Effective with the December 2018 Letting 370 2019 Standard Spec ifications Section 620 Concrete Corrugated Median and Concrete Median Nos e
620.1Description
one course on a pr epared foundation.
620.2Materials
Joint filler .................................................. ................................................................................................ 415.2.3
Provide QMP for class II ancilla ry concrete as specified in 716.
620.3Construction
ancillary concrete. Repair cracke d concrete as the engineer dir ects.
section, placed in one course on a prepared foundation.
620.3.1 Preparing the Foundation
show and required for placing t he concrete. Remove and replace any soft or unsuitable material encountered with suitable material and thoroughly compact and f inish the foundation to a firm surface. Ensure the foundation is moist when placing the concrete. 620.3.2 Placing Concrete
required elevation and crown. For m the required corrugations with tools and equipment appropriate for the purpose, according to the plan details.
joints in concrete pavement under 415.3.7.2 .
across the full width of the medi an surface with adjacent strokes slightly overlapping. Perform brooming in a way that produces corrugations uniform in appearance and not greater than 1/8 inch deep. Complete the brooming befor e the concrete’s condition causes the surface to tear or become rough from the operation. Provide a finished surface free from rough or porous areas, irregularities, and depressions resulting from improper broom handling. Ensure brooms are the quality, size, and construction appropriate for the job and operated to produce a surface finish meeting the engineer’s approval.
conform to 415.3.13 for cold weather conc reting. Conform to 415.3.14 for protection of concrete median.
620.4Measurement
including the nose section.
square foot acceptably completed, for the nose section only.
620.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
620.0100 Concrete Corrugated Median SF
620.0200 Concrete Median Blunt Nose SF
Effective with the December 2018 Letting 371 2019 Standard Spec ifications 620.0300 Concrete median Sloped Nose SF
ancillary concrete.
Nose is full compensation for pr eparing the foundation; for providing materials, including concrete, joint filler and tie bars; for hauling , placing, consolidating, shapi ng, finishing, curing , and protecting the concrete; and for disposing of surplus materials.
Effective with the December 2018 Letting 372 2019 Standard Spec ifications Section 621 Landmark Reference Monuments
621.1Description
621.2Materials
Reinforc ement ................................................. ............................................................................................ 505.2 Miscellaneous metals .......................................... ..................................................................................... 506.2.3 Brick and concrete bri ck or block masonr y ..................... ............................................................................. 519.2 Mortar ........................................................ ............................................................................................... 519.2.3 Foundation backfill ........................................... ............................................................................................ 520.2
manufacturer determines.
Provide QMP for class III ancilla ry concrete as specified in 716.
621.3Construction
621.3.1 Monument Location
and that require reference monuments until construction and mar king of the landmark reference monuments.
work under contract, and at the exact locations, the engineer d etermines. However, if the contract specifies or the enginee r directs, construct monuments at the e xact locations of, and to replace, landmarks disturbed by the construction. 621.3.2 Placing Monuments 621.3.2.1 General
concrete monuments or aluminum monuments in holes excavated in the ground or, in the case of type C aluminum monuments, driven into the ground.
contractor-furnished metal marker, conforming to plan details, on all aluminum monuments.
ground. Make the holes the size and depth the plans show or as the engineer directs.
621.3.2.2 Cast In Place Concrete Monuments
the concrete as the plans show . Place the metal marker while th e concrete is still plastic. 621.3.2.3 Precast Concrete and Non-Driven Aluminum Monuments
and backfill with suitable material and thoroughly compact in 6 -inch layers. 621.3.2.4 Aluminum Drive-In Monuments
monuments into the ground to the minimum depth the plans show a nd drive the top flush with the surface.
621.3.2.5 Monument and Cover
Monuments and Aluminum Covers bid items, construct cast in plac e or precast reinforced concrete monuments in holes excavated in the ground and covered with cas t iron covers or, if specified, aluminum monuments excavated or driven into the ground and cove red with aluminum covers.
above subsections, except as follows: