B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Jacksonville, Florida Building Permit Cost Calculator

Estimates permit cost in Jacksonville from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○New building, accessory building or addition, enclosed area, below grade through the fourth story above grade
$0.06 x 2,000 = $127.60
$127.60
○New building, accessory building or addition, unenclosed area
$0.01 x 2,000 = $15.00
$15.00
○Resource management fee, enclosed area
$0.02 x 2,000 = $32.00
$32.00
○Development Services fee, enclosed area
$0.02 x 2,000 = $42.60
$42.60
Landscape fee · add-on
12% of BID permit fee — select the permit fee line above to calculate
see rule
○Residential new buildings, shell buildings, accessory buildings and additions construction and demolition debris fee
$0.09 x 2,000 = $175.00
$175.00
Minimum Building Inspection Division permit fee for new buildings and additions
$112.50 or $33.75 per required inspection, whichever is greater
see rule
Plan review fee for new buildings and additions · add-on
67% of BID permit fee or $90.00, whichever is greater — select the permit fee line above to calculate
see rule
○Alterations, tenant build-out or converting use, including major repair to buildings
$3.00 x 250 = $750.00
$750.00
Minimum Building Inspection Division permit fee for alterations and major repairs
$112.50 or $33.75 per required inspection, whichever is greater
see rule
○Window and door replacement
$4.00 x 250 = $1,000.00
$1,000.00
○Minimum permit fee for window and door replacement requiring one or more inspections
Flat fee $150.00
$150.00
How this jurisdiction calculates the fee

New buildings, shell buildings, accessory buildings and additions are charged per 100 square feet of floor area for each story, with separate resource management, landscape, Development Services and construction and demolition debris charges added; alterations, tenant build-outs and major repairs are charged per $1,000 of estimated cost.

Source: published fee schedule · Verified 9/18/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○New single-family residential occupancy, 0 to 200 ampere service
Flat fee $170.00
$170.00
○New single-family residential occupancy, each additional 50 amperes or fractional part thereof
Flat fee $20.00
$20.00
○Residential service change, 0 to 100 ampere service
Flat fee $80.00
$80.00
○Residential service change, 101 to 200 ampere service
Flat fee $100.00
$100.00
○Room additions
Flat fee $100.00
$100.00
○Temporary service
Flat fee $80.00
$80.00
○Single family low voltage with no inspections
Flat fee $10.00
$10.00
○Safety inspection
Flat fee $60.00
$60.00
○Repairs and miscellaneous
Flat fee $60.00
$60.00
○Minimum fee
Flat fee $60.00
$60.00
Late fee
Double fee
see rule
How this jurisdiction calculates the fee

Electrical permits are charged by service size for service installations and by item for outlets, fixtures, heat, air conditioning circuits, motors and appliances, subject to a minimum permit fee.

Source: published fee schedule · Verified 9/18/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Roofing, for each 1,000 square feet or fractional part thereof
$10.00 Building Inspection Division permit fee
see rule
○Minimum permit fee for roofing permits not requiring an inspection
Flat fee $80.00
$80.00
○Minimum permit fee for roofing permits requiring one or more inspections
Flat fee $150.00
$150.00
○Roofing repairs less than 500 square feet
Flat fee $10.00
$10.00
○Construction and demolition debris fee
Flat fee $17.50
$17.50
How this jurisdiction calculates the fee

Roofing permits are charged per 1,000 square feet of roof area or fractional part thereof, subject to a minimum that depends on whether inspections are required, plus a construction and demolition debris fee.

Source: published fee schedule · Verified 9/18/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

For each $1,000 of estimated cost or fractional part thereof up to $500,000
$1.88 Building Inspection Division permit fee
see rule
For each $1,000 of estimated cost or fractional part thereof greater than $500,000
$0.56 Building Inspection Division permit fee
see rule
○Resource management fee, up to $500,000
$0.30 x 250 = $75.00
$75.00
○Development Services fee, up to $500,000
$0.63 x 250 = $157.50
$157.50
○Construction and demolition debris fee
$0.90 x 250 = $225.00
$225.00
Minimum Building Inspection Division permit fee
$112.50 or $33.75 per required inspection, whichever is greater
see rule
Plan review fee · add-on
67% of BID permit fee or $90.00, whichever is greater — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Retaining walls are permitted as new construction other than buildings and are charged per $1,000 of estimated cost, with resource management, landscape, Development Services and construction and demolition debris charges added.

Source: published fee schedule · Verified 9/18/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Residential accessory structures not exceeding 150 square feet and $5,000 and not requiring a final inspection, including plan review fee
Flat fee $45.00
$45.00
○Residential accessory structures requiring only one inspection, including plan review fee
Flat fee $75.00
$75.00
Residential accessory structures requiring more than one inspection
$112.50 or $33.75 per required inspection, whichever is greater
see rule
○Development Services fee for accessory structures not exceeding 150 square feet and $5,000
Flat fee $15.00
$15.00
○Development Services fee for accessory structures requiring one inspection
Flat fee $25.00
$25.00
○Construction and demolition debris fee per permit
Flat fee $25.00
$25.00
How this jurisdiction calculates the fee

Residential accessory structures are charged from the accessory structure schedule based on size, cost and the number of inspections required, with the Development Services fee and construction and demolition debris fee added.

Source: published fee schedule · Verified 9/18/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Roughing-in and setting each fixture or plugged outlet, including hot water tanks or boosters
Flat fee $11.00
$11.00
○Solar water heater
Flat fee $21.00
$21.00
○Minimum fee for a plumbing permit
Flat fee $60.00
$60.00
○Minimum electrical permit fee
Flat fee $60.00
$60.00
How this jurisdiction calculates the fee

Plumbing permits are charged per roughing-in, fixture or plugged outlet, including hot water tanks and boosters, subject to a minimum plumbing permit fee; an electrical permit may also be required for an electric unit.

Source: published fee schedule · Verified 9/25/2026

See the full write-up: Jacksonville building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.