Effective with the December 2018 Letting 374 2019 Standard Spec ifications Section 623 Dust Control Surface Treatment
623.1Description
other drivable surfaces.
623.2Materials
623.2.1 General
solutions with less than 1 percent sediment falling out of solution below 0 F.
composition. The department will ac cept material based on those certifications as specified in 106.3.3 . 623.2.2 Magnesium Chloride
percent calcium chloride by wei ght, and less than 1 percent sod ium chloride by weight.
calcium chloride by weight, and le ss than 1 percent sodium chlo ride by weight. 623.2.3 Calcium Chloride
magnesium chloride by weight, and less than 1 percent sodium ch loride by weight.
magnesium chloride by weight, and less than 1 percent sodium ch loride by weight.
623.3Construction
areas of the project as necessar y to control dust from construction equipment and public traffic. Consult with engineer before applying dust control chemical. Ap ply chemical treatment as the engineer directs.
dust control chemical to treat thos e areas of the project vulnerable at any time during construction. Also, provide, within the same 24 hours, sufficient spreading e quipment to apply the chemical. Provide spreading equipment capable of applying the dust control chemical, uniformly and without runoff, over the treated surface at the s pecified application rate.
penetrate at least 2 inches. After this pre-wetting and while the surface is still moist but not muddy, apply the required quantity of chem ical uniformly over that sur face at the following rate:
24 hours, or under other conditions that might result in a significant loss of material.
623.4Measurement
completed. The engineer may calculate the yardage using volume or weight and applying a conversion factor.
623.5Payment
item: ITEM NUMBER DESCRIPTION UNIT
623.0200 Dust Control Su rface Treatment SY
treatment and pre-wetting water.
Effective with the December 2018 Letting 375 2019 Standard Spec ifications Section 624 Water
624.1Description
compacting existing base, or dust control within the right-of-w ay.
624.2Materials
624.3Construction
pressure-type distributor device that allows uniform applicatio n over the specified area. Use tanks with a minimum capacity of 1000 gallons and equipped with positives hut-off valves controlled while the vehicle is in motion.
purposes that the engineer orders or allows. Load and unload th e tank and operate the equipment in a way that does not waterlog or damage the subgrade or base.
624.4Measurement
equals the volume of water furnished and applied as the enginee r directs according to the contract. The department will determine the volume by engineer-approved m eters, or from tanks of known capacity.
624.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
624.0100 Water MGAL
other items of work.