460-1Description
460-1.1General: Prepare, fabricate, assemble, erect, and perform all nondes tructive
testing for structural steel or miscellaneous metal structures, or portions thereof in accordance with the Contract Documents . Obtain Structural Steel and Miscellaneous Metals from a fabricator that is currently on the Department’s Production Facility Listing. Fabricators seeking inclusion on the list shall meet the req uirements of Section 105. As used in this specification, the following terms shall apply: Main or primary load -carrying member or component: This designation refers to the following;
(I or box, curved or straight)
curved beams or girders
traffic live load and/or other loads
or box girders (trapezoidal members) and their connection plates
cross frame and diaphragm connection and gusset plates, but not transverse and bearing stiffeners (unless acting as a cross frame or diaphragm )
secondary in the Contract Documents
Documents
Miscellaneous components - This designation refers to, but is not limited to, the following:
460-1.2Fabrication Categories : As a prerequisite for being on the Department’s
Production Facility Listing, fabricators must currently be accredited in accordance with one of the programs in Table 460-1, by fabrication category/categories of the products that they are producing. 634 FY 2023-24 Return to Table of Contents Fabricators are required to submit their proposed fabrication Quality Control (QC) Plan for review by the Department.
Table 460-1 Fabrication Categories Structure Type Accepted Accreditation Program Simple Steel Bridge: Pedestrian bridge (prefabricated steel truss pedestrian bridges meeting the Category 1 conditions of FDOT Design Manual 266.4), bridge grid decking AISC Simple Bridge Steel Bridge: Vehicular bridge, Pedestrian bridge (all others) AISC Advanced Bridge Fracture Critical Endorsement Structural Highway Metal Components , Group I: bridge machinery, bridge bearings, modular joints, load plates, laminated bearing pads, cantilever, truss/span, monotube, gantry, mast arms, steel light poles, aluminum light poles, aluminum j -arms, drainage (welded gratings, frames, inlets) AISC Components Manufacturer or AWS Welding Fabricator Structural Highway Metal Components, Group II: bridge forgings, bridge castings, steel railing, aluminum railing, castings (manhole, grating, inlet, frame), guardrail, coated steel fence, elastomeric bearing pads, stay in -place forms ISO 9001 Notes: An AISC fracture critical (FC) endorsement is required for all FC work. Other accreditations programs may be submitted to the FDOT State Materials Office for review and consideration in addition to the programs listed in the table above.
460-2Materials
Provide the materials specified in the Contract Documents in accordance with Sections 6, 105, ASTM A6, and AASHTO/AWS D1.5, Bridge Welding Code. Fabricate all unpainted steel elements using steels with weathering characteristics as defined in ASTM A709 for grades with a “W” suffix. Structural components designated as “fracture critical” shall conform to the provisions of the AASHTO/AWS D1.5, Bridge Welding Code, Clause 12-AASHTO/AWS Fracture Critical Control Plan for Non -Redundant Members, in a ddition to the requirements of the Contract Documents. Meet the additional following requirements: Steel and Miscellaneous Metal Items ................. Section 962 Material Testing and Certifications .................... Section 962 Galvanizing ................................ ......................... Section 962 Structural Coatings ................................ ..............Section 560 Structural Coating Materials ............................... Section 975
460-3Pre-Assembly Requirements
460-3.1Shop Drawings: When shop drawings are required, submit such drawings in
accordance with Section 5. For drawing presentation format, refer to the AASHTO/NSBA Steel Bridge Col laboration “Guidelines for Shop Detail Drawing Presentation”. 635 FY 2023-24 Return to Table of Contents
460-3.2Welding Procedures: Submit all shop and field welding procedures to the
Engineer. Such procedures shall contain a notation that they have been reviewed by a Certified Welding Inspector, and shall be signed, dated and stamped accordingly.
460-3.3Pre-Assembly Meeting: Prior to commencing work, a meeting shall be held
between the Contractor and the Engineer. Representatives of the Fabricator, Suppliers or subcontractors may attend the meeting if requested by the Engineer or Contractor. During this meeting, the Engineer may review various aspects of the job, including but not limited to, any of the following:
painting.
specific fabrication/erection operations.
specifically between the fabrication shop blocking diagrams and available site locations for temporary support during erection.
460-3.4Access to Fabrication Facilities: Provide the Engineer full access of facilities or
sites where the product is being stored, fa bricated, assembled , coated or erected. Provide and maintain office facilities at the fabrication facility for the Department’s inspectors that ensure a reasonable amount of privacy, are clean, properly illuminated, heated or air -conditioned as necessary and are relatively free of noise, dust an d odors. Locate the office reasonably close to the work and provide access any time fabrication, assembly or erection operations are in progress. Provide a desk, chair, and a four -drawer locking file cabinet for the use by each inspector and the Engineer. Provide a telephone within the office with an outside line suitable for modem communication. Provide ready access to adequate parking, fax and copy machines, and clean, contractor -maintained restrooms within a reasonable distance to the office. The Engin eer may observe any or all activities and perform nondestructive testing of materials, components and the fabricated product to the extent considered necessary to confirm the conformance with Contract Documents.
460-3.5Notification Prior to Commencement of Assembly : Notify the Engineer at
least one wee k prior to beginning assembly , when conducted in -state, and at least two weeks prior to beginning assembly , when conducted out -of-state.
460-4Shop Workmanship and Assembly
460-4.1Handling , Transporting and Storage of Materials:
636 FY 2023-24 Return to Table of Contents 460-4.1.1 General: Handle, transport and store plates, shapes, assemblies, fastener components and other parts in a manner that protects them from damage and facilitates subsequent inspections in a safe manner. Provide storage which will keep materials, assemblies, other c omponents and parts clean, and free from dirt, grease, other foreign matter , unacceptable corrosion or coating deterioration , and any other adverse environmental conditions. 460-4.1.2 Bulk Mate rials: Ensure that all bulk materials, such as shear studs , are stored together in individual LOTs and that the outside of each container has a list and description of the contents. Maintain a sep arate list of the weights of all tools and erection materials. 460-4.1.3 Fastener Assemblies (Bolts, Nuts and Washers): Transport and store fastener assemblies in sealed, watertight containers. Label the side of each container with the supplier’s name and LOT identification number, and marked to identify the cont ents and size of the fastener components. Ensure that all surfaces of the nuts are lubricated prior to their placement in watertight containers. Provide containers for components that are capable of protecting them from moisture and other harmful materials . Maintain containers in their sealed conditions until they are opened for use at their assembly locations. Do not remove more fastener assemblies from the protected area than can be installed and tightened during a work shift. Leave the containers unop ened until needed for assembly. At the end of the work shift, return unused fastener assemblies to the protected storage area for future use. Protect opened storage containers from contamination. 460-4.1.4 Coatings: Store coatings in accordance with Sections 962, and 975 and the manufacturer’s recommendations. Notify the Engineer if the manufacturer’s recommendations vary from that provided in the Contract Documents. 460-4.1.5 Anchor Rods and Nuts: Ship anchor rods and nuts as an assembly. Washers may be shipped separate from the assembly.
