B
HomeLibrariesCopilotSearchProjectsBookmarks
FeedbackHelp Desk
Libraries
Building Codes
Code LibraryIBC — BuildingIRC — ResidentialIFC — FireIPC — PlumbingIMC — MechanicalIFGC — Fuel GasIECC — EnergyNEC — ElectricalModel Codes
Specifications
CSI SpecificationsDOT SpecsTransit SpecsUSACE
Standards
TransportationRailroadFire SafetyAccessibilityStructural
Tools & References
DiagramsAssembliesProductsCalculatorsChecklistsPermits
PricingLog in
General

302LS

WY · 2021 Standard SpecificationsBook pages 00View official source ↗

=

Lot size for Blended Base or Blended Subbase pay item (ton [t], CY [m3])

VU

=

Percent virgin crushed base

224

Vacant

225

Vacant

226

Vacant

227

Vacant

228

Vacant

229

Vacant

230

Vacant

231

Stockpiled Aggregate

310.1DESCRIPTION

This section describes the requirements for furnishing and placing aggregate in stockpiles.

310.2MATERIALS

1 Provide materials in accordance with the following:

Material

Subsection

Aggregates Sodium Chloride

803

803.12.4

310.3EQUIPMENT

1 Unless otherwise approved by the engineer, use a pugmill capable of thorough and

consistent blending to mix water and aggregate or sodium chloride and aggregate.

310.4CONSTRUCTION

310.4.1 General 1 Furnish, deliver, and place aggregate in stockpiles at designated sites.

Ensure that the sites are firm, smooth, and well drained. When required, clear and grub sites in accordance with Section 201, Clearing and Grubbing. Remove and stockpile topsoil in accordance with Section 207, Topsoil. 2 To prevent the intrusion of soil or foreign material, place a bed of the same aggregate

being stockpiled under the stockpile. Make the bed at least 6 in [150 mm] deep, and extend it at least 10 ft [3 m] beyond the edge of the stockpile. 3 To prevent mixing, separate stockpiles of different types or sizes of aggregates by spacing

them at least 30 ft [10 m] apart or by using suitable walls or partitions. 4 Do not use stockpiling methods that allow contamination or excessive degradation of the

aggregate. The engineer will use gradation tests to evaluate degradation. If samples fail to meet gradation requirements, the engineer will reject stockpiled aggregates. Change stockpiling procedures to provide the specified gradation. 5 When specified, blend sodium chloride uniformly with the aggregate.

[mass] tickets with each load of sodium chloride.

232

Furnish weigh

Stockpiled Aggregate

Source: Wyoming Standard Specifications for Road and Bridge Construction, 2021 Edition. Pages 00 of 771.