a minimum.
of the terminal and recommended by the manufacturer for the terminals being
furnished.
of the terminal and which will not release until proper indentation is complete.
of each cable and each cable wire and all single wires that terminate in the cases,
junction boxes, gate mechanisms, instrument housings on entrance racks, and any
equipment of the AHCWS outside of such locations shall be permanently identified
with a tag. Tags shall not obscure connecting links used between terminal binding
posts. Tags shall be installed so that they may be read with a minimum of
disturbance of the tags and wiring. Each conductor of the cable shall be rung out
and identified before applying the tag.
transformers, resistors, reactors, and other components shall meet the following
requirements:
and field-installed wires within the cases and AHCWS instrument shelters,
base of signal junction boxes, and similar applications shall be of the type
specified on the Plans. The application of the conductor nomenclature shall
be in accordance with the manufacturer’s instructions and shall result in a
permanently bonded and legible identification.
781
transformers, resistors, reactors, terminals, and other miscellaneous
components within the cases or AHCWS instrument shelters shall
be the flat plastic laminated type.
ii. Identification tags shall be 1-1/2 inches long × 3/4 inches wide with
one 5/16-inch hole located in the center of the width. The distance
from the edge of the tag to the hole shall be approximately 9/32 of
an inch. The untreated tag shall be milk white in color and composed
of nontoxic, thermoplastic, acid-resistant vinyl resins.
iii. The identifying nomenclature space shall allow for three rows of
lettering, and the tag material shall be capable of receiving typed-on
characters by conventional means. The height of the lettering shall
be not less than 1/8 inch. Hand-written tags shall not be allowed.
iv. After lettering, both the face and back side of the tag shall be
covered with a clear plastic coating, or nontoxic, thermoplastic,
acid-resistant vinyl resin coating, shall have a minimum thickness
of 0.01 inch.
shall show the terminal post identification on the top line. The
functional nomenclature shall appear on the bottom line, or, if
required, on the middle and bottom lines. The terminal posts shall
be identified by geometry coordinates, such as rack, row, and post
number.
in relays, within the AHCWS instrument shelter and the wayside cases,
shall be of the wrap around, self-adhesive type.
mounted relays, and wires and conductors in junction boxes, shall be flag
marker tags of the miniature locking type.
781
labels bearing the geometric coordinates.
applied. These tags shall be of the wrap-around self-adhesive type.
cases, conduit, hangers, brackets, clamps, etc., shall be hot-dip galvanized.
All lock-washers shall be cadmium plated. All nuts, bolts, and washers used for the
mounting of equipment within finished enclosures shall be cadmium plated or stainless
steel.
All galvanized mounting hardware nicked or damaged during construction shall be
repaired in accordance with Subsection 726.06 and coated when dry with a non-
oxide grease to prevent corrosion.
grained, continuous, closely adhering coating of commercially pure cadmium, free
from capillaries and shall completely cover the surface of the part in a smooth,
bright layer. Plating on raised or prominent portions shall show no evidence of
blackness or loose crystalline structure. It shall have a minimum thickness of
0.0006 inches and shall withstand the salt spray test for at least 1,000 hours.
shown on the Plans. The types of rigid conduit shall be as follows:
protected inside and outside by a coat of hot-dip galvanizing. Where elbows
are used, they shall be the long radius type. Steel conduits shall be protected
in shipping and handling by approved thread protectors.
of ASTM D1784.
781
internal tube neoprene cover.
Type UA.
steel conduit shall be of cast malleable iron and shall be protected by hot-
dip galvanizing.
Plans.
housing or case doors and covers of signal equipment installed under the Contract. Switch
padlocks shall be furnished and installed for manual control boxes requiring access by train
crews. The Contractor shall obtain through the Engineer the proper ordering references for
the Operating Railroad’s signal and switch padlocks.
accordance with the AREMA C&S Manual, Part 15.2.15.
shall be 6-inch schedule 40 PVC pipe, 3 feet long, with a bell housing on one end.
requirements given in the AREMA C&S Manual, Part 1.5.10.
least 8 feet in length and at least 5/8-inch in diameter.
screws.
AWG or No. 10 AWG stranded copper wire. Insulated ground wire shall be colored
green.
781
mats shall meet the requirements of the applicable sections of ANSI and NEMA standards.
bond installed on the field side of the joint bars.
C&S Manual, Part 8.1.20, AREMA C&S Manual, Part 8.1.30, and AREMA C&S
Manual, Part 8.6.40.
shall be furnished and installed in accordance with the AREMA C&S Manual, Part
8.1.20 and AREMA C&S Manual, Part 8.1.25 (Type 2 plugs).
C&S Manual, Part 14.2.10 for single-phase transformers, where the requirements
do not conflict with any requirements of this subsection.
secondary voltage taps to adjust between 85% and 110% for varying feeder
voltages. All transformers shall be rated to carry 125% of the total load
continuously.
inside the transformer case, and a connection for each secondary tap and at
least two connections for the primary winding shall be brought out of the
transformer to terminals conforming to the requirements of the AREMA
C&S Manual. All terminals shall be identified.
taps to provide output voltage adjustment in one-volt steps, from 6 volts to 15 volts.
The primary excitation voltage shall be 120 volts AC at 60 Hz.
781
design. One bank shall be used for electronic track circuits (MB12) and a
separate bank shall be used for signal lighting and gates (XB).
continuous operation, shall provide constant current and constant voltage
charge, and shall meet the requirements of the AREMA C&S Manual, Part
9.2.5.
an input voltage of 100 volts AC to 130 volts AC at 60 Hz, single phase,
two-wire input.
the calculated requirements. Locations using gates shall be provided with a
40-amp minimum XB rectifier.
of output current.
constant voltage charge and shall meet the requirements of the AREMA C&S
Manual, Part 9.2.5. Chargers shall have a selectable float voltage to match supplied
battery manufacturers requirements of the type as specified on the Plans.
the type specified on the Plans.
The Contractor shall furnish DC battery bank chargers for operating all equipment
required to operate the connected equipment.
The charger shall provide a stabilized output voltage, with output current limiting.
The capacity of the battery charger shall be determined by the Contractor and
approved by the Engineer. The charger shall adjust its output current automatically
according to the load and to the demand on the battery.
781
otherwise approved by the Engineer.
Low maintenance railroad signal batteries, of the type specified on the
Plans, will be used by the Operating Railroad as a standby source of power
for highway crossing warning devices, signal control systems, and other
similar uses.
The batteries shall operate, with a high degree of reliability, at -40°F to
160°F in a harsh environment, enclosed only in a relay house or raised
concrete battery box.
The batteries shall not be capable of exploding under any condition,
including a short circuit discharge.
9.1.3, where they do not conflict with any requirements of this subsection.
shall calculate the loads based upon the equipment that the Contractor
proposes to furnish. All batteries shall be sized for a minimum 24-hour
standby capacity at an ambient temperature of 40°F.
ii. 340 amp-hour (minimum) – Local MB12 battery
iii. 340 amp-hour (minimum) – Local XB battery
ii. Projected design life of 20 years at 80% rated capacity.
iii. Individual cells (multiple cell groups or modules are not allowed).
iv. The battery shall be low maintenance, meaning no overcharge will
be required.
781
6.2.1.
through an operating temperature range of -40°F to 158°F.
for ventilation where required for heat dissipation.
board.
special function relays.
application relays, shall be equipped with front current testing facilities.
relays of the wrong style, contact arrangement, or operating characteristics,
from being inserted into the plug-board.
are to be used. They shall be packaged individually, each in a sturdy
corrugated cardboard carton with the drawing number of the relay printed
on the outside of the carton. Relays shall be stored in a protected area until
tested and installed.
be capable of operating continuously without resultant damage, with a
minimum voltage range of 7 volts to 21 volts, inclusive, applied to their
operating circuits.
781
prevent the armature from picking up if the permanent magnet is de-
energized or if no current is applied to the coil due to interruption of the
normal magnetic circuit. Biased neutral vital relays shall be designed so that
up to at least 50 times working energization applied for two seconds at both
normal and reverse polarity will not affect their operating characteristics by
more than 2%, and will not pick up their armature on reverse polarity.
contacts, two independent front contacts, and one independent back contact.
All front contacts shall be silver-to-metalized carbon, except for heavy duty,
extra heavy duty, or special application relays.
65 times per minute and shall be in accordance with the AREMA C&S
Manual, Part 3.2.55.
the vital solid-state type.
of the selected time delay. The timer shall be accurate to within ± 0.1% over
the entire temperature range of -40°F to 158°F.
Manual, Part 3.1.17.
providing a DC whetting voltage to break down rust and contaminants on the rail.
Shunt enhancement systems shall be of the type specified on the Plans.
781
volts to the rails.
check output of 12.0 volts to 15.0 volts DC for the use of activating the
crossing if the shunt enhancement system fails.
120-volt AC line. The system shall automatically switch to DC voltage in
the event of AC power failure.
the requirements of the AREMA C&S Manual, Part 8.2.1.
highway crossing warning systems shall be of the type as specified on the Plans.
circuits shall be system engineered by one manufacturer. The Contractor
shall furnish documentation that their selection of audio frequencies and
location of equipment will not introduce harmonic interference to other
audio frequency assemblies (including motion sensor assemblies) or false
and spurious inductive currents within adjacent audio frequency cable
conductors or track circuits.
of 0.25 ohms, or greater, rail-to-rail resistance.
feet using a 0.06-ohm shunt. The receiver post shunt shall be a maximum
of ten feet using a 0.06-ohm shunt.
781
system compatible with the proposed type of audio frequency overlay track circuit
subsystem.
8,000 feet.
power source. The module shall be provided with built-in battery and lightning
surge protection.
C&S Manual, Part 14.1.10 and the AREMA C&S Manual, Part 14.1.11.
10.3.17 and shall be rated for minimum life expectancy of 40 years. These cables
shall be suitable for use in the environment to be encountered on a railroad signal
system and shall be certified for continuous operation at 167°F in wet or dry
locations with no conductor failing in continuity or with loss of insulation to cross
or ground less than one meg-ohm.
sizes and cable makeup shall be detailed for application of the Contractor’s final
design. The Contractor shall submit voltage drop calculations and size conductors
to provide minimum voltages as specified in the AREMA C&S Manual, Part 3.2.15,
AREMA C&S Manual, Part 3.2.35, and, as applicable, the AREMA C&S Manual,
Part 3.2.60 or the AREMA C&S Manual, Part 3.2.61 under maximum calculated
load conditions. Sizing for conductors in remaining circuits shall allow no more
than a 5% voltage drop between the power source and the load under maximum
calculated load conditions.
contain a minimum of 10% spare conductors or two spare conductors, whichever
is greater, except that two conductor cables shall not require spare conductors.
781
tape shall be bright yellow, 6 inches wide, and continuously coded in black lettering with
the following legend:
CAUTION CAUTION CAUTION
BURIED SIGNAL CABLE
available and ready for use at least 48 hours in advance of the test being required. Ready
for use shall mean properly matched for test parameters, properly calibrated, and
sufficiently supplied with leads, probes, adapters, stands, and other accessories necessary
to conduct the particular test in a completely professional manner.
shall be furnished and available in advance of the test being required.
