B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Libraries
Estimate & calculate
CalculatorsChecklists
PricingLog in
Home / USACE / Engineer Manuals / EM 1110-2-1908
EM 1110-2-1908PDF2020-11-30

EM 1110-2-1908 Instrumentation of Embankment Dams and Levees

Instrumentation design and data management for monitoring embankment dams and levees.

What This Publication Covers

Ch. 1
Introduction

Purpose of instrumentation: verifying design assumptions and detecting developing problems in embankments.

Ch. 2
Planning a Program

Defining what questions the instruments must answer, redundancy, and cost/benefit of instrument selection.

Ch. 3
Pore Pressure & Seepage

Piezometer types (open standpipe, vibrating wire, pneumatic), weirs and flumes for seepage measurement, and turbidity monitoring.

Ch. 4
Movement

Surface monuments, inclinometers, settlement plates and cells, and extensometers.

Ch. 5
Data Management

Reading schedules, automated data acquisition, threshold/action levels, and evaluation and reporting.

U.S. government publication — public domain. Outline for orientation; the full text is in the PDF at USACE.

Open PDF ↗
🏛️

Read EM 1110-2-1908 at USACE

The USACE publications server only allows its PDFs to be framed on its own site, so the copy below opens at the source. It is a public-domain federal document — free, no account, no paywall. BuildSpec members read it inline here instead.

Open EM 1110-2-1908 (PDF) ↗