307.01 307-1 SECTION 307 LIME TREATED SUBGRADE DESCRIPTION
307.01 This work consists of treating the earth subgrade by combining lime and water with the
pulverized soil subgrade material to the specified depth and compaction requirements as shown on the plans. MATERIALS
307.02 Lime. Lime for lime treated subgrade shall be applied in slurry form. Dry application
of lime will not be allowed unless otherwise approved by the Engineer. Commercial lime slurry shall be a pumpable suspension of solids in water. Lime for lime treated subgrad e shall conform to the requirements of ASTM C977 and rate of slaking test for moderate reactivity per ASTM C110 and shall be the product of a high -calcium limestone as defined by ASTM C51.
307.03 Water. Water used for mixing or curing shall be per subsection 712.01, with the
additional requirement that the sulfate content shall be less than 500 ppm. CONSTRUCTION REQUIREMENTS
307.04 General. The Contractor shall construct one or more compacted courses of treated
material, to the depth specified in the Contract. The treated material shall be a uniform blend of soil, lime, and water, free from loose or segregated areas. It shall have uniform density and moisture content and be void of all vegetation and other organic or man -made material. The subgrade shall be well bound for its full depth and width wit h a smooth surface suitable for placing subsequent courses. The Contractor shall re gulate the sequence of the work to accurately apply and uniformly blend the lime at the designated rate and rework the courses as necessary to meet the above requirements. The Contractor shall submit a mix design to the Engineer for approval, before constructing the test section. The Contractor shall mix hydrated or quicklime with water to produce lime slurry at the job site with equipment specifically manufactured for this purpose. Excessive aeration of lime slurry will not be permitted. The lime- treated subgrade shall not be mixed when it is raining, or when the subgrade material is frozen. The lime- treated subgrade shall not be mixed or compacted if the temperature of the lime or soil is below 35 °F.
307.05 Preparation of Subgrade . Before beginning any lime treatment, the subgrade shall be
constructed and finished to smooth and uniform surfaces conforming to the grades and typical sections specified. Variation from the subgrade plane elevations specified shall not be more than plus or minus 0.1 foot. The subgrade shall also be proof rolled per subsection 307.07. Soft or otherwise unsuitable subgrade disclosed by proof rolling shall be over -excavated and replaced to a compacted stable state. The in -place density shall be at least 95 percent of AASHTO T 99 density within 0- 3 percent of optimum moisture content. 307.06 307-2 307.06 Test Section . Before full-scale production, the Contractor shall construct a test section to demonstrate, to the satisfaction of the Engineer, subgrade stabilization using the materials, equipment, and methods to be used in full -scale production. The test section shall be at least 100 feet long, two spreading and mixing lanes wide, and the same depth as the course represented in the plans. The test section shall be constructed at a location approved by the Engineer. The test section shall be tested per the same test requirements for the lime and soil design mix, and as determined by the Contractor. If the test section is unsatisfactory, the Contractor shall adjust the materials, equipment, and methods or combinations thereof as necessary to conform to the specifications. Additional test sections shall be constructed as required to produce a satisfac tory test section before full-scale production. Unsatisfactory test sections shall be removed and replaced at the Contractor’s expense. Full production shall not begin until a satisfactory test section is completed and approved by the Engineer. Before start of work, the Contractor shall determine the lime application rate, and the maximum dry density and optimum moisture content of the material after it has been treated with lime. All tests shall be performed in the presence of the Engineer. These tes t results will be used to determine the Contract requirements for lime application.
307.07 Proof Rolling . Both before and after the lime treatment, the Contractor shall
perform proof rolling per subsection 203.08, except that final proof rolling will take place a minimum of seven days after lime treatment, unless otherwise approved by the Engineer.
307.08 Processing Materials . After the subgrade has been finished and approved as
specified, the subgrade shall then be cut and pulverized by a cutting and pulverizing machine to the depth and width shown on the plans. Precautions shall be taken to avoid forming furrows of loosened material below the depth specified for the lime -stabili zed soil mixture. The machine shall uniformly cut and pulverize the loosened material to a depth not greater than 10 percent over the thickness of the lime- treated layer as specified in the Contract an d shall have cutters that plane the base of the cut and pulverize zone to a smooth surface over the entire width of the cut. The machine must give visible indication at all times that it is cutting to the proper depth.
307.09 Compaction .
307.11 Construction Joints. Construction joints are not required after each day’s work
unless there is a time lapse of seven days or more between the processing of adjacent sections. If construction joints are required, they shall be formed by cutting back into the completed work to form a vertical face. Damage to completed work shall be avo ided.