781
This Page Intentionally Left Blank
Index of Pay Items
I-1
INDEX OF PAY ITEMS
Pay Item Pay Unit
646.2010 4 Inch White Line, Waterborne Paint ........................................................Linear Foot
646.2111 4 Inch Yellow Line, Waterborne Paint ......................................................Linear Foot
680.6500 6 Inch Magnetic Information Plaque ........................................................Each
41 6 Inch White Line, Waterborne Paint ........................................................Linear Foot
51 6 Inch Yellow Line, Waterborne Paint ......................................................Linear Foot
601.2603 8 Inch CPEP(SL).......................................................................................Linear Foot
646.2210 8 Inch White Line, Waterborne Paint ........................................................Linear Foot
646.2310 8 Inch Yellow Line, Waterborne Paint ......................................................Linear Foot
601.0205 12 Inch CAAP .060 (2-2/3 × 1/2) .............................................................Linear Foot
601.5205 12 Inch CAAP Elbow .060 (2-2/3 × 1/2) ..................................................Each
601.0905 12 Inch CPEP ............................................................................................Linear Foot
601.5802 12 Inch CPEP Elbow.................................................................................Each
601.7005 12 Inch CPEPES .......................................................................................Each
05 12 Inch CPEP(SL).....................................................................................Linear Foot
601.5902 12 Inch CPPP Elbow .................................................................................Each
601.7105 12 Inch CPPPES .......................................................................................Each
601.2805 12 Inch CPPP(SL) .....................................................................................Linear Foot
601.0005 12 Inch CSP .064 (2-2/3 × 1/2) .................................................................Linear Foot
601.5005 12 Inch CSP Elbow .064 (2-2/3 × 1/2)......................................................Each
601.6005 12 Inch CSPES .064 (2-2/3 × 1/2) ............................................................Each
601.0405 12 Inch PCCSP .064 (2-2/3 × 1/2) ............................................................Linear Foot
601.5405 12 Inch PCCSP Elbow .064 (2-2/3 × 1/2) .................................................Each
601.0805 12 Inch RCP Class III ...............................................................................Linear Foot
06 12 Inch RCP Class IV ...............................................................................Linear Foot
646.2410 12 Inch White Line, Waterborne Paint ......................................................Linear Foot
646.2510 12 Inch Yellow Line, Waterborne Paint ....................................................Linear Foot
10 15 Inch CAAP .060 (2-2/3 × 1/2) .............................................................Linear Foot
11 15 Inch CAAP .075 (2-2/3 × 1/2)..............................................................Linear Foot
10 15 Inch CAAP Elbow .060 (2-2/3 × 1/2) ..................................................Each
601.6210 15 Inch CAAPES .060 (2-2/3 × 1/2).........................................................Each
10 15 Inch CPEP ............................................................................................Linear Foot
08 15 Inch CPEP Elbow.................................................................................Each
10 15 Inch CPEPES .......................................................................................Each
10 15 Inch CPEP(SL).....................................................................................Linear Foot
Index of Pay Items
I-2
Pay Item Pay Unit
08 15 Inch CPPP Elbow .................................................................................Each
10 15 Inch CPPPES........................................................................................Each
10 15 Inch CPPP(SL) .....................................................................................Linear Foot
10 15 Inch CSP .064 (2-2/3 × 1/2) .................................................................Linear Foot
11 15 Inch CSP .079 (2-2/3 × 1/2) .................................................................Linear Foot
10 15 Inch CSP Elbow .064 (2-2/3 × 1/2)......................................................Each
10 15 Inch CSPES .064 (2-2/3 × 1/2) ............................................................Each
10 15 Inch PCCSP .064 (2-2/3 × 1/2) ............................................................Linear Foot
10 15 Inch PCCSP Elbow .064 (2-2/3 × 1/2) .................................................Each
10 15 Inch RCP Class III ...............................................................................Linear Foot
11 15 Inch RCP Class IV ...............................................................................Linear Foot
601.6810 15 Inch RCPES Class III...........................................................................Each
15 18 Inch CAAP .060 (2-2/3 × 1/2) .............................................................Linear Foot
16 18 Inch CAAP .075 (2-2/3 × 1/2) .............................................................Linear Foot
17 18 Inch CAAP .105 (2-2/3 × 1/2) .............................................................Linear Foot
15 18 Inch CAAP Elbow .060 (2-2/3 × 1/2) ..................................................Each
15 18 Inch CAAPES .060 (2-2/3 × 1/2).........................................................Each
15 18 Inch CPEP ............................................................................................Linear Foot
14 18 Inch CPEP Elbow.................................................................................Each
15 18 Inch CPEPES .......................................................................................Each
15 18 Inch CPEP(SL).....................................................................................Linear Foot
14 18 Inch CPPP Elbow .................................................................................Each
15 18 Inch CPPPES........................................................................................Each
15 18 Inch CPPP(SL) .....................................................................................Linear Foot
15 18 Inch CSP .064 (2-2/3 × 1/2) .................................................................Linear Foot
16 18 Inch CSP .079 (2-2/3 × 1/2) .................................................................Linear Foot
15 18 Inch CSP Elbow .064 (2-2/3 × 1/2)......................................................Each
15 18 Inch CSPES .064 (2-2/3 × 1/2) ............................................................Each
15 18 Inch PCCSP .064 (2-2/3 × 1/2) ............................................................Linear Foot
16 18 Inch PCCSP .079 (2-2/3 × 1/2) ............................................................Linear Foot
15 18 Inch PCCSP Elbow .064 (2-2/3 × 1/2) .................................................Each
601.0615 18 Inch PCCSP(PI) .064 (2-2/3 × 1/2) ......................................................Linear Foot
15 18 Inch RCP Class III ...............................................................................Linear Foot
16 18 Inch RCP Class IV ...............................................................................Linear Foot
17 18 Inch RCP Class V.................................................................................Linear Foot
15 18 Inch RCPES Class III...........................................................................Each
20 21 Inch RCP Class III ...............................................................................Linear Foot
21 21 Inch RCP Class IV ...............................................................................Linear Foot
Index of Pay Items
I-3
Pay Item Pay Unit
25 24 Inch CAAP .060 (2-2/3 × 1/2) .............................................................Linear Foot
26 24 Inch CAAP .075 (2-2/3 × 1/2) .............................................................Linear Foot
27 24 Inch CAAP .105 (2-2/3 × 1/2) .............................................................Linear Foot
25 24 Inch CAAP Elbow .060 (2-2/3 × 1/2) ..................................................Each
25 24 Inch CAAPES .060 (2-2/3 × 1/2).........................................................Each
20 24 Inch CPEP ............................................................................................Linear Foot
24 24 Inch CPEP Elbow.................................................................................Each
20 24 Inch CPEPES .......................................................................................Each
20 24 Inch CPEP(SL).....................................................................................Linear Foot
24 24 Inch CPPP Elbow .................................................................................Each
20 24 Inch CPPPES .......................................................................................Each
20 24 Inch CPPP(SL) .....................................................................................Linear Foot
25 24 Inch CSP .064 (2-2/3 × 1/2) .................................................................Linear Foot
25 24 Inch CSPES .064 (2-2/3 × 1/2) ............................................................Each
25 24 Inch PCCSP .064 (2-2/3 × 1/2) ............................................................Linear Foot
26 24 Inch PCCSP .079 (2-2/3 × 1/2) ............................................................Linear Foot
27 24 Inch PCCSP .109 (2-2/3 × 1/2) ............................................................Linear Foot
25 24 Inch PCCSP Elbow .064 (2-2/3 × 1/2) .................................................Each
25 24 Inch PCCSP(PI) .064 (2-2/3 × 1/2) ......................................................Linear Foot
25 24 Inch RCP Class III ...............................................................................Linear Foot
26 24 Inch RCP Class IV ...............................................................................Linear Foot
27 24 Inch RCP Class V.................................................................................Linear Foot
25 24 Inch RCPES Class III...........................................................................Each
646.2610 24 Inch Stop Bar, Waterborne Paint ..........................................................Linear Foot
601.0305 30 Inch CAAP .060 (3 × 1) .......................................................................Linear Foot
36 30 Inch CAAP .075 (2-2/3 × 1/2) .............................................................Linear Foot
06 30 Inch CAAP .075 (3 × 1) .......................................................................Linear Foot
37 30 Inch CAAP .105 (2-2/3 × 1/2) .............................................................Linear Foot
36 30 Inch CAAP Elbow .075 (2-2/3 × 1/2) ..................................................Each
36 30 Inch CAAPES .075 (2-2/3 × 1/2).........................................................Each
25 30 Inch CPEPES .......................................................................................Each
25 30 Inch CPEP(SL).....................................................................................Linear Foot
25 30 Inch CPPPES .......................................................................................Each
25 30 Inch CPPP(SL) .....................................................................................Linear Foot
36 30 Inch CSP .079 (2-2/3 × 1/2) .................................................................Linear Foot
36 30 Inch CSP Elbow .079 (2-2/3 × 1/2)......................................................Each
36 30 Inch CSPES .079 (2-2/3 × 1/2) ............................................................Each
Index of Pay Items
I-4
Pay Item Pay Unit
36 30 Inch PCCSP .079 (2-2/3 × 1/2) ............................................................Linear Foot
37 30 Inch PCCSP .109 (2-2/3 × 1/2) ............................................................Linear Foot
36 30 Inch PCCSP Elbow .079 (2-2/3 × 1/2) .................................................Each
36 30 Inch PCCSP(PI) .079 (2-2/3 × 1/2) ......................................................Linear Foot
35 30 Inch RCP Class III ...............................................................................Linear Foot
36 30 Inch RCP Class IV ...............................................................................Linear Foot
37 30 Inch RCP Class V.................................................................................Linear Foot
35 30 Inch RCPES Class III...........................................................................Each
601.3236 35 Inch × 24 Inch CAAPA .075 (2-2/3 × 1/2)...........................................Linear Foot
601.8236 35 Inch × 24 Inch CAAPAES .075 (2-2/3 × 1/2) ......................................Each
601.8036 35 Inch × 24 Inch CSPAES .079 (2-2/3 × 1/2) .........................................Each
601.3436 35 Inch × 24 Inch PCCSPA .079 (2-2/3 × 1/2) .........................................Linear Foot
10 36 Inch CAAP .060 (3 × 1) .......................................................................Linear Foot
46 36 Inch CAAP .075 (2-2/3 × 1/2) .............................................................Linear Foot
46 36 Inch CAAPES .075 (2-2/3 × 1/2).........................................................Each
30 36 Inch CPEPES .......................................................................................Each
30 36 Inch CPEP(SL).....................................................................................Linear Foot
30 36 Inch CPPPES .......................................................................................Each
30 36 Inch CPPP(SL) .....................................................................................Linear Foot
46 36 Inch CSP .079 (2-2/3 × 1/2) .................................................................Linear Foot
46 36 Inch CSP Elbow .079 (2-2/3 × 1/2)......................................................Each
46 36 Inch CSPES .079 (2-2/3 × 1/2) ............................................................Each
46 36 Inch PCCSP .079 (2-2/3 × 1/2) ............................................................Linear Foot
47 36 Inch PCCSP .109 (2-2/3 × 1/2) ............................................................Linear Foot
46 36 Inch PCCSP(PI) .079 (2-2/3 × 1/2) ......................................................Linear Foot
45 36 Inch RCP Class III ...............................................................................Linear Foot
46 36 Inch RCP Class IV ...............................................................................Linear Foot
45 36 Inch RCPES Class III...........................................................................Each
16 42 Inch CAAP .075 (3 × 1) .......................................................................Linear Foot
52 42 Inch CAAP .105 (2-2/3 × 1/2) .............................................................Linear Foot
52 42 Inch CAAP Elbow .105 (2-2/3 × 1/2) ..................................................Each
52 42 Inch CAAPES .105 (2-2/3 × 1/2).........................................................Each
35 42 Inch CPEP(SL).....................................................................................Linear Foot
35 42 Inch CPPP(SL) .....................................................................................Linear Foot
52 42 Inch CSP .109 (2-2/3 × 1/2) .................................................................Linear Foot
52 42 Inch CSPES .109 (2-2/3 × 1/2) ............................................................Each
Index of Pay Items
I-5
Pay Item Pay Unit
52 42 Inch PCCSP .109 (2-2/3 × 1/2) ............................................................Linear Foot
56 42 Inch PCCSP Elbow .109 (2-2/3 × 1/2) .................................................Each
50 42 Inch RCP Class III ...............................................................................Linear Foot
57 48 Inch CAAP .105 (2-2/3 × 1/2) .............................................................Linear Foot
57 48 Inch CAAPES .105 (2-2/3 × 1/2).........................................................Each
40 48 Inch CPEP(SL).....................................................................................Linear Foot
57 48 Inch CSP .109 (2-2/3 × 1/2) .................................................................Linear Foot
57 48 Inch CSPES .109 (2-2/3 × 1/2) ............................................................Each
57 48 Inch PCCSP .109 (2-2/3 × 1/2) ............................................................Linear Foot
57 48 Inch PCCSP(PI) .109 (2-2/3 × 1/2) ......................................................Linear Foot
55 48 Inch RCP Class III ...............................................................................Linear Foot
55 48 Inch RCPES Class III...........................................................................Each
601.4252 49 Inch × 33 Inch CAAPA(SL) .105 (2-2/3 × 1/2) ...................................Linear Foot
62 54 Inch CAAP .105 (2-2/3 × 1/2) .............................................................Linear Foot
45 54 Inch CPEP(SL).....................................................................................Linear Foot
601.0526 54 Inch PCCSP .079 (3 × 1) ......................................................................Linear Foot
27 54 Inch PCCSP .109 (3 × 1) ......................................................................Linear Foot
58 57 Inch × 38 Inch CAAPA .135 (2-2/3 × 1/2)...........................................Linear Foot
58 57 Inch × 38 Inch CAAPA(SL) .135 (2-2/3 × 1/2) ...................................Linear Foot
57 57 Inch × 38 Inch PCCSPA .109 (2-2/3 × 1/2) .........................................Linear Foot
601.4457 57 Inch × 38 Inch PCCSPA(SL) .109 (2-2/3 × 1/2) ..................................Linear Foot
68 60 Inch CAAP .135 (2-2/3 × 1/2) .............................................................Linear Foot
50 60 Inch CPEP(SL).....................................................................................Linear Foot
601.0132 60 Inch CSP .109 (3 × 1)...........................................................................Linear Foot
68 60 Inch CSP .138 (2-2/3 × 1/2) .................................................................Linear Foot
