Effective with the December 2018 Letting 498 2019 Standard Spec ifications Section 661 Temporary Traffic Signals and Temporary Ramp Meters
661.1Description
signals, and temporary ramp meters.
661.2Materials
661.2.1 General
door lock and an access door tha t allows placing the controller in emergency flash. Provide keys to the access door to the engineer and la w enforcement agencies as req uired. Also provide a manual control accessible by the police. Supply a controller capable of executing the timing program supplied in this contract for this te mporary traffic signal. Test traffic signal control cabinets before installation. The department may request timing inte rval changes during the proje ct as required by construction or traffic conditions. Make engineer- requested changes within 24 h ours.
emergency vehicle preemption (EVP) system. Furnish a NEMA monit or for the controller. Test the monitor with an automated progra mmed testing system. Test annua lly if used for more than one year. This test verifies that the monito r complies with the intersection requirements. Attach a copy of the monitor test report to the monito r, and provide a copy to the a uthority having jurisdiction of the intersection.
the applicable electrical utility. Provide an affidavit to the electrical utility in a timely manner so the electrical utility can schedule service turn on. If the control cabinet is not mounted on the electrical service pole, add a second electrical service disconnect to the outside of the control cabinet for the convenience of emergency pers onnel. If required, install the el ectrical service.
may furnish engineer-app roved used components.
proposed equipment and locations to the engineer for approval; do not install before the engineer approves. 661.2.1.1 Wood Poles Class 4
trademark, plant location and year of treatment, code letters d enoting the pole species and preservative used, and class numeral and pole length. The engin eer may refuse the pole upon inspection depending on the phy sical condition of the pole.
inches from the butt of each pole. Make these letters not less than 5/8 inch high.
letters not less than 5/8 inch high. Attach a metal tag with these same 4 items to the wood pole.
661.2.1.2 Cable
determine if larger wire size is needed to keep the voltage dro p below 5 percent. 661.2.1.3 Guy, Span, and Messenger Wire
utility grade breaking strength of 15,400 pounds. 661.2.1.4 Guy, Span, and Messenger Wire Mounting Hardware
square washers, straight to angl e thimbleye bolts, thimble eyen uts, angle thimbleye eyes, ovaleye bolts, standard eye nuts, twiste d loop dead-end grips, 3 bolt g uy clamps, bolted deadends, serving sleeves, messenger hangers, drive hooks, sidewalk guy fittings, guy wire thimbles, guy strain insulators, guy safety markers, a nchor bolts, guy adapters, exp anding anchors, and screw anchors. Remove screw anchors upon completion.
Effective with the December 2018 Letting 499 2019 Standard Spec ifications (2) Furnish 5/8-inch minimum diameter bolts with square nuts. For eye hardware, use dropforged steel. Use galvanized metal hardware.
strength of 11,500 pounds. Fasten to the span pole using an ova leye bolt.
nominal diameter of 3/8 inch t hat accommodate 7-strand wire and have a minimum breaking strength of 11,500 pounds.
and minimum tensile strength of 12,000 pounds.
Attach the pole plate to the pole with one 5/8-inch machine bol t and two 1/2-inch by 4-inch minimum lag bolts.
pounds.
minimum rod diameter of 1 1/4 inches and 66 inches long. 661.2.1.5 Tether and Messenger Wire
with common grade breaking strength of 1900 pounds. 661.2.1.6 Temporary Traffic Signal Control Cabinet Base
stringers 4-inch square by a sp ecified length as needed. Seal b ases to prevent rodents from entering the cabinets. 661.2.1.7 Control Cabinet Approval
the cabinet and equipment conform to the contract. Submit copies to the region and to the department electrical engineer.
electronic components are in pr oper working condition, and the installation conforms to the contract. 661.2.2 Temporary Traffic Signals for Intersections
fittings for the tether wire conne ction, or the contractor may use a tether clamp assembly. Use hardware of unpainted aluminum or that is yellow, Federal Stand ard 595 - FS13538, in color. For traffic signal head mounting lock nuts, use 1 1/2-inch hexagon, galvanized malleable iron. Use nuts 1/2 inch thick and measuring 2 1/2 inches across flat to flat.
661.2.3 Temporary Traffic Signals for Bridges
661.2.4 Temporary Ramp Meters 661.2.4.1 Cable
conductor, 600 volt AC, cross-lin ked polyethylene insulated. Ensure that the 10 AWG USE current carrying neutral wire is white in color.
