Chesapeake, Virginia Building Permit Cost Calculator
Estimates permit cost in Chesapeake from the city's own published fee schedule — not a national average. Every figure is computed from a rule quoted verbatim from that document, and rules that cannot be computed honestly are shown as the published text instead of a number.
217 jurisdictions with fee schedules on file
Total cost of work, labor and materials
Used by cities that price per square foot
Fences and retaining walls
Electrical permits priced by the ampere
Building Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
New residential construction, 2,200 square feet $270 base fee ($220 plus the $50 administrative fee) | see rule |
○Land Disturbance permit fee (for new construction only) Flat fee $209.00 | $209.00 |
○Zoning review of residential plans Flat fee $10.00 | $10.00 |
○Certificate of Occupancy fee, included in the building permit fee Flat fee $50.00 | $50.00 |
○Driveway permit fee (if applicable) Flat fee $50.00 | $50.00 |
○Hampton Road Sanitary Disposal (HRSD) fee Flat fee $2,055.00 | $2,055.00 |
How this jurisdiction calculates the fee
The minimum fee is a $50 administrative fee for issuing each permit, plus $10 per 100 square feet of structure or fraction thereof; a 2 percent state levy is assessed on each fee by the State of Virginia (excluding City water and sewer fees), and a $10 technology fee, City water and sewer fees, and other project fees apply. | 2026-09-25 (lane B run 1754) RE-VERIFIED VERBATIM. The page states the minimum fee is an administrative fee of $50 for issuing each permit plus $10 per 100 square feet, and works the stored example through explicitly: "2200 / 100 = 22; 22 x 10 = $220 + $50 (administrative fee) = base fee $270". Land Disturbance $209 (new construction only), Zoning Review of residential plans $10, Certificate of Occupancy $50 included in the building permit fee, Driveway permit $50, HRSD fee $2055 - all verbatim. TWO ITEMS ON THE PAGE THAT ARE NOT STORED: a 2 percent state levy assessed on each fee excluding City water and sewer fees, and a $10 Technology Fee. METHOD NOTE: headless Chromium rendered only this CivicPlus page's navigation and footer; the fee text is in the served HTML and had to be read from the raw markup.
Source: published fee schedule · Verified 11/11/2026
Deck Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
10-foot by 20-foot deck (200 square feet) $127.40 total, including the $50 plan review fee, 2 percent state levy ($2.40), and $5 technology fee | see rule |
How this jurisdiction calculates the fee
The minimum fee is $50 plus $10 per 100 square feet of deck area, with a $50 plan review fee, a 2 percent state levy, and a technology fee added. CONFLICT RECORDED 2026-09-11, NEITHER FIGURE PICKED: the Build a Deck page prints a $5 technology fee in its worked $127.40 example, while the New Residential Building Construction Permits page and the Fence Regulations page both print "Technology Fee is $10" for the same department. Every other figure on this row (minimum $50 administrative fee, $10 per 100 square feet, $50 plan review, 2 percent state levy, $127.40 total for a 10ft x 20ft deck) was re-read verbatim on the cited page on 2026-09-11 and is unchanged.