66 60 Inch RCP Class IV ...............................................................................Linear Foot
70 66 Inch RCP Class III ...............................................................................Linear Foot
42 72 Inch CAAP .105 (3 × 1) .......................................................................Linear Foot
42 72 Inch PCCSP .109 (3 × 1) ......................................................................Linear Foot
629.2800 Adjust Elevation of Valve Box .................................................................Each
621.0220 Adjust Height of Guardrail........................................................................Linear Foot
415.5100 Aggregate for CCPR .................................................................................Ton
414.5100 Aggregate for CIR .....................................................................................Ton
402.1200 Aggregate Shoulders .................................................................................Ton
402.1300 Aggregate Shoulders, RAP .......................................................................Ton
401.1000 Aggregate Surface Course.........................................................................Cubic Yard
401.1500 Aggregate Surface Course, Paths and Trails .............................................Cubic Yard
Index of Pay Items
I-6
Pay Item Pay Unit
608.2501 All-Purpose Excavator Rental, Type I.......................................................Hour
02 All-Purpose Excavator Rental, Type II .....................................................Hour
621.1520 Anchor for Steel Beam Guardrail .............................................................Each
30 Anchor for Steel Beam Guardrail, MGS ...................................................Each
40 Anchor for Steel Beam to Box Beam Transition ......................................Each
418.1000 Asphaltic Approach Material ....................................................................Square Foot
662.0360 Ballasted Track Construction with CWR ..................................................Linear Foot
50 Ballasted Track Construction with Jointed Rail........................................Linear Foot
620.8000 Barbed Wire Fence ....................................................................................Linear Foot
653.5000 Barrier Fence .............................................................................................Linear Foot
655.0060 Bat Roosting Feature.................................................................................Each
531.1800 Bearing Device Assembly, Elastomeric Pad w/Ext. Load Plates..............Each
531.1500 Bearing Device Assembly, High Load Multi-Rotational ..........................Each
531.1600 Bearing Device Assembly, Plain Elastomeric Pad ....................................Each
531.1700 Bearing Device Assembly, Steel Reinforced Elastomeric Pad .................Each
681.2010 Bicycle Rack .............................................................................................Each
654.0060 Bioretention Area ......................................................................................Square Yard
616.3101 Bituminous Concrete Curb, Type A ..........................................................Linear Foot
02 Bituminous Concrete Curb, Type B ..........................................................Linear Foot
616.4700 Bituminous Concrete Gutters and Traffic Islands .....................................Ton
406.3400 Bituminous Concrete Pavement, Non-Paver Placed, Type IVS ...............Square Yard
406.2400 Bituminous Concrete Pavement, Surface Preparation, Type IVS .............Ton
406.0110 Bituminous Concrete Pavement, Type IS, QA Tier I ................................Ton
20 Bituminous Concrete Pavement, Type IS, QA Tier II...............................Ton
30 Bituminous Concrete Pavement, Type IS, QA Tier III .............................Ton
406.0210 Bituminous Concrete Pavement, Type IIS, QA Tier I...............................Ton
20 Bituminous Concrete Pavement, Type IIS, QA Tier II .............................Ton
30 Bituminous Concrete Pavement, Type IIS, QA Tier III ............................Ton
406.0310 Bituminous Concrete Pavement, Type IIIS, QA Tier I .............................Ton
20 Bituminous Concrete Pavement, Type IIIS, QA Tier II ............................Ton
30 Bituminous Concrete Pavement, Type IIIS, QA Tier III...........................Ton
406.0410 Bituminous Concrete Pavement, Type IVS, QA Tier I .............................Ton
20 Bituminous Concrete Pavement, Type IVS, QA Tier II ............................Ton
30 Bituminous Concrete Pavement, Type IVS, QA Tier III ..........................Ton
406.1410 Bituminous Concrete Pavement, Type IVSB, QA Tier I ..........................Ton
20 Bituminous Concrete Pavement, Type IVSB, QA Tier II .........................Ton
30 Bituminous Concrete Pavement, Type IVSB, QA Tier III ........................Ton
Index of Pay Items
I-7
Pay Item Pay Unit
618.1500 Bituminous Concrete Sidewalk.................................................................Ton
417.1000 Bituminous Crack Sealing ........................................................................Pound
417.2000 Bituminous Crack Sealing, “Blow and Go” Method ................................Pound
629.3000 Blow-Off Assembly ..................................................................................Each
629.3100 Blow-Off Assembly, All-Inclusive ...........................................................Each
619.1400 Bollards .....................................................................................................Each
407.0100 Bonded Wearing Course, Type A ..............................................................Square Yard
407.0200 Bonded Wearing Course, Type B ..............................................................Square Yard
407.0300 Bonded Wearing Course, Type C ..............................................................Square Yard
619.1000 Boundary Markers ....................................................................................Each
621.2300 Box Beam Guardrail .................................................................................Linear Foot
621.6021 Box Beam Guardrail End Assembly, Type IIA ........................................Each
620.2004 Bracing Assembly for Chain-Link Fence, 4 Foot .....................................Each
06 Bracing Assembly for Chain-Link Fence, 6 Foot .....................................Each
08 Bracing Assembly for Chain-Link Fence, 8 Foot .....................................Each
679.4700 Bracket Arm ..............................................................................................Each
516.1000 Bridge Expansion Joint, Asphaltic Plug....................................................Linear Foot
516.1200 Bridge Expansion Joint, Finger Plate........................................................Linear Foot
516.1100 Bridge Expansion Joint, Vermont .............................................................Linear Foot
525.4030 Bridge Railing, Aluminum 3 Rail .............................................................Linear Foot
525.4130 Bridge Railing, Aluminum 3 Rail, Pedestrian ..........................................Linear Foot
525.5300 Bridge Railing, Concrete F-Shape ............................................................Linear Foot
525.5400 Bridge Railing, Concrete Single Slope .....................................................Linear Foot
525.5500 Bridge Railing, Concrete Vertical Face ....................................................Linear Foot
525.6200 Bridge Railing, Covered Bridge ...............................................................Linear Foot
525.3000 Bridge Railing, Fascia Mounted ...............................................................Linear Foot
525.3120 Bridge Railing, Galvanized 2 Rail Box Beam ..........................................Linear Foot
30 Bridge Railing, Galvanized 3 Rail Box Beam ..........................................Linear Foot
525.3230 Bridge Railing, Galvanized 3 Rail Box Beam, Curbless ..........................Linear Foot
40 Bridge Railing, Galvanized 4 Rail Box Beam ..........................................Linear Foot
525.4400 Bridge Railing, Galvanized HDSB/Fascia Mounted/Steel Tubing ...........Linear Foot
525.5000 Bridge Railing, Galvanized Steel Tubing/Concrete Combination ............Linear Foot
525.5100 Bridge Railing, Galv. Steel Hand Rail/Conc. Parapet Comb. ...................Linear Foot
525.6100 Bridge Railing, Metal Truss Bridge ..........................................................Linear Foot
525.5210 Bridge Railing, Texas Rail without Windows ...........................................Linear Foot
00 Bridge Railing, Texas Rail with Windows ................................................Linear Foot
Index of Pay Items
I-8
Pay Item Pay Unit
525.1310 Bridge Railing Repair, Box Beam, Type I ................................................Linear Foot
20 Bridge Railing Repair, Box Beam, Type II ...............................................Linear Foot
30 Bridge Railing Repair, Box Beam, Type III .............................................Linear Foot
525.1210 Bridge Railing Repair, HDSB, Type I ......................................................Linear Foot
20 Bridge Railing Repair, HDSB, Type II .....................................................Linear Foot
30 Bridge Railing Repair, HDSB, Type III ....................................................Linear Foot
608.1001 Bulldozer Rental, Type I ...........................................................................Hour
02 Bulldozer Rental, Type II ..........................................................................Hour
680.2500 Business Directional Sign .........................................................................Square Foot
590.0010 Bus Shelter ................................................................................................Each
678.2005 Cabinet Assembly .....................................................................................Each
311.5100 Calcium Chloride for FDR, Calcium Chloride .........................................Gallon
604.6000 Cap Drop Inlet...........................................................................................Each
604.5500 Cast Iron Cover with Frame......................................................................Each
604.5600 Cast Iron Cover with Frame, Sewer..........................................................Each
604.4903 Cast Iron Grate, Type C ............................................................................Each
604.4501 Cast Iron Grate with Frame, Type A .........................................................Each
02 Cast Iron Grate with Frame, Type B .........................................................Each
04 Cast Iron Grate with Frame, Type D .........................................................Each
05 Cast Iron Grate with Frame, Type E .........................................................Each
616.2701 Cast-In-Place Concrete Curb, Type A .......................................................Linear Foot
02 Cast-In-Place Concrete Curb, Type B .......................................................Linear Foot
602.1500 Cement Masonry .......................................................................................Cubic Yard
620.1004 Chain-Link Fence, 4 Foot .........................................................................Linear Foot
06 Chain-Link Fence, 6 Foot .........................................................................Linear Foot
08 Chain-Link Fence, 8 Foot .........................................................................Linear Foot
604.4000 Changing Elevation of DIs, Catch Basins, or Manholes ..........................Each
604.4200 Changing Elevation of Sewer Manholes...................................................Each
203.2500 Channel Excavation of Earth ....................................................................Cubic Yard
203.2600 Channel Excavation of Rock ....................................................................Cubic Yard
653.2501 Check Dam, Type I ...................................................................................Cubic Yard
02 Check Dam, Type II ..................................................................................Cubic Yard
03 Check Dam, Type III .................................................................................Each
199.5204 Claim Decision Attorney Fees (N.A.B.I.) .................................................Dollar
05 Claim Decision Interest Payment (N.A.B.I.) ............................................Dollar
03 Claim Decision, Judicial (N.A.B.I.) ..........................................................Dollar
01 Claim Decision Payment, Administrative (N.A.B.I.) ...............................Dollar
02 Claim Settlement, Administrative (N.A.B.I.) ...........................................Dollar
Index of Pay Items
I-9
Pay Item Pay Unit
601.9950 Cleaning Culvert Pipe, In-Place (0 to 24 Inches, Inclusive) .....................Linear Foot
60 Cleaning Culvert Pipe, In-Place (Greater than 24 Inches) ........................Linear Foot
201.1000 Clearing and Grubbing, Including Individual Trees and Stumps .............Lump Sum
201.1100 Clearing and Grubbing, Including Individual Trees and Stumps..............Acre
210.1000 Coarse-Milling, Bituminous Pavement.....................................................Square Yard
208.4000 Cofferdam .................................................................................................Lump Sum
208.3000 Cofferdam Excavation, Earth....................................................................Cubic Yard
208.3500 Cofferdam Excavation, Rock ....................................................................Cubic Yard
415.0200 Cold Central Plant Recycling, 2 Inch Depth .............................................Square Yard
50 Cold Central Plant Recycling, 2.5 Inch Depth ..........................................Square Yard
415.0300 Cold Central Plant Recycling, 3 Inch Depth .............................................Square Yard
50 Cold Central Plant Recycling, 3.5 Inch Depth ..........................................Square Yard
415.0400 Cold Central Plant Recycling, 4 Inch Depth .............................................Square Yard
50 Cold Central Plant Recycling, 4.5 Inch Depth ..........................................Square Yard
415.0500 Cold Central Plant Recycling, 5 Inch Depth .............................................Square Yard
414.0200 Cold In-Place Recycling, 2 Inch Depth ....................................................Square Yard
50 Cold In-Place Recycling, 2.5 Inch Depth .................................................Square Yard
414.0300 Cold In-Place Recycling, 3 Inch Depth ....................................................Square Yard
50 Cold In-Place Recycling, 3.5 Inch Depth .................................................Square Yard
414.0400 Cold In-Place Recycling, 4 Inch Depth ....................................................Square Yard
50 Cold In-Place Recycling, 4.5 Inch Depth .................................................Square Yard
414.0500 Cold In-Place Recycling, 5 Inch Depth ....................................................Square Yard
646.9000 Colored Pavement Markings.....................................................................Square Foot
01 Colored Pavement Markings, Green .........................................................Square Foot
203.1500 Common Excavation.................................................................................Cubic Yard
625.7040 Communications Vault ..............................................................................Each
667.0015 Compromise Joint Bar Sets .......................................................................Each
509.1500 Concrete Bridge Deck Surface Preparation ..............................................Square Foot
604.1000 Concrete Catch Basin with Cast Iron Grate ..............................................Each
541.2100 Concrete, Class A ......................................................................................Cubic Yard
541.2000 Concrete, Class AA ...................................................................................Cubic Yard
541.2200 Concrete, Class B ......................................................................................Cubic Yard
541.2300 Concrete, Class C ......................................................................................Cubic Yard
541.2400 Concrete, Class D......................................................................................Cubic Yard
541.1000 Concrete, Class HPAA ..............................................................................Cubic Yard
541.1100 Concrete, Class HPA .................................................................................Cubic Yard
541.1200 Concrete, Class HPB .................................................................................Cubic Yard
541.2900 Concrete, Class LW ..................................................................................Cubic Yard
541.2800 Concrete, Class SCC .................................................................................Cubic Yard
Index of Pay Items
I-10
Pay Item Pay Unit
625.4000 Concrete Encased Conduit ........................................................................Linear Foot
04 Concrete Encased Conduit, 1 to 4 Conduits .............................................Linear Foot
08 Concrete Encased Conduit, 5 to 8 Conduits .............................................Linear Foot
12 Concrete Encased Conduit, 9 to 12 Conduits ...........................................Linear Foot
604.1100 Concrete Manhole with Cast Iron Cover ..................................................Each
580.1201 Concrete Repair Material, Type I .............................................................Cubic Foot
02 Concrete Repair Material, Type II ............................................................Cubic Foot
03 Concrete Repair Material, Type III ...........................................................Cubic Foot
04 Concrete Repair Material, Type IV ..........................................................Cubic Yard
250.0100 Construction Vibration and Crack Monitoring .........................................Lump Sum
543.1000 Contractor-Fabricated Precast Concrete Structure ....................................Lump Sum
602.4500 Coring Concrete ........................................................................................Each
