B
HomeLibrariesCode AISearchProjectsBookmarksAddress
FeedbackHelp Desk
Calculators
All Calculators
Permits
Permit Fee
Egress
Occupant Load & Egress
Structural
Beam SpanConcrete VolumeExcavationDeck Footings
Electrical
Electrical LoadWire Size
Mechanical
HVAC Load
Fire Safety
Fire Resistance
General
Stair Layout
Elsewhere
Code LibraryDiagramsAssembliesChecklistsNeed a custom calculation? →
PricingLog in
Home / Calculators / Building Permit Fee Calculator

Pembroke Pines, Florida Building Permit Cost Calculator

Estimates permit cost in Pembroke Pines from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Submittal fee deposit, residential accessory structures and/or uses
Flat fee $100.00
$100.00
○Submittal fee deposit, residential new construction and/or additions
Flat fee $500.00
$500.00
○Construction costs up to $2,500 (per structure per trade)
Flat fee $124.42
$124.42
Construction costs greater than $2,500 and up to $1,000,000 · add-on
3.79% of construction cost — select the permit fee line above to calculate
see rule
Construction costs greater than $1,000,000 and up to $3,000,000
$37,929.67 plus 2.77% of the construction costs over $1,000,000
see rule
Construction costs greater than $3,000,000
$93,329.67 plus 2.08% of the construction cost
see rule
Mechanical, electrical and plumbing main permits for completion of a building
Minimum fee per trade up to a construction cost of $5,000 and 2.50% of construction costs above $5,000
see rule
Minimum permit application fee
Not less than the number of mandatory inspections multiplied by the $124.42 minimum inspection fee
see rule
○Maximum residential roof permit fee
Flat fee $500.00
$500.00
Broward County Board of Rules & Appeals (BRA) fee
$0.52 per each $1,000.00 or any fraction thereof of the total cost of construction
see rule
DCA Florida Homeowner Recovery Fund · add-on
1.5% of permit fee, minimum $2.00 per permit — select the permit fee line above to calculate
see rule
DBPR Building Code Administrators and Inspectors Fund · add-on
1.0% of permit fee, minimum $2.00 per permit — select the permit fee line above to calculate
see rule
○Zoning building permit review, residential accessory structures and/or uses
Flat fee $89.86
$89.86
○Zoning building permit review, residential new construction and/or additions
Flat fee $138.24
$138.24
○Engineering residential building permit review
Flat fee $27.11
$27.11
○Re-inspection after partial approval or first disapproval of a mandatory inspection
Flat fee $121.29
$121.29
○Re-inspection after second disapproval
Flat fee $181.94
$181.94
○Re-inspection after third and subsequent disapprovals
Flat fee $363.88
$363.88
○Extension of permit, homeowner
Flat fee $34.57
$34.57
Renewal of expired permit, less than 90 days · add-on
50% of permit fee — select the permit fee line above to calculate
see rule
Renewal of expired permit, greater than 90 days · add-on
100% of permit fee — select the permit fee line above to calculate
see rule
○Revisions to plans, homeowner, per discipline
Flat fee $41.49
$41.49
Work done without a permit
Double the required permit fee
see rule
How this jurisdiction calculates the fee

The building permit fee is based on the cost of construction attested by the applicant on the permit application; the Building Official may require a certified construction cost estimate from a licensed architect, engineer, general contractor, or certified construction cost estimator, or apply the current RS Means Construction Valuation system, and the greatest value is used to calculate the fee.

Source: published fee schedule · Verified 9/15/2026

See the full write-up: Pembroke Pines building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.