Source: published fee schedule · Verified 11/11/2026
Electrical Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Administrative fee to issue a permit (applies to all permits) Flat fee $50.00 | $50.00 |
○Technology fee per permit (applies to all permits) Flat fee $10.00 | $10.00 |
State levy on permit fees 2% | see rule |
○Temporary pole Flat fee $50.00 | $50.00 |
New service, single-phase (includes all circuits and outlets) $25.00 per 50 amps | see rule |
New service, three-phase (includes all circuits and outlets) $25.00 per 50 amps | see rule |
Change of service, single-phase (additional fees required for circuits) $12.50 per 50 amps | see rule |
Change of service, three-phase (additional fees required for circuits) $12.50 per 50 amps | see rule |
○Circuits - repairs, alterations: 0 to 30 amps Flat fee $5.00 | $5.00 |
○Circuits - repairs, alterations: 31 to 60 amps Flat fee $6.00 | $6.00 |
○Circuits - repairs, alterations: 61 to 100 amps Flat fee $7.00 | $7.00 |
○Circuits - repairs, alterations: 101 to 200 amps Flat fee $10.00 | $10.00 |
○Circuits - repairs, alterations: over 200 amps Flat fee $15.00 | $15.00 |
○Pool bonding Flat fee $40.00 | $40.00 |
○Early electrical release Flat fee $50.00 | $50.00 |
○Reconnection of service Flat fee $40.00 | $40.00 |
○Reinspection fee Flat fee $50.00 | $50.00 |
○Beginning work without a permit Flat fee $150.00 | $150.00 |
○Reissuance of a permit - permit renewal fee (plus 2% state levy) Flat fee $50.00 | $50.00 |
○Certificate of occupancy fee Flat fee $75.00 | $75.00 |
○Board of Building Code Appeals Flat fee $200.00 | $200.00 |
How this jurisdiction calculates the fee
City of Chesapeake Department of Development and Permits Fee Schedule and Permit Information, rev 08/24/2026 (49 pages). Every permit carries a $50.00 administrative fee and a $10.00 technology fee in addition to the trade fee, and a 2 percent state levy is assessed on permit fees under Virginia law. Electrical work is priced by service size for new services and changes of service (per 50 amps) and per circuit for repairs and alterations, banded by amperage. The 08/24/2026 revision replaced the schedule previously cited here (rev 12/31/2025); every electrical amount below is unchanged, but the revision no longer prints a stated minimum electrical permit fee or a per-meter-base charge, and both of those previously stored lines have been removed rather than carried forward without a source. Permit reissuance is now printed as a Permit Renewal Fee plus the 2 percent state levy. UNRESOLVED CONFLICT OPENED 2026-09-11 (run 810), NOT REWRITTEN. The cited page cityofchesapeake.net/740/Fees is itself the fee schedule (no PDF exists), and its Electrical table is internally ambiguous. The table header declares TWO columns (Fee Description, Fee), and every ordinary row carries a single fee cell of width 25.6981% matching that header. But three rows carry THREE cells, neither extra one matching the header width: "Temporary power pole" = $15 each / $50 each; "New service, single-phase" = $15 per 50 amps / $25 per 50 amps; "New service, three-phase" = $20 per 50 amps for first 1,000 amps and $10 per 50 amps over 1,000 amps / $25 per 50 amps. Nothing on the page marks either value as superseded - no strikethrough, no old/new column heading, no effective date beside them - and the page carries no revision date at all except a note that certain state-set fees rose 7/1/2022. The stored figures ($50.00 temporary pole, $25.00 per 50 amps both phases) correspond to the THIRD cell throughout. Protocol forbids picking one: BOTH readings are recorded here and the figures are left exactly as they stand. Change of service single-phase and three-phase at $12.50 per 50 amps, all circuit bands ($5/$6/$7/$10/$15 each), pool bonding $40, early electrical release $50, reconnection $40, and the standard administrative $50, technology $10, reinspection $50 and no-permit $150 fees are all unambiguous single-cell rows and verify exactly. This row is deliberately NOT stamped. HUMAN DECISION: confirm with Chesapeake Development and Permits which column is in force. | 2026-09-12 (lane B run 897): CONFLICT OPENED BY RUN 810 IS NOW RESOLVED IN FAVOUR OF THE STORED FIGURES. Run 810 read the /740/Fees web page, whose Electrical table prints three cells on three rows with nothing marking either value as superseded. The City's own PDF fee schedule, DocumentCenter View/12392, rev 08/24/2026 - a NEWER document than that page - states the same items unambiguously on page 38 of 49: Temporary Pole 50.00; New Service (includes all circuits and outlets) single-phase per 50 amps $25.00 and three-phase per 50 amps $25.00; Change of Service single-phase and three-phase per 50 amps $12.50; Circuits - Repairs and Alterations 0-30 amps $5.00, 31-60 $6.00, 61-100 $7.00, 101-200 $10.00, over 200 $15.00; Pool Bonding $40.00; Early Electrical Release $50.00; Reconnection of Service $40.00; Administrative Fee $50.00; State Levy 2%; Technology Fee $10.00. Every stored figure verifies verbatim. No change made; the ambiguity is closed, not carried forward.
