Newport News, Virginia Building Permit Cost Calculator
Estimates permit cost in Newport News from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Plan review, 0-2,499 square feet Flat fee $30.00 | $30.00 |
○Plan review, 2,500-4,999 square feet Flat fee $55.00 | $55.00 |
○Plan review, 5,000 square feet and above Flat fee $110.00 | $110.00 |
How this jurisdiction calculates the fee
Plan review fees are based on floor area and may be required, along with additional applicable permits, prior to final approval of the building permit. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Both cited documents re-read in full with pdftotext -layout and every stored figure re-reads verbatim, including the three electrical-service figures ($86.70 for 126-150 amps single phase, $86.70 for 0-125 amps three phase, $198.90 for over 200 amps three phase). SUCCESSOR HUNT DRIVEN TO A DEFINITE ANSWER, NEGATIVE, DESPITE A SEVENTEEN-YEAR-OLD DOCUMENT: the fee schedule is headed "Effective July 1, 2009", but the City's own Permit Fee Schedule page (nnva.gov/456/Permit-Fee-Schedule) links exactly DocumentCenter/View/576 as its "printable version of our fee schedule" and links no successor, and states that "Fees are prescribed in Section 13-26 of the City Code." No newer schedule exists. WORTH A FUTURE CROSS-CHECK: the City also publishes a fee page at nnva.gov/1588 carrying its own amounts; reconciling the two would give this jurisdiction a second official source.
Source: published fee schedule · Verified 11/12/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Deck and other structures, use groups R3, R4 and R5, per Building Permit Fees (a)(3) 0.44 percent (.0044) of the value of the construction | see rule |
Same provision, all other use groups 0.48 percent (.0048) of the value of the construction | see rule |
○Minimum fee for any building permit Flat fee $56.10 | $56.10 |
○Residential valuation up to which the minimum fee applies Flat fee $12,500.00 | $12,500.00 |
State surcharge added to the computed permit fee (Code of Virginia Section 36-137) 2.0 percent | see rule |
Worked residential example printed in the schedule: $13,000.00 valuation $57.20 permit fee plus $1.15 state surcharge, $58.35 total | see rule |
Work performed prior to obtaining the appropriate permit double fee charge | see rule |
How this jurisdiction calculates the fee
Newport News prices building permits by formula rather than by a per-item table. A deck falls under the provision covering the alteration or repair of any building or structure and the construction or erection of piers, bulkheads, exterior walls or fences, towers, swimming pools or other structures or things: the fee is a percentage factor applied to the value of the construction, 0.44 percent for use groups R3, R4 and R5 and 0.48 percent for all other use groups. A minimum permit fee applies, and a 2.0 percent state surcharge is computed on the permit fee and added to it.
Source: published fee schedule · Verified 11/6/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum electrical permit fee Flat fee $56.10 | $56.10 |
○New electrical system, 0-125 amps, single phase Flat fee $56.10 | $56.10 |
○New electrical system, 126-150 amps, single phase Flat fee $86.70 | $86.70 |
○New electrical system, 151-200 amps, single phase Flat fee $112.20 | $112.20 |
○New electrical system, over 200 amps, single phase Flat fee $168.30 | $168.30 |
○New electrical system, 0-125 amps, three phase Flat fee $86.70 | $86.70 |
○New electrical system, 126-150 amps, three phase Flat fee $112.20 | $112.20 |
○New electrical system, 151-200 amps, three phase Flat fee $168.30 | $168.30 |
○New electrical system, over 200 amps, three phase Flat fee $198.90 | $198.90 |
○Each additional 50 amperes or fraction thereof on a new system Flat fee $30.60 | $30.60 |
○Temporary service installation or mobile home reconnection Flat fee $51.00 | $51.00 |
○Service size increase, up to and including 200 amperes Flat fee $51.00 | $51.00 |
Service size increase over 200 amperes $51.00 plus $15.30 for each 50 amperes or fraction thereof over 200 | see rule |
○Relocation of an existing service without increasing the size Flat fee $51.00 | $51.00 |
How this jurisdiction calculates the fee
Fees for new electrical systems are set by the rated size of the service panel in amperes, with flat fees for temporary service, service size increases and service relocations; repairs and added receptacles, lighting or other outlets are charged at 0.44% of the current value of all service, labor, materials and equipment for use groups R3, R4 and R5. The minimum fee for any electrical permit is $56.10; listed flat fees include the 2.0% state surcharge, which is added on top of fees computed as a percentage of value. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Both cited documents re-read in full with pdftotext -layout and every stored figure re-reads verbatim, including the three electrical-service figures ($86.70 for 126-150 amps single phase, $86.70 for 0-125 amps three phase, $198.90 for over 200 amps three phase). SUCCESSOR HUNT DRIVEN TO A DEFINITE ANSWER, NEGATIVE, DESPITE A SEVENTEEN-YEAR-OLD DOCUMENT: the fee schedule is headed "Effective July 1, 2009", but the City's own Permit Fee Schedule page (nnva.gov/456/Permit-Fee-Schedule) links exactly DocumentCenter/View/576 as its "printable version of our fee schedule" and links no successor, and states that "Fees are prescribed in Section 13-26 of the City Code." No newer schedule exists. WORTH A FUTURE CROSS-CHECK: the City also publishes a fee page at nnva.gov/1588 carrying its own amounts; reconciling the two would give this jurisdiction a second official source.