629.2000 Corporation Stop .......................................................................................Each
03 Corporation Stop, 0.75 Inch ......................................................................Each
04 Corporation Stop, 1 Inch ...........................................................................Each
05 Corporation Stop, 1.25 Inch ......................................................................Each
06 Corporation Stop, 1.5 Inch ........................................................................Each
07 Corporation Stop, 1.75 Inch ......................................................................Each
08 Corporation Stop, 2 Inch ...........................................................................Each
629.2100 Corporation Stop, All-Inclusive ................................................................Each
03 Corporation Stop, All-Inclusive, 0.75 Inch ...............................................Each
04 Corporation Stop, All-Inclusive, 1 Inch ....................................................Each
05 Corporation Stop, All-Inclusive, 1.25 Inch ...............................................Each
06 Corporation Stop, All-Inclusive, 1.5 Inch .................................................Each
07 Corporation Stop, All-Inclusive, 1.75 Inch ...............................................Each
08 Corporation Stop, All-Inclusive, 2 Inch ....................................................Each
404.8100 Cover Material, Sand ................................................................................Pound
633.1000 CPM Schedule ..........................................................................................Each
646.3110 Crosswalk Marking, Waterborne Paint .....................................................Linear Foot
629.0500 Crushed Stone Bedding.............................................................................Cubic Yard
248.5700 Datalogger .................................................................................................Each
656.3500 Deciduous Shrubs .....................................................................................Each
656.3003 Deciduous Trees, Large ............................................................................Each
02 Deciduous Trees, Medium ........................................................................Each
01 Deciduous Trees, Small ............................................................................Each
604.6500 Decommission Drop Inlet .........................................................................Each
676.2000 Delineator with Flexible Post....................................................................Each
676.1000 Delineator with Steel Post .........................................................................Each
Index of Pay Items
I-11
Pay Item Pay Unit
202.1000 Demolition and Disposal of Building .......................................................Each
618.3000 Detectable Warning Surface......................................................................Square Foot
625.5000 Direct Burial Conduit ................................................................................Linear Foot
04 Direct Burial Conduit, 1 to 4 Conduits .....................................................Linear Foot
08 Direct Burial Conduit, 5 to 8 Conduits .....................................................Linear Foot
12 Direct Burial Conduit, 9 to 12 Conduits ...................................................Linear Foot
230.0010 Disposal of Contaminated Materials (N.A.B.I.) .......................................Dollar
503.1000 Drilled Shaft in Earth ................................................................................Linear Foot
503.1500 Drilled Shaft in Rock ................................................................................Linear Foot
503.2000 Drilled Shaft Obstruction Drilling and Removal ......................................Linear Foot
205.1000 Drilling and Blasting of Solid Rock Subgrade .........................................Square Yard
205.2000 Drilling and Blasting Using Perimeter Control ........................................Cubic Yard
507.1600 Drilling and Grouting Dowels ..................................................................Linear Foot
620.3000 Drive Gate for Woven Wire Fence ............................................................Each
602.2000 Dry Masonry .............................................................................................Cubic Yard
10 Dry Swale..................................................................................................Linear Foot
15 Dry Swale with Underdrain ......................................................................Linear Foot
628.1600 Ductile Iron Sewer Pipe, Cement-Lined ...................................................Linear Foot
24 Ductile Iron Sewer Pipe, Cement-Lined, 6 Inch .......................................Linear Foot
32 Ductile Iron Sewer Pipe, Cement-Lined, 8 Inch .......................................Linear Foot
40 Ductile Iron Sewer Pipe, Cement-Lined, 10 Inch .....................................Linear Foot
48 Ductile Iron Sewer Pipe, Cement-Lined, 12 Inch .....................................Linear Foot
60 Ductile Iron Sewer Pipe, Cement-Lined, 15 Inch .....................................Linear Foot
72 Ductile Iron Sewer Pipe, Cement-Lined, 18 Inch .....................................Linear Foot
96 Ductile Iron Sewer Pipe, Cement-Lined, 24 Inch .....................................Linear Foot
628.1700 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive ............................Linear Foot
24 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive, 6 In. ..................Linear Foot
32 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive, 8 In. ..................Linear Foot
40 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive, 10 In. ................Linear Foot
48 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive, 12 In. ................Linear Foot
60 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive, 15 In. ................Linear Foot
72 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive, 18 In. ................Linear Foot
96 Ductile Iron Sewer Pipe, Cement-Lined, All-Inclusive, 24 In. ................Linear Foot
629.1600 Ductile Iron Water Pipe, Cement-Lined ...................................................Linear Foot
12 Ductile Iron Water Pipe, Cement-Lined, 3 Inch .......................................Linear Foot
16 Ductile Iron Water Pipe, Cement-Lined, 4 Inch .......................................Linear Foot
24 Ductile Iron Water Pipe, Cement-Lined, 6 Inch .......................................Linear Foot
Index of Pay Items
I-12
Pay Item Pay Unit
32 Ductile Iron Water Pipe, Cement-Lined, 8 Inch .......................................Linear Foot
40 Ductile Iron Water Pipe, Cement-Lined, 10 Inch .....................................Linear Foot
48 Ductile Iron Water Pipe, Cement-Lined, 12 Inch .....................................Linear Foot
629.1700 Ductile Iron Water Pipe, Cement-Lined, All-Inclusive ............................Linear Foot
12 Ductile Iron Water Pipe, Cement-Lined, All-Inclusive, 3 In. ...................Linear Foot
16 Ductile Iron Water Pipe, Cement-Lined, All-Inclusive, 4 In. ...................Linear Foot
24 Ductile Iron Water Pipe, Cement-Lined, All-Inclusive, 6 In. ...................Linear Foot
32 Ductile Iron Water Pipe, Cement-Lined, All-Inclusive, 8 In. ...................Linear Foot
40 Ductile Iron Water Pipe, Cement-Lined, All-Inclusive, 10 In. .................Linear Foot
48 Ductile Iron Water Pipe, Cement-Lined, All-Inclusive, 12 In. .................Linear Foot
646.4030 Durable 4 Inch White Line, Epoxy Paint ..................................................Linear Foot
40 Durable 4 Inch White Line, Polyurea .......................................................Linear Foot
90 Durable 4 Inch White Line, Recessed Epoxy Paint ..................................Linear Foot
60 Durable 4 Inch White Line, Recessed Polyurea .......................................Linear Foot
80 Durable 4 Inch White Line, Recessed Thermoplastic...............................Linear Foot
71 Durable 4 Inch White Line, Recessed Type A Tape ..................................Linear Foot
72 Durable 4 Inch White Line, Recessed Type B Tape .................................Linear Foot
20 Durable 4 Inch White Line, Thermoplastic ..............................................Linear Foot
646.4130 Durable 4 Inch Yellow Line, Epoxy Paint ................................................Linear Foot
40 Durable 4 Inch Yellow Line, Polyurea ......................................................Linear Foot
90 Durable 4 Inch Yellow Line, Recessed Epoxy Paint ................................Linear Foot
60 Durable 4 Inch Yellow Line, Recessed Polyurea ......................................Linear Foot
80 Durable 4 Inch Yellow Line, Recessed Thermoplastic .............................Linear Foot
71 Durable 4 Inch Yellow Line, Recessed Type A Tape ................................Linear Foot
72 Durable 4 Inch Yellow Line, Recessed Type B Tape ................................Linear Foot
20 Durable 4 Inch Yellow Line, Thermoplastic .............................................Linear Foot
646.4230 Durable 6 Inch White Line, Epoxy Paint ..................................................Linear Foot
40 Durable 6 Inch White Line, Polyurea .......................................................Linear Foot
90 Durable 6 Inch White Line, Recessed Epoxy Paint ..................................Linear Foot
60 Durable 6 Inch White Line, Recessed Polyurea .......................................Linear Foot
80 Durable 6 Inch White Line, Recessed Thermoplastic...............................Linear Foot
71 Durable 6 Inch White Line, Recessed Type A Tape ..................................Linear Foot
72 Durable 6 Inch White Line, Recessed Type B Tape .................................Linear Foot
20 Durable 6 Inch White Line, Thermoplastic ..............................................Linear Foot
646.4330 Durable 6 Inch Yellow Line, Epoxy Paint ................................................Linear Foot
40 Durable 6 Inch Yellow Line, Polyurea ......................................................Linear Foot
Index of Pay Items
I-13
Pay Item Pay Unit
90 Durable 6 Inch Yellow Line, Recessed Epoxy Paint ................................Linear Foot
60 Durable 6 Inch Yellow Line, Recessed Polyurea ......................................Linear Foot
80 Durable 6 Inch Yellow Line, Recessed Thermoplastic .............................Linear Foot
71 Durable 6 Inch Yellow Line, Recessed Type A Tape ................................Linear Foot
72 Durable 6 Inch Yellow Line, Recessed Type B Tape ................................Linear Foot
20 Durable 6 Inch Yellow Line, Thermoplastic .............................................Linear Foot
646.4430 Durable 8 Inch White Line, Epoxy Paint ..................................................Linear Foot
40 Durable 8 Inch White Line, Polyurea .......................................................Linear Foot
90 Durable 8 Inch White Line, Recessed Epoxy Paint ..................................Linear Foot
60 Durable 8 Inch White Line, Recessed Polyurea .......................................Linear Foot
80 Durable 8 Inch White Line, Recessed Thermoplastic...............................Linear Foot
71 Durable 8 Inch White Line, Recessed Type A Tape ..................................Linear Foot
72 Durable 8 Inch White Line, Recessed Type B Tape .................................Linear Foot
20 Durable 8 Inch White Line, Thermoplastic ..............................................Linear Foot
646.4530 Durable 8 Inch Yellow Line, Epoxy Paint ................................................Linear Foot
40 Durable 8 Inch Yellow Line, Polyurea ......................................................Linear Foot
90 Durable 8 Inch Yellow Line, Recessed Epoxy Paint ................................Linear Foot
60 Durable 8 Inch Yellow Line, Recessed Polyurea ......................................Linear Foot
80 Durable 8 Inch Yellow Line, Recessed Thermoplastic .............................Linear Foot
71 Durable 8 Inch Yellow Line, Recessed Type A Tape ................................Linear Foot
72 Durable 8 Inch Yellow Line, Recessed Type B Tape ................................Linear Foot
20 Durable 8 Inch Yellow Line, Thermoplastic .............................................Linear Foot
646.4630 Durable 12 Inch White Line, Epoxy Paint ................................................Linear Foot
40 Durable 12 Inch White Line, Polyurea .....................................................Linear Foot
90 Durable 12 Inch White Line, Recessed Epoxy Paint ................................Linear Foot
60 Durable 12 Inch White Line, Recessed Polyurea .....................................Linear Foot
80 Durable 12 Inch White Line, Recessed Thermoplastic.............................Linear Foot
71 Durable 12 Inch White Line, Recessed Type A Tape ................................Linear Foot
72 Durable 12 Inch White Line, Recessed Type B Tape ...............................Linear Foot
20 Durable 12 Inch White Line, Thermoplastic ............................................Linear Foot
646.4730 Durable 12 Inch Yellow Line, Epoxy Paint ..............................................Linear Foot
40 Durable 12 Inch Yellow Line, Polyurea ....................................................Linear Foot
90 Durable 12 Inch Yellow Line, Recessed Epoxy Paint ..............................Linear Foot
60 Durable 12 Inch Yellow Line, Recessed Polyurea ....................................Linear Foot
80 Durable 12 Inch Yellow Line, Recessed Thermoplastic ...........................Linear Foot
71 Durable 12 Inch Yellow Line, Recessed Type A Tape ..............................Linear Foot
72 Durable 12 Inch Yellow Line, Recessed Type B Tape ..............................Linear Foot
20 Durable 12 Inch Yellow Line, Thermoplastic ...........................................Linear Foot
Index of Pay Items
I-14
Pay Item Pay Unit
646.4830 Durable 24 Inch Stop Bar, Epoxy Paint ....................................................Linear Foot
40 Durable 24 Inch Stop Bar, Polyurea .........................................................Linear Foot
60 Durable 24 Inch Stop Bar, Recessed Polyurea .........................................Linear Foot
90 Durable 24 Inch Stop Bar, Recessed Epoxy Paint ....................................Linear Foot
80 Durable 24 Inch Stop Bar, Recessed Thermoplastic .................................Linear Foot
71 Durable 24 Inch Stop Bar, Recessed Type A Tape ....................................Linear Foot
72 Durable 24 Inch Stop Bar, Recessed Type B Tape....................................Linear Foot
20 Durable 24 Inch Stop Bar, Thermoplastic.................................................Linear Foot
646.5030 Durable Crosswalk Marking, Epoxy Paint ...............................................Linear Foot
40 Durable Crosswalk Marking, Polyurea .....................................................Linear Foot
90 Durable Crosswalk Marking, Recessed Epoxy Paint ...............................Linear Foot
60 Durable Crosswalk Marking, Recessed Polyurea .....................................Linear Foot
80 Durable Crosswalk Marking, Recessed Thermoplastic ............................Linear Foot
71 Durable Crosswalk Marking, Recessed Type A Tape ...............................Linear Foot
72 Durable Crosswalk Marking, Recessed Type B Tape ...............................Linear Foot
20 Durable Crosswalk Marking, Thermoplastic ............................................Linear Foot
646.4930 Durable Letter or Symbol, Epoxy Paint ....................................................Each
40 Durable Letter or Symbol, Polyurea .........................................................Each
90 Durable Letter or Symbol, Recessed Epoxy Paint ....................................Each
60 Durable Letter or Symbol, Recessed Polyurea .........................................Each
80 Durable Letter or Symbol, Recessed Thermoplastic ................................Each
71 Durable Letter or Symbol, Recessed Type A Tape ...................................Each
72 Durable Letter or Symbol, Recessed Type B Tape ...................................Each
20 Durable Letter or Symbol, Thermoplastic ................................................Each
646.5130 Durable Railroad Crossing Symbol, Epoxy Paint.....................................Each
40 Durable Railroad Crossing Symbol, Polyurea ..........................................Each
90 Durable Railroad Crossing Symbol, Recessed Epoxy Paint .....................Each
60 Durable Railroad Crossing Symbol, Recessed Polyurea ..........................Each
80 Durable Railroad Crossing Symbol, Recessed Thermoplastic .................Each
71 Durable Railroad Crossing Symbol, Recessed Type A Tape ....................Each
72 Durable Railroad Crossing Symbol, Recessed Type B Tape ....................Each
20 Durable Railroad Crossing Symbol, Thermoplastic .................................Each
609.1500 Dust Control with Calcium Chloride ........................................................Ton
609.1000 Dust Control with Water ...........................................................................MGAL
505.4500 Dynamic Pile Loading Test .......................................................................Each
203.3000 Earth Borrow.............................................................................................Cubic Yard
45 Electrical Vault ..........................................................................................Each
Index of Pay Items
I-15
Pay Item Pay Unit
50 Emergency Vehicle Preemption System ...................................................Each
634.1000 Employee Traineeship ...............................................................................Hour
415.5300 Emulsified Asphalt for CCPR ...................................................................Hundredweight
414.5300 Emulsified Asphalt for CIR ......................................................................Hundredweight
312.5100 Emulsified Asphalt for FDR, Emulsion ....................................................Hundredweight
621.7120 Energy Absorption Attenuator, Permanent, TL-2.....................................Each
30 Energy Absorption Attenuator, Permanent, TL-3.....................................Each
621.7020 Energy Absorption Attenuator, Temporary, TL-2 ....................................Each
30 Energy Absorption Attenuator, Temporary, TL-3 ....................................Each