Source: published fee schedule · Verified 11/4/2026
Fence Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Construction cost $0 to $1,000 $75 plus a $10 technology fee, totaling $80 | see rule |
○Each additional $1,000 of construction value Flat fee $15.00 | $15.00 |
How this jurisdiction calculates the fee
The Fence Regulations page bases the fence permit fee on construction cost in $1,000 increments, at $75 for the first $1,000 plus a $10 technology fee and $15 for each additional $1,000 of value; the city's Zoning Fees page lists the first $1,000 at $65.00 with a $10 zoning plan review fee. Pool and spa barrier fences require a building permit, and the fee may be higher due to inspection requirements.
Source: published fee schedule · Verified 11/11/2026
Reroof Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit, residential alterations and repairs $15.00 x 250 = $3,750.00 | $3,750.00 |
○Administrative fee to issue a permit Flat fee $50.00 | $50.00 |
○Technology fee per permit Flat fee $10.00 | $10.00 |
○Plan review, residential 1 and 2 family additions and alterations, 0 to 1,999 square feet Flat fee $50.00 | $50.00 |
○Plan review, residential 1 and 2 family additions and alterations, 2,000 square feet and over Flat fee $75.00 | $75.00 |
○Reinspection fee Flat fee $50.00 | $50.00 |
○Beginning work without a permit Flat fee $150.00 | $150.00 |
How this jurisdiction calculates the fee
City of Chesapeake Department of Development and Permits published fee schedule. There is no re-roofing line item; a residential re-roof is charged under the building fee for residential alterations and repairs, at a rate per $1,000 of value, plus the $50 administrative fee and $10 technology fee that apply to every permit. A 2 percent state levy is assessed on permit fees under Virginia law, and a plan review fee applies where plans are required.
Source: published fee schedule · Verified 10/2/2026
Retaining Wall Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Administrative fee to issue a permit, applicable to all permits (NOT a retaining-wall rate; no retaining-wall permit rate is published) Flat fee $50.00 | $50.00 |
○Technology fee assessed for every permit issued, in addition to all other fees Flat fee $10.00 | $10.00 |
State levy assessed on the total permit fee (Code of Virginia Section 36-137) 2.00 percent | see rule |
Add 2% state levy to all plan review fees; zoning plan review is excepted 2.00 percent | see rule |
○Zoning plan review fee (state 2% is not added) Flat fee $10.00 | $10.00 |
○Beginning work without a permit Flat fee $150.00 | $150.00 |
○Reinspection fee Flat fee $50.00 | $50.00 |
○Certificate of occupancy fee Flat fee $75.00 | $75.00 |
○Board of Building Code Appeals Flat fee $200.00 | $200.00 |
Permit refund Not published as a formula; the schedule directs applicants to the Development and Permits office for refund information | see rule |
How this jurisdiction calculates the fee
A building permit with construction plans and a site plan is required for retaining wall construction in Chesapeake. NO RETAINING-WALL PERMIT RATE IS PUBLISHED. The City of Chesapeake Fee Schedule and Permit Information document (49 pages, rev 08/24/2026) is the city's comprehensive published fee schedule, and neither its 43-entry table of contents nor its body contains a retaining wall category or line item. A retaining wall also does not fall within either of the two residential building categories the schedule does price: Accessory Structures and Residential Permits - New Structure and Addition, charged per 100 square feet, and Residential Permits - Alterations and Repairs, charged per $1,000 of job value; a new retaining wall is neither an alteration nor a repair and has no meaningful floor area. The 08/24/2026 revision replaced the schedule previously cited here (rev 12/31/2025): the amounts below are unchanged, but the printed refund policy was replaced with a direction to contact the department, so the previously stored refund formula has been removed rather than carried forward without a source. The amounts below are only the charges the schedule applies to every permit; none of them is a retaining-wall permit rate.
