Effective with the December 2018 Letting 367 2019 Standard Spec ifications Section 617 Hauling
617.1Description
617.2 (Vacant)
617.3Construction
site in an engineer-approved v ehicle. The engineer may approve any size or type of vehicle for hauling provided that vehicle conforms to the following:
being hauled.
structures as necessary to reach the work site from the materia l source. Also, maintain, repair, and restore previously constructed pr ivate roads, bridges, culverts , and structures used to pre-hauling condition. 617.4 Measurement
department will determine the total quantity for payment by mul tiplying the number of cubic yards hauled and placed in each zone by the mile number of the zone. The department will determine mile zones along the shortest and mo st practicable line of haul from the loading point to and along the project. The department will only measure hauling of materials specifically included in a Hauling bid item.
617.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
617.0100 Hauling (material) CYMI
the contract specifies otherwise, costs associated with private roads, bridges, culverts, and structures used to haul material under this bid item.
Hauling materials not specifically included in a Hauling bid item is also incidental to related work.
Effective with the December 2018 Letting 368 2019 Standard Spec ifications Section 618 Maintenance and Repair of Haul Roads
618.1Description
and other components used for hauling by contractor, subcontractor, or supplier to support work for a department contract to its pre-haul condition. Public roads and streets shall be limited to those not a part of the State Trunk Highway Sy stem and from now on called h aul roads.
loads exceeding statutory size and weight limitations.
618.2Materials
road before its use as a haul road. The engineer will determine the quantity, quality, and acceptability of materials.
618.3Construction
618.3.1 General
quality of materials used. If 2 or more contractors having contracts with the department transport materials over the same haul road at the same time, or at about the same time, the engineer will determine the repair and restoration obligations of the respective contractors. 618.3.2 Maintenance
abatement, at any time during hauling operations, as necessary to ensure reasonable service to other users of the road.
existing facilities before hauli ng starts; and may condition th e surface and perform repairs during hauling operations. 618.3.3 Restoration
including drainage facilities and other components, to the equi valent of pre-hau ling conditions.
618.4Measurement
acceptably completed, measured only if the condition of the hau l road after work is complete is better than or equal to the condition before work began. The departmen t will measure the item even if no hauling was done on the road and even if no maintenance or repa ir work was required.
618.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
618.0100 Maintenance and Repair of Haul Roads (project) EACH
hauling, and placing required mate rials; and for other costs in curred by the contractor to prevent or minimize damage to the haul roads.
engineer may make partial payment for work performed.