Home / Calculators / Building Permit Fee Calculator

Virginia Beach, Virginia Building Permit Cost Calculator

Estimates permit cost in Virginia Beach from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.

217 jurisdictions with fee schedules on file

Total cost of work, labor and materials

Used by cities that price per square foot

Fences and retaining walls

Electrical permits priced by the ampere

Building Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Residential living area (heated), new and additions
$50.00 plus $7.00 per 100 square feet of area or fraction thereof
see rule
○Heated area up to 100 square feet
Flat fee $57.00
$57.00
○Heated area up to 500 square feet
Flat fee $85.00
$85.00
○Heated area up to 1200 square feet
Flat fee $134.00
$134.00
○Residential plan review fee
Flat fee $100.00
$100.00
○Residential counter plan review
Flat fee $25.00
$25.00
○Residential plan review revision
Flat fee $25.00
$25.00
○Certificate of occupancy
Flat fee $75.00
$75.00
○Re-inspection fee
Flat fee $75.00
$75.00
○Water service line / sewer service line, each
Flat fee $50.00
$50.00
○Technology fee, assessed on all permits
Flat fee $10.00
$10.00
State levy under Code of Virginia section 36-137, assessed on the permit fees in this schedule (state charge, not a city fee) · add-on
2% of the permit fee — select the permit fee line above to calculate
see rule
○Administrative fee for beginning work without a permit
Flat fee $250.00
$250.00
How this jurisdiction calculates the fee

City of Virginia Beach Residential Building Permit Fees schedule, revised July 2025, administered by Permits and Inspections. New heated residential living area and heated additions are assessed on floor area: a flat amount plus a charge for each 100 square feet or fraction of it. Plan review, certificate of occupancy and re-inspection charges are separate. A 2% state levy is added on the permit fees in the schedule - that is a Commonwealth of Virginia charge under Code of Virginia section 36-137, not a city fee - and the city adds a $10.00 technology fee to all permits.

Source: published fee schedule · Verified 11/5/2026

Deck Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Non-heated residential new and additions
$50.00 plus $4.00 per 100 square feet of area or fraction thereof
see rule
○Non-heated area up to 100 square feet
Flat fee $54.00
$54.00
○Non-heated area up to 300 square feet
Flat fee $62.00
$62.00
○Non-heated area up to 500 square feet
Flat fee $70.00
$70.00
○Non-heated area up to 1200 square feet
Flat fee $98.00
$98.00
○Residential plan review fee
Flat fee $100.00
$100.00
○Residential counter plan review
Flat fee $25.00
$25.00
○Re-inspection fee
Flat fee $75.00
$75.00
○Technology fee, assessed on all permits
Flat fee $10.00
$10.00
State levy under Code of Virginia section 36-137, assessed on the permit fees in this schedule (state charge, not a city fee) · add-on
2% of the permit fee — select the permit fee line above to calculate
see rule
○Administrative fee for beginning work without a permit
Flat fee $250.00
$250.00
How this jurisdiction calculates the fee

City of Virginia Beach Residential Building Permit Fees schedule, revised July 2025. The schedule has no line item named for decks; a deck is unheated residential floor area, so it falls under the non-heated residential new and additions line, which charges a flat amount plus a charge per 100 square feet or fraction of it. Decks are expressly listed by the city as residential construction requiring a building permit, and uncovered decks of any size can be submitted over the counter. A 2% state levy under Code of Virginia section 36-137 is added on the permit fees in the schedule (a Commonwealth charge, not a city fee) and the city adds a $10.00 technology fee to all permits.