50 Environmental Oversight ..........................................................................Hour
653.0100 EPSC Plan .................................................................................................Lump Sum
613.0601 E-Stone Fill, Type I ...................................................................................Cubic Yard
02 E-Stone Fill, Type II..................................................................................Cubic Yard
03 E-Stone Fill, Type III ................................................................................Cubic Yard
04 E-Stone Fill, Type IV ................................................................................Cubic Yard
653.6000 Erosion Log...............................................................................................Linear Foot
656.2500 Evergreen Shrubs ......................................................................................Each
656.2003 Evergreen Trees, Large .............................................................................Each
02 Evergreen Trees, Medium .........................................................................Each
01 Evergreen Trees, Small .............................................................................Each
203.2800 Excavation of Surfaces and Pavements ....................................................Cubic Yard
629.4000 Expansion Assembly .................................................................................Each
629.2200 Extension Service Box and Curb Stop ......................................................Each
03 Extension Service Box and Curb Stop, 0.75 Inch .....................................Each
04 Extension Service Box and Curb Stop, 1 Inch ..........................................Each
05 Extension Service Box and Curb Stop, 1.25 Inch .....................................Each
06 Extension Service Box and Curb Stop, 1.5 Inch .......................................Each
07 Extension Service Box and Curb Stop, 1.75 Inch .....................................Each
08 Extension Service Box and Curb Stop, 2 Inch ..........................................Each
629.2300 Extension Service Box and Curb Stop, All-Inclusive ...............................Each
03 Extension Service Box and Curb Stop, All-Inclusive, 0.75 In. ................Each
04 Extension Service Box and Curb Stop, All-Inclusive, 1 In. .....................Each
05 Extension Service Box and Curb Stop, All-Inclusive, 1.25 In. ................Each
06 Extension Service Box and Curb Stop, All-Inclusive, 1.5 In. ..................Each
07 Extension Service Box and Curb Stop, All-Inclusive, 1.75 In. ................Each
08 Extension Service Box and Curb Stop, All-Inclusive, 2 In. .....................Each
Index of Pay Items
I-16
Pay Item Pay Unit
631.2600 Field Office Communications (N.A.B.I.) .................................................Dollar
631.1000 Field Office, Engineer’s ............................................................................Lump Sum
631.1100 Field Office, Soils and Materials ..............................................................Lump Sum
513.1030 Field Painting Steel, Three Coat System ..................................................Lump Sum
653.4500 Filter Bag ..................................................................................................Each
210.1200 Fine-Milling, Bituminous Pavement.........................................................Square Yard
630.1500 Flaggers .....................................................................................................Hour
35 Flashing Beacon, Aerial Mounted.............................................................Each
541.4500 Flowable Fill .............................................................................................Cubic Yard
541.4600 Flowable Fill, Excavatable........................................................................Cubic Yard
415.5400 Foamed Asphalt for CCPR........................................................................Hundredweight
414.5400 Foamed Asphalt for CIR ...........................................................................Hundredweight
404.3100 Fog Seal, Emulsified Asphalt ....................................................................Hundredweight
199.9061 Force Account Work (N.A.B.I.) ................................................................Dollar
675.4300 Foundation for Tubular Steel Post ............................................................Each
675.4100 Foundation for W-Shape Steel Post, 24 Inch Diameter ............................Each
675.4200 Foundation for W-Shape Steel Post, 30 Inch Diameter ............................Each
310.0100 Full Depth Reclamation ............................................................................Square Yard
311.0100 Full Depth Reclamation, Calcium Chloride ..............................................Square Yard
312.0100 Full Depth Reclamation, Emulsion ...........................................................Square Yard
504.1000 Furnishing Equipment for Driving Piling .................................................Lump Sum
662.0450 Gaging Track.............................................................................................Linear Foot
620.1504 Gate for Chain-Link Fence, 4 Foot ...........................................................Linear Foot
06 Gate for Chain-Link Fence, 6 Foot ...........................................................Linear Foot
08 Gate for Chain-Link Fence, 8 Foot ...........................................................Linear Foot
629.2400 Gate Valve with Valve Box ......................................................................Each
12 Gate Valve with Valve Box, 3 Inch ..........................................................Each
16 Gate Valve with Valve Box, 4 Inch ..........................................................Each
24 Gate Valve with Valve Box, 6 Inch ..........................................................Each
32 Gate Valve with Valve Box, 8 Inch ..........................................................Each
40 Gate Valve with Valve Box, 10 Inch ........................................................Each
48 Gate Valve with Valve Box, 12 Inch ........................................................Each
629.2500 Gate Valve with Valve Box, All-Inclusive ...............................................Each
12 Gate Valve with Valve Box, All-Inclusive, 3 Inch ...................................Each
16 Gate Valve with Valve Box, All-Inclusive, 4 Inch ...................................Each
24 Gate Valve with Valve Box, All-Inclusive, 6 Inch ...................................Each
32 Gate Valve with Valve Box, All-Inclusive, 8 Inch ...................................Each
40 Gate Valve with Valve Box, All-Inclusive, 10 Inch .................................Each
48 Gate Valve with Valve Box, All-Inclusive, 12 Inch .................................Each
Index of Pay Items
I-17
Pay Item Pay Unit
649.1100 Geotextile for Roadbed Separator .............................................................Square Yard
649.4100 Geotextile for Underdrain Trench Lining .................................................Square Yard
649.2100 Geotextile Under Railroad Ballast ............................................................Square Yard
649.3100 Geotextile Under Stone Fill ......................................................................Square Yard
610.2000 GNSS Construction Inspection Equipment ..............................................Each
610.2500 GNSS Construction Inspection Surface Models .......................................Lump Sum
610.1000 GNSS Machine Control Grading ..............................................................Lump Sum
616.2000 Granite Slope Edging ................................................................................Linear Foot
204.3000 Granular Backfill for Structures................................................................Cubic Yard
203.3200 Granular Borrow .......................................................................................Cubic Yard
203.3500 Gravel Filter for Slope Stabilization .........................................................Cubic Yard
20 Gravel Wetland .........................................................................................Square Yard
656.4000 Ground Covers and Vines .........................................................................Each
510.2400 Grouting Shear Keys .................................................................................Linear Foot
651.4000 Grubbing Material .....................................................................................Square Yard
02 Grubbing Material, 2 Inch.........................................................................Square Yard
06 Grubbing Material, 6 Inch.........................................................................Square Yard
12 Grubbing Material, 12 Inch.......................................................................Square Yard
621.8120 Guardrail Approach Section, 2 Rail Box Beam ........................................Each
30 Guardrail Approach Section, 3 Rail Box Beam ........................................Each
621.8230 Guardrail Approach Section, 3 Rail Box Beam, Curbless ........................Each
40 Guardrail Approach Section, 4 Rail Box Beam ........................................Each
621.9990 Guardrail Approach Section, Covered Bridge ..........................................Each
621.8030 Guardrail Approach Section, HD Steel Beam ..........................................Each
40 Guardrail Approach Section, HD Steel Beam with 8 Foot Posts .............Each
80 Guardrail Approach Section, Metal Truss Bridge ....................................Each
31 Guardrail Approach Section to 3 Rail Aluminum ....................................Each
32 Guardrail Approach Section to 3 Rail Aluminum, Pedestrian ..................Each
621.8320 Guardrail Approach Section to Concrete Bridge Rail, TL-2 ....................Each
30 Guardrail Approach Section to Concrete Bridge Rail, TL-3 ....................Each
10 Guardrail Approach Section, Type I .........................................................Each
20 Guardrail Approach Section, Type II........................................................Each
50 Guardrail Transition, Steel Beam to Box Beam .......................................Linear Foot
620.9000 Hand Railing .............................................................................................Linear Foot
206.1000 Hand Scaling with Vegetation Removal ...................................................Hour
653.1000 Hay Mulch ................................................................................................Ton
621.1260 HD Steel Beam Guardrail .........................................................................Linear Foot
621.1360 HD Steel Beam Guardrail, Nested ............................................................Linear Foot
Index of Pay Items
I-18
Pay Item Pay Unit
80 HD Steel Beam Guardrail with 8 Foot Posts ............................................Linear Foot
80 HD Steel Beam Guardrail with 8 Foot Posts, Nested ...............................Linear Foot
542.1000 High Performance Concrete, Rapid Set ....................................................Cubic Yard
413.0100 Hot In-Place Recycling .............................................................................Square Yard
629.3400 Hydrant .....................................................................................................Each
629.3500 Hydrant, All-Inclusive ..............................................................................Each
653.1100 Hydraulic Mulch .......................................................................................Gallon
199.8101 Incentive or Disincentive (N.A.B.I.) .........................................................Dollar
653.4001 Inlet Protection Device, Type I .................................................................Each
02 Inlet Protection Device, Type II ................................................................Each
03 Inlet Protection Device, Type III...............................................................Cubic Yard
248.5000 Instrumentation and Monitoring Plan .......................................................Lump Sum
20 Insulated Joints..........................................................................................Each
622.1000 Insulation Board ........................................................................................MFBM
614.2000 In-Water Sediment Isolation Measures .....................................................Lump Sum
524.1300 Joint Sealer, Cold Poured ..........................................................................Linear Foot
524.1100 Joint Sealer, Hot Poured ............................................................................Linear Foot
524.2100 Joint Sealer, Polyurethane .........................................................................Linear Foot
10 Junction Box .............................................................................................Each
656.8000 Landscape Backfill, Truck Measurement .................................................Cubic Yard
656.6500 Landscape Watering ..................................................................................MGAL
206.3000 Ledge Salvage Material ............................................................................Ton
206.3500 Ledge Waste Material ...............................................................................Ton
646.3010 Letter or Symbol, Waterborne Paint .........................................................Each
646.7600 Line Striping Targets .................................................................................Each
21 Liquidated Damages, Interim Completion Date (N.A.B.I.) ......................Dollar
199.9999 Liquidated Damages, Train Delay (N.A.B.I.) ...........................................Dollar
656.1000 Live Fascines ............................................................................................Linear Foot
656.1100 Live Stakes ................................................................................................Each
608.4001 Loader Rental, Type I................................................................................Hour
679.5000 Luminaire ..................................................................................................Each
698.1000 Lump Sum Project, ID/IQ .........................................................................Lump Sum
698.2000 Lump Sum Project, JOC ...........................................................................Lump Sum
206.1500 Machine Scaling with Vegetation Removal ..............................................Hour
653.0300 Maintenance of EPSC Plan (N.A.B.I.) .....................................................Dollar
641.1200 Maintenance of Pedestrian Traffic ............................................................Lump Sum
527.1000 Maintenance of Structures and Approaches ..............................................Lump Sum
Index of Pay Items
I-19
Pay Item Pay Unit
60 Management of Contaminated Groundwater ............................................Lump Sum
70 Management of Contaminated Groundwater ............................................MGAL
10 Mast Arm Pole Foundation .......................................................................Each
410.1000 Material Transfer Vehicle ..........................................................................Ton
507.1900 Mechanical Bar Connector .......................................................................Each
50 Media Filter Drain.....................................................................................Linear Foot
519.1000 Membrane Waterproofing, Spray Applied ................................................Square Yard
519.2000 Membrane Waterproofing, Torch Applied Sheet ......................................Square Yard
213.1000 Milled Rumble Strips ................................................................................Linear Foot
213.3010 Milled Rumble Strips, Centerline .............................................................Linear Foot
213.2010 Milled Rumble Strips, Shoulder ...............................................................Linear Foot
15 Milled Rumble Strips, Sinusoidal Centerline ...........................................Linear Foot
15 Milled Rumble Strips, Sinusoidal Shoulder..............................................Linear Foot
635.1100 Mobilization/Demobilization ....................................................................Lump Sum
503.2500 Mobilization of Drilled Shaft Equipment .................................................Lump Sum
653.0200 Monitoring EPSC Plan ..............................................................................Hour
541.5100 Mortar, Type I ...........................................................................................Cubic Yard
541.5400 Mortar, Type IV ........................................................................................Cubic Yard
621.4120 MTS, Box Beam, Flared, TL-2 .................................................................Each
30 MTS, Box Beam, Flared, TL-3 .................................................................Each
621.4020 MTS, Box Beam, Tangent, TL-2 ..............................................................Each
30 MTS, Box Beam, Tangent, TL-3 ..............................................................Each
621.3120 MTS, MGS, Flared, TL-2 .........................................................................Each
30 MTS, MGS, Flared, TL-3 .........................................................................Each
621.3020 MTS, MGS, Tangent, TL-2 ......................................................................Each
30 MTS, MGS, Tangent, TL-3 ......................................................................Each
203.2000 Muck Excavation ......................................................................................Cubic Yard
50 Nesting Box ..............................................................................................Each
522.3500 Nonstructural Lumber, Treated .................................................................MFBM
522.3000 Nonstructural Lumber, Untreated .............................................................MFBM
248.5200 Observation Well ......................................................................................Linear Foot
528.1000 One Lane Temporary Bridge.....................................................................Lump Sum
