405.01 405-1 HEATING AND SCARIFYING TREATMENT DESCRIPTION
405.01 This work consists of recycling the top portion of the existing asphalt pavement as
shown in the Contract, by cleaning, heating, scarifying , redistributing, re -leveling, compacting, and rejuvenating the existing asphaltic material. MATERIALS
405.02 Asphalt rejuvenating agent shall meet the requirements of subsection 702.02(f).
CONSTRUCTION REQUIREMENTS
405.03 Weather limitations shall be as provided in subsection 401.07. Before commencing
heating and scarifying operations, the pavement shall be cleaned of all loose material. Power brooms shall be supplemented by hand brooming and use of other tools as required to bring the surface to a clean, suitable condition free of deleterious material. Equipment used to heat and scarify the asphalt surface shall meet the following requirements:
405.04 Heating and scarifying treatment will be measured by the square yard of work
completed and accepted. BASIS OF PAYMENT
405.05 The accepted quantities of heating and scarifying treatment will be paid at the
contract unit price per square yard for heating and scarifying treatment, and shall include cleaning, heating, scarifying, redistributing, re- leveling, and compacting the existing asphalt surfacing. Payment will be made under: Pay Item Pay Unit Heating and Scarifying Treatment Square Yard Asphalt rejuvenating agent will be measured and paid for per Section 411. 406.01 406-1 SECTION 406 COLD ASPHALT PAVEMENT (RECYCLE) DESCRIPTION
406.01 This work consists of pulverizing the existing asphalt surfacing to the depth shown on
the plans, mixing a recycling agent and water, if required, with the pulverized material, then spreading and compacting the mixed material. MATERIALS
406.02 The recycling agent shall be either a high float emulsified asphalt (polymerized) or
emulsified recycling agent meeting the requirements of subsection 702.02(e). The pulverized material shall meet the following gradation requirements: Table 406 -1 COLD ASPHALT PAVEMENT (RECYCLE) PULVERIZED MATERIAL GRADATION REQUIREMENTS Sieve Size Percent Passing 31.5 mm (1 1/4 inch) 100 25.0 mm (1 inch) 90-100 The sealing emulsion shall be high float emulsion (diluted), emulsified asphalt (SS), or approved equal. CONSTRUCTION REQUIREMENTS
406.03 Weather Limitations . Daily recycling operations shall not begin until the atmospheric
temperature is 55 ºF and rising. Recycling operations shall be discontinued when the temperature is 60 ºF and falling. Recycling operations shall not be performed when the weather is foggy or rainy, or when weather conditions are such that the proper mixing, spreading, compacting, and curing of the recycled material cannot be accomplished. Cold recycled pavement damaged by precipitation shall be reprocessed or repaired by methods approved by the Engineer, at the Contractor’s expense. The construction of cold recycled pavement will not be allowed from September 16 through May 14 unless otherwise approved. The Contractor’s Progress Schedule shall show the methods to be used to comply with this requirement.
406.04 Milling . The existing asphalt surfacing shall be cold recycled in a manner that does not
disturb the underlying material in the existing roadway. Adjacent recycling passes shall overlap at the longitudinal joint a minimum of 4 inches. The beginning of each day’s recycling operation shall overlap the end of the preceding recycling operation a minimum of 100 feet unless otherwise directed.