460-4.2Material Traceability:
460-4.2.1 General : All materials arriving at the shop shall be properly identified in accordance the requirements of ASTM A6. Document all m ain load-carrying member material, high -strength fastener assemblies, and weld materials incorporated into the work through the entire fabrication process. Document this material traceability in a report type format that correlates heat numbers to their re spective locations in the completed members. Submit diagrams and sketches as requested by the Engineer for clarity. At the fabrication facility, m aintain the records of the material testing and certification processes and component/part identification a s part of the fabricator’s permanent project records for a period of not less than two years as measured from the last shipment of materials from the fabricator’s facility . Submit all project-related records to the Engineer. Mark the weight on members w eighing more than three tons , in a visible location. 460-4.2.2 Match Marking of Members and Assemblies: Match mark all connecting members or parts that have been reamed or drilled while assembled . The fabricator shall submit a diagram showi ng all marks and c learly indicate the location of all the marks on the shop drawings. Use painted marks, attached metal tags, other durable methods which do not degrade the finish of the piece, including plasma etching or low-stress type steel die stamps to identify and match mark pieces. If steel die stamps are used, they must be blunt nosed or 637FY 2023-24Return to Table of Contents
interrupted dot dies, manufactured to produce impressions that are rounded at the bottom of the
impression. Re-mark coated type markings as necessary to maintain continuity in traceability.
Plasma etching using robotic equipment may be used to mark the surface of a steel plate when
done at 10 amps and at 150 inches per minute. Plasma etching outside of these parameters
requires Engineer approval.
Mark splice plates and girders so that upon erection, the mark on the splice
plate is located opposite a matching mark on the girder. Place the mark on web splice plates,
midway down the long side of the plate, on either the right or left side, to correspond with the
girder to which the splice plate will be temporarily attached for shipping to the erection site.
Make a matching stamp on the girder web opposite the mark on the splice plate.
Place the mark on top or bottom flange splice plates, on the right or left
end of the plate, corresponding to the girder to which the plate will be attached for shipment to
the erection site. Place a corresponding mark on the girder flange opposite the mark in the splice
plate.
As an alternate location for tub girder bottom flange splice plates, place
the mark midway down the long side of the plate, on either the right or left side, to correspond
with the girder to which the splice plate will be temporarily attached for shipping to the erection
site. Make a matching mark on the girder flange opposite the mark on the splice plate.
Mark girders and beams on the left end, according to the orientation
shown in the shop drawings, near the top flange. Mark diaphragms in the middle upper portion of
the web. Mark cross-frames in the middle of the top or bottom horizontal member.
When heat numbers and other identification marking are applied by die
stamping to fracture critical members, low stress dies shall be used.
Low-stress die stamp markings applied to fracture critical members shall
be placed in locations or zones shown or described in the approved shop drawings. Low-stress or
compression areas are preferred.
Ensure that during fabrication, the heat number is maintained on each
primary load-carrying component by paint until the component is permanently joined into a
piece marked member or assembly.
460-4.3Workmanship:
460-4.3.1 Cutting, Shearing and Machining: Cutting (including burning and
sawing), shearing, and machining shall be accomplished in accordance with the
AASHTO/AWS 1.5, Bridge Welding Code and the following requirements:
Plane, mill, grind or thermally cut the sheared edges of main load-carrying
member plate components greater than 5/8 inch thick to a depth of 1/4 inch.
Cut and fabricate steel plates so that the primary direction of rolling is
parallel to the direction of the member or component main stress. For flanges and webs, the
direction of rolling is parallel to the flanges unless noted otherwise in the Contract Documents.
Web splice plates may be rolled parallel to their length.
460-4.3.2 Bending:
460-4.3.2.1 Cold Bending: Fracture critical and non fracture critical
plates and bars shall be cold bent, unless otherwise permitted according to the provisions of
The minimum bend radii measured to the concave face of the plate,
shall be taken as 5.0(t) for all grades and thicknesses of steel conforming to structural steel for
bridges, AASHTO M 270M/M 270 (ASTM A709/A709M), where ‘t’ is the thickness of the plate 638FY 2023-24Return to Table of Contents
in inches. For cross-frame or diaphragm connection plates up to 0.75 inches, the minimum
bending radii may be taken as 1.5(t). For all other grades of steel the minimum bend radii
recommendations from the plate fabricator shall be followed, but the radii shall not be less than
the minimums specified herein.
Wherever possible, bend lines shall be oriented perpendicular to
the direction of final rolling of the plate. If the bend lines are parallel to the direction of final
rolling, the minimum bend radii shall be increased to 7.5(t).
460-4.3.2.2 Hot Bending: Fracture critical and non-fracture critical plates
and bars may be bent hot subject to the approval of the Engineer. Heat-shrink methods as
described in 460-4.3.4 are also permitted. If hot bending is to be employed, the heating and
bending procedure shall be submitted for review and approval by the Engineer. The plates and
bars shall be bent hot at a temperature above the blue brittle temperature of steel (700° F), not to
exceed the temperature limits in Table 460-2. The minimum radii of the hot bend must satisfy
the requirements of 460-4.3.2.1.
460-4.3.3 Straightening: Member components, such as plates, angles or shapes,
are to be straightened before the parts are assembled. Perform straightening such that no cracking
or other damage occurs in the part. If heat is to be used for straightening, follow the provisions of
460-4.3.4.
460-4.3.4 Heat Application:
460-4.3.4.1 General: At various points during the fabrication of structural
steel, applications of heat may be necessary for hot-bending, cambering, curving or
straightening. Use the temperature limits and guidelines given in this Section, unless alternate
procedures have been approved by the Engineer. Routine straightening of material other than
quenched and tempered material shall be done in accordance with the temperature limits and
guidelines as specified herein, but do not require a submitted procedure.
Heat curving may be used in conjunction with a cut-curve
procedure, in which a portion of the curvature is obtained by cutting the plates to all or part of
the required radius, except as limited by 460-4.3.4.4.
460-4.3.4.2 Heating Process and Equipment:
460-4.3.4.2.1 Maximum Temperatures: The maximum allowable
temperature to which the material can be heated is given in Table 460-2, Maximum Temperature
Limits for Heat Applications.
Table 460-2
Maximum Temperature Limits for Heat Applications
ASTM A709 Grade Maximum Temperature, °F
36, 50, 50S, 50W & HPS 50W 1,200
HPS 70W & HPS 100W 1,100
460-4.3.4.2.2 Timing of Heat Applications: Conduct heating
operations prior to the application of coatings.
460-4.3.4.2.3 Allowable Preload Stresses: Preload compressive
stresses will be permitted up to 0.5 times the minimum specified yield strength (Fy) of the
material. This stress limit is applicable to all steels covered by this specification as listed in
Table 460-2. If jacks are used, energize and lock off prior to the application of heat. 639FY 2023-24Return to Table of Contents
460-4.3.4.2.4 Heating Tips: Apply heat using orifice tips only.
Select tip sizes proportional to the thickness of the heated material.
460-4.3.4.2.5 Torches: Manipulate the heating torches to guard
against general and surface overheating. In addition, place heat reflective sheet material against
the web before applying heat to the inside flange surface. When heating the inside flange surface,
point the torches to prevent applying heat directly to the web.
460-4.3.4.2.6 Heating Patterns: Fundamental heating patterns
(such as vee, line, edge, spot, and strip) may be used separately or in combination. Mark vee and
strip heat patterns on the material surfaces prior to heating. When heating, bring the steel within
the planned pattern to the specified heating temperature as rapidly as possible without
overheating the steel. Apply heat in accordance with the approved procedure.