Source: published fee schedule · Verified 11/5/2026

Electrical Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

New Service Single Phase
$50.00 plus $20.00 per 50 amps
see rule
○New Service 100 amps (single phase)
Flat fee $90.00
$90.00
○Change of Service Up to 100 amps (single phase)
Flat fee $45.00
$45.00
○New Service 200 amps (single phase)
Flat fee $130.00
$130.00
○Change of Service Up to 200 amps (single phase)
Flat fee $65.00
$65.00
○New Service 400 amps (single phase)
Flat fee $210.00
$210.00
New Service Three Phase
$80.00 plus $20.00 per 50 amps
see rule
○New Service 200 amps (three phase)
Flat fee $160.00
$160.00
○New Service 800 amps (three phase)
Flat fee $400.00
$400.00
Additions or Repairs
$50.00 plus $5.00 per circuit
see rule
○Generator Circuit, Temporary Service Pole, Subfed Panel, Panel Replacement or Relocation, Meter/Meterbase Replacement/Relocation, Pool Bonding, Trailer Service, or Overhead to Underground
Flat fee $50.00
$50.00
○Administrative Fee for beginning work without a permit
Flat fee $250.00
$250.00
○Re-inspection Fee
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

A new single-phase service is $50.00 plus $20.00 per 50 amps and a new three-phase service is $80.00 plus $20.00 per 50 amps; a change of service is one half of the new service fee. For additions or repairs, the fee for each piece of equipment connected and for each circuit or feeder installed, extended, relocated or repaired is $50.00 plus $5.00 per circuit. A 2% State Levy is assessed on these permit fees and a $10.00 Technology Fee is assessed on all permits. | 2026-09-24 (lane B run 1728) HELD, SOURCING GAP, NO FIGURE CHANGED AND NONE CONTRADICTED. The cited page planning.virginiabeach.gov/permits/trade was re-read in full today, including with every accordion expanded in headless Chromium: it prints NO dollar amount of any kind for electrical work - the only fee document it links anywhere is Amusement-Permit-Fees.pdf. The city's own Application for Electrical Permit (s3.us-east-1.amazonaws.com/virginia-beach-departments-docs/planning/Divisions-Offices/Permits_Inspections/Documents/Electrical-Application.pdf, rev. Jun-2025) was downloaded and read in full: it lists every work type by name (0-30 AMP Circuit, Change of Service 1 Phase, Service 1 Phase, Temporary Pole, Sub-fed Panels, Pool Bonding, Generator Circuit, Overhead to Underground, Relocate/Replace Meter and Panel, Trailer Service, EV Charger and the rest) but prints NO amounts either. planning.virginiabeach.gov/permits/fees does not exist and the departments-docs S3 bucket denies listing, so guessed filenames prove nothing (S3 returns 403 for absent and present objects alike). None of the thirteen stored figures ($50.00 plus $20.00 per 50 amps new single phase, $90.00, $45.00, $130.00, $65.00, $210.00, $80.00 plus $20.00 per 50 amps three phase, $160.00, $400.00, $50.00 plus $5.00 per circuit additions or repairs, $50.00 each for generator circuit / temporary service pole / sub-fed panel / panel replacement / meter replacement / pool bonding / trailer service / overhead to underground, $250 administrative fee for beginning work without a permit, $75 re-inspection) could be located on any city domain this pass, and none was contradicted. Deliberately left unstamped rather than stamping a verified date onto thirteen figures none of which could be checked. HUMAN ACTION: locate the Virginia Beach trade permit fee schedule and set fee_source_url, or empty the fees. | 2026-09-25 (lane B run 1754) HELD, SECOND CONSECUTIVE PASS, SOURCING GAP UNCHANGED. planning.virginiabeach.gov/permits/trade was re-fetched in full today and CONTAINS NOT ONE DOLLAR SIGN anywhere in its 5,782 characters. None of the thirteen stored figures has a source on any city domain. Nothing contradicts them; nothing supports them. Left UNSTAMPED rather than stamping a verified date onto thirteen unverifiable figures. HUMAN ACTION: locate the Virginia Beach trade permit fee schedule, or empty the fees. NOTE: the sibling virginia-beach/fence row is unaffected - its S3-hosted Fence_Wall_Bulletin.pdf serves normally and its figure verifies. HELD AGAIN 2026-09-28 (lane B, pipeline run 98) - THIRD CONSECUTIVE PASS, verified_at deliberately not advanced. planning.virginiabeach.gov/permits/trade was fetched successfully (HTTP 200, 315,098 bytes) and converted to text: IT CONTAINS NOT ONE DOLLAR SIGN. Thirteen electrical figures with no source. The contrast recorded in run 1754 still holds and still points the way: the sibling virginia-beach/water_heater row IS fully sourced, from City Code s. 8-33 in Municode. HUMAN ACTION: look for the electrical schedule in City Code Chapter 8 first, or empty the fees.