307.12 Thickness Acceptance . Lime treated subgrade will be accepted for minimum
thickness on a lot basis. A lot will consist of 1,500 square yards. One core shall be taken at random by the Contractor’s Process Control Inspector in each lot. When the measurement of the core from a lot is not deficient by more than 0.5 inch from the minimum plan thickness, full payment will be made. When such measurement is deficient by more than 0.5 inch and not more than 1.0 inch from the plan thickness, two additional cores shall be taken at random and used in determining the average thickness for that lot. The thickness of the core shall be determined by average caliper measurement of cores tested per ASTM C174. When the average measurement of the three cores is not deficient by more than 0.5 inch from the plan thickness, full payment will be made. If the average measurement of the three cores is deficient by more than 0.5 inch but less than 1.0 inch from the plan thickness, the entire lot may be left in place and a 10 percent price reduction t o the contract unit price will be made. If the average measurement of the three cores is deficient more than 1.0 inch but less than 2.0 inches from the plan thickness, the entire lot may be left in place and a 50 percent price reduction to the contract un it price will be made. When the average thickness is deficient by more than 2.0 inches, the entire lot shall be replaced at the Contractor’s expense. 307.12 307-5 Table 307 -1 SCHEDULE FOR MINIMUM SAMPLING AND TESTING Element and Procedure Process Control Acceptance Remarks pH ASTM C977 (App) (Design) ASTM G51 (Field) 1/5000 sq yd or fraction thereof 1/10,000 sq yd or fraction pH will be determined after % lime has been established based on unconfined compressive strength Atterburg Limits AASHTO T89, T90 1/5000 sq yd or fraction thereof 1/10,000 sq yd or fraction Reduce by 1/2 original PI Swell Potential ASTM D4546 1/5000 sq yd or fraction thereof 1/10,000 sq yd or fraction 1/2% or less with 200 psf surcharge pressure Unconfined Compressive Strength ASTM D5102 (Procedure B) 1/5000 sq yd or fraction thereof 1/soil type 1/10,000 sq yd or fraction 1/soil type Determined by design plan criteria. Do not immerse in water after moist -cure period. The tests shall be conducted on samples cured in a moist environment for 5 days @ 100 °F. Thickness Acceptance ASTM C174 A lot is defined as 1 core per 1500 sq yd or fraction thereof 1/3000 sq yd or fraction When measurement is <0.5”, 2 additional cores shall be taken in that lot and the average of 3 cores will determine the thickness of that lot Gradation AASHTO T11 and T27 1/5000 sq yd or fraction thereof 1/10,000 sq yd or fraction 1": 100% passing; #4: 60% passing. Dry sieving after final mixing Determining Percent Relative Compaction Soil-Aggregate by Nuclear Method CP 80 1/5000 sq yd or fraction thereof 1/10,000 sq yds or fraction Minimum 95% of maximum dry density per AASHTO T 99. Moisture content of mixture at the start of compaction shall be at 2 ± 1% above optimum moisture content. Moisture Density Curve AASHTO T99 1/soil type 1/soil type Sulfate CP-L 2103 1/soil type 1/soil type Water soluble sulfate content in soil shall be less than 0.2% by dry soil weight. 307.13 307-6 METHOD OF MEASUREMENT
307.13 Hydrated lime will be measured by the ton. If quicklime is used the pay quantity will
be determined using the certified lime purity for each truckload as follows: Pure quicklime (CaO) • 1.32 = Hydrated Lime (Ca(OH) 2) Quicklime delivered • % purity • 1.32 = A Quicklime delivered • % inert material = B A + B = total hydrated lime produced = pay quantity Processing lime -treated subgrade will be measured by the square yard for the area completed and accepted. Overlap mixing will not be measured and paid for separately but shall be included in the work. BASIS OF PAYMENT
307.14 The accepted quantities will be paid for at the contract unit price for each of the
pay items listed below that appear in the bid schedule. Payment shall include all processing materials, lime application and mixing, compaction, and materials used in curin g. Payment will be made under: Pay Item Pay Unit Hydrated Lime Ton Processing Lime Treated Subgrade ( Inch) Square Yard Test sections and coring will not be measured and paid for separately but shall be included in the work. All proof rolling will be measured and paid for per Section 203. 401.01 401-1 DIVISION 400 PAVEMENTS SECTION 401 PLANT MIX PAVEMENTS –GENERAL DESCRIPTION
401.01 These specifications include general requirements that are applicable to all types of
hot mix asphalts irrespective of gradation of aggregate, kind and quantity of asphalt cement , or pavement use. Deviations from these general requirements will be indicated in the specific requirements for each type. This work consists of one or more courses of asphalt mixture constructed on a prepared foundation per these specifications and the specific requirements of the type under contract, and in conformity with the lines, grades , thicknesses, and typical cross sections shown on the plans or established. MATERIALS
401.02 Composition of Mixtures . The asphalt plant mix shall be composed of a mixture of
aggregate, filler or additives if required and approved, asphalt cement, and reclaimed material if permitted and used.