460-4.3.4.2.7 Thin Wide Plates: Prevent buckling of thin wide
plates by not applying excessive heat.
460-4.3.4.2.8 Verification of Temperatures: Use temperature-
sensitive crayons, pyrometers, or infrared non-contact thermometers for verifying temperatures
during heating operations. When heating patterns are used, make regular verifications of the
temperatures throughout the pattern. Remove the heating flame from the material before taking
measurements.
460-4.3.4.2.9 Cooling: Prior to the use of any artificial cooling,
allow steel to cool below 600°F. Use only dry compressed air. Do not quench with water or a
water and air mixture.
460-4.3.4.2.10 Reheating: Reheat only after the material has
cooled below 250°F.
460-4.3.4.2.11 Over Heating: The Engineer may reject the
product, if any portion of the material is exposed to heating higher than the allowable
temperature.
460-4.3.4.3 Heat-Curving of Bridge Members (Weak Axis Shaping):
460-4.3.4.3.1 General: Rolled beams and girders may be heat-
curved at the job site, provided that the heating is performed in accordance with the Engineer’s
approval.
460-4.3.4.3.2 Sequence of Operations: Heat curve members prior
to the attachment of longitudinal stiffeners.
460-4.3.4.3.3 Web Position: When the radius is less than
1,000 feet, heat curve members with the web in the horizontal position or preloaded to induce
stress prior to heating. Otherwise, members may be heat-curved with the web in either the
vertical or horizontal position.
460-4.3.4.3.4 Subsequent Heats: If multiple locations are to be
heated, do not reheat the same location until after at least three heats at other locations.
460-4.3.4.3.5 Locating Heating Patterns: Space the heating
patterns along the full length of each flange to produce a circular (not parabolic) curvature.
Adjust the heating patterns to produce the necessary curvature. Compensate for differences in
flange thickness and width as necessary. Use enough heating patterns in each piece to eliminate
chording effects.
460-4.3.4.4 Minimum Radius for Heat-Curving: Heat-curving of beams
and girders is allowed when the horizontal radius of curvature measured to the centerline of the
member web is greater than both values calculated by Equations 4.1 and 4.2 below, and greater 640FY 2023-24Return to Table of Contents
than 150 feet at any and all cross sections throughout the length of the member. Do not heat
curve steels with a minimum specified yield strength greater than 50 ksi, other than
ASTM A709, Grade HPS 70W. tF
bD
R
y
ψ
=
in. (Equation 4.1) ψ y F
b
R 7500
=
in. (Equation 4.2)
where:
Fy = specified minimum yield point of member web, ksi;
ψ = ratio of the total cross section area to the cross-sectional area of both flanges;
b = width of the widest flange, inch;
D = clear distance between flanges, inch;
t = web thickness, inch;
R = radius, inch.
In addition to the above requirements, do not heat curve if the radius is
less than 1,000 feet when the flange thickness exceeds 3 inches or the flange width exceeds 30 inches.
460-4.3.4.5 Heat-Cambering (Strong Axis Shaping):
460-4.3.4.5.1 General: Procedures for cambering of built-up plate
girders shall be submitted as a part of the Producer Quality Control (QC) Plan. In the procedures,
address any proposed preloading and heat application and control. Minor heat adjustments in
camber at the finishing stage of the girder do not require approval if the patterns and
temperatures are followed in accordance with the approved procedures.
Do not utilize heat-cambering as the primary source of
vertical camber in horizontally curved main load-carrying members; cut the web plate to the
required position. Only use heat-cambering on horizontally curved main members to adjust cut
cambering with the approval of the Engineer.
460-4.3.4.5.2 Web Position: Support members to be heat-
cambered with the web vertical. Space supports to take maximum advantage of dead load in the
member prior to the application of heat.
460-4.3.4.5.3 Subsequent Heats: If multiple locations are to be
heated, do not reheat the same location until after at least three heats at other locations.
460-4.3.4.5.4 Rolled Beams: Rolled beams may be heat-cambered
to provide the required curvature at the producing mill. Attach all detail material, such as
connection plates, bearing stiffeners and gusset plates, after the beam has been heat-cambered.
460-4.3.4.6 Heat-Straightening Damaged Structural Steel:
460-4.3.4.6.1 General: Submit procedures for heat-straightening
for the Engineer’s review prior to beginning the work. Describe in detail the distortion to be
corrected and all details for preloading, heating, cooling, verifying final dimensions, and
nondestructive testing. 641FY 2023-24Return to Table of Contents
460-4.3.4.6.2 Cracking: As a minimum, visually examine all heat-
straightened areas. Notify the Engineer when suspected areas of cracking are found. Examine
these areas by one or more of the following methods, as directed by the Engineer:
460-4.3.4.6.3 Restraining Forces: Restraining forces (usually
jacks) shall be set to restrain the steel during heating, but allow free contraction during cooling.
In addition, apply the restraining forces in a direction tending to restore the member and limit the
magnitude so that the material is not overstressed during heating.
460-4.3.4.6.4 Heating: Heat the steel in a single pass following the
specified pattern and allow it to cool to below 250°F prior to reheating. Select heating patterns
and sequences appropriate for the type of damage and shape of the cross section. Simultaneous
vee heats may be used provided the clear spacing between vees is greater than the width of the
plate element.
460-4.3.4.6.5 Subsequent Repair: Heat cambered members
damaged after cambering may be repaired. However, do not repair previously heat-straightened
members in the same region of damage without the approval of the Engineer.
460-4.3.4.7 Heat Treatment:
460-4.3.4.7.1 General: When any special form of heat treatment is
required, it will be described in the Contract Documents. Perform heat treatments prior to any
boring, machining or straightening operations.
460-4.3.4.7.2 Stress Relief: Where required, perform thermal
stress relief in accordance with the procedure outlined in the AASHTO/AWS D1.5, Bridge
Welding Code. Provide welding materials consistent with the stress relieving process utilized.
460-4.3.4.7.3 Normalizing and Annealing: Where required by the
Contract Documents, perform normalizing and annealing as defined in ASTM A941. Maintain
temperatures uniformly throughout the furnace during heating and cooling so that the
temperatures at any points on the member do not differ by more than 130°F.
460-4.3.4.8 Contact and Bearing Surfaces: Provide surface finishes of
bearings, base plates, and other contact surfaces in accordance with the ANSI surface roughness
requirements as defined in ANSI B46.1, Surface Roughness, Waviness and Lay, Part I, given in
Table 460-3, ANSI Surface Roughness Requirements.
Table 460-3
ANSI Surface Roughness Requirements
Steel slabs ANSI 2000 micro-inch
Heavy plates in contact with shoes to be welded ANSI 1000 micro-inch
Milled ends to compression members, milled or
ground ends of stiffeners or rockers ANSI 500 micro-inch
Bridge rollers and rockers ANSI 250 micro-inch
Sliding bearings ANSI 125 micro-inch
Pins and pin holes ANSI 125 micro-inch 642FY 2023-24Return to Table of Contents
460-4.3.4.9 Cleaning and Coating (Including Galvanizing):
460-4.3.4.9.1 General: Clean and coat the work in accordance
with 460-2 and/or 460-7.2 and Sections 560, and 562.