Source: published fee schedule · Verified 9/29/2026

Fence Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Fence permit
Flat fee $61.00
$61.00
How this jurisdiction calculates the fee

The fee for a fence permit is $61.

Source: published fee schedule · Verified 11/11/2026

Reroof Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Roofing or siding permit fee
$50.00 base plus $5.00 x 250 = $1,300.00
$1,300.00
○Roofing or siding permit, construction value up to $1,000
Flat fee $55.00
$55.00
○Roofing or siding permit, construction value up to $5,000
Flat fee $75.00
$75.00
○Roofing or siding permit, construction value up to $12,000
Flat fee $110.00
$110.00
○Technology fee, assessed on all permits
Flat fee $10.00
$10.00
State levy, assessed on the permit fees listed in the roofing and siding schedule · add-on
2% of the permit fee — select the permit fee line above to calculate
see rule
How this jurisdiction calculates the fee

Virginia Beach publishes a dedicated Roofing and Siding Permit Fees schedule (rev. Jul-2025). Roofing and siding permit fees are assessed at $50.00 plus $5.00 per $1,000 of construction value or fraction thereof. A 2% State Levy is assessed on the permit fees listed in that schedule, and a $10.00 Technology Fee is assessed on all permits.

Source: published fee schedule · Verified 11/5/2026

Retaining Wall Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

○Technology fee, assessed on all permits
Flat fee $10.00
$10.00
State levy under Code of Virginia section 36-137, assessed on the permit fees in the schedule (state charge, not a city fee) · add-on
2% of the permit fee — select the permit fee line above to calculate
see rule
○Residential plan review fee
Flat fee $100.00
$100.00
○Re-inspection fee
Flat fee $75.00
$75.00
○Administrative fee for beginning work without a permit
Flat fee $250.00
$250.00
How this jurisdiction calculates the fee

No retaining-wall fee is published. Under the Virginia Uniform Statewide Building Code a permit is not required for a retaining wall of 3 feet or less measured from the bottom of the footing to the top of the wall unless it supports a surcharge or impounds flammable liquids, so a taller or surcharged wall needs a building permit from Virginia Beach Permits and Inspections. Both city fee schedules - Residential Building Permit Fees and Commercial Building Permit Fees, each revised July 2025 - were read in full and neither carries a retaining-wall line item. They price work either by floor area (new construction and additions) or by construction value (alterations, a flat amount plus a charge per $1,000), and the schedules do not say which applies to a freestanding wall, so the amount must be confirmed with Permits and Inspections. The charges below are the ones the schedules state apply to every permit.

Source: published fee schedule · Verified 11/5/2026

Shed Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Non-heated residential new and additions
$50.00 plus $4.00 per 100 square feet of area or fraction thereof
see rule
○Non-heated area up to 300 square feet
Flat fee $62.00
$62.00
○Non-heated area up to 400 square feet
Flat fee $66.00
$66.00
○Non-heated area up to 600 square feet
Flat fee $74.00
$74.00
○Non-heated area up to 1000 square feet
Flat fee $90.00
$90.00
○Residential plan review fee
Flat fee $100.00
$100.00
○Residential counter plan review (accessory structures 500 square feet or less, five pages or fewer)
Flat fee $25.00
$25.00
○Re-inspection fee
Flat fee $75.00
$75.00
○Technology fee, assessed on all permits
Flat fee $10.00
$10.00
State levy under Code of Virginia section 36-137, assessed on the permit fees in this schedule (state charge, not a city fee) · add-on
2% of the permit fee — select the permit fee line above to calculate
see rule
○Administrative fee for beginning work without a permit
Flat fee $250.00
$250.00
How this jurisdiction calculates the fee

