Service Mast Requirements — Overhead Clearances & Support
A service mast has one structural job — holding up the utility’s service drop — and one code job: keeping those conductors far enough from people, vehicles, roofs, and windows. The clearance numbers in NEC 230.24 are the heart of it, and the utility’s own standards layer on top, so a mast job always means checking two rulebooks.
Worth knowing
- The utility’s service standards manual governs the drop itself and often dictates mast diameter (2-inch rigid metal conduit is the common minimum), attachment hardware, and roof flashing details — get their spec sheet before buying material.
- Couplings in the mast above the roofline are prohibited by most utilities and many inspectors because they create a hinge point — use a single length of rigid conduit through the roof.
- A mast bent by drop tension is a common storm-damage finding; where the drop span is long, guying or a stouter mast is cheaper than the repair, which usually involves the utility, a permit, and an emergency electrician.
- These rules cover overhead services; underground (lateral) services trade clearance problems for burial depth and conduit rules in NEC 300.5.
Common questions
What does the code say about clearance above grade for Service Mast?
Service-drop conductors need 10 feet of clearance above finished grade and walkways (measured from the lowest point of the drip loop), 12 feet over residential driveways, and 18 feet over public streets and roads subject to truck traffic. (NEC 230.24(B))
What does the code say about clearance over roofs for Service Mast?
Conductors passing over a roof generally need 8 feet of vertical clearance, reduced to 3 feet where the roof slope is 4-in-12 or steeper. (NEC 230.24(A))
What does the code say about overhang exception for Service Mast?
Where conductors cross only the roof overhang and terminate at a through-the-roof mast, clearance can drop to 18 inches — provided no more than 6 feet of conductor passes over no more than 4 feet of roof measured horizontally. (NEC 230.24(A) Exc. 3)
Adopted edition by state
Base-code year from BuildSpec’s adoption records. States often amend the base code, and your city or county may differ, so confirm with your building department.