Division 200 — Earthwork

203Dismantling Structures

WV · 2023 Standard Specifications✓ Full text on BuildSpecBook pages 115–117 Save this section

Ask about Section 203

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

203.1-DESCRIPTION: This work shall consist of dismantling such structure or structures specifically designated on the Plans for removal, match marking, handling and storage if called for, or disposal if required. The Contractor is responsible for determining the current condition of the structure (s) and shall use methods and procedures for dismantling the structures in a safe and efficient manner. Bridge inspection reports are available for informational purposes and may be viewed at the following location: West Virginia Division of Highways 1900 Kanawha Boulevard East Building 5, Room A-350, Operations Division Charleston, West Virginia 25305 The work shall also include the preparation of a demolition/dismantling plan by the contractor. The plan shall be prepared and sealed by a Professional Engineer registered in the State of West Virginia, experienced in structural analysis of bridges. The plan shall include a complete structural analysis for all phases of the demolition/dismantling with due regard to the existing condition of the structure at the time the work is performed. Additionally, the analysis shall show that the structure meets the design criteria of the latest edition, including all Interims, of the AASHTO Standard Specifications for Highway Bridges, or the AASHTO LRFD Bridge Design Specifications during all phases of demolition/dismantling. The design loads shall match those applied to the structure by the contractor’s “means and methods” of demolition/dismantling. The demolition/dismantling plan shall be provided to the Division’s Project Supervisor at least seven (7) calendar days prior to the beginning of any demolition/dismantling work. Receipt of the demolition/dismantling plan does not constitute review or approval or relieve the Contractor of his/her responsibility to satisfactorily demolish/dismantle the structure specified. 203.2-MATERIALS: Not specified. 203.3-CONSTRUCTION METHODS: The work shall include dismantling and storing, or disposing of designated structures by such methods as specified on the Plans. If the old structure is remain the property of the Division, it shall be carefully dismantled without unnecessary damage, the parts match marked, and carefully stored or erected as required by the Plans or as directed by the Engineer. Unless otherwise noted in the plans, all material removed shall become the property of the contractor and shall be removed. Disposal, if required, shall be accomplished in accordance with the provisions of 201. The final ground around dismantled structures shall conform to the final grading plan or shall be graded to drain as directed by the Engineer. The bridge may contain lead base paint and the Contractor shall provide protection for their Workers as per the requirements of 29 CFR 1926.62. 103 203.4-METHOD OF MEASUREMENT: "Dismantling Structures" will be measured as a complete unit and shall include the complete execution of the work of dismantling, handling, storing, or removing all of the structures so designated. 203.5-BASIS OF PAYMENT: The quantity, determined as provided above, will be paid for at the contract lump sum price bid for this item, which price and payment shall be full compensation for completing the item, including removal and disposition of all falsework, debris and refuse resulting from the work, leaving the premises in good condition. The cost of preparation and transmittal of the demolition/dismantling plan shall be included in the lump sum bid for Item 203001-*. 203.6-PAY ITEM: ITEM DESCRIPTION UNIT 203001-* Dismantling Structure Lump Sum * Sequence number 104

Get an email when 203 changes

West Virginia revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Standard Specifications for Roads and Bridges, 2023 Edition. Pages 115–117 of 1,006. View official source ↗

Ask about this section

Scoped to West Virginia Standard Specifications for Roads & Bridges, Section 203 — Dismantling Structures. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.