City of Virginia Beach Residential Building Permit Fees schedule, revised July 2025. The city requires a building permit for detached structures including sheds greater than 256 square feet, gazebos, storage buildings and trellises. The schedule names no shed or accessory-structure line item; a shed is unheated floor area, so it is assessed under the non-heated residential new and additions line - a flat amount plus a charge per 100 square feet or fraction of it. Garages and sheds over 256 square feet take setback/footing, framing and final inspections. A 2% state levy under Code of Virginia section 36-137 is added on the permit fees in the schedule (a Commonwealth charge, not a city fee) and the city adds a $10.00 technology fee to all permits.

Source: published fee schedule · Verified 11/4/2026

Water Heater Permit

These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.

Minimum fee for the installation of gas outlets for a gas piping system, Section 8-33(b)
$50.00 plus $4.00 for each outlet
see rule
Minimum fee for the installation or replacement of mechanical/life safety systems or equipment, Section 8-33(a)
$50.00 plus $5.00 for each $1,000.00 of value or fraction thereof
see rule
○Mechanical permit, construction value up to $1,000 (Section 8-33(a) formula applied)
Flat fee $55.00
$55.00
○Mechanical permit, construction value up to $2,000 (Section 8-33(a) formula applied)
Flat fee $60.00
$60.00
○Mechanical permit, construction value up to $5,000 (Section 8-33(a) formula applied)
Flat fee $75.00
$75.00
○Mechanical permit, construction value up to $10,000 (Section 8-33(a) formula applied)
Flat fee $100.00
$100.00
○Minimum fee for the relocation of a gas meter, Section 8-33(c)
Flat fee $50.00
$50.00
○Administrative fee added where mechanical, life safety, elevator or gas work is commenced before a permit has been issued, per unit, Section 8-33(e)
Flat fee $250.00
$250.00
○Reinspection fee, minimum additional fee charged for each reinspection, Section 8-32(16)
Flat fee $75.00
$75.00
How this jurisdiction calculates the fee

Virginia Beach City Code Section 8-33 (mechanical, life safety, elevator and gas permits) prices the work a water heater replacement requires. The mechanical/life safety minimum is $50.00 plus $5.00 for each $1,000.00 of value or fraction thereof, and a gas piping system is $50.00 plus $4.00 for each outlet; the tiered mechanical amounts below are that formula applied at common construction values, not separate printed lines. LABEL CORRECTED 2026-09-03: this row previously carried a line labelled "Mechanical plan review = $50", which does not appear in Section 8-33; the only $50.00 plan-review line in Section 8-32 is a fee for the waiver of formal site plan review, so the paraphrased label has been removed rather than carried forward. Reinspection and administrative amounts are from Section 8-32. No stored dollar amount changed. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM from City Code s. 8-33 in Municode: "The minimum fee for the installation of gas outlets for a gas piping system shall be fifty dollars ($50.00) plus four dollars ($4.00) for each outlet"; "The minimum fee for the relocation of a gas meter shall be fifty dollars ($50.00)"; and the $250.00 administrative fee for work commenced before a permit is issued, per unit. CONTRAST WORTH RECORDING: this row is fully sourced from the City Code, while the sibling virginia-beach/electrical row remains entirely unsourced - planning.virginiabeach.gov/permits/trade contains no dollar sign at all. If the electrical fees exist anywhere official, City Code Chapter 8 is where to look first.

Source: published fee schedule · Verified 9/25/2026

See the full write-up: Virginia Beach building permit cost

Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.