460-4.3.4.9.2 Removal of Lubricants: Remove lubricants from
the exposed surfaces of installed fastener assemblies and other surfaces in accordance with the
approved Producer QC Plan or the paint manufacturer’s recommendations prior to painting.
Demonstrate the procedures to the Engineer prior to preparations for painting. Bring to the
Engineer’s attention any manufacturer’s processes or procedures that conflict with those
specified in the Contract Documents.
460-4.3.5 Bolt Holes:
460-4.3.5.1 General: Unless shown otherwise in the Contract Documents,
the bolt hole geometry is to be as shown in Table 460-4, Bolt Hole Geometry.
Table 460-4
Bolt Hole Geometry
Bolt Diameter
(d), inch
Standard
(Diameter, inch)
Oversize
(Diameter, inch)
Short-Slotted
(Width, inch by
Length, inch)
Long-Slotted
(Width, inch by
Length, inch)
1/2 9/16 5/8 9/16 x 11/16 9/16 x 1 1/4
5/8 11/16 13/16 11/16 x 7/8 11/16 x 1 9/16
3/4 13/16 15/16 13/16 x 1 13/16 x 1 7/8
7/8 15/16 1 1/16 15/16 x 1 1/8 15/16 x 2 3/16
1 1 1/16 1 1/4 1 1/16 x 1 5/16 1 1/16 x 2 1/2
> 1 1/8 d + 1/16 D + 5/16 (d + 1/16) x (d + 3/8) (d + 1/16) x
(2.5 x d)
Note: Except as shown elsewhere in the Contract Documents, bolt holes in the connections of primary members are to be
standard size.
460-4.3.5.2 Holes, Tolerances and Quality: Make bolt (and anchor rod)
holes using any method suitable to the Fabricator and as specified below; except holes for high
strength fasteners in main or primary load-carrying members which are not to be punched full
size, but may be thermally cut in accordance with 460-4.3.5.4 and ground smooth with the
approval of the Engineer.
The misalignment of holes in a bolt group relative to the same
holes in the component or components it is joined to in a connection, shall not exceed 1/32 inch
for 85% of the bolt holes in that group. Bolt holes are to be normal to the work and have no tears,
cracks, fins, dirt, loose rust, burrs or other anomalies, and the surface is to be flat within a slope
of 1/20. Bolt holes are to be round within plus or minus 1/32 inch and within plus or minus 1/32
inch of the specified size. For subsize holes, a pin 1/8 inch smaller than the subsize holes must be
able to pass through all assembled plies in at least 75% of the locations prior to reaming. Holes
inclined more than 3 degrees to a surface in any direction must have a hardened beveled washer
provided at that face. Unless specified elsewhere in the Contract Documents, it is not required to
coat the inside of the bolt holes.
460-4.3.5.3 Slotted Holes: Slots may be made by a single punch, or by
joining two adjacent drilled or punched holes when punching is permitted. When joining holes,
thermal cutting is to follow the common tangent to the two holes, and this cut is to be ground. Do 643FY 2023-24Return to Table of Contents
not make slotted holes more than 1/32 inch in width nor 1/16 inch greater in length than
specified. Grind smooth any flame cut portions of the slot to ANSI 1000 micro-inches.
460-4.3.5.4 Holes in Plates Not Subjected to Tensile Stress: Large
diameter holes in heavy plates not subjected to tensile stress (such as bearing plates) and slotted
holes in materials not subject to tensile stress may be thermally cut, followed by appropriate
grinding to smooth the periphery. Stop the practice if gouges or other defects occur, or if directed
by the Engineer. These holes are to meet the following criteria:
Do not thermally cut holes in ASTM A709, GradeHPS 100W steel.
Provide hole centerlines aligned within plus or minus 1/16 inch of theoretical. The inside (cut)
faces of the hole are to be perpendicular to the plane of the plate. Eighty-five percent of the
1/16 inch. Local notches, gouges or the maximum diameter shall not exceed that specified in the
Contract Documents plus or minus 3/32 inch.
460-4.3.5.5 Punching: Material forming parts of a member composed of
five thicknesses or less of metal may be punched full-size. When more than five thicknesses of
material are joined, material shall be subdrilled or subpunched and then reamed full-size, or
drilled full-size while in assembly. Subpunched or subdrilled holes, when required, must be at
least 3/16 inches smaller than the finished hole size.
Holes in cross frames, lateral bracing components, and the
corresponding holes in connection plates between girders and cross frames or lateral components
may be punched full size. Holes in longitudinal main load-carrying members, transverse
floorbeams, and any components designated as fracture critical (FCMs) shall not be punched
full-size.
460-4.3.5.6 Edge Distance: Provide minimum as-fabricated distance from
the center of a bolt hole to an edge as given in Table 460-5, Edge Distances, unless otherwise
shown in the Contract Documents.
Table 460-5
Edge Distances
Fastener Size, Inch Sheared Edge, Inch Rolled Edges of Plates or Shapes
or Gas Cut Edges Inch
5/8 1-1/8 7/8
3/4 1-1/4 1
7/8 1-1/2 1-1/8
1 1-3/4 1-1/4
460-4.3.5.7 Bolted Splice Gaps: Unless shown elsewhere in the Contract
Documents, the tolerance for bolted splice gaps (open distance face-of-web/flange to face-of-
web/flange) shall be from zero (no gap between faces) to a maximum of 1/8 inch greater than the
gap shown on the Plans. If no gap is shown in the Plans, assume that a nominal gap of 3/8 inch is
required. In addition, meet the edge distance requirements, provided above.
460-4.3.5.8 Maximum Edge Distance: Unless otherwise specified in the
Contract Documents, the maximum fabricated distance from any edge to the center of the hole
shall be 8 times the thickness of the thinnest outside plate, not to exceed 5 inches with no
additional tolerance allowed. 644FY 2023-24Return to Table of Contents
460-4.3.5.9 Spacing of Bolt Holes: Space bolt holes within plus or minus
3/16 inch of that shown in the Contract Documents.
460-4.3.5.10 Holding of Plies: When drilling or reaming is accomplished
through multiple plies of material, do not hold the materials together by welds not specified in
the Contract Drawings.
460-4.4Member Geometry:
460-4.4.1 General:
460-4.4.1.1 Tolerances: Provide dimensional tolerances as follows:
miscellaneous steel in accordance with ASTM A6;
Bridge Welding Code and as described below;
AASHTO/AWS D1.5, apply AASHTO/AWS D1.5, Bridge Welding Code, except as noted
below or as directed by the Engineer.
460-4.4.1.2 Camber and Sweep: Tolerances for camber and sweep of
continuous and simply supported girders of any shape shall be as described in the
AASHTO/AWS D1.5, Bridge Welding Code. The camber and sweep tolerances for steel pier
caps shall be the same as those specified for girders. Measure sweep for horizontally curved
members from the theoretical centerline for comparison to the aforementioned requirements.
460-4.4.1.3 Alternate Sections: Rolled sections or fabricated sections of
equal or slightly greater dimensions than the section specified may be proposed for the
Engineer’s approval. Changes that reduce fatigue resistance or significantly affect splice design
or deflection will require complete design calculations.