Effective with the December 2018 Letting 500 2019 Standard Spec ifications 661.2.4.2 Span Wire and Tether Wire Signal Head Mounting Hardw are
fittings for the tether wire conne ction, or the contractor may use a tether clamp assembly. Use hardware of unpainted aluminum or that is yellow, Federal Stand ard 595 - FS13538, in color. For traffic signal head mounting lock nuts, use 1 1/2-inch hexagon, galvanized malleable iron, class 150 pipe fitting. Use nuts 1/2 inch th ick and measuring 2 1/2 inches across flat to flat.
661.2.4.3 Splice Box
cover.
661.3Construction
661.3.1 General
wire, tether wire hardware, messenger wire hardware, guy wire, span wire, guy wire hardware, and span wire hardware, traffic signal cable, traffic signal faces mounting hardware, electrical service, traffic signal faces, traffic si gnal faces with backplates, inc luding providing, installing, and programming the controller with control cabinet as the plans show.
the engineer at least 5 working days before the requested inspection. Department region electrical personnel will perform the inspection.
661.3.1.1 Wood Poles, Class 4
of fill. Before attaching span w ires or messenger wires, rake p oles one foot at the top of the pole and guy if needed.
661.3.1.2 Wire and Cable
signal wiring diagrams.
department-approved adhesive t ape or UV resistant, outdoor rated nylon lock fasteners.
any opening in the insulation occu rs other than the end of the wire or cable, replace the wire or cable.
cover with plastic. Place the splice a minimum of 11 feet above finished grade level.
661.3.1.3 Temporary Traffic Signal Control Cabinet Base
and the bolt head flush with the pl ywood surface. Arrange stringers to be underneath all 4 sides of the cabinet.
temporary cabinet platform.
minimum length of 3 feet. Secure the anchors to the cabinet base with lag bolts. 661.3.1.4 Maintenance
heights throughout the project duration.
for view by the motoring public.
Effective with the December 2018 Letting 501 2019 Standard Spec ifications (3) Provide a primary contact as w ell as a backup contact assigned to and qualified to maintain temporary traffic signals. Submit names , addresses, and telephone numbers of contact persons to the engineer, local police, and county sheriff. Also post contact information on temporary traffic signal control cabinets and cover with weatherpr oof material. Ensure that a co ntact person is available 24 hours a day, 7 days a week, from the star t of the project until the tem porary traffic signal is not needed. Ensure that emergency calls are received by an individual and not by a n answering machine. 661.3.2 Temporary Traffic Signals for Intersections and Temporary Ramp Meter 661.3.2.1 Tether Wire Mounting Hardware
tether clips. Secure loose tether wire ends using serving sleeves. 661.3.2.2 Tether Wire
Use the tension control cable to maintain minimum height. Use a tension control cable consisting of tether wire and wire rope tether wire clips. Use 1/4-inch galva nized U-bolts on both ends, top and bottom, of the tension control cable to prevent movement. 661.3.2.3 Wire and Cable
splice boxes and pole guards. Gr ound each electrically isolated assembly at one end by mechanically attaching (lug or split bolt) the equipment-grounding conductor (6 AWG stranded copper wire) that terminates at a 5/8-inch by 8-f oot. grounding electrode installed at the wood pole base. For the equipment-grounding conductor use an exothermic weld or clamp t o the grounding electrode. Ensure grounding hardware is UL or NRTL listed. 661.3.2.4 Span Wire
bottom is a maximum of 19 feet above the roadway (minimum heigh t is 17 feet). Compute the vertical height of the span wire on the span pole using the following fo rmula: HD (0.05) + RC + HH = SH
minimum clearance over the roadway value.
measure up the pole t he distance SH from this mark. This is whe re the top span wire should dead end on the span pole.
661.3.2.5 Span Wire and Tether Wire Signal Head Mounting Hardw are
enable moving the signal head along the span as the engineer di rects. Neatly coil and attach the extra signal cable to the upper span wire until it is needed.
661.3.2.6 Implementation and Removal
operation of the sig nal to the engineer.
intersection over to the permanent cabinet installation. Remove signal cable and wires, wood poles, wood posts, control cabinet, control equipment, and incidental materials. Upon deactivation of the controller, call the electrical u tility immediately for the temporary electrical service disconnect.
