6-376 SECTION 698 – ID/IQ AND JOC PAY ITEMS
698.01 DESCRIPTION . This work shall be as specified in the Contract. This section is a placeholder for
ID/IQ and JOC pay items.
698.02 METHOD OF MEASUREMENT . The quantity of Lump Sum Project, ID/IQ to be measured for
payment will be on a lump sum basis for the complete and accepted work. The quantity of Lump Sum Project, JOC to be measured for payment will be on a lump sum basis for the complete and accepted work.
698.03 BASIS OF PAYMENT . The accepted quantity of Lump Sum Project, ID/IQ will be paid for at
the Contract lump sum price. Payment will be full compensation for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the work. The accepted quantity of Lump Sum Project, JOC will be paid for at the Contract lump sum price. Payment will be full compensation for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the work . Payment will be made under: Pay Item Pay Unit 698.1000 Lump Sum Project, ID/IQ ................................ ................................ ......... Lump Sum 698.2000 Lump Sum Project, JOC ................................ ................................ ........... Lump Sum 6-377 SECTIO N 699 – FAA PAY ITEMS 699.0 1 DESCRIPTION . This work shall be as specified in the Aviation Technical Specifications included in the Contract. This section is a placeholder for FAA pay items on aviation Contracts.