460-4.4.1.4 Web Flatness: Maximum deviation from flatness for webs of
curved and/or cambered sections shall be the same as for straight built-up girders. Measure
curved girder web flatness using a straightedge oriented perpendicular to the flanges (“vertical”,
flange to flange).
460-4.4.1.5 Girder Length: If measuring girder length with a device that
is free of thermal effects, appropriately adjust the measurements to the reference temperature
shown in the Contract Documents. Measure the length of horizontally curved girders along the
arc.
460-4.4.2 Specialty Structures:
460-4.4.2.1 Box Members as Bent Caps:
460-4.4.2.1.1 Tolerances: Unless otherwise shown in the Contract
Documents, submit tolerances for bearing planes and box twist to the Engineer for review and
approval. Prior to submitting these tolerance values for approval, coordinate between the Erector
and the Fabricator.
460-4.4.2.1.2 Bearings: Unless otherwise specified in the Contract
Documents, each bearing is to be true to a tolerance of 1/32 inch across its entire width in either
direction.
460-4.4.2.1.3 Beam Trueness: Unless otherwise specified in the
Contract Documents, the plane of beam supports on the box girder (the bearing area specifically
attached to the box girder) is to be true to the box girder bearing within 1/16 inch in the short
direction and true to the vertical axis of the nesting girders (those girders attached to or resting
on the box girder) within 1/16 inch. 645FY 2023-24Return to Table of Contents
460-4.4.2.2 Trapezoidal Bridge Members: As a minimum, trapezoidal
bridge members (tub or box girders) shall meet AASHTO/AWS D1.5, Bridge Welding Code
dimensional tolerances. Camber may be verified with the girder in its upright position, supported
to avoid dead load deflections.
460-4.4.2.3 Pinholes: Unless shown elsewhere in the Contract
Documents, bore pinholes:
more than 0.015 inch for pins 5 inches or less in diameter, or 1/32 inch for larger pins.
460-4.4.2.4 Truss Chord Joints: Abutting joints in truss chords not
specified to be mill-to-bear shall have openings of 1/4 inch, plus or minus 1/8 inch.
Abutting joints in truss chords specified to be mill-to-bear shall be
faced and brought into bearing. When assembled, provide 85% or more of the abutting surfaces
in full contact. Allowable visible gaps shall not exceed 1/64 inch.
460-4.4.2.5 Horizontally Curved Beams and Skewed Steel Girders:
Account for torsion induced deflections for horizontally curved beams and skewed steel girders.
Unless otherwise defined in the Contract Documents, a horizontally curved beam or girder is a
longitudinal or transverse bridge component with a radius less than 10,000 feet anywhere along
its continuous length.
460-4.5Shop Assembly:
460-4.5.1 General: Ensure the fit of all connections and the geometry of all
components. Unless specified elsewhere in the Contract Documents, check the fit of all
longitudinal girder/beam lines in accordance with 460-4.5.1.1. Perform this prior to transporting
the pieces in question to the site for erection.
460-4.5.1.1 Progressive Girder or Truss Assembly: Assemble the
structure for a minimum of three spans, panels, field sections, segments or longitudinal chords of
the structure. Successive assemblies shall consist of at least one longitudinal segment of the
previous assembly, repositioned as necessary for accurate alignment, plus two or more
longitudinal segments added at the advancing end. For entire structures less than 150 feet in
length or less than three segments, assemble the entire longitudinal line. Meet the requirements
of 460-4.5.1.4 when utilizing computer-numerically-controlled drilling equipment.
When a transverse structural steel member or members is required
for the continuation of the uninterrupted girder or beam line, truss, arch rib, bent tower face or
rigid frame, and is designated elsewhere in the Contract Documents to be shop assembled, the
Fabricator may include this member or component in a separate subassembly and not the three
segment longitudinal assembly (discussed above). If combined in a different subassembly,
include the longitudinal member(s) or component(s), as designated elsewhere in the Contract
Documents to be shop assembled, that frame directly into the transverse structural member. Do
not include the transverse member(s) in the longitudinal assembly unless directed so elsewhere
in the Contract Documents or by the Engineer. Account for end rotations and deflections as
necessary, and submit the procedure to the Engineer for review.
460-4.5.1.2 Progressive Chord Assembly: When specified elsewhere in
the Contract Documents, assemble the truss chords for a minimum of three panels or longitudinal 646FY 2023-24Return to Table of Contents
segments of the structure. Successive assemblies shall consist of at least one longitudinal
segment of the previous assembly, repositioned as necessary for accurate alignment, plus two or
more longitudinal segments added at the advancing end. For entire structures less than 150 feet
in length or less than three segments, assemble the entire longitudinal line. Meet the
requirements of 460-4.5.1.4 when using computer-numerically-controlled drilling equipment.
Account for transverse members indicted elsewhere in the Contract
Documents to be included in the shop assembly as in 460-4.5.1.1.
When assembled in accordance with this subsection, the holes of
the connections will be so located that they will be drilled to the final geometric angles. This will
require that the truss members, when erected under the no load (or practically no load or stress)
condition, must be bent and forced to fit the end conditions. This condition will introduce an
initial reverse secondary stress that will theoretically wane when the structure assumes the
loading for which it is cambered. Submit the procedure to the Engineer for review.
460-4.5.1.3 Special Complete Structure Assembly: When specified
elsewhere in the Contract Documents, this type of shop assembly will include assembling the
entire structure including the diaphragms, cross frames, integral steel substructure and floor
components. Miscellaneous components are not included unless directed elsewhere in the
Contract Documents. Establish procedures for each structure or structure type including
consideration of incremental erection, temporary field support locations, stage construction and
final tightening of field connections. Submit the procedures for review by the Engineer.
460-4.5.1.4 Computer-Numerically-Controlled (CNC) Drilling
Associated with Progressive Girder, Truss or Chord Assembly: If the Fabricator chooses to
drill the holes in all plies of all connections of the continuous main girder or beam line, truss,
arch rib, bent, tower face or rigid frame and any intersecting (transverse) members utilizing
computer-controlled-numerical drilling procedures, piece-wise assembly of the entire continuous
girder or beam line, truss, arch rib, bent, tower face or rigid frame is not required if the following
requirements are met:
Prior to transporting to the site, perform a check fit of the first
three spans, panels, field sections, segments or longitudinal chords; or entire first bent, tower
face or rigid frame of the structure to ensure the accuracy of the CNC procedures and equipment.
As selected by and at the discretion of the Engineer and prior to
transporting to the site, perform another check fit of a different assembly of three spans, panels,
field sections, segments or longitudinal chords; or another entire bent, tower face or rigid frame
of the structure to ensure that the accuracy of the CNC procedures and equipment is maintained.
If either of the above fails to meet the Contract requirements, assemble the entire girder or beam
line, truss, arch rib, bent, tower face or rigid frame as originally prescribed in 460-4.5.1.1 or 460-
4.5.1.2 as prescribed elsewhere in the Contract Documents. Account for transverse members
indicated elsewhere in the Contract Documents to be included in the shop assembly as in 460-
4.5.1.1.
460-4.6Evaluation of Work: The Engineer will evaluate and accept materials and work
conforming to the Contract Documents. These evaluations may take place prior to or following
delivery of the materials to the site of the structure. Materials or work that fails to meet Contract
requirements will be rejected.
