103 ALASKA 2020 SECTION 205
205-1.01 DESCRIPTION . Excavate and backfill for bridges, retaining walls, concrete box culverts,
and other major structures. Furnish all resources to place and remove cribbing. Perform all required sheeting, bracing, bailing, pumping, draining, and grouting. Replace unsuitable material encountered below the elevation of the bottom of footings.
205-2.01 MATERIALS. Use materials that conform to the following:
Selected Material, Type C Subsection 703- 2.07 Porous Backfill Material Subsection 703- 2.10 Structural Fill Subsection 703- 2.13 Controlled Low -Strength Material Subsection 712- 2.22 CONSTRUCTION REQUIREMENTS
205-3.01 Excavation.
205-3.03 BACKFILL. Unless otherwise noted, reuse excavated material for backfill where shown
on the Plans. If additional backfill is required, use material meeting Selected Material, Type C, or as approved by the Engineer. Place backfill material in layers and compact to meet Subsection
205-3 05.
Place underwater backfill in natural stream channels without compaction or layer requirements. Place backfill as unifor mly as possible on all sides of structural units. Avoid unbalanced loading of backfill which could damage the structure. When placed against concrete, place backfill according to the requirements of Section 501. No ponding or jetting of backfill is allow ed.
205-3.04 POROUS BACK FILL MATERIAL. Place porous backfill material continuously within a
vertical plane 1 foot behind retaining walls and abutments, unless otherwise shown on the Plans. Compact to the satisfaction of the Engineer. Where weep holes are shown on the Plans or required by the Specifications, place not less than 1 cubic foot of porous backfill material in the fill at each hole, securely tied in a burlap bag, or wrapped with an acceptable geotextile fabric. Extend the wrapped porous backfill material at least 6 inches above the hole.
205-3.05 COMPACTION. Compact material in conformance with the following, using moisture
and density control unless the Engineer determines that such controls are not feasible.
205-3.06 CONTROLLED LOW -STRENGTH MATERIA L. Acceptance will be based on a
certificat e of compliance. Provide a certificate of compliance for each batch of controlled low - strength material (CLSM) in accordance with Subsection 106- 1.05. Do not place CLSM on frozen ground, in standing water, or during wet weather conditions. Do not place CL SM if ambient air temperature is expected to be less than 40 °F within 48 hours. Ensure the material temperature is at least 50 °F while being placed. 105 ALASKA 2020 Do not apply loads to the CLSM until the compressive strength reaches 50 psi.
205-4.01 METHOD OF M EASUREME NT. See Section 109 and the following:
205-5.01 BASIS OF PA YMENT. Backfill material, obtained f rom within the limits of structure
excavation, is subsidiary to item 205.0001.____. Any backfill material from sources other than excavation for structures will be paid for at the contract unit price for the material being used, or as extra work if no unit price has been established. Porous backfill material includes all materials and construction operations for making weep holes. When Items205.0004.____, 205.0007.___, and 205.0008.____, Porous Backfill Material, do not appear in the bid schedule, porous backfill material is subsidiary. Excavation for Structures includes removal, and disposal of unsuitable material. Excavation for footings ordered by the Engineer, at a depth greater than 3 feet below the bottom of such footings shown on the Plans will be pai d for as extra work. When controlled low -strength material is used as an alternative to structural fill, controlled low - strength material is paid for at the Contract price for structural fill. Payment will be made under: PAY ITEM Item Number Item Descri ption Unit 205.0001.____ Excavation for Structures CY 205.0004.____ Porous Backfill Material CY 205.0005.____ Controlled Low -Strength Material CY 205.0006.____ Structural Fill CY 205.0007.____ Porous Backfill Material TON 205.0008.____ Porous Backfil l Material LS 205.0009.____ Structural Fill TON 205.0010.____ Structural Fill LS 106 ALASKA 2020 SECTION 206 FILTER BLANKET
206-1.01 DESCRIPTION. Construct a layer of specified material in conformance to the plan
dimensions and elevations.
206-2.01 MATERIALS. Use materials that conform to the following:
Filter Blanket Subsection 703- 2.08
206-3.01 CONSTRUCTIO N REQUIREMENTS. Construct Filter Blanket in an even,
homogeneous layer, avoiding contamination by the underlying material. Place the layer to full thickness in on e application or end- dump and spread by tracked equipment.
206-4.01 METHOD OF MEASUREMENT. See Section 109, by volume in final position or by
weight.
206-5.01 BASIS OF PA YMENT. The contract price includes excavating, processing, hauling,
spreading and lev eling of the filter blanket layer. Payment will be made under: PAY ITEM Item Number Item Description Unit 206.0001.____ Filter Blanket CY 206.0002.____ Filter Blanket TON