Source: published fee schedule · Verified 11/12/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Fence construction permit application fee Flat fee $35.00 | $35.00 |
How this jurisdiction calculates the fee
Completed applications for fence construction permits are accepted and reviewed upon payment of an application fee set by City Code section 13-147.
Source: published fee schedule · Verified 9/25/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Plan review, 0-2,499 square feet Flat fee $30.00 | $30.00 |
○Plan review, 2,500-4,999 square feet Flat fee $55.00 | $55.00 |
○Plan review, 5,000 square feet and above Flat fee $110.00 | $110.00 |
How this jurisdiction calculates the fee
Plan review fees are based on floor area and may be required, along with additional applicable permits, prior to final approval of the building permit. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Both cited documents re-read in full with pdftotext -layout and every stored figure re-reads verbatim, including the three electrical-service figures ($86.70 for 126-150 amps single phase, $86.70 for 0-125 amps three phase, $198.90 for over 200 amps three phase). SUCCESSOR HUNT DRIVEN TO A DEFINITE ANSWER, NEGATIVE, DESPITE A SEVENTEEN-YEAR-OLD DOCUMENT: the fee schedule is headed "Effective July 1, 2009", but the City's own Permit Fee Schedule page (nnva.gov/456/Permit-Fee-Schedule) links exactly DocumentCenter/View/576 as its "printable version of our fee schedule" and links no successor, and states that "Fees are prescribed in Section 13-26 of the City Code." No newer schedule exists. WORTH A FUTURE CROSS-CHECK: the City also publishes a fee page at nnva.gov/1588 carrying its own amounts; reconciling the two would give this jurisdiction a second official source.
Source: published fee schedule · Verified 11/12/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Shed application (256 square feet and less) Flat fee $35.00 | $35.00 |
How this jurisdiction calculates the fee
A fee applies to the shed application for sheds of 256 square feet and less, which is processed by the Department of Planning.
Source: published fee schedule · Verified 11/11/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Minimum fee for any plumbing permit Flat fee $56.10 | $56.10 |
○Each plumbing fixture installed, including a water heater Flat fee $10.20 | $10.20 |
How this jurisdiction calculates the fee
Water heaters are plumbing fixtures on the plumbing permit. Newport News Permit Fees (effective July 1, 2009, the schedule the city still publishes) section (b) Plumbing Fees sets a minimum fee of $56.10 for any plumbing permit and $10.20 for each plumbing fixture installed. The schedule does not state how many fixtures the minimum fee covers; an earlier note here claiming it covers up to five fixtures was not supported by the document and was removed on 2026-09-14. RE-VERIFIED 2026-09-28 (lane B, pipeline run 98). Both cited documents re-read in full with pdftotext -layout and every stored figure re-reads verbatim, including the three electrical-service figures ($86.70 for 126-150 amps single phase, $86.70 for 0-125 amps three phase, $198.90 for over 200 amps three phase). SUCCESSOR HUNT DRIVEN TO A DEFINITE ANSWER, NEGATIVE, DESPITE A SEVENTEEN-YEAR-OLD DOCUMENT: the fee schedule is headed "Effective July 1, 2009", but the City's own Permit Fee Schedule page (nnva.gov/456/Permit-Fee-Schedule) links exactly DocumentCenter/View/576 as its "printable version of our fee schedule" and links no successor, and states that "Fees are prescribed in Section 13-26 of the City Code." No newer schedule exists. WORTH A FUTURE CROSS-CHECK: the City also publishes a fee page at nnva.gov/1588 carrying its own amounts; reconciling the two would give this jurisdiction a second official source.
Source: published fee schedule · Verified 11/12/2026
See the full write-up: Newport News building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.