B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Broward County, Florida Building Permit Cost Calculator

Estimates permit cost in Broward County from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
○Minimum base roofing permit fee
Flat fee $250.00
$250.00
○Certificate of Occupancy / Certificate of Completion / Temporary or Partial CO, per discipline for inspection
Flat fee $50.00
$50.00
○Permit extension
Flat fee $50.00
$50.00
○Expired permit (minimum)
Flat fee $125.00
$125.00
○Change of contractor
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded.

Source: published fee schedule · Verified 9/15/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded.

Source: published fee schedule · Verified 9/15/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded. 2026-09-17 (lane B run 1390, pipeline run 94): all eleven stored figures re-verified verbatim. library.municode.com serves an Angular shell to curl and was rendered with headless Chromium (4,060 lines), returning full section text. Broward County Administrative Code s. 40.27 General Fees Schedule carries the amendment history "(2004-490, 5-25-04; ... 2024-062, 2-20-24; 2025-038, 2-25-25, eff. 5-1-25; 2026-27, 2-3-26)" - the current edition, last amended 2-3-26, no successor. Confirmed present: minimum permit fee $125.00, permit application processing fee $125.00, reinspection $100.00 with 2nd/3rd/4th at $200.00/$300.00/$400.00, training and continuing education $0.02 per $1.00 of permit and plan review fee, public awareness $0.005, and the s.553.721 (1%) and s.468.631(1) (1.5%) Florida surcharges with their $2.00 minimums. FLORIDA HB 803 CHECK, NEGATIVE FOR THIS ROW: s.40.27(d)(12) DOES price private providers (inspections-only reduces the permit fee by $100.00 per inspection; plan-review-and-inspections is billed hourly at $37.70 clerical / $99.80 Building Official), but NONE of those lines is among our stored examples, so HB 803's invalidation of private-provider fees does not touch any stored Broward figure.

Source: published fee schedule · Verified 9/17/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded. 2026-09-17 (lane B run 1390, pipeline run 94): all eleven stored figures re-verified verbatim. library.municode.com serves an Angular shell to curl and was rendered with headless Chromium (4,060 lines), returning full section text. Broward County Administrative Code s. 40.27 General Fees Schedule carries the amendment history "(2004-490, 5-25-04; ... 2024-062, 2-20-24; 2025-038, 2-25-25, eff. 5-1-25; 2026-27, 2-3-26)" - the current edition, last amended 2-3-26, no successor. Confirmed present: minimum permit fee $125.00, permit application processing fee $125.00, reinspection $100.00 with 2nd/3rd/4th at $200.00/$300.00/$400.00, training and continuing education $0.02 per $1.00 of permit and plan review fee, public awareness $0.005, and the s.553.721 (1%) and s.468.631(1) (1.5%) Florida surcharges with their $2.00 minimums. FLORIDA HB 803 CHECK, NEGATIVE FOR THIS ROW: s.40.27(d)(12) DOES price private providers (inspections-only reduces the permit fee by $100.00 per inspection; plan-review-and-inspections is billed hourly at $37.70 clerical / $99.80 Building Official), but NONE of those lines is among our stored examples, so HB 803's invalidation of private-provider fees does not touch any stored Broward figure.

Source: published fee schedule · Verified 9/17/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base roofing permit fee
Flat fee $250.00
$250.00
○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded.

Source: published fee schedule · Verified 9/15/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded.

Source: published fee schedule · Verified 9/15/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded. 2026-09-17 (lane B run 1390, pipeline run 94): all eleven stored figures re-verified verbatim. library.municode.com serves an Angular shell to curl and was rendered with headless Chromium (4,060 lines), returning full section text. Broward County Administrative Code s. 40.27 General Fees Schedule carries the amendment history "(2004-490, 5-25-04; ... 2024-062, 2-20-24; 2025-038, 2-25-25, eff. 5-1-25; 2026-27, 2-3-26)" - the current edition, last amended 2-3-26, no successor. Confirmed present: minimum permit fee $125.00, permit application processing fee $125.00, reinspection $100.00 with 2nd/3rd/4th at $200.00/$300.00/$400.00, training and continuing education $0.02 per $1.00 of permit and plan review fee, public awareness $0.005, and the s.553.721 (1%) and s.468.631(1) (1.5%) Florida surcharges with their $2.00 minimums. FLORIDA HB 803 CHECK, NEGATIVE FOR THIS ROW: s.40.27(d)(12) DOES price private providers (inspections-only reduces the permit fee by $100.00 per inspection; plan-review-and-inspections is billed hourly at $37.70 clerical / $99.80 Building Official), but NONE of those lines is among our stored examples, so HB 803's invalidation of private-provider fees does not touch any stored Broward figure.

