Effective with the December 20 18 Letting 369 2019 Standard Spec ifications Section 619 Mobilization
619.1Description
(1)This section describes the work and operations necessary to mo ve personnel, equipment, supplies, and incidentals to the project site and to establish all of the contractor’s offices, buildings, sanitary accommodations, and other facilities necessary to work on the p roject. It also includes all other work and operations whose performance is required, or for costs nece ssarily incurred before beginning work on various items on the project site. 619.2 (Vacant) 619.3 (Vacant)619.4 Measurement (1)The department will measure Mob ilization once for the contract acceptably com pleted.
619.5Payment
(1)The department will pay for the measured quantity at the contr act unit price under the following bid item: ITEM NUMBER DESCRIPTION UNIT
619.1000 Mobilization EACH
(2)Payment for Mobilization is full compensation for supplying and providing materials, facilities, and services, and for performing all work necessary to complete this contract bid item. The department will make incremental payments as determined using department form W S6191 available at: https://wisconsindot.gov/Documents/doing-bus/eng-consultants/cnslt-rsrces/tools/estimating/ws6191.xls (3)If the contract does not include a separate Mobilization bid i tem, the work necessary for mobilization is incidental to work in cluded under other contract bid items.
Effective with the December 2018 Letting 370 2019 Standard Spec ifications Section 620 Concrete Corrugated Median and Concrete Median Nos e
620.1Description
one course on a pr epared foundation.
620.2Materials
Joint filler .................................................. ................................................................................................ 415.2.3
Provide QMP for class II ancilla ry concrete as specified in 716.
620.3Construction
ancillary concrete. Repair cracke d concrete as the engineer dir ects.
section, placed in one course on a prepared foundation.
620.3.1 Preparing the Foundation
show and required for placing t he concrete. Remove and replace any soft or unsuitable material encountered with suitable material and thoroughly compact and f inish the foundation to a firm surface. Ensure the foundation is moist when placing the concrete. 620.3.2 Placing Concrete
required elevation and crown. For m the required corrugations with tools and equipment appropriate for the purpose, according to the plan details.
joints in concrete pavement under 415.3.7.2 .
across the full width of the medi an surface with adjacent strokes slightly overlapping. Perform brooming in a way that produces corrugations uniform in appearance and not greater than 1/8 inch deep. Complete the brooming befor e the concrete’s condition causes the surface to tear or become rough from the operation. Provide a finished surface free from rough or porous areas, irregularities, and depressions resulting from improper broom handling. Ensure brooms are the quality, size, and construction appropriate for the job and operated to produce a surface finish meeting the engineer’s approval.
conform to 415.3.13 for cold weather conc reting. Conform to 415.3.14 for protection of concrete median.
620.4Measurement
including the nose section.
square foot acceptably completed, for the nose section only.
620.5Payment
items: ITEM NUMBER DESCRIPTION UNIT