B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Code LibraryDiagramsAssembliesProductsCalculatorsChecklistsCSI MasterFormat SpecificationsPermitsAddress ReportDOT SpecsModel CodesTransportationRailroadFire SafetyAccessibilityStructuralTransit SpecsUSACE
Other Jurisdictions
Transportation
MUTCDFHWA FP-14
Accessibility
ADA StandardsPROWAG
PricingLog in

MainePortland

General building work permit checklist — Portland, Maine

Assembled from Portland’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

Portland requires a permit for general building work.

When a permit is not required

Certain smaller activities may not require a building permit, and the property owner is still responsible for meeting code requirements, with historic preservation standards potentially still applying. Examples of projects that do not need permits include re-shingling a roof or re-siding a building, as long as no structural changes are made; replacing windows in buildings of up to 4 residential dwelling units, as long as no changes to the framing are made, though escape window requirements may still apply; and fences that are 7 feet or less in height.

Loading the full checklist…

Sources

Other permits Portland publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All Portland permit requirementsPortland permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with Portland before you build.

General building work permit checklist — Portland, Maine | BuildSpec