Effective with the December 2018 Letting 514 2019 Standard Spec ifications Section 677 Cameras
677.1Description
lowering systems.
677.2Materials
provisions.
and camera control data between t he camera assembly and the cam era controller assembly. Conform to the following:
polyethylene jacket. Furnish cabl e consisting of 4-pairs of 24 AWG solid copper conductors and according to ANSI/TIA/EIA 5 68A Category 5 e, CENELEC EN50173, ICEAS-90-6 61, and ISO/IEC 11801.
jacket. Furnish MSHA approved and RoHS compliant cable accordin g to CSA flexible cord - C22.2-49.
677.3Construction
bases at locations the plans show and conforming to 657. Install contractor-fur nished identification plaques as the plans show.
form DT2321. Complete department form DT2321 for each structure. Indicate the parties responsible for the installation and submit the form to the engineer for in clusion in the permanent project record.
necessary to make the proposed cl osed circuit television (CCTV) system complete from the source of supply to the most remote unit.
Deliver the assemblies to the job site as complete units, and install units on top of the camera poles using a pole mounting adapter as the plans show.
to the pole. Electrically bond the pan/tilt drive to the mounti ng adapter.
motion, the orientation of the camera's line of sight is as the plans show.
splices between the camera assembly and the camera controller a ssembly.
Workmen should not step on cable or run over by any vehicle or equipment. Do not pull the cable along the ground or over or around obstructions.
QPL. Do not use tape to seal the cable end. Keep the cable end sea led until connectors are installed.
test the installed camera cable between the camera assembly and the camera controller assembly. Successfully perform the follo wing tests before any connections are made.
reflectometer (MTDR) with chart recorder. Camera cable shall no t exhibit any discontinuities such as opens, shorts, crimps, or defects.
5, class E compliance. Repair c onnections or cable as needed fo r the test to register a “Pass”.
shielding using a megger. Ensur e that the resistance is greater than 500 mega ohms.
replace the cable at no expense to the department. Retest the n ew cable as specified above.
Effective with the December 2018 Letting 515 2019 Standard Spec ifications (18) The ATMS field system integrato r shall submit copies of the test results, including any unsuccessful and subsequently successful tests to the engineer before any field operations testing.
other associated devices.
control receiver.
control selection and operation, washer/wiper, and power on/off functions while observi ng the video picture on a portable video and waveform monitor.
monitor to verify NTSC Standards.
tested and the new cameras have been integrated into the existi ng central camera controller, the ATMS field system integrator sha ll test the intertie with the c entral camera control hardware and new CCTV system components installed under this contract. The tests shall include the following:
conform to the specifications.
iris opening, and washer and wiper functions while observing th e video picture on the local monitor and on monitors at central.
on for 30 consecutive days. Duri ng this period, ensure that mat erials and components of the CCTV subsystem furnished and installed operate as specified and with out any failure.
below the level specified, the department will terminate the test period, and will require the ATMS field system integrator to determine and correct the problems, including repair or replacement of equipment, at no cost to the department. Upon correction of the problems, the engineer will start a new 30-day test period. If a malfunction is the result of equipment not installed by the contractor, the engineer will suspend the acceptance test period until the resp onsible party corrects these problems.
677.4Measurement
individual unit acceptably completed.
677.5Payment
items: ITEM NUMBER DESCRIPTION UNIT
677.0100 - 0199 Install Camera Pole (length) EACH
677.0200 Install Camera Assembly EACH
poles including materials, mounting adapter, and camera lowing system, hardware, and fittings necessary to completely install the pole.
assemblies on camera poles; for providing camera cables; and fo r installing the camera controller assembly, control receiver, and connections.
Effective with the December 2018 Letting 516 2019 Standard Spec ifications Section 678 Communication Systems
678.1Description
678.2Materials
678.2.1 Department-Furnished Materials
wireless antennas, and cellular modems.
- Furnish cables between ethernet switches and terminal servers or other devices. Furnish outdoor rated cables between wireless antennas and other devices. Furnish Rs-232 patch cables and Cat 5 (E10/100) cables as well as connectors between cellular modems and other devices. Furnish a 19-inch rack mountable shelf. 678.2.2 Fiber Optic Terminations
ferrule. 678.2.3 Communication System Testing
Test equipment will remain contractor's property. Use equipment consisting of, but not limited to, the following: - Optical time domain reflectometer (OTDR). - Optical source/power meter. - Patch cabling. - OTDR software.
678.3Construction
678.3.1 Fiber Optic Cable
and a track pushing mechanism. Do not use a single pull tape fo r more than a single cable pull. Install the pull tape and fiber optic cables according to the testing p rocedures completed for this project and the pull tape and cable manufac turer’s recommendations.
duct. Follow these procedures reg ardless of the manufacturer of the cable. If the cable manufacturer recommends an operation in conflict with these procedures, subm it a request for installation procedure change to the department for approva l. Do not exceed a maximum pulling tension of 608 pounds-force during installation and 200 pounds-force after installation.
run. If elevated attenuation due to exceeding the pulling tensi on during installation is determined, replace that cable run. 678.3.2 Fiber Optic Splices
forth in 678.3.4.
shrink coating before placement in a sleeve or housing. Install the heat-shrink coating in to protect the fiber from scoring, dirt, accumulation, moisture intrusion, and micro bending.
enclosure units.
according to Siecor recommended procedure SRP-004-013 for mid-s pan access of fiber optic cable with cable slack present, or appropriate manufacturer instructi ons. Contain mid-span splices within enclosures.