677.1200 Overhead Traffic Sign Support, Cantilever ..............................................Each
677.2200 Overhead Traffic Sign Support, Cantilever with Lighting........................Each
677.1300 Overhead Traffic Sign Support, Multi-Support ........................................Each
677.2300 Overhead Traffic Sign Support, Multi-Support with Lighting .................Each
680.7200 Overlay for Travel Information Sign ........................................................Each
Index of Pay Items
I-20
Pay Item Pay Unit
646.8100 Painted Curb..............................................................................................Linear Foot
646.8200 Painted Island ............................................................................................Square Foot
45 Pan-Tilt-Zoom Camera .............................................................................Each
681.3010 Parking Meter............................................................................................Each
30 Parking Meter Post and Sleeve .................................................................Each
516.2000 Partial Removal and Modification of Bridge Joint ...................................Linear Foot
529.2000 Partial Removal of Structure .....................................................................Each
646.8600 Pavement Marking Mask ..........................................................................Square Foot
406.9300 Pay Adjustment, BCP, Longitudinal Joint Density (N.A.B.I.) ..................Dollar
406.9200 Pay Adjustment, BCP, Mat Density (N.A.B.I.) .........................................Dollar
406.9100 Pay Adjustment, BCP, Mixture Properties (N.A.B.I.) ..............................Dollar
406.9400 Pay Adjustment, BCP, Pavement Roughness (N.A.B.I.) ..........................Dollar
407.9100 Pay Adjustment, BWC, Mixture Properties (N.A.B.I.) ............................Dollar
15 Pedestal Post Assembly.............................................................................Each
20 Pedestrian Signal Assembly ......................................................................Each
656.4100 Perennials ..................................................................................................Each
501.3700 Performance-Based Concrete, Class PCD ................................................Cubic Yard
501.3800 Performance-Based Concrete, Class PCS .................................................Cubic Yard
501.3900 Performance-Based Concrete, Class SCC ................................................Cubic Yard
629.3200 Permanent Manual Air Release ................................................................Each
629.3300 Permanent Manual Air Release, All-Inclusive .........................................Each
505.3500 Permanent Steel Sheet Piling ....................................................................Square Foot
248.5603 Piezometer, Type III .................................................................................Each
620.4500 Plank Rail Fence .......................................................................................Linear Foot
629.1200 Plastic Water Pipe, Flexible ......................................................................Linear Foot
03 Plastic Water Pipe, Flexible, 0.75 Inch .....................................................Linear Foot
04 Plastic Water Pipe, Flexible, 1 Inch ..........................................................Linear Foot
05 Plastic Water Pipe, Flexible, 1.25 Inch .....................................................Linear Foot
06 Plastic Water Pipe, Flexible, 1.5 Inch .......................................................Linear Foot
07 Plastic Water Pipe, Flexible, 1.75 Inch .....................................................Linear Foot
08 Plastic Water Pipe, Flexible, 2 Inch ..........................................................Linear Foot
629.1300 Plastic Water Pipe, Flexible, All-Inclusive ...............................................Linear Foot
03 Plastic Water Pipe, Flexible, All-Inclusive, 0.75 Inch ..............................Linear Foot
04 Plastic Water Pipe, Flexible, All-Inclusive, 1 Inch...................................Linear Foot
05 Plastic Water Pipe, Flexible, All-Inclusive, 1.25 Inch..............................Linear Foot
06 Plastic Water Pipe, Flexible, All-Inclusive, 1.5 Inch................................Linear Foot
07 Plastic Water Pipe, Flexible, All-Inclusive, 1.75 Inch ..............................Linear Foot
08 Plastic Water Pipe, Flexible, All-Inclusive, 2 Inch...................................Linear Foot
Index of Pay Items
I-21
Pay Item Pay Unit
629.1400 Plastic Water Pipe, Rigid ..........................................................................Linear Foot
03 Plastic Water Pipe, Rigid, 0.75 Inch .........................................................Linear Foot
04 Plastic Water Pipe, Rigid, 1 Inch ..............................................................Linear Foot
05 Plastic Water Pipe, Rigid, 1.25 Inch .........................................................Linear Foot
06 Plastic Water Pipe, Rigid, 1.5 Inch ...........................................................Linear Foot
07 Plastic Water Pipe, Rigid, 1.75 Inch .........................................................Linear Foot
08 Plastic Water Pipe, Rigid, 2 Inch ..............................................................Linear Foot
12 Plastic Water Pipe, Rigid, 3 Inch ..............................................................Linear Foot
16 Plastic Water Pipe, Rigid, 4 Inch ..............................................................Linear Foot
24 Plastic Water Pipe, Rigid, 6 Inch ..............................................................Linear Foot
32 Plastic Water Pipe, Rigid, 8 Inch ..............................................................Linear Foot
40 Plastic Water Pipe, Rigid, 10 Inch ............................................................Linear Foot
48 Plastic Water Pipe, Rigid, 12 Inch ............................................................Linear Foot
629.1500 Plastic Water Pipe, Rigid, All-Inclusive ...................................................Linear Foot
03 Plastic Water Pipe, Rigid, All-Inclusive, 0.75 Inch ..................................Linear Foot
04 Plastic Water Pipe, Rigid, All-Inclusive, 1 Inch .......................................Linear Foot
05 Plastic Water Pipe, Rigid, All-Inclusive, 1.25 Inch ..................................Linear Foot
06 Plastic Water Pipe, Rigid, All-Inclusive, 1.5 Inch ....................................Linear Foot
07 Plastic Water Pipe, Rigid, All-Inclusive, 1.75 Inch ..................................Linear Foot
08 Plastic Water Pipe, Rigid, All-Inclusive, 2 Inch .......................................Linear Foot
12 Plastic Water Pipe, Rigid, All-Inclusive, 3 Inch .......................................Linear Foot
16 Plastic Water Pipe, Rigid, All-Inclusive, 4 Inch .......................................Linear Foot
24 Plastic Water Pipe, Rigid, All-Inclusive, 6 Inch .......................................Linear Foot
32 Plastic Water Pipe, Rigid, All-Inclusive, 8 Inch .......................................Linear Foot
40 Plastic Water Pipe, Rigid, All-Inclusive, 10 Inch .....................................Linear Foot
48 Plastic Water Pipe, Rigid, All-Inclusive, 12 Inch .....................................Linear Foot
641.1600 Portable Arrow Board ...............................................................................Each
641.1800 Portable Arrow Board Rental ....................................................................Day
641.1500 Portable Changeable Message Sign ..........................................................Each
641.1700 Portable Changeable Message Sign Rental...............................................Day
618.1005 Portland Cement Concrete Sidewalk, 5 Inch ............................................Square Yard
08 Portland Cement Concrete Sidewalk, 8 Inch ............................................Square Yard
415.5200 Portland Cement for CCPR .......................................................................Ton
414.5200 Portland Cement for CIR ..........................................................................Ton
312.5200 Portland Cement for FDR, Emulsion ........................................................Ton
608.3001 Power Broom Rental, Type I.....................................................................Hour
02 Power Broom Rental, Type II ...................................................................Hour
03 Power Broom Rental, Type III ..................................................................Hour
Index of Pay Items
I-22
Pay Item Pay Unit
00 Power Drop Stanchion ..............................................................................Each
608.1500 Power Grader Rental .................................................................................Hour
540.2000 Precast Concrete Deck Panels ...................................................................Square Foot
663.0250 Precast Concrete Panel Grade Crossing Surface Repair ...........................Each
00 Precast Concrete Panel Grade Crossing System .......................................Lump Sum
540.1000 Precast Concrete Structure ........................................................................Lump Sum
604.2000 Precast Reinforced Concrete Catch Basin with Cast Iron Grate...............Each
604.3000 Precast Reinforced Concrete Curb DI with Cast Iron Grate .....................Each
616.2501 Precast Reinforced Concrete Curb, Type A ..............................................Linear Foot
02 Precast Reinforced Concrete Curb, Type B ..............................................Linear Foot
604.1800 Precast Reinforced Concrete DI with Cast Iron Grate ..............................Each
604.2100 Precast Reinforced Concrete Manhole with Cast Iron Cover ...................Each
604.2500 Precast Reinforced Concrete Pipe DI with Cast Iron Grate ......................Each
604.2600 Precast Reinforced Concrete Pipe DI with Concrete Cover .....................Each
546.1000 Pre-Excavation of Abutment Piles, Earth .................................................Linear Foot
546.2000 Pre-Excavation of Abutment Piles, Rock..................................................Linear Foot
544.1000 Prefabricated Bridge Unit Superstructure .................................................Linear Foot
248.5800 Pressure Cell .............................................................................................Each
510.2100 Prestressed Concrete Box Beams..............................................................Linear Foot
510.4000 Prestressed Concrete Deck Panels ............................................................Square Foot
510.2300 Prestressed Concrete Girders ....................................................................Linear Foot
510.2600 Prestressed Concrete NEXT D Beams ......................................................Linear Foot
510.2500 Prestressed Concrete Solid Slabs ..............................................................Linear Foot
510.2200 Prestressed Concrete Voided Slabs ...........................................................Linear Foot
690.0300 Price Adjustment, Asphalt (N.A.B.I.) .......................................................Dollar
690.0400 Price Adjustment, Fuel (N.A.B.I.) ............................................................Dollar
653.5500 Project Demarcation Fence .......................................................................Linear Foot
40 Project Operations Completion Report .....................................................Lump Sum
30 Project Operations Plan.............................................................................Lump Sum
551.1000 Public Protection for Bridge Projects .......................................................Lump Sum
22 Pull Box, Double .......................................................................................Each
21 Pull Box, Single ........................................................................................Each
628.1400 PVC Sewer Pipe ........................................................................................Linear Foot
06 PVC Sewer Pipe, 1.5 Inch.........................................................................Linear Foot
08 PVC Sewer Pipe, 2 Inch............................................................................Linear Foot
16 PVC Sewer Pipe, 4 Inch............................................................................Linear Foot
24 PVC Sewer Pipe, 6 Inch............................................................................Linear Foot
32 PVC Sewer Pipe, 8 Inch............................................................................Linear Foot
Index of Pay Items
I-23
Pay Item Pay Unit
40 PVC Sewer Pipe, 10 Inch..........................................................................Linear Foot
48 PVC Sewer Pipe, 12 Inch..........................................................................Linear Foot
60 PVC Sewer Pipe, 15 Inch..........................................................................Linear Foot
72 PVC Sewer Pipe, 18 Inch..........................................................................Linear Foot
96 PVC Sewer Pipe, 24 Inch..........................................................................Linear Foot
628.1500 PVC Sewer Pipe, All-Inclusive.................................................................Linear Foot
06 PVC Sewer Pipe, All-Inclusive, 1.5 Inch .................................................Linear Foot
08 PVC Sewer Pipe, All-Inclusive, 2 Inch ....................................................Linear Foot
16 PVC Sewer Pipe, All-Inclusive, 4 Inch ....................................................Linear Foot
24 PVC Sewer Pipe, All-Inclusive, 6 Inch ....................................................Linear Foot
32 PVC Sewer Pipe, All-Inclusive, 8 Inch ....................................................Linear Foot
40 PVC Sewer Pipe, All-Inclusive, 10 Inch ..................................................Linear Foot
48 PVC Sewer Pipe, All-Inclusive, 12 Inch ..................................................Linear Foot
60 PVC Sewer Pipe, All-Inclusive, 15 Inch ..................................................Linear Foot
72 PVC Sewer Pipe, All-Inclusive, 18 Inch ..................................................Linear Foot
96 PVC Sewer Pipe, All-Inclusive, 24 Inch ..................................................Linear Foot
662.0010 Railroad Ballast.........................................................................................Ton
646.3210 Railroad Crossing Symbol, Waterborne Paint ..........................................Each
632.1000 Railroad Flaggers (N.A.B.I.).....................................................................Dollar
664.1000 Railroad-Highway Crossing Active Warning System ...............................Lump Sum
665.0100 Railroad Turnout .......................................................................................Each
08 Railroad Turnout, No. 8 ............................................................................Each
10 Railroad Turnout, No. 10 ..........................................................................Each
665.0550 Raise, Align, and Surface Crossover.........................................................Each
10 Raise, Align, and Surface Track ................................................................Linear Foot
00 Raise, Align, and Surface Turnout ............................................................Each
602.3500 Rebuilt Stone Masonry .............................................................................Cubic Yard
663.0100 Reconstruct Railroad-Highway Grade Crossing .......................................Lump Sum
604.4101 Rehabilitating DIs, Catch Basins, or Manholes, Class I ...........................Each
02 Rehabilitating DIs, Catch Basins, or Manholes, Class II ..........................Each
03 Rehabilitating DIs, Catch Basins, or Manholes, Class III ........................Each
618.1205 Reinforced Portland Cement Concrete Sidewalk, 5 Inch .........................Square Yard
08 Reinforced Portland Cement Concrete Sidewalk, 8 Inch .........................Square Yard
217.1000 Reinforced Soil Slope ...............................................................................Square Yard
507.1100 Reinforcing Steel, Level I .........................................................................Pound
507.1200 Reinforcing Steel, Level II ........................................................................Pound
507.1300 Reinforcing Steel, Level III ......................................................................Pound
Index of Pay Items
I-24
Pay Item Pay Unit
00 Re-Laying Pipe Culverts ...........................................................................Linear Foot
15 Re-Laying Pipe Culverts, 15 Inch .............................................................Linear Foot
18 Re-Laying Pipe Culverts, 18 Inch .............................................................Linear Foot
24 Re-Laying Pipe Culverts, 24 Inch .............................................................Linear Foot
628.1800 Re-Laying Sewer Pipe ..............................................................................Linear Foot
629.3600 Relocate Hydrant ......................................................................................Each
680.4000 Relocate Information Plaza .......................................................................Each
511.1001 Removal, Containment, and Disposal of Lead Paint, Type I ....................Lump Sum
02 Removal, Containment, and Disposal of Lead Paint, Type II ...................Lump Sum
529.1000 Removal of Bridge Pavement ...................................................................Square Yard
529.2500 Removal of Concrete or Masonry .............................................................Cubic Yard
529.2600 Removal of Concrete or Masonry .............................................................Square Yard
525.1000 Removal of Existing Bridge Railing .........................................................Linear Foot
616.4100 Removal of Existing Curb ........................................................................Linear Foot
676.1200 Removal of Existing Delineator and Post .................................................Each
620.5500 Removal of Existing Fence .......................................................................Linear Foot
646.8500 Removal of Existing Pavement Markings ................................................Square Foot
