403.1Description.
This work consists of providing and placing bituminous pavement as TRM.
403.2Materials.
403.3Construction.
Coordinate placement and compaction of TRM with all other work and operations necessary to maintain traffic safety.
403.4Method of Measurement.
The Department will measure TRM by tons placed calculated in accordance with Section 109.1.
403.5Basis of Payment.
The Department will pay for TRM at the contract unit price per ton. Payment constitutes full compensation for providing, preparing, placing, and removing materials. ITEM DESCRIPTION UNIT 403000 BITUMINOUS CONCRETE AND/OR COLD-LAID BITUMINOUS CONCRETE (TRM) TON