The Engineer may, at his sole discretion, permit further inspections and testing of
materials or work that fail to meet Contract requirements for acceptance. The cost of such
inspections and tests shall be borne by the Contractor. 647FY 2023-24Return to Table of Contents
Bring to the attention of the Engineer, all nonconforming work and or materials
that cannot be brought into conformance with the Contract Documents using pre-established
procedures as outlined in the Department approved Producer QC Plan. Submit the following
information to the Engineer:
A cover letter prepared on the Contractor’s letterhead and addressed to the
Engineer briefly describing the nonconforming work and the proposed credit to the Contract
proportionate to the nonconformance. For each fabricating facility and for each project within
that fabrication facility, submittals must be numbered consecutively beginning with the number
1, at the start of each project. Erectors will start with one for each individual project.
A completed Department Nonconforming Structural Steel and Miscellaneous
Metal Component Data Sheet prepared by the Contractor and countersigned by the Engineer’s
designated representative to indicate agreement between the Contractor and the Department
regarding the nonconformance, not any solution, resolution or credit. If the Contractor and the
Engineer’s designated representative are not in agreement regarding the nonconformance, the
Engineer’s designated representative will either reject the submittal indicating the reason(s) for
the rejection or modify the submittal and forward to the Engineer. In the event of modification,
the Contractor will initial the submittal before being forwarded to the Engineer, thereby
indicating the Contractor’s concurrence with the modification.
A list of supporting information such as sketches, documentation, calculations,
pictures, etc., must be included in the appropriate space on the Nonconforming Component Data
Sheet. Supporting information regarding Contract Document noncompliance in the form of
separate documents is only necessary when space on the Department Nonconforming Structural
Steel and Miscellaneous Metal Component Data Sheet is inadequate for the required data. All of
the supporting information required for the form must be prepared by, or under the supervision
of, the Specialty Engineer who will sign and seal the supporting information.
If requested by the Engineer, submit a structural and durability evaluation of the
proposed repair and/or remediation. This evaluation must be conducted under the supervision of
a Specialty Engineer and the submittal is to bear the Specialty Engineer’s signature and seal.
460-4.7Member or Component Certification: Coordinate with the Engineer to
schedule final inspection of the completed work within two weeks prior to shipment or erection
to verify that all Contract Document requirements have been met. After verification that all
Contract Document requirements have been met and all necessary repairs have been
satisfactorily completed, the Quality Control Manager shall certify, by initials and/or signature,
such materials, components or members. The record shall include certification for:
1.Items being shipped or stored prior to final assembly. Affix a certification in the
form of a stamp or tag in accordance with 460-4.2 and as indicated in the Producer Q C Plan, and
with a copy of the certification placed in the Contractor’s permanent project records,
permanent project records.
Submit a summary certification at the least once a month or with each payment
request that includes the following or similar wording. “The undersigned, being a responsible
official of (insert Contractor identification) certifies that the materials, components or members
listed herein have been produced under strict quality control and meet the requirements of the
Contract Documents” Include a positive identification in the certification such that the applicable
materials, components and/or members can be uniquely identified utilizing just the summary
certification document. The Quality Control Manager shall sign this summary certification. 648FY 2023-24Return to Table of Contents
460-5Bolted Connections
460-5.1General: High strength bolts are described as follows:
Use bolts as follows:
structural steel connections for painted steel.
installed bolted structural steel connections that will be shop painted.
connections for weathering steel that is to remain unpainted.
designated as miscellaneous components where the fastener type is specified elsewhere in the
Contract Documents.
Tighten Grade A325 bolts in accordance with the procedures specified below for
turn-of-nut or direct-tension-indicator (DTI) tightening.
Lubricate and maintain consistency in lubrication of fastener assembly during
Rotational Capacity (RC) testing and installation. Assemblies that exhibit a loss of lubrication, as
determined by the Engineer, may be re-lubricated and retested prior to installation.
Use Grade A490 bolts only with the approval of the Engineer. Submit procedures
in accordance with ASTM F3125 Grade A490 for the handling, lubrication, installation,
tightening and testing of such bolts. Do not install Grade A490 bolts without prior approval of
the procedures by the Engineer.
When the Engineer approves ASTM A307 bolts for use in miscellaneous
components, tighten them such that the plies of the joint are in firm contact. Use three to five
impacts of an impact wrench or the full effort of a person using an ordinary spud wrench to
obtain a snug connection.
Fasten aluminum, other materials or assemblies of dissimilar materials in
accordance with the Contract Documents.
Install ordinary rough or machine bolts and nuts in accordance with the Contract
Documents.
460-5.2Testing:
460-5.2.1 Rotational Capacity (RC) Tests: At the location of and prior to
installation of permanent high-strength fasteners in main or primary load-carrying member
connections, perform RC tests in accordance with FM 5-581 (for long bolts) or FM 5-582 (for
short bolts) to ensure that the fasteners are capable of developing the specified strength and that
the fasteners are properly lubricated. As a minimum, test two assemblies per LOT designation.
The bolt, nut and washer shall come from the same LOT and be packed in the same container (or
group of containers assigned the same LOT), except in special cases where nuts and washers
have only one production LOT number for each size.
Short bolts may also be tested using FM 5-583 with DTIs calibrated with
long bolts installed in a Tension Measuring Device.
Washers are required for RC tests even though they may not be required
for jobsite installation. Where washers are not required for jobsite installation, LOT
identification is not required. The washer coating shall be the same as that for the bolt and nut.
If any of the required tests fails, the entire LOT will be rejected. 649FY 2023-24Return to Table of Contents
460-5.2.2 Verification of Direct Tension Indicator (DTI) Device Performance:
On a daily basis (when DTI devices are being installed) and at the location of installation,
perform DTI Verification tests in accordance with FM 5-583. Perform this test on a minimum of
two high-strength fastener assemblies from each fastener assembly LOT and position of the DTI
prior to production installation. If either assembly fails, test additional fastener assembly
LOT/DTI combinations as requested by the Engineer to verify that the Requirements of the
Contract Documents have been satisfied. These two tests are in addition to the RC tests required
in 460-5.2.1. If, after additional testing, the DTI fails to meet the requirements of FM 5-583, the
LOT will be rejected by the Engineer.
460-5.3Reuse and Retightening: Do not reuse Grade A490 bolts or galvanized
Grade A325 bolts. Black Grade A325 bolts with free spinning nuts may be reused one time with
the Engineer’s approval. Previously tightened bolts that may have been loosened by the
tightening of adjacent bolts can be further tightened from the original position. Ensure proper
lubrication prior to retightening. Discard and replace fractured or damaged bolts.
460-5.4Assembly of Bolted Connections:
460-5.4.1 General: Verify that the faying surfaces are in accordance with the
Contract Documents, are free of dirt or other foreign materials, and that the geometry of the bolt
holes and the connection meets the requirements of 460-4.3.5.
Install fastener assembly components of the same LOT and of the size and
quality specified in the Contract Documents. Provide final bolts, cylindrical erection pins or
other fit-up bolts as indicated in the Erection Plan.
When it is impractical to turn the nut, tighten the fastener by turning the
bolt while preventing the nut from rotating. During this tightening operation, do not allow the
rotation of the part of the fastener assembly not turned by the wrench.
