Specified Completion Date
Defined in the standard specifications of 2 state transportation agencies. Each definition below is the agency’s own text, with the section it comes from — they do not all say the same thing, and on a contract the difference is the point.
Definitions are quoted from state-authored public specification books. This page carries no I-Code-derived terms.
The date on which the contract work is specified to be completed. Speed Change Lane. An auxiliary lane, including tapered areas, primarily for the acceleration or deceleration of vehicles entering or leaving the through traffic lanes. Stabilization. Modification of soils or aggregates by incorporating materials that will increase load bearing capacity, firmness, and resistance to weathering or displacement. Standard Drawings. Drawings approved for repetitive use, showing details to be used where appropriate. Standard Specifications. A book of specifications approved for general application and repetitive use. State. The State of Alabama, the party of the first part to the contract, acting by and through the
Section 101 — DEFINITION OF TERMS →The date that the contract work is specified to be completed.
Section 101 — DEFINITIONS AND TERMS →