Deck permit checklist — St. Paul, Minnesota
Assembled from St. Paul’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.
Do you need a permit?
St. Paul requires a permit for a deck.
A building permit is not required for a deck or platform standing 30 inches or less over grade, provided it is not attached to a structure with frost footings and serves no accessible route. Zoning regulations, including setbacks, must still be met for decks that stand more than 24 inches over grade even when no building permit is required.
What St. Paul publishes for this permit
- 3 submittal documents to include with the application
- 1 process step from application to final
- 1 published fee line from the city's fee schedule
- Checked against St. Paul's documents on November 4, 2026
Loading the full checklist…
Sources
- deck — permit rules ↗verified November 2026
- deck — fee schedule ↗verified November 2026
Other permits St. Paul publishes rules for
Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.
- Fence permit checklist
- Shed permit checklist
- Water heater permit checklist
- Re-roof permit checklist
- Retaining wall permit checklist
- Electrical work permit checklist
- General building work permit checklist
BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with St. Paul before you build.