BITUMINOUS MATERIALS

403BITUMINOUS PAVEMENT MATERIALS FOR TEMPORARY ROADWAY MATERIAL

DE · 2026 Standard Specifications✓ Full text on BuildSpecBook pages 145–0 Save this section

Ask about Section 403

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

403.1Description.

This work consists of providing and placing bituminous pavement as TRM.

403.2Materials.

A.Cold Patch Section 1015

403.3Construction.

Coordinate placement and compaction of TRM with all other work and operations necessary to maintain traffic safety.

403.4Method of Measurement.

The Department will measure TRM by tons placed calculated in accordance with Section 109.1.

403.5Basis of Payment.

The Department will pay for TRM at the contract unit price per ton. Payment constitutes full compensation for providing, preparing, placing, and removing materials. ITEM DESCRIPTION UNIT 403000 BITUMINOUS CONCRETE AND/OR COLD-LAID BITUMINOUS CONCRETE (TRM) TON

Referenced in this section
Sections that cite this one

Get an email when 403 changes

Delaware revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Delaware Standard Specifications for Road and Bridge Construction, 2026 Edition. Pages 145–0 of 786. View official source ↗