Source: published fee schedule · Verified 9/17/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Minimum base permit fee
Flat fee $125.00
$125.00
Permit fee rate on job value, $1 to $9,999,999.99
3.0%
see rule
Permit fee rate on job value over $10,000,000.00
2.5%
see rule
○Permit application processing fee, nonrefundable, paid at application in addition to permit fees
Flat fee $125.00
$125.00
○Reinspection for the same violation (1st)
Flat fee $100.00
$100.00
Reinspection for the same violation (2nd / 3rd / 4th)
$200.00 / $300.00 / $400.00
see rule
○Training and continuing education surcharge, per $1.00 of permit and plan review fee
Flat fee $0.02
$0.02
○Public awareness surcharge, per $1.00 of permit and plan review fee
Flat fee $0.01
$0.01
Florida Department of Commerce surcharge, s. 553.721 F.S. (min $2.00)
1%
see rule
Building Code Administrators and Inspectors surcharge, s. 468.631(1) F.S. (min $2.00)
1.5%
see rule
Work without a permit
Double Fee
see rule
How this jurisdiction calculates the fee

Fees are set by the Broward County Administrative Code, Chapter 40, Part VI (Building Code Division), sections 40.27 through 40.32, read in the Administrative Code as codified through Supplement 28 (banner: codified through Resolution No. 2026-283, adopted June 9, 2026). Sections 40.29 through 40.32 were last amended by Resolution 2025-038, adopted 2-25-25, effective 5-1-25; section 40.28 by Resolution 2026-27, 2-3-26. Permit fees are the greater of the $125.00 minimum base permit fee ($250.00 minimum base roofing permit fee) or 3.0% of job value for job values of $1 to $9,999,999.99, and 2.5% for job values over $10,000,000.00. Job value is the greater of the RS MEANS Manual (latest edition) figure or the applicant's estimated job value. Permit fees include standard inspections but do not include plan review or reinspections. A nonrefundable $125.00 permit application processing fee is charged at application in addition to applicable permit fees. Reinspection for the same violation is $100.00 and subsequent reinspections are charged in multiples of $100.00 ($200.00, $300.00, $400.00). Surcharges stack on top: training and continuing education at $0.02 per $1.00 of permit and plan review fee, public awareness at $0.005 per $1.00, a Florida Department of Commerce surcharge of 1% under s. 553.721 F.S. (minimum $2.00), and a Building Code Administrators and Inspectors surcharge of 1.5% under s. 468.631(1) F.S. (minimum $2.00). A Board of Rules and Appeals surcharge also applies under section 43.1. Work started without a permit is charged double fee. SUPERSESSION NOTE (2026-09-10): the previously cited PDF at broward.org/Building/Forms/Documents/40.27.___General_Fees_Schedule.pdf now returns HTTP 404 - broward.org has migrated to a new CMS and no longer publishes this schedule as a standalone PDF. The stored figures had been the pre-2025 ones: a 1.85% rate, reinspections at $66/$132/$198/$264, a 1.5% Florida DCA surcharge and no application processing fee. All of those are superseded. 2026-09-17 (lane B run 1390, pipeline run 94): all eleven stored figures re-verified verbatim. library.municode.com serves an Angular shell to curl and was rendered with headless Chromium (4,060 lines), returning full section text. Broward County Administrative Code s. 40.27 General Fees Schedule carries the amendment history "(2004-490, 5-25-04; ... 2024-062, 2-20-24; 2025-038, 2-25-25, eff. 5-1-25; 2026-27, 2-3-26)" - the current edition, last amended 2-3-26, no successor. Confirmed present: minimum permit fee $125.00, permit application processing fee $125.00, reinspection $100.00 with 2nd/3rd/4th at $200.00/$300.00/$400.00, training and continuing education $0.02 per $1.00 of permit and plan review fee, public awareness $0.005, and the s.553.721 (1%) and s.468.631(1) (1.5%) Florida surcharges with their $2.00 minimums. FLORIDA HB 803 CHECK, NEGATIVE FOR THIS ROW: s.40.27(d)(12) DOES price private providers (inspections-only reduces the permit fee by $100.00 per inspection; plan-review-and-inspections is billed hourly at $37.70 clerical / $99.80 Building Official), but NONE of those lines is among our stored examples, so HB 803's invalidation of private-provider fees does not touch any stored Broward figure.

Source: published fee schedule · Verified 9/17/2026

See the full write-up: Broward County building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.