678.1000 Removal of Existing Traffic Control Signal System ................................Each
621.0100 Removal of Guardrail ...............................................................................Linear Foot
20 Removal of Guardrail Offset Blocks ........................................................Each
10 Removal of Guardrail Posts ......................................................................Each
665.0200 Removal of Railroad Turnout ...................................................................Each
529.1500 Removal of Structure ................................................................................Each
681.1010 Remove and Relocate Landscape Items ...................................................Each
662.0110 Remove and Replace Bridge Ties .............................................................Each
20 Remove and Replace Cross Ties ...............................................................Each
676.1500 Remove and Replace Delineator ...............................................................Each
531.1900 Remove and Replace Existing Anchor Bolt..............................................Each
10 Remove and Replace Joint Bar Sets .........................................................Each
662.0200 Remove and Replace Jointed Rail ............................................................Linear Foot
617.2200 Remove and Replace Mailbox, Multiple Support.....................................Each
617.2100 Remove and Replace Mailbox, Single Support ........................................Each
30 Remove and Replace Switch Ties .............................................................Linear Foot
667.0100 Remove and Replace Tie Plates ................................................................Each
10 Remove and Reset Guardrail ....................................................................Linear Foot
50 Remove and Reset Jointed Railroad Track ...............................................Linear Foot
679.2500 Remove and Reset Light Pole ...................................................................Each
Index of Pay Items
I-25
Pay Item Pay Unit
617.1200 Remove and Reset Mailbox, Multiple Support.........................................Each
617.1100 Remove and Reset Mailbox, Single Support ............................................Each
677.2500 Remove and Reset Overhead Traffic Sign Support ..................................Each
20 Remove and Reset Parking Meter.............................................................Each
679.2600 Remove and Reset Private Light Assembly ..............................................Each
665.0300 Remove and Reset Railroad Turnout ........................................................Each
00 Remove and Reset Temporary Traffic Barrier .........................................Linear Foot
677.3000 Remove Existing Overhead Sign Assembly, Cantilever ...........................Each
677.3500 Remove Existing Overhead Sign Assembly, Multi-Support.....................Each
629.3800 Remove Hydrant .......................................................................................Each
00 Remove Jointed Rail and Install CWR .....................................................Linear Foot
20 Remove Landscape Items .........................................................................Each
40 Remove Parking Meter Post and Sleeve ...................................................Each
00 Remove Railroad Track ............................................................................Linear Foot
679.2400 Remove Street Light Assembly ................................................................Each
616.4000 Removing and Resetting Curb ..................................................................Linear Foot
620.5000 Removing and Resetting Fence ................................................................Linear Foot
619.2000 Removing and Resetting Property Markers ..............................................Each
201.2100 Removing Large Stumps...........................................................................Each
201.1600 Removing Large Trees ..............................................................................Each
201.2000 Removing Medium Stumps ......................................................................Each
201.1500 Removing Medium Trees ..........................................................................Each
580.1101 Repair of Concrete Substructure Surface, Class I .....................................Square Yard
02 Repair of Concrete Substructure Surface, Class II ...................................Square Yard
03 Repair of Concrete Substructure Surface, Class III ..................................Cubic Yard
580.1001 Repair of Concrete Superstructure Surface, Class I..................................Square Yard
02 Repair of Concrete Superstructure Surface, Class II ................................Square Yard
03 Repair of Concrete Superstructure Surface, Class III ...............................Cubic Yard
602.4000 Repairing Stone Masonry .........................................................................Square Yard
621.0400 Replace Guardrail Beam Unit, Box Beam ................................................Each
621.0500 Replace Guardrail Beam Unit, Thrie Beam ..............................................Each
621.0300 Replace Guardrail Beam Unit, W-Beam ..................................................Each
50 Replace Guardrail Post Assembly, Box Beam .........................................Each
50 Replace Guardrail Post Assembly, Thrie Beam .......................................Each
60 Replace Guardrail Post Assembly, W-Beam with 6 Foot Posts ...............Each
80 Replace Guardrail Post Assembly, W-Beam with 8 Foot Posts ...............Each
616.2250 Repointing Granite Bridge Curb ...............................................................Gallon
602.3000 Repointing Masonry..................................................................................Square Yard
Index of Pay Items
I-26
Pay Item Pay Unit
525.1100 Reset Existing Bridge Railing ...................................................................Linear Foot
675.6000 Resetting Signs..........................................................................................Each
225.0300 Retaining Wall, Cast-In-Place Concrete ...................................................Lump Sum
225.0500 Retaining Wall, Concrete ..........................................................................Lump Sum
227.0100 Retaining Wall, Mechanically Stabilized Earth ........................................Lump Sum
225.0400 Retaining Wall, Precast Concrete..............................................................Lump Sum
20 Reuse of Contaminated Materials .............................................................Cubic Yard
613.1520 Riprap, Heavy Type ..................................................................................Cubic Yard
10 Riprap, Light Type ....................................................................................Cubic Yard
506.8500 Rivet Replacement ....................................................................................Each
221.2000 Rock Slope Stabilization Anchor ..............................................................Linear Foot
221.2500 Rock Slope Stabilization Anchor Testing .................................................Each
221.1000 Rock Slope Stabilization Dowel ...............................................................Linear Foot
221.1500 Rock Slope Stabilization Dowel Testing ..................................................Each
221.4000 Rock Slope Stabilization Drain .................................................................Linear Foot
221.5000 Rock Slope Stabilization Nail ...................................................................Linear Foot
221.3000 Rock Slope Stabilization Shear Key .........................................................Linear Foot
221.6000 Rock Slope Stabilization Shotcrete ...........................................................Cubic Yard
653.2001 Rolled Erosion Control Product, Type I....................................................Square Yard
02 Rolled Erosion Control Product, Type II ..................................................Square Yard
70 Rubber Rail Seal .......................................................................................Linear Foot
203.3100 Sand Borrow .............................................................................................Cubic Yard
604.2200 Sanitary Sewer Manhole ...........................................................................Each
404.5100 Seal Coat, Emulsified Asphalt ..................................................................Hundredweight
629.1000 Seamless Copper Water Tube ...................................................................Linear Foot
03 Seamless Copper Water Tube, 0.75 Inch ..................................................Linear Foot
04 Seamless Copper Water Tube, 1 Inch .......................................................Linear Foot
05 Seamless Copper Water Tube, 1.25 Inch ..................................................Linear Foot
06 Seamless Copper Water Tube, 1.5 Inch ....................................................Linear Foot
07 Seamless Copper Water Tube, 1.75 Inch ..................................................Linear Foot
08 Seamless Copper Water Tube, 2 Inch .......................................................Linear Foot
629.1100 Seamless Copper Water Tube, All-Inclusive ............................................Linear Foot
03 Seamless Copper Water Tube, All-Inclusive, 0.75 Inch ...........................Linear Foot
04 Seamless Copper Water Tube, All-Inclusive, 1 Inch ................................Linear Foot
05 Seamless Copper Water Tube, All-Inclusive, 1.25 Inch ...........................Linear Foot
06 Seamless Copper Water Tube, All-Inclusive, 1.5 Inch .............................Linear Foot
07 Seamless Copper Water Tube, All-Inclusive, 1.75 Inch ...........................Linear Foot
08 Seamless Copper Water Tube, All-Inclusive, 2 Inch ................................Linear Foot
Index of Pay Items
I-27
Pay Item Pay Unit
675.6100 Setting Salvaged Posts ..............................................................................Each
248.5501 Settlement Platform, Type I ......................................................................Each
02 Settlement Platform, Type II.....................................................................Each
628.3000 Sewer Cleanout .........................................................................................Each
628.3100 Sewer Cleanout, All-Inclusive ..................................................................Each
248.5300 Shape Array Instrument ............................................................................Each
508.1500 Shear Connectors ......................................................................................Lump Sum
502.1000 Shoring Superstructure..............................................................................Lump Sum
502.1100 Shoring Superstructure Bearings ..............................................................Each
203.4000 Shoulder Berm Removal ...........................................................................Linear Foot
675.5100 Sign Removal, Extruded Aluminum .........................................................Each
675.5000 Sign Removal, Flat Sheet Aluminum........................................................Each
653.4701 Silt Fence, Type I ......................................................................................Linear Foot
02 Silt Fence, Type II .....................................................................................Linear Foot
625.1000 Sleeves for Utilities, HDPE ......................................................................Linear Foot
02 Sleeves for Utilities, HDPE, 2 Inch ..........................................................Linear Foot
04 Sleeves for Utilities, HDPE, 4 Inch ..........................................................Linear Foot
06 Sleeves for Utilities, HDPE, 6 Inch ..........................................................Linear Foot
08 Sleeves for Utilities, HDPE, 8 Inch ..........................................................Linear Foot
10 Sleeves for Utilities, HDPE, 10 Inch ........................................................Linear Foot
12 Sleeves for Utilities, HDPE, 12 Inch ........................................................Linear Foot
14 Sleeves for Utilities, HDPE, 14 Inch ........................................................Linear Foot
16 Sleeves for Utilities, HDPE, 16 Inch ........................................................Linear Foot
18 Sleeves for Utilities, HDPE, 18 Inch ........................................................Linear Foot
20 Sleeves for Utilities, HDPE, 20 Inch ........................................................Linear Foot
22 Sleeves for Utilities, HDPE, 22 Inch ........................................................Linear Foot
24 Sleeves for Utilities, HDPE, 24 Inch ........................................................Linear Foot
625.2000 Sleeves for Utilities, PVC .........................................................................Linear Foot
02 Sleeves for Utilities, PVC, 2 Inch .............................................................Linear Foot
04 Sleeves for Utilities, PVC, 4 Inch .............................................................Linear Foot
06 Sleeves for Utilities, PVC, 6 Inch .............................................................Linear Foot
08 Sleeves for Utilities, PVC, 8 Inch .............................................................Linear Foot
10 Sleeves for Utilities, PVC, 10 Inch ...........................................................Linear Foot
12 Sleeves for Utilities, PVC, 12 Inch ...........................................................Linear Foot
14 Sleeves for Utilities, PVC, 14 Inch ...........................................................Linear Foot
16 Sleeves for Utilities, PVC, 16 Inch ...........................................................Linear Foot
18 Sleeves for Utilities, PVC, 18 Inch ...........................................................Linear Foot
Index of Pay Items
I-28
Pay Item Pay Unit
20 Sleeves for Utilities, PVC, 20 Inch ...........................................................Linear Foot
22 Sleeves for Utilities, PVC, 22 Inch ...........................................................Linear Foot
24 Sleeves for Utilities, PVC, 24 Inch ...........................................................Linear Foot
625.3000 Sleeves for Utilities, Steel .........................................................................Linear Foot
02 Sleeves for Utilities, Steel, 2 Inch .............................................................Linear Foot
04 Sleeves for Utilities, Steel, 4 Inch .............................................................Linear Foot
06 Sleeves for Utilities, Steel, 6 Inch .............................................................Linear Foot
08 Sleeves for Utilities, Steel, 8 Inch .............................................................Linear Foot
10 Sleeves for Utilities, Steel, 10 Inch ...........................................................Linear Foot
12 Sleeves for Utilities, Steel, 12 Inch ...........................................................Linear Foot
14 Sleeves for Utilities, Steel, 14 Inch ...........................................................Linear Foot
16 Sleeves for Utilities, Steel, 16 Inch ...........................................................Linear Foot
18 Sleeves for Utilities, Steel, 18 Inch ...........................................................Linear Foot
20 Sleeves for Utilities, Steel, 20 Inch ...........................................................Linear Foot
22 Sleeves for Utilities, Steel, 22 Inch ...........................................................Linear Foot
24 Sleeves for Utilities, Steel, 24 Inch ...........................................................Linear Foot
248.5100 Slope Inclinometer ....................................................................................Linear Foot
219.1000 Slope Stabilization Nail ............................................................................Linear Foot
219.1500 Slope Stabilization Nail Testing ................................................................Each
219.2000 Slope Stabilization System, Shotcrete Facing ..........................................Square Foot
219.3000 Slope Stabilization System, Wire Mesh Facing ........................................Square Foot
620.7500 Snow Barrier Fence...................................................................................Linear Foot
675.3500 Soil Bearing Slip Base ..............................................................................Each
203.1600 Solid Rock Excavation ..............................................................................Cubic Yard
608.2601 Special Purpose Excavator Rental, Type I ................................................Hour
620.8100 Split Rail Fence .........................................................................................Linear Foot
620.8200 Square Steel Fence ....................................................................................Linear Foot
675.3410 Square Tube Sign Post and Anchor ...........................................................Linear Foot
653.3500 Stabilized Construction Entrance ..............................................................Cubic Yard
618.4005 Stamped Concrete Apron, 5 Inch ..............................................................Square Yard
618.4108 Stamped Concrete Island, 8 Inch ..............................................................Square Yard
621.2600 Steel Backed Timber Guardrail ................................................................Linear Foot
621.1060 Steel Beam Guardrail ................................................................................Linear Foot
621.1160 Steel Beam Guardrail, Nested ...................................................................Linear Foot
00 Steel Beam Guardrail Offset Block ..........................................................Each
80 Steel Beam Guardrail with 8 Foot Posts ...................................................Linear Foot
80 Steel Beam Guardrail with 8 Foot Posts, Nested ......................................Linear Foot
620.4000 Steel Brace for Woven Wire Fence ...........................................................Each
Index of Pay Items
I-29
Pay Item Pay Unit