Effective with the December 2018 Letting 502 2019 Standard Spec ifications (4) Immediately remove the wood poles and wood posts obstructing the view of the new permanent signal faces. Remove remaining wood poles and wood posts within 3 working days of new permanent signal activation.
inches with engineer-approved material. 661.3.2.7 Maintenance
limited to knockdowns, signal cable problems, and controller equipment failures. If equipment becomes damaged or faulty beyond repair, replace it within one working day. In order to fulfill this requirement, maintain, in stock , sufficient materials and equipment to provide repairs. Replace the traffic signal control equipmen t including the cabinet, controller, and cabinet accessories within 4 hours.
controlled lane. The far right signal shall be mounted over the center of the right through lane. The far left turn signals shall be suspended straight ahead of the left turn lane. 661.3.3 Temporary Traffic Signals for Bridges 661.3.3.1 General
conduit.
a solar powered charging system and a backup power source. Do n ot use gasoline powered equipment.
responsible contact person respond to the project site, within 1/2 hour of receivi ng a call, for any emergency to the electrical supply system.
connect the generators to the temporary traffic bridge signal. The engineer will determine the location of the generators in the field. 661.3.3.2 Messenger Wire
661.3.3.3 Messenger Wire Hardware
661.3.3.4 Wood Posts
of fill.
661.3.3.5 Implementation and Removal
signal to the engineer.
traffic signal is no longer needed, remove the signal cable, messenger wire, wood poles, wood posts, control cabinet, control equipment, and incidental materials. U pon deactivation of the controller, call the electrical utility immediatel y for the temporary electrical service disconnect.
material. Compact the material in 12-inch lifts. 661.3.3.6 Maintenance
limited to knockdowns, signal cable problems, and controller equipment failures. If equipment becomes damaged or faulty beyond repair, replace it. In order t o fulfill this requirement, maintain, in
Effective with the December 2018 Letting 503 2019 Standard Spec ifications stock, sufficient materials and equipment to provide repairs. Replace the traffic signal control equipment including cabinet, controller, and cabinet accessories within 2 hours. 661.3.4 Temporary Ramp Meter
the region freeway operations personnel who will verify ramp ti mings and validate communications.
661.4Measurement
Intersections, and Temporary Ramp Meter bid items as a single l ump sum unit for each structure or intersection acceptably completed.
day operation.
661.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
661.0100 Temporary Traffic Signals for Bridges (structure) LS
661.0200 Temporary Traffic Signals for Intersections (location) L S
661.0300 Generators DAY
661.0700 Temporary Ramp Meter (location) LS
and Temporary Ramp Meter bid items is full compensation for providing, operating, maintaining, and repairing the complete temporary installation; and for removal. Payment also includes the following:
including fuel and oil; for providing and locating a backup generator at the site; and for providing flaggers.
Effective with the December 2018 Letting 504 2019 Standard Spec ifications Section 670 General Requirements for Intelligent Transportation Systems (ITS)
670.1Description
requirements used to perform ITS work.
670.2Materials
670.3Construction 670.3.1 General
670.3.2 Personnel Qualifications 670.3.2.1 Field System Integrator
integrator selected from the department's approved field system integrator list. The field system integrator provides assistance a nd expertise to the contractor in the areas of equipment installation, operation, integration with existing equipment, testing, and ne twork management for ITS installations including traffic signal communications.
and functions properly. The field system integrator also helps submit material lists, shop drawings, documentation, as-builts, test r esults, training and operation manuals as well as associated presentations, wiring schematics, and equipment test procedures .
progress meetings beginning with in one month after ITS work under the contract begins. Hold additional meetings at least monthly while ITS work under the c ontract is scheduled. The department defines ITS work as operations r equired under the contract related to electrical work. 670.3.2.2 Certified Fiber Optic Technician
Have a certified fiber optic tec hnician supervise all fiber optic cable installation.
- Education: attend and successfully complete at least one 4-da y class on installation of fiber optic products conducted by major manufacture r and have FOA certification. - Work history: demonstrate a minimum of 2 years work experience in the last 5 years with splicing, termination, and testing of fiber optic cable.
communications equipment and material. 670.3.3 Testing 670.3.3.1 Contractor-Furnished Equipment and Materials
engineer's satisfaction that equipment is calibrated and in wor king order.
in contract.
and dates.
testing. The department may approv e rejected material but is not considered acceptance for equipment or material until final post-installation testing. 670.3.3.2 Department-Furnished Equipment and Materials
they conform to contract requirements and function properly. No tify the department w ithin 3 days if the inspection identifies defective equipment or materials. The dep artment will replace whatever is defective.
is responsible for replacing defective equipment and materials.