Page 4-2 M 41-10
4-02 Gravel Base4-02 Gravel Base
4-02.1 Description
This Work shall consist of constructing one or more layers of gravel base upon a prepared Subgrade in accordance with these Specifications and in conformity with the lines, grades, depth, and typical cross-section shown in the Plans or as established by the Engineer.
4-02.2 Materials
Materials shall meet the requirements of the following section: Gravel Base 9-03.10
4-02.3 Construction Requirements
Gravel base shall be uniformly spread upon the prepared Subgrade to the depth, width, and cross-section shown in the Plans. Construction methods used shall meet the applicable requirements of Sections 4-04.3 .
4-02.4 Measurement
Gravel base will be measured in the same manner prescribed for the measurement of crushed surfacing materials as set forth in Section 4-04.4 .
4-02.5 Payment
Payment will be made for the following Bid item when shown in the Proposal: “Gravel Base”, per ton, or per cubic yard.