B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

ArizonaGlendale

Shed permit checklist — Glendale, Arizona

Assembled from Glendale’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Glendale requires a permit for a shed.

When a permit is not required

An accessory structure of 120 square feet or less does not require a building permit; a structure below 120 square feet that exceeds a building height of 6 feet is not required to submit a building permit but does need to comply with accessory structure building setbacks. Movable or manufactured structures such as children's play equipment, trash enclosures, tool or storage sheds, and pet shelters smaller than 120 square feet in area and less than 6 feet in height may be placed within a required rear or side yard setback, but not in a required landscape setback, and must be behind a property screen wall or behind the nearest front plane of the principal building where such a wall does not exist.

Loading the full checklist…

Sources

Other permits Glendale publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Glendale permit requirementsGlendale permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Glendale before you build.

Shed permit checklist — Glendale, Arizona | BuildSpec