B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

ConnecticutBridgeport

Retaining wall permit checklist — Bridgeport, Connecticut

Assembled from Bridgeport’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Bridgeport requires a permit for a retaining wall.

When a permit is not required

Under Connecticut State Building Code Section 105.2, as posted on the City's Work Exempt from Building Permits page, a retaining wall qualifies for the building permit exemption when it stands 3 feet or less, taking the measurement between finished grade at the wall's bottom and finished grade at its top; a wall of any height that supports a surcharge or holds back Class I, II or III-A liquids needs a permit.

Loading the full checklist…

Sources

Other permits Bridgeport publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Bridgeport permit requirementsBridgeport permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Bridgeport before you build.

Retaining wall permit checklist — Bridgeport, Connecticut | BuildSpec