505.1000 Steel Piling, HP 10 × 42 ............................................................................Linear Foot
505.1200 Steel Piling, HP 10 × 57 ............................................................................Linear Foot
505.1500 Steel Piling, HP 12 × 53 ............................................................................Linear Foot
50 Steel Piling, HP 12 × 63 ............................................................................Linear Foot
505.1600 Steel Piling, HP 12 × 74 ............................................................................Linear Foot
50 Steel Piling, HP 12 × 84 ............................................................................Linear Foot
505.1700 Steel Piling, HP 14 × 73 ............................................................................Linear Foot
505.1800 Steel Piling, HP 14 × 89 ............................................................................Linear Foot
505.1900 Steel Piling, HP 14 × 102 ..........................................................................Linear Foot
505.2000 Steel Piling, HP 14 × 117 ..........................................................................Linear Foot
70 Stone Diaphragm ......................................................................................Linear Foot
613.1001 Stone Fill, Type I .......................................................................................Cubic Yard
02 Stone Fill, Type II .....................................................................................Cubic Yard
03 Stone Fill, Type III ....................................................................................Cubic Yard
04 Stone Fill, Type IV ....................................................................................Cubic Yard
602.2500 Stone Masonry Facing ..............................................................................Square Yard
653.1200 Straw Mulch ..............................................................................................Ton
10 Stream Habitat Boulders ...........................................................................Lump Sum
679.4600 Street Light Assembly ...............................................................................Each
679.5400 Street Lighting Control Device .................................................................Each
522.4000 Structural Glued Laminated Timber .........................................................MFBM
522.2500 Structural Lumber and Timber, Treated ....................................................MFBM
522.2000 Structural Lumber and Timber, Untreated ................................................MFBM
506.6000 Structural Steel ..........................................................................................Pound
506.7500 Structural Steel ..........................................................................................Lump Sum
506.5600 Structural Steel, Curved Plate Girder........................................................Pound
506.5500 Structural Steel, Plate Girder ....................................................................Pound
506.5000 Structural Steel, Rolled Beam ...................................................................Pound
506.5700 Structural Steel, Truss ...............................................................................Pound
204.2500 Structure Excavation .................................................................................Cubic Yard
301.2500 Subbase of Crushed Gravel, Coarse Graded .............................................Cubic Yard
301.2600 Subbase of Crushed Gravel, Fine Graded .................................................Cubic Yard
301.2800 Subbase of Crushed Gravel, Fine Graded .................................................Ton
301.3500 Subbase of Dense Graded Crushed Stone .................................................Cubic Yard
301.1500 Subbase of Gravel .....................................................................................Cubic Yard
301.4000 Subbase, RAP ...........................................................................................Ton
580.1600 Surface Preparation for Membrane ...........................................................Square Foot
30 Surface Sand Filter ....................................................................................Square Yard
Index of Pay Items
I-30
Pay Item Pay Unit
404.1100 Tack Coat, Emulsified Asphalt ..................................................................Hundredweight
404.1200 Tack Coat, Polymer-Modified Emulsified Asphalt ...................................Hundredweight
629.2600 Tapping Sleeve and Valve with Valve Box ..............................................Each
629.2700 Tapping Sleeve and Valve with Valve Box, All-Inclusive .......................Each
646.6000 Temporary 4 Inch White Line ...................................................................Linear Foot
20 Temporary 4 Inch White Line, Paint .........................................................Linear Foot
12 Temporary 4 Inch White Line, Type C Tape .............................................Linear Foot
646.6100 Temporary 4 Inch Yellow Line .................................................................Linear Foot
20 Temporary 4 Inch Yellow Line, Paint .......................................................Linear Foot
12 Temporary 4 Inch Yellow Line, Type C Tape ...........................................Linear Foot
646.6200 Temporary 6 Inch White Line ...................................................................Linear Foot
20 Temporary 6 Inch White Line, Paint .........................................................Linear Foot
12 Temporary 6 Inch White Line, Type C Tape .............................................Linear Foot
646.6300 Temporary 6 Inch Yellow Line .................................................................Linear Foot
20 Temporary 6 Inch Yellow Line, Paint .......................................................Linear Foot
12 Temporary 6 Inch Yellow Line, Type C Tape ...........................................Linear Foot
646.6400 Temporary 8 Inch White Line ...................................................................Linear Foot
20 Temporary 8 Inch White Line, Paint .........................................................Linear Foot
12 Temporary 8 Inch White Line, Type C Tape .............................................Linear Foot
646.6500 Temporary 8 Inch Yellow Line .................................................................Linear Foot
20 Temporary 8 Inch Yellow Line, Paint .......................................................Linear Foot
12 Temporary 8 Inch Yellow Line, Type C Tape ...........................................Linear Foot
646.6600 Temporary 12 Inch White Line .................................................................Linear Foot
20 Temporary 12 Inch White Line, Paint .......................................................Linear Foot
12 Temporary 12 Inch White Line, Type C Tape ...........................................Linear Foot
646.6700 Temporary 12 Inch Yellow Line ...............................................................Linear Foot
20 Temporary 12 Inch Yellow Line, Paint .....................................................Linear Foot
12 Temporary 12 Inch Yellow Line, Type C Tape .........................................Linear Foot
646.6800 Temporary 24 Inch Stop Bar .....................................................................Linear Foot
20 Temporary 24 Inch Stop Bar, Paint ...........................................................Linear Foot
12 Temporary 24 Inch Stop Bar, Type C Tape ...............................................Linear Foot
240.0100 Temporary Access Road............................................................................Lump Sum
240.0200 Temporary Causeway ................................................................................Lump Sum
646.7000 Temporary Crosswalk Marking ................................................................Linear Foot
20 Temporary Crosswalk Marking, Paint ......................................................Linear Foot
12 Temporary Crosswalk Marking, Type C Tape ..........................................Linear Foot
646.6900 Temporary Letter or Symbol .....................................................................Each
20 Temporary Letter or Symbol, Paint...........................................................Each
12 Temporary Letter or Symbol, Type C Tape...............................................Each
Index of Pay Items
I-31
Pay Item Pay Unit
528.1200 Temporary Pedestrian Bridge....................................................................Lump Sum
240.0300 Temporary Railroad Access ......................................................................Lump Sum
646.7100 Temporary Railroad Crossing Symbol ......................................................Each
20 Temporary Railroad Crossing Symbol, Paint ...........................................Each
12 Temporary Railroad Crossing Symbol, Type C Tape ................................Each
614.1000 Temporary Relocation of Stream ..............................................................Each
679.7000 Temporary Street Light Assembly ............................................................Each
621.2400 Temporary Traffic Barrier ........................................................................Linear Foot
641.2100 Temporary Traffic Control Signal System, Fixed .....................................Each
641.2200 Temporary Traffic Control Signal System, Portable .................................Each
621.2500 Temporary Traffic Protection ...................................................................Linear Foot
10 Terminal Connector for Steel Beam Guardrail .........................................Each
203.4500 Test Borings ..............................................................................................Linear Foot
631.1700 Testing Equipment, Bituminous ................................................................Lump Sum
631.1600 Testing Equipment, Concrete ....................................................................Lump Sum
631.1900 Testing Equipment, Grout .........................................................................Lump Sum
631.1800 Testing Equipment, Protective Coatings ...................................................Lump Sum
201.3000 Thinning and Trimming ............................................................................Acre
201.3100 Thinning and Trimming for Signs.............................................................Each
621.2200 Thrie Beam Guardrail ...............................................................................Linear Foot
248.5400 Tiltmeter ....................................................................................................Each
651.3500 Topsoil.......................................................................................................Cubic Yard
60 Traffic Barrier Delineator .........................................................................Each
641.1000 Traffic Control ..........................................................................................Lump Sum
641.1100 Traffic Control, All-Inclusive ....................................................................Lump Sum
25 Traffic Signal Assembly ............................................................................Each
30 Traffic Signal Head Assembly ..................................................................Each
675.2100 Traffic Sign, Extruded Aluminum.............................................................Square Foot
675.2000 Traffic Sign, Flat Sheet Aluminum ...........................................................Square Foot
628.4300 Transfer to New System, Sanitary Sewer, All-Inclusive ..........................Lump Sum
629.4300 Transfer to New System, Water, All-Inclusive .........................................Lump Sum
656.5500 Transplanting Ground Cover.....................................................................Square Yard
656.5000 Transplanting Shrubs ................................................................................Each
656.4500 Transplanting Trees ...................................................................................Each
680.3000 Travel Information Plaza...........................................................................Each
680.2000 Travel Information Sign ............................................................................Square Foot
680.7000 Travel Information Symbol .......................................................................Each
Index of Pay Items
I-32
Pay Item Pay Unit
616.3500 Treated Timber Curb .................................................................................Linear Foot
656.8500 Tree Protection ..........................................................................................Lump Sum
204.2000 Trench Excavation of Earth ......................................................................Cubic Yard
204.2200 Trench Excavation of Earth, Exploratory (N.A.B.I.) ................................Cubic Yard
204.2100 Trench Excavation of Rock .......................................................................Cubic Yard
209.0100 Trenchless Excavation, Horizontal Directional Drilling ...........................Linear Foot
608.4500 Truck-Mounted Attenuator........................................................................Hour
608.5000 Truck-Mounted Attenuator, AWV/PV ......................................................Hour
608.3700 Truck Rental ..............................................................................................Hour
656.1200 Tubelings ...................................................................................................Each
675.3300 Tubular Steel Sign Post .............................................................................Pound
651.1500 Turf Establishment, General Seed.............................................................Square Yard
651.1800 Turf Establishment, Sod ............................................................................Square Yard
651.1600 Turf Establishment, Specialty Seed ..........................................................Square Yard
651.1700 Turf Establishment, Temporary Seed ........................................................Square Yard
528.1100 Two Lane Temporary Bridge ....................................................................Lump Sum
203.2700 Unclassified Channel Excavation .............................................................Cubic Yard
203.1700 Unclassified Excavation............................................................................Cubic Yard
605.2006 Underdrain Carrier Pipe, 6 Inch ................................................................Linear Foot
08 Underdrain Carrier Pipe, 8 Inch ................................................................Linear Foot
12 Underdrain Carrier Pipe, 12 Inch ..............................................................Linear Foot
605.9500 Underdrain Flushing Basin .......................................................................Each
605.1006 Underdrain Pipe, 6 Inch ............................................................................Linear Foot
08 Underdrain Pipe, 8 Inch ............................................................................Linear Foot
12 Underdrain Pipe, 12 Inch ..........................................................................Linear Foot
40 Underground Sand Filter...........................................................................Each
630.1000 Uniformed Traffic Officers .......................................................................Hour
50 Utility Pad .................................................................................................Each
30 Utility Pedestal ..........................................................................................Each
91 Value Engineering Proposal Development Costs (N.A.B.I.) ....................Dollar
92 Value Engineering Proposal Net Savings (N.A.B.I.) ................................Dollar
93 Value Engineering Proposal Payment Adjustment (N.A.B.I.) ..................Dollar
40 Vehicle Detection System .........................................................................Each
616.2100 Vertical Granite Curb ................................................................................Linear Foot
50 Vertical Granite Curb, Mountable .............................................................Linear Foot
514.1000 Water Repellent, Silane .............................................................................Gallon
Index of Pay Items
I-33
Pay Item Pay Unit
70 Wildlife Exclusionary Measures ...............................................................Lump Sum
20 Wildlife Guide Fence ................................................................................Linear Foot
40 Wildlife Habitat Cover ..............................................................................Lump Sum
30 Wildlife Shelf ............................................................................................Linear Foot
625.6000 Wired Conduit ...........................................................................................Linear Foot
02 Wired Conduit, 2 Inch ...............................................................................Linear Foot
03 Wired Conduit, 3 Inch ...............................................................................Linear Foot
04 Wired Conduit, 4 Inch ...............................................................................Linear Foot
06 Wired Conduit, 6 Inch ...............................................................................Linear Foot
620.4100 Wood Brace for Woven Wire Fence ..........................................................Each
619.1500 Wood Marker Posts ...................................................................................Each
620.2500 Woven Wire Fence with Steel Posts .........................................................Linear Foot
620.2600 Woven Wire Fence with Wood Posts ........................................................Linear Foot
675.3100 W-Shape Steel Sign Post ...........................................................................Pound
619.1700 Yielding Marker Posts ...............................................................................Each
Index of Pay Items
I-34
This Page Intentionally Left Blank
This Page Intentionally Left Blank
This Page Intentionally Left Blank
This Page Intentionally Left Blank
This Page Intentionally Left Blank