Effective with the December 2018 Letting 512 2019 Standard Spec ifications Section 675 Controllers and Detectors
675.1Description
assemblies, and microwave detectors.
675.2Materials
675.3Construction
starting any work as specified in 670.
that the series resistance of each circuit is less than 5 ohms. Ensure that the insulation resistance of loop conductors to ground, and between adjacent loops/lead-in c ircuit is greater than 500 mega ohms as measured with a 500 volt megger test meter.
responsibility for the ultimate correct operati on of the loop/lead-in.
locations the plans show. Provide bolted stainless steel connections with lock washers, locking nuts, or other engineer-approved means to prevent the connection nuts from backing off. Isolate dissimilar materials from one another by stainless steel fittings.
provide the required operation.
cabinet as specified in 658.
the neutral bus from the cabinet and equipment ground. Terminat e the neutral bus at the neutral lug ultimately attached in the meter pedestal.
assembly cabinet to the equipment-grounding terminal strip.
cabinet current carrying neutra l at the current carrying neutra l ground lug in the meter pedestal or breaker disconnect box.
engineer directs otherwise. Wiring includes bonding wire, condu ctors and loop detector lead-in cable, and loop detector wire.
interface modems at locations the plans show.
firmware on contractor-supplied EPROM's. Pick up the EPROM's with firmware from the department, and install it into each controller before installation.
procedure, perform the new loop/ lead-in circuit series resistance test and resistance to ground test. Ensure that the series resistance of each circuit is less than 5 ohms. Ensure that the insulation resistance of loop conductors to ground, and between adjacent l oop/lead-in circui t, is greater than 500 mega ohms as measured with a 500 volt megger test meter. Docume nt the test results, and submit them to the engineer as part of t he set up to begin the testing procedure.
that the traffic flow information obtained from each detector i s within +/- 5 percent of each of two 10- minute manual data periods.
detection hardware, communications hardware, power supply, and connecting cabling; and successfully completing, docum enting and presenting, to the eng ineer, testing and verification, the field system integrator, followi ng the contractor-submitted and engineer-approved te sting procedure, shall successfully conducted a fi eld test for each processor as sembly. The test is designed to demonstrate that hardware, cable, and connections furnished and installed by the contractor operates
Effective with the December 2018 Letting 513 2019 Standard Spec ifications correctly and that all functions are in conformance with the sp ecifications. It is not necessary to test all locations concurrently.
- Testing of new and existing loop detectors. - Testing of ramp control signal wiring. - Submission of documented results to the engineer. - Installation of ramp signing and pavement marking, including HOV and trailblazing.
engineer that it is ready to begin the test, the processor is c ommunicating to central, and documentation has been presented. B egin the test once the field system integrator has satisfied itself that work has been completed at each processor assembly locatio n. After the processor assembly has been placed in operation, the field system integrator shall demonstrate that equipment furnished and installed by the contractor operates as specified.
for 30 consecutive days. During the testing period, ensure that contractor-provided equipment at the assembly location operates without failures of any type. If any component malfunctions or fails to provide the specifie d capabilities, durin g the 30-day test period, the field system integrator shall replace or repair the defective equipment within 48 hours of th e engineer's notification.
30-day test period. The 30-day te st applies only to contractor- furnished hardware. In the event of a failure of hardware fu rnished by others that prevents the 30-da y test from continuing, the engineer will suspend the 30-day test until the other hardware failures are c orrected, at which time the test will resume.
675.4Measurement
completed. 675.5 Payment
items: ITEM NUMBER DESCRIPTION UNIT
675.0100 Install Controller Ramp Meter Processor Assembly EACH
675.0200 Install Controller Detec tor Processor Assembly EACH
675.0300 Install Mounted Controller Microwave Detector Assembly EACH
Processor Assembly is full comp ensation for installing the processor assembly, for making connections, and for testing.
installing the mounting brackets on poles, for installing the microwave detector on the bracket, for making connections, for positioni ng the detector to provide the optimum field of view, for setting up and programming the detector, and for testing.
exposed during the 30-day testi ng period. The department will not make complete payment under a bid item in this section until eac h processor assembly completes a successful test over 30 consecutive days without interruption by any contractor-furnished component malfunction.
Effective with the December 2018 Letting 514 2019 Standard Spec ifications Section 677 Cameras
677.1Description
lowering systems.
677.2Materials
provisions.
and camera control data between t he camera assembly and the cam era controller assembly. Conform to the following:
polyethylene jacket. Furnish cabl e consisting of 4-pairs of 24 AWG solid copper conductors and according to ANSI/TIA/EIA 5 68A Category 5 e, CENELEC EN50173, ICEAS-90-6 61, and ISO/IEC 11801.
jacket. Furnish MSHA approved and RoHS compliant cable accordin g to CSA flexible cord - C22.2-49.
677.3Construction
bases at locations the plans show and conforming to 657. Install contractor-fur nished identification plaques as the plans show.
form DT2321. Complete department form DT2321 for each structure. Indicate the parties responsible for the installation and submit the form to the engineer for in clusion in the permanent project record.
necessary to make the proposed cl osed circuit television (CCTV) system complete from the source of supply to the most remote unit.
Deliver the assemblies to the job site as complete units, and install units on top of the camera poles using a pole mounting adapter as the plans show.
to the pole. Electrically bond the pan/tilt drive to the mounti ng adapter.
motion, the orientation of the camera's line of sight is as the plans show.
splices between the camera assembly and the camera controller a ssembly.
Workmen should not step on cable or run over by any vehicle or equipment. Do not pull the cable along the ground or over or around obstructions.
QPL. Do not use tape to seal the cable end. Keep the cable end sea led until connectors are installed.
test the installed camera cable between the camera assembly and the camera controller assembly. Successfully perform the follo wing tests before any connections are made.
reflectometer (MTDR) with chart recorder. Camera cable shall no t exhibit any discontinuities such as opens, shorts, crimps, or defects.
5, class E compliance. Repair c onnections or cable as needed fo r the test to register a “Pass”.
shielding using a megger. Ensur e that the resistance is greater than 500 mega ohms.
replace the cable at no expense to the department. Retest the n ew cable as specified above.