Effective with the December 2018 Letting 509 2019 Standard Spec ifications Section 674 Intelligent Transportation Systems - Cable
674.1Description
cable.
674.2Materials
674.2.1 ITS Communication Cable
individual pairs 12 turns pe r foot within the cable.
with color-coded polyethylene insulation, black polyethylene ou ter jacket, and aluminum tape shield between jackets required to conne ct ramp meter and detector pro cessor assemblies. 674.2.2 Microwave Detector Cable
polyethylene outer jacket, aluminu m tape shield between jackets , and gel filled. The pair-utilization shall be as follows: Pair 1: power. Pair 7: detection zone contact closure. Pairs 2 and 3: RS-232 bus for l aptop computer. Pair 8: detection zone contact closure. Pair 4: detection zone contact closure. Pair 9: detection zone contact closure. Pair 5: detection zone contact closure. Pairs 10 through 12: sp are. Pair 6: detection zone contact closure.
674.3Construction
674.3.1 ITS Communication Cable
communication cable as the plans show.
to transmit and share data communications between cabinets.
run over by any vehicle or equipm ent. Do not pull along the gro und, or over or around obstructions.
tape. Keep sealed until termination. For cable not immediately terminated, provide a 4-foot length of cable extending out of t he cabinet opening.
cable.
opening in conduit or du ct, unless the engi neer approves. Pull the necessary length to be installed from the pull box or cabinet to the immediate next downstream p ull box or cabinet. C arefully store remaining length of copper communication cable to prevent damag e and in a manner not hazardous to pedestrian or vehicular traffic. Cable shall enter a pull box or cabinet directly from the cable reel or storage directly out of the immediate downstream pull box or ca binet.
corners, over or around obstructions, or through unnecessary cu rves or bends. Copper communication cable shall be looped in and out of cabinets and pull boxes to provide adequate slack and minimize stress on conductors.
jacket or 80 percent of the manufacturer's maximum pulling tension whichever is smaller.
Lubricate as it is fed off of the ca ble reel or st orage stack i nto the cable feeder. Place lubricator funnel around the cable just ahead of the feeder. After installation, clean the copper communication cable with a cloth at a pull box o r cabinet before leaving.
minimum of 6 feet for cabinets.
Effective with the December 2018 Letting 510 2019 Standard Spec ifications (12) Terminate cable pairs entering a cabinet on termination blocks located in cabinets in a neat and orderly fashion and according to the REA color code. Ground cable shield for each run at only one of the termination locations. Attach 8 AWG grounding wire to the s hield with an engi neer-approved clamp according to REA PC-2.
- Use a megger to test the ground resistance of all conductors including the shield, and conductor-to- conductor, including all indivi dual conductors to the shield. E nsure that conductor tests, including the shield, read greater than 500 mega ohms to ground, and from con ductor to conductor and all individual conductors to the shield, read greater than 500 mega ohms. Repl ace cable with one or more failing tests. - Test continuity of each pair to show a resistance of not more than 8 ohms per 1000 feet of conductor. Use meter with a minimum input resistance measurement of 20,000 ohms per volt. 674.3.2 Microwave Detector Cable
processor assembly as the plans show.
or equipment. Do not pull along t he ground, or ov er or around o bstructions.
sealed until connectors are installed.
- Use a megger to test the grou nd resistance of conductors incl uding the shield, and conductor-to- conductor, including all indivi dual conductors to the shield. E nsure that all conductor tests, including the shield, read greater than 500 mega ohms to ground, and from con ductor to conductor and all individual conductors to the shield, read greater than 500 mega ohms. Repl ace cable with one or more failing tests. - Test continuity of each pair to show a resistance of not more than 8 ohms per 1000 feet of conductor. Use meter with a minimum input resistance measurement of 20,000 ohms per volt. 674.3.3 Removing Cable
existing cable connections from the cabinet or remove splices.
document existing damage shall ma ke repair the responsibility o f the contractor. 674.3.4 Reinstalling Cable
protection from oil, moisture, and corrosion.
QPL.
674.4Measurement
completed, measured along the c enterline of the conduit, including slack between terminations within the ramp meter processor assemblies.
measured along the centerline o f the conduit, including slack t o its connection with the proper terminals in the processor assembly cabinet.
the centerline of the conduits rem oved between 2 points such as pull boxes, manholes, or other points defined.
the centerline of the conduit run in which the group of cables was reinstalled.
Effective with the December 2018 Letting 511 2019 Standard Spec ifications 674.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
674.0100 - 0199 Cable ITS Communication (pairs) LF
674.0200 Cable Microwave Detector LF
674.0300 Remove Cable LF
674.0400 Reinstall Cable LF
making connections and testing installed cable system; and for disposing of surplus material.
making necessary connections; and for testing.
and terminations, including wire nuts, splice kits, tape, insul ating varnish or sealant, and ground lug fasteners; and for testing.
connections, including wire nuts, splice kits, tape, insulating varnish or sealant, and ground lug fasteners; and for testing.
mega ohms.
Effective with the December 2018 Letting 512 2019 Standard Spec ifications Section 675 Controllers and Detectors
675.1Description
assemblies, and microwave detectors.
675.2Materials
675.3Construction
starting any work as specified in 670.
that the series resistance of each circuit is less than 5 ohms. Ensure that the insulation resistance of loop conductors to ground, and between adjacent loops/lead-in c ircuit is greater than 500 mega ohms as measured with a 500 volt megger test meter.
responsibility for the ultimate correct operati on of the loop/lead-in.
locations the plans show. Provide bolted stainless steel connections with lock washers, locking nuts, or other engineer-approved means to prevent the connection nuts from backing off. Isolate dissimilar materials from one another by stainless steel fittings.
provide the required operation.
cabinet as specified in 658.
the neutral bus from the cabinet and equipment ground. Terminat e the neutral bus at the neutral lug ultimately attached in the meter pedestal.
assembly cabinet to the equipment-grounding terminal strip.
cabinet current carrying neutra l at the current carrying neutra l ground lug in the meter pedestal or breaker disconnect box.
engineer directs otherwise. Wiring includes bonding wire, condu ctors and loop detector lead-in cable, and loop detector wire.
interface modems at locations the plans show.
firmware on contractor-supplied EPROM's. Pick up the EPROM's with firmware from the department, and install it into each controller before installation.
procedure, perform the new loop/ lead-in circuit series resistance test and resistance to ground test. Ensure that the series resistance of each circuit is less than 5 ohms. Ensure that the insulation resistance of loop conductors to ground, and between adjacent l oop/lead-in circui t, is greater than 500 mega ohms as measured with a 500 volt megger test meter. Docume nt the test results, and submit them to the engineer as part of t he set up to begin the testing procedure.
that the traffic flow information obtained from each detector i s within +/- 5 percent of each of two 10- minute manual data periods.
detection hardware, communications hardware, power supply, and connecting cabling; and successfully completing, docum enting and presenting, to the eng ineer, testing and verification, the field system integrator, followi ng the contractor-submitted and engineer-approved te sting procedure, shall successfully conducted a fi eld test for each processor as sembly. The test is designed to demonstrate that hardware, cable, and connections furnished and installed by the contractor operates