Source: published fee schedule · Verified 11/4/2026
Shed Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
○Building permit - residential 1 and 2-family dwellings, additions, garages, and sheds, governed by the building code $0.10 x 2,000 = $200.00 | $200.00 |
○Administrative fee to issue a permit Flat fee $50.00 | $50.00 |
○Technology fee per permit Flat fee $10.00 | $10.00 |
○Zoning permit, shed 0 to 100 square feet Flat fee $59.00 | $59.00 |
○Zoning permit, shed 101 to 200 square feet Flat fee $68.00 | $68.00 |
○Zoning permit, shed 201 to 300 square feet Flat fee $77.00 | $77.00 |
○Zoning permit, shed 301 to 400 square feet Flat fee $86.00 | $86.00 |
○Zoning permit, shed 401 to 500 square feet Flat fee $95.00 | $95.00 |
○Zoning permit, shed 501 to 600 square feet Flat fee $104.00 | $104.00 |
○Zoning permit, shed 601 to 700 square feet Flat fee $113.00 | $113.00 |
○Zoning permit, shed 701 to 800 square feet Flat fee $122.00 | $122.00 |
○Zoning plan review fee (added to the banded zoning permit fee) Flat fee $10.00 | $10.00 |
○Reinspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
City of Chesapeake Department of Development and Permits published fee schedules. Sheds are a named category in the building fee schedule and are charged per 100 square feet, plus the $50 administrative fee and $10 technology fee that apply to every permit. Separately, zoning approval is required for all accessory buildings, and the zoning permit fee for a shed is charged in size bands on the city's Zoning Fees page, which adds a $10 zoning plan review fee and states that a $5 technology fee is not included in the banded amounts. A 2 percent state levy is assessed on permit fees under Virginia law.
Source: published fee schedule · Verified 11/4/2026
Water Heater Permit
These lines are alternatives, not a running bill. Pick the one that describes your project and any percentage-based add-ons will be calculated from it.
Electric water heater replacement, same for same No permit required, no fee | see rule |
Water heater repair No permit required, no fee | see rule |
○Gas water heater replacement, same for same - mechanical and gas permit, per $1,000 of construction value or fraction thereof $8.00 x 250 = $2,000.00 | $2,000.00 |
○Plumbing, each fixture (e.g., water line, drain piping, sewer) Flat fee $7.00 | $7.00 |
○Gas outlet Flat fee $7.00 | $7.00 |
○Administrative fee to issue a permit Flat fee $50.00 | $50.00 |
○Technology fee per permit Flat fee $10.00 | $10.00 |
○Reinspection fee Flat fee $50.00 | $50.00 |
How this jurisdiction calculates the fee
City of Chesapeake Department of Development and Permits published fee schedule, with permit applicability taken from the city's Homeowner's Permit Guide. Whether any fee is due depends on the work: a like-for-like electric water heater replacement needs no permit at all, while a like-for-like gas water heater replacement needs a mechanical permit, priced per $1,000 of construction value. A new electric water heater installation needs electrical and plumbing permits, and a new gas water heater installation needs gas, plumbing and electrical permits; plumbing is priced per fixture. Any permit that is required also carries the $50 administrative fee and the $10 technology fee, and a 2 percent state levy is assessed on permit fees under Virginia law.
Source: published fee schedule · Verified 11/4/2026
See the full write-up: Chesapeake building permit cost
Estimate only.Fee schedules change, and building departments set the final valuation and decide which fees apply to your scope. Confirm with the jurisdiction before budgeting. Lines marked “see rule” could not be computed from the published wording and are shown verbatim rather than guessed.