Electrical work permit checklist — St. Louis, Missouri

Assembled from St. Louis’s own published permit rules. Every line below is quoted from a city document and linked to it. Nothing here is generated, estimated, or inferred from another jurisdiction.

Do you need a permit?

St. Louis requires a permit for electrical work.

When a permit is not required

Ordinance 70802, which adopts the 2017 National Electrical Code for the City of Saint Louis, does not require an electrical permit for minor repairs, defined as: replacement of a convenience outlet, except where the existing outlet is of the ungrounded type when replaced with grounding type that requires new wiring to provide grounding connection, with replacement units having the same current carrying capacity as the existing outlet; a light switch with the same current carrying capacity as the existing switch; a light socket and holder; a light fixture, one maximum, installed on the same outlet box and having the same current rating; and, within a dwelling unit, a fan, blower, pump, or other fractional horsepower motors of the same horsepower rating and having the same electrical characteristics and current rating as the existing, limited to 240 volts. The ordinance separately excepts minor repair work including the replacement of lamps, fuses, or breakers up to 60 amps.

What St. Louis publishes for this permit

  • 1 process step from application to final
  • 1 published fee line from the city's fee schedule
  • Checked against St. Louis's documents on November 11, 2026

Loading the full checklist…

Sources

Other permits St. Louis publishes rules for

Listed because the city publishes a separate rule for each type — not because this project necessarily triggers one. Whether it does depends on your scope of work.

All St. Louis permit requirementsSt. Louis permit costsApply with the city ↗

BuildSpec is a reference, not the authority having jurisdiction. Confirm requirements with St. Louis before you build.

Electrical work permit checklist — St. Louis | BuildSpec