Falsework
Defined in the standard specifications of 5 state transportation agencies. Each definition below is the agency’s own text, with the section it comes from — they do not all say the same thing, and on a contract the difference is the point.
Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.
Falsework is temporary construction used to support structural elements of concrete, steel, masonry, or other materials during their construction or erection until they become self-supporting. Falsework may also be used to provide temporary support to elements of a structure during demolition or reconstruction.
Section 101 — DEFINITIONS AND TERMS →Temporary construction intended to support permanent construction of a structural element until the element is self-supporting. Final Acceptance. The work is substantially complete with all corrective work completed. The contractor is relieved of maintenance responsibilities as of the date of final acceptance. Force Account. Work performed by the contractor at the engineer’s direction. Formwork. A temporary structure or mold used to retain and resist the operations of placing a plastic or fluid material in a designated shape until the material hardens. General Description. The information that appears in the bid proposal before the general notices that consists of specific project related information that may include, but is not limited to; location, description, completion time, prospective bidders notes, anticipated notices to proceed, special notices, bidding criteria, construction sequence notes, road user costs, modifications to liquidated damages, addenda issued, questions and answers published, prebid meeting transcripts, construction items units of measure, and table of contents. General Notices. Federal and State of Delaware regulations contained in the bid proposal.
Section 101 — GENERAL INFORMATION, DEFINITIONS, AND TERMS →Temporary construction work on which a main work is wholly or partly built and supported until it is strong enough to support itself; a temporary framework used to support part or all of a structure during demolition.
Section 101 — General Information, Definitions, and Terms →Any temporary facility/device used to support a permanent structure until the structure is self-supporting. Falsework includes, but is not limited to, steel or timber beams, girders, columns, piles and foundations, and any propriety equipment including modular shoring frames, post shores, and adjustabl e horizontal shoring.
Section 101 — Terms, Format, and Definitions →Scaffolding or other temporary structural support for concrete formw ork. Federal-Aid Project. A project that is constructed entirely or partially with federal funds. Field Sampling and Testing Manual. A Department publication that can be found at https://www.dot.nd.gov/divisions/materials/testingmanual.htm Float/Total Float. The number of days by which an activity may be delayed without delaying the project or a milestone. Force Account. Payment for contract revisions per approved costs and additives in accordance with Section 109.03, “Compensation for Contract Revisions.”
Section 101 — ABBREVIATIONS AND DEFINITIONS →