460-5.4.2 Preparation of Faying Surfaces: Provide coated and non-coated
faying surfaces in accordance with the Contract Documents. Faying surfaces specified as blast-
cleaned must satisfy SSPC SP-10 ‘Near-White Blast Cleaning.’
When painting of the slip-critical faying surface of bolted connections is
required, use only the prime coat. Prepare and coat the faying surfaces prior to installation of the
fasteners. Provide certification of the slip critical classification required in the Contract
Documents.
Submit certification to the Engineer that galvanized faying surfaces meet
or exceed a Class C slip critical classification, unless a different classification is required
elsewhere in the Contract Documents. Mechanically roughen galvanized faying surfaces in
accordance with the galvanizer’s recommendations.
460-5.4.3 Reaming: Do not over size bolt holes by reaming (or any other
method) without the approval of the Engineer.
460-5.4.4 Drifting: Do not over size, stretch or otherwise damage bolt holes by
improper and excessive drifting.
460-5.4.5 Splice Plate Filler Material: Unless otherwise specified in the
Contract Documents, provide filler material edges within 1/8 inch of the adjacent splice material
edge. Where required for proper alignment at a bolted flange splice, additional filler material
may be added provided that the total thickness of filler plates is less than 1/4 inch.
460-5.4.6 Installation of Fastener Assemblies: Unless shown otherwise in the
Erection Plan, install the bolts of the connection by progressing systematically from the most
rigid part of the connection to the free edges. Install bolts in all holes of the connection and bring 650FY 2023-24Return to Table of Contents
them to a “snug tight” condition. Following the sequence indicated in the Erection Plan, further
tighten all the bolts in the connection.
For Grade A325 bolts, obtain the required bolt tension as shown in
Table 460-6, Minimum Required Fastener Tension in accordance with the turn-of-nut method
specified in 460-5.4.8, or when DTIs are used, the DTI tightening method specified in 460-5.4.9.
For connections (such as large main load-carrying members or truss joints)
in which previously tightened high strength bolts become loose and require retightening upon the
tensioning of others, install into a minimum of ten percent of the holes fully tensioned bolts prior
to final tensioning of the permanent bolts. Distribute these first bolts randomly throughout the
connection. If directed by the Engineer, remove the initial bolts and install permanent bolts at
each location, otherwise retighten in accordance with 460-5.3.
Table 460-6
Minimum Required Fastener Tension
Bolt Size,
inch
Tension Grade A325 bolts,
kips
5/8 19
3/4 28
7/8 39
1 51
1-1/8 64
1-1/4 81
1-3/8 97
1-1/2 118
460-5.4.7 Bolt Tension: Provide a Skidmore-Wilhelm Calibrator, or other
equivalent bolt tension measuring device, wherever final connections are being made. Confirm
the accuracy of the tension measuring device by having it calibrated by an approved testing
agency once a year.
460-5.4.8 Turn-of-Nut Tightening: For each work shift, perform tests utilizing a
representative sample of five fastener assemblies, from each LOT to be installed that shift.
Perform the tests using the tension measuring device, following the same procedure to be used
for actual installation of the fastener assemblies, to a snug-tight tension and corresponding
torque, which, when the additional turns required in Table 460-7, Nut Rotation from the Snug-
Tight Condition are added, will result in at least 1.05 times the minimum required fastener
installation tension as shown in Table 460-6. Place a washer under the part turned in the
tightening of the bolt. Consider the job inspection snug-tight torque as the average of three test
values determined after rejecting the high and low-test values.
For fastener assemblies too short to fit in the tension measuring device,
modify the determination of the job inspection snug-tight torque in accordance with FM 5-582.
460-5.4.8.1 Snug-Tight Condition: In the turn-of-nut method, first bring
all the fastener assemblies of the connection to a “snug-tight” condition to ensure that all parts of
the connection are in firm contact with each other. For the purposes of this specification, “firm
contact” shall mean the condition that exists on a faying surface when the plies are solidly seated
against each other, but not necessarily in continuous contact. Regard snug-tight as the tightness 651FY 2023-24Return to Table of Contents
required to produce the bolt tension, which following the final applied rotation, produces at least
1.05 times the minimum required bolt tension in accordance with Table 460-6, Minimum
Required Fastener Tension. In the presence of the Engineer, and on a daily basis, determine the
job inspection snug-tight torque as specified herein.
460-5.4.8.2 Final Tightening: After verification of the snug-tight
condition in accordance with 460-5.4.11 by the Engineer, tighten all fastener assemblies in the
joint by applying the applicable amount of nut rotation specified in Table 460-7, Nut Rotation
from the Snug-Tight Condition. Once snug-tight, bring all fasteners to the required tension
within the same work shift.
Table 460-7
Nut Rotation from the Snug-Tight Condition
Bolt Length Measured from
Underside of Head to End of
Bolt
Both Faces
Normal to
Bolt Axis
One Face Normal to Bolt
Axis and Other Face Sloped
Not More than 20:1.
Bevel Washer not Used.
Both Faces Sloped Not
More than 20:1 from
Normal to Bolt Axis.
Bevel Washers not
Used.
Up to and Including Four (4)
Diameters 1/3 turn 1/2 turn 2/3 turn
Over Four (4) Diameters but
not Exceeding Eight (8)
Diameters
1/2 turn 2/3 turn 5/6 turn
Over Eight (8) Diameters but
Not Exceeding Twelve (12)
Diameters
2/3 turn 5/6 turn 1 turn
Notes:
degrees.
simulating the actual conditions. Submit procedures to the Engineer for review.
460-5.4.9 Direct-Tension-Indicator (DTI) Tightening: After complying with
the requirements of 460-5.2.2, install and tighten DTI devices following the procedures
described in the DTI Verification Test. Do not permit the DTI to turn during installation and
tightening. Provide washers in accordance with 460-5.4.10.
460-5.4.9.1 Snug-Tight Condition: Install the bolts as specified through
Step 3 (Snug-Tight Condition) of the DTI Verification test. If the 0.005 inch feeler gage is
refused in more gaps than shown in the table in Step 3.5 of the test, or the DTI device becomes
loose and can be spun by hand, remove the bolt and DTI device, discarding the DTI device.
Provide a new DTI device and reinstall the assembly and bring to the snug-tight condition.
460-5.4.9.2 Final Tightening: After verification by the Engineer that the
snug-tight condition for all bolts has been met, tighten all fastener assemblies in the joint such
that the number of spaces in which the 0.005 inch thickness gauge is refused is equal to or
greater than the number shown in Table 460-8, DTI Device Tightening Criteria. Once snug-tight,
bring all fasteners to the required tension within the same work shift. 652FY 2023-24Return to Table of Contents
Table 460-8
DTI Device Tightening Criteria
Number of Spaces in DTI 4 5 6 7 8 9
Minimum Spaces in which Gage is Refused 2 3 3 4 4 5
Do not tighten the assembly beyond the smallest gap permitted in
Step 3.5 of FM 5-583. Remove and replace bolts, discarding the DTI, which have a DTI with a
smaller gap or no gap.
