6-377 SECTIO N 699 – FAA PAY ITEMS
699.0 1 DESCRIPTION . This work shall be as specified in the Aviation Technical Specifications included
in the Contract. This section is a placeholder for FAA pay items on aviation Contracts. 6-378 This Page Intentionally Left Blank 7-1 DIVISION 700 MATERIALS SECTIO N 701 – HYDRAULI C CEMENT
701.0 1 GENERA L REQUIREMENTS . Hydraulic cement shall meet the following general requirements :
701.0 2 PORTLAN D CEMENT . Portland cement shall meet the requirements of AASHTO M 85 , Type II
and ASTM C150, Type II, unless otherwise shown on the Plans or directed by the Engineer.
701.0 3 HIGH EARLY -STRENGT H PORTLAN D CEMENT . High early -strength Portland cement shall
meet the requirements of AASHTO M 85, Type III and ASTM C150, Type III .
701.0 4 PORTLAND -POZZOLA N CEMENT . Portland -pozzolan cem ent shall meet the requirements of
AASHTO M 240 and ASTM C595 , Type IP.
701.0 5 PORTLAND -LIMESTON E CEMENT . Portland -limestone cement shall meet the requirements
of AASHTO M 240 and ASTM C595 , Type IL.
701.0 6 PORTLAN D BLAST -FURNAC E SLAG CEMENT . Portland blast -furnace slag cement shall
meet the requirements of AASHTO M 240 and ASTM C595 , Type IS .
701.0 7 TERNAR Y BLENDE D CEMENT . Ternary blended cement shall meet the requirements of
AASHTO M 240 and ASTM C595 , Type IT .
Get an email when 699 changes
Vermont revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.