Effective with the December 2018 Letting 372 2019 Standard Spec ifications Section 621 Landmark Reference Monuments
621.1Description
621.2Materials
Reinforc ement ................................................. ............................................................................................ 505.2 Miscellaneous metals .......................................... ..................................................................................... 506.2.3 Brick and concrete bri ck or block masonr y ..................... ............................................................................. 519.2 Mortar ........................................................ ............................................................................................... 519.2.3 Foundation backfill ........................................... ............................................................................................ 520.2
manufacturer determines.
Provide QMP for class III ancilla ry concrete as specified in 716.
621.3Construction
621.3.1 Monument Location
and that require reference monuments until construction and mar king of the landmark reference monuments.
work under contract, and at the exact locations, the engineer d etermines. However, if the contract specifies or the enginee r directs, construct monuments at the e xact locations of, and to replace, landmarks disturbed by the construction. 621.3.2 Placing Monuments 621.3.2.1 General
concrete monuments or aluminum monuments in holes excavated in the ground or, in the case of type C aluminum monuments, driven into the ground.
contractor-furnished metal marker, conforming to plan details, on all aluminum monuments.
ground. Make the holes the size and depth the plans show or as the engineer directs.
621.3.2.2 Cast In Place Concrete Monuments
the concrete as the plans show . Place the metal marker while th e concrete is still plastic. 621.3.2.3 Precast Concrete and Non-Driven Aluminum Monuments
and backfill with suitable material and thoroughly compact in 6 -inch layers. 621.3.2.4 Aluminum Drive-In Monuments
monuments into the ground to the minimum depth the plans show a nd drive the top flush with the surface.
621.3.2.5 Monument and Cover
Monuments and Aluminum Covers bid items, construct cast in plac e or precast reinforced concrete monuments in holes excavated in the ground and covered with cas t iron covers or, if specified, aluminum monuments excavated or driven into the ground and cove red with aluminum covers.
above subsections, except as follows:
Effective with the December 2018 Letting 373 2019 Standard Spec ifications - Place 12 inches of granular b ackfill to an elevation at least 3 inches below the top of concrete monuments according to plan details. - If using cast in place conc rete monuments, form at least the top 3 inches of the monument.
621.3.3 Protecting and Curing
contractor may use curing compound conforming to 501.2.9 . Wait at least 72 hours before loading.
621.4Measurement
completed.
621.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
621.0100 Landmark Reference Monuments EACH
621.1100 Landmark Reference Monuments and Cast Iron Covers EACH
621.1200 Landmark Reference Monuments and Aluminum Covers EACH
concrete; for providing aluminum monuments, including markers; for providing steel rod; for placing department-furnished markers; for providing and adjusting iron or aluminum covers; for backfilling; and for disposing of surplus materials.
suitable foundation.
Effective with the December 2018 Letting 374 2019 Standard Spec ifications Section 623 Dust Control Surface Treatment
623.1Description
other drivable surfaces.
623.2Materials
623.2.1 General
solutions with less than 1 percent sediment falling out of solution below 0 F.
composition. The department will ac cept material based on those certifications as specified in 106.3.3 . 623.2.2 Magnesium Chloride
percent calcium chloride by wei ght, and less than 1 percent sod ium chloride by weight.
calcium chloride by weight, and le ss than 1 percent sodium chlo ride by weight. 623.2.3 Calcium Chloride
magnesium chloride by weight, and less than 1 percent sodium ch loride by weight.
magnesium chloride by weight, and less than 1 percent sodium ch loride by weight.
623.3Construction
areas of the project as necessar y to control dust from construction equipment and public traffic. Consult with engineer before applying dust control chemical. Ap ply chemical treatment as the engineer directs.
dust control chemical to treat thos e areas of the project vulnerable at any time during construction. Also, provide, within the same 24 hours, sufficient spreading e quipment to apply the chemical. Provide spreading equipment capable of applying the dust control chemical, uniformly and without runoff, over the treated surface at the s pecified application rate.
penetrate at least 2 inches. After this pre-wetting and while the surface is still moist but not muddy, apply the required quantity of chem ical uniformly over that sur face at the following rate:
24 hours, or under other conditions that might result in a significant loss of material.
623.4Measurement
completed. The engineer may calculate the yardage using volume or weight and applying a conversion factor.
623.5Payment
item: ITEM NUMBER DESCRIPTION UNIT
623.0200 Dust Control Su rface Treatment SY
treatment and pre-wetting water.