705.03 Construction Requirements.
705.04 Method of Measurement.
Pavement Markers installed as directed and accepted will be measured by counting separately the number of various class and types of markers provided by the plans or proposal.
705.05 Basis of Payment.
707.01 Description.
This Section shall cover the work of furnishing delineators and object markers and the installation of such at the locations designated on the plans or directed, in conformity with the plans and these specifications. Delineators will be classified by the "type" installation in accordance with plan details, which set forth details of various types of delineator installation. All delineators will be mounted on posts except as shown on the plans or detailed hereinafter. At those locations shown on the plans or directed by the Engineer, delineators meeting the requirements specified hereinafter or on the plans shall be mounted on guardrail. All old delineators shall be removed and disposed of in a manner acceptable to the Engineer. Also at those locations shown on the plans or directed by the Engineer, delineators meeting the requirements specified hereinafter or on the plans shall be mounted on barrier rail. Object Markers will be classified according to the type of installation, in accordance with plan details. Object markers may be composed of sign panel and/or reflectors with backing panel, mounted on posts or highway structures. Object Markers shall also include reflective safety markings applied on roadway objects and bridges in accordance with the details shown on the plans or directed. These object markers shall include: Marking an area with alternate diagonal stripes of reflective yellow and a stripe of a non-reflective material. The size of the area and the width and slope of the stripes along with the reflective color will be shown in the detailed plans or directed by the Engineer. Marking an area with reflective white or silver-white material. The size and shape of the area of coverage will be shown in the detailed plans or directed by the Engineer,
707.02 Materials.
707.03 Construction Requirements.
707.04 Method of Measurement.
Delineator Installations installed as directed and accepted will be measured by counting separately the number of a particular type or types of delineator installations provided by the plans or proposal. Guardrail mounted delineator, installed as directed and accepted, will be measured per each for the number installed. SECTION 707 DELINEATORS AND OBJECT MARKERS Barrier rail mounted delineator, installed as directed and accepted, will be measured per each for the number installed. There will be no measurement of delineators that the Contractor must install to replace damaged or missing delineators. Object Marker Installations installed as directed and accepted will be measured by counting separately the number of a particular type or types of object marker installations provided by the plans or the proposal. Flexible delineator post with base will be measured per each for the number installed. There will be no measurement of posts or bases that the Contractor must install to replace any that are damaged or missing Raised curb channelizer will be measured per linear foot for the quantity installed. There will be no measurement of posts or curb that the Contractor must install to replace any that are damaged or missing. For Object Marker Installations with Applied Materials, the actual area ordered and accepted will be computed in square feet {square meters} to the nearest square foot {0.1 m²} from measurements taken on the surface of the prepared area.
707.05 Basis of Payment.