460-5.4.10 Washers:
460-5.4.10.1 General: Provide ASTM F436 hardened steel washers as
follows:
bolts, use a hardened washer under each element.
under the turned element.
tests.
than 20:1 with respect to a plane normal to the bolt axis, use a hardened, beveled washer to
compensate for the lack of parallelism.
an outer ply, provide a single washer satisfying ASTM F436, or continuous bar satisfying
ASTM A709: for Grade A325 bolts, provide a thickness of at least 5/16 inch; and for
Grade A490 bolts, provide a thickness of 3/8 inch. Provide these washers or bars to completely
cover the slot after installation. Provide a finish consistent with the bolt specified.
washers on one side to a point not closer than 7/8 of the bolt diameter from the center of the
washer, if necessary.
460-5.4.10.2 Use of Washers with Direct-Tension-Indicators (DTIs)
Devices: When DTIs are used; use ASTM F436 hardened washers as follows:
head, a hardened washer is to be located under the nut.
hardened washer is to be located between the nut and the DTI.
nut, a hardened washer is to be located under the bolt head.
bolt head, a hardened washer is to be located between the bolt head and the DTI.
460-5.4.11 Inspection:
460-5.4.11.1 Turn-of-Nut Tightening:
assemblies of the connection, within 24 hours of snugging the first bolt in the connection and in
the presence of the Engineer, verify for a minimum of three (3) bolts [two (2) for two bolt
connections] or 10% of the fastener assemblies, that the job inspection snug-tight torque has
been attained. These fasteners are to have a snug-tight torque equal to or exceeding that specified 653FY 2023-24Return to Table of Contents
in 460-5.4.8. Perform this check using the same torque wrench used in 460-5.4.8. For bolts tested
in accordance with FM 5-583 or when multiple torque wrenches are required, provide a
calibrated torque wrench or wrenches.
torque, test all remaining untested fastener assemblies using the torque wrench in the connection
in question. Following testing of all assemblies, bring to snug-tight all assemblies and retest as
stated above. Re-snug and retest as necessary using the calibrated torque wrench until the
minimum testing stated above is performed favorably.
by the Contractor, and in the presence of the Engineer, match mark the fastener assemblies on
the end of the bolt thread and on the nut, and then tighten the nut the amount of rotation specified
in Table 460-7, Nut Rotation from the Snug-Tight Condition. The Engineer will accept the
connection as fully tightened when all of the following conditions are met:
yielding has occurred in the fastener assembly,
460-5.4.11.2 Direct-Tension-Indicator (DTI) Tightening: Prior to
bringing the connection to a snug-tight condition, verify in the presence of the Engineer that the
‘dimples’ of the DTI are not deformed or damaged. Bring the connection to a snug-tight
condition and tighten in accordance with the requirements of 460-5.4.9. The Engineer will accept
the connection as fully tightened when all of the following conditions are met:
occurred in the fastener assembly,
460-6Welding
460-6.1General: Perform all shop and field welding in accordance with the applicable
AWS Welding Code. This requirement includes the use of qualified welders, qualified weld
procedures, and qualified inspection personnel.
460-6.2Welding on Non-Dynamically Loaded Elements: Perform welding on
miscellaneous components and other statically (non-dynamically, non-cyclically, etc.) loaded
structural elements in accordance with the AWS D1.1, Structural Welding Code, or the
AASHTO/AWS D1.5, Bridge Welding Code.
460-6.3Electroslag Welding: Perform NGI-ESW welding in accordance with the
AASHTO/AWS D1.5, Bridge Welding Code.
460-6.4Welding of Hollow Structural Steel Sections (Pipes and Tubes): Except as
noted in the Contract Documents, perform all shop and field welding of Hollow Structural
Shapes in accordance with the AWS D1.1, Structural Welding Code as amended herein.
460-6.4.1 Highway Sign, Lighting and Traffic Signal Support Structures: For
structural steel supports for signs, lighting, and traffic signals, comply with the AWS D1.1
Structural Welding Code as amended by the following. 654FY 2023-24Return to Table of Contents
Unless otherwise shown in the Plans, perform ultrasonic testing (UT) or
radiographic testing (RT) on full penetration groove welds at the following frequency (use the
AWS D1.1 Tubular Connections Class R Criteria for UT and Cyclically Loaded Criteria for RT.
One hundred percent of each joint subject to tension or reversal of
stress.
Twenty-five percent of each joint subject to only compression or
shear. If discontinuities are found in the joint, the remainder of the joint shall be tested.
Perform Magnetic Particle Testing at the following frequencies:
A minimum of 25% of all fillet or partial penetration groove welds
in main members (Use the AWS D1.1 Tubular Connections Criteria). If discontinuities are
found, the remainder of the welds on the members shall be tested.
460-6.4.2 Tubular Bridge: Comply with the requirements of the AWS D1.1
Structural Welding Code as amended by the following:
Unless otherwise shown in the Plans, perform ultrasonic testing (UT) or
radiographic testing (RT) on full penetration groove welds at the following frequency (use the
AWS D1.1 Tubular Connections Class R Criteria for UT and Cyclically Loaded Criteria for RT).
One hundred percent of each joint subject to tension or reversal of
stress.
Twenty-five percent of each joint subject to only compression or
shear. If unacceptable discontinuities are found in the joint, the remainder of the joint shall be
tested.
Perform Magnetic Particle Testing at the following frequencies:
A minimum of 25% of all fillet or partial penetration groove welds in
main members (Use the AWS D1.1 Tubular Connections Criteria). If unacceptable
discontinuities are found, the remainder of the welds on the members shall be tested.
460-6.4.3 Overhead Sign Structures and Toll Gantries: Comply with the
requirements of the AWS D1.1 Structural Welding Code as amended by the following:
Unless otherwise shown in the Plans, perform 100 percent ultrasonic
testing (UT) or radiographic testing (RT) on all full penetration groove welds.
Prior to galvanizing, perform Magnetic Particle Testing (MT) at the
following frequencies:
One hundred percent of all fillet or partial penetration groove
welds in the upright columns. A minimum of 25% of all other fillet or partial penetration groove
welds in main members other than upright columns. If unacceptable discontinuities are found,
the remainder of the welds on the member shall be tested.
After members are galvanized, perform one hundred percent MT
of all fillet welds in the upright columns.
For acceptance, use AWS D1.1 Tubular Connection Criteria for MT, Tubular
Connection Class R Criteria for UT, and Cyclically Loaded Criteria for RT.
460-6.5Field Welding: Field weld only with the approval of the Engineer or as shown in
the Plans. All field welding operations must be conducted in accordance with AWS D1.5 and in
the presence of a Certified Welding Inspector.
460-6.6Tack Welds: Do not weld or tack any fill plates, brackets, clips, shipping
devices, or other materials not required by the Contract Documents or allowed by the
AASHTO/AWS D1.5 Bridge Welding Code. 655FY 2023-24Return to Table of Contents
460-7Erection
460-7.1Pre-erection Requirements:
460-7.1.1 Erection Quality Control (QC) Plan: Submit an Erection QC Plan for
review and approval of the Engineer.
460-7.1.2 Submittals: Meet the requirements of Sections 5 and 103 for any
required submittals. Provide submittals to the Engineer for review by the Department in
accordance with Section 5 and the Contract Documents.
460-7.1.3 Erection Plan: Submit, for the Engineer’s review, an Erection Plan
locating all primary members, lifting equipment and temporary supports or braces, and bolting
pattern tightening procedