Alexandria, Virginia Building Permit Cost Calculator
Estimates permit cost in Alexandria from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
New residential unit built under the Virginia Residential Code (detached single family, duplex or townhouse) $194.00 per dwelling unit | see rule |
○Renovation, alterations, additions, equipment, appliances, devices and service panel replacement $19.50 x 250 = $4,875.00 | $4,875.00 |
○Minimum permit fee Flat fee $95.00 | $95.00 |
○Temporary service installation, 60 through 100 amperes Flat fee $82.00 | $82.00 |
○Temporary service installation, 101 through 401 amperes Flat fee $124.00 | $124.00 |
○Temporary service installation, over 401 amperes Flat fee $192.00 | $192.00 |
○Service equipment new and replacement, first 200 amperes Flat fee $92.00 | $92.00 |
○Service equipment new and replacement, 201 through 600 amperes Flat fee $182.00 | $182.00 |
○Service equipment new and replacement, 601 through 1200 amperes Flat fee $271.00 | $271.00 |
Service equipment new and replacement, over 1200 amperes $379.00 plus $25.00 per 100 amps or fraction thereof above 1200 amps | see rule |
EV charging equipment, per unit Minimum permit fee ($95.00) | see rule |
How this jurisdiction calculates the fee
Electrical permit fees for renovation, alterations, additions, equipment, appliances, devices and service panel replacement are $19.50 per $1,000 of the total construction cost or the minimum permit fee, whichever is greater; new residential units and special electrical work carry set fees. Re-verified 2026-09-10: all eleven amounts re-read in the cited FY26 Code Administration Alexandria Permit Center Fee Schedule (Effective July 1, 2025), each on the same line as its label. The FY27 successor question raised by the previous pass is now RESOLVED IN THE NEGATIVE: the alexandriava.gov Drupal sitemap (generated 2026-09-09, 21,189 URLs) contains no FY27 Code Administration / Permit Center Fee Schedule of any kind; the most recent edition published anywhere on the site is the 2026-04 upload of this same FY26 document (Last-Modified 2026-04-03). alexandriava.gov serves this PDF normally to a client sending full browser headers with Sec-Fetch-Site: same-origin and a same-host Referer.
Source: published fee schedule · Verified 11/9/2026
See the full write-up: Alexandria building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.