202.1-DESCRIPTION: This work shall consist of the demolition of buildings and the abandonment of Septic Tanks, Water Wells, Gas Wells, Oil Wells and appurtenances as are specifically designated on the Plans. It shall include rodent control, disconnecting utilities, salvaging and disposing of the resulting materials in the manner and subject to the conditions and regulations prescribed. The Contractor shall obtain all necessary permits, bonds and licenses required for this work and must provide them to the Engineer prior to commencing the work 202.2-UTILITIES: The Contractor shall be solely responsible for making all necessary arrangements and for performing any necessary work to the satisfaction of the utility companies and municipal departments involved in connection with the discontinuance or interruption of all public utilities or services, such as gas, water, sewage, electricity, and telephone, which may be affected by the work to be done under the demolition specified. 202.3-DISPOSAL OF MATERIALS: Materials resul ting from demolition shall be disposed of by the Contractor at a West Virginia Division of Natural Resources approved landfill. Any material that is considered hazardous material must be disposed of at an approved site. 202.4-BUILDINGS: Buildings and appurtenances shall be removed to the existing ground level, which operation shall include removal of concrete slabs or any other type of floor resting upon the ground. Basements shall be cleared of all debris, appliances, wood or metal partition walls, wood floors, etc., so that only the foundation walls and basement floor remain. The basement floors shall be shattered. If pits, trenches, holes, or basements are not to be elimina ted in subsequent excavation operation, they shall be backfilled. All backfill within the roadway prism shall be accomplished in accordance with the requirements of Section 207. Compaction of backfill outside the roadway prism shall be performed so as to obtain a minimum density equal to that of the surrounding ground. The demolition shall conform to the schedule of construction set up for the project. 202.4.1-Rodent Control: When specified in the Contract, the following rodent control provisions shall apply. 202.4.1.1-General: The Contractor shall furnish and place suitably prepared bait containing rodenticide in and around buildings to be demolished and shall also furnish and place insecticide for control of ectoparasites. Two rodenticide treated baits differing in content and method of placement will be required within 24 hours after receipt of notification to proceed. The Contractor shall place rodenticide treated bait within the building demolition area. If the rodent contr ol measures are not promptly furnished by the Contractor, the Division may provide the measures as required and deduct the cost from the money due the Contractor. 202.4.1.2-Materials: The rodenticide treated bait shall consist of the following:
Division 700 — as follows:
MATERIAL SUBSECTION Bentonite 715.45 ** Concrete 601 ** Class D with or without air entrainment at the option of the Contractor. 202.5.2-Gas and Oil Wells: The well shall be plugged using bentonite and cement as provided for by law, and the work shall be accomplished by a qualified service company meeting the approval of the Department of Environmental Protection office of Oil and Gas. All work pertaining to plugging the well must be performed under the supervision of the representative of the DEP office of Oil and Gas. The Contractor shall notify the Project Engineer and the DEP office of Oil and Gas at least 14 days in advance of the date on which the Contractor intends to begin work. The Division will make available upon request copies of regulation Title 35 Series 4 and
Article 6 — , Chapter 22 of the Gas and Oil Laws. The Contractor shall obtain a permit from DEP
office of Oil and Gas and must follow all procedures prescribed in the permit. 202.5.3-Water Wells: The Contractor shall plug all drilled water wells within the right - of-way limits prior to starting any other work in the vicinity of the wells. The well casing shall be pulled as much as practical and then filled from the bottom to the top with bentonite, concrete or a mixture of concrete and 5% bentonite to the ground surface. This operation shall be continuous. The Contractor shall obtain a permit to abandon a water well from the County Sanitarian or State Health Department and must follow all procedures prescribed in the permit. 202.6-SEPTIC TANKS: A septic tank that serves a building that is being demolished shall be abandoned as follows: The contents of the septic tank shall be removed by a licensed septic tank clean er and the tank removed and disposed of at an approved landfill. The excavation made to remove the tank shall be backfilled with material free of sod, trash, organic substances and muck. The backfill shall be compacted as outlined in 202.4. 202.7-METHOD OF MEASUREMENT: The unit of measurement will be lump sum value as determined for each building to be demolished and removed, each water well abandonment, each septic tank abandonment, each gas well abandonment, or each oil well abandonment. 202.8-BASIS OF PAYMENT: The Building Demolition shall constitute full compensation for performing all of the requirements of this item, including furnishing all material, labor, tools, equipment, supplies, rodent control and incidentals thereto. Salvageable materials shall become the property of the Contractor, unless otherwise indicated on the Plans or in the Proposal. The water wells, gas wells, oil wells, or septic tanks abandoned as provided above will be paid for at the contract price per each and shall be full compensation for performing all of the requirements of the item, including furnishing all material, labor, tools, equipment, supplies, permits, and incidentals thereto. 202.9-PAY ITEMS: ITEM DESCRIPTION UNIT 202001-* Building Demolition Number, “x” / ”y” Lump Sum 202002-* Water Well Abandonment Number, “x” / ”y” Lump Sum 202003-* Septic Tank Abandonment Number, “x” / ”y” Lump Sum 202004-* Gas Well Abandonment Number, “x” / ”y” Lump Sum 202005-* Oil Well Abandonment Number, “x” / ”y” Lump Sum * Sequence number x = parcel number y = building, well, or septic tank number
Get an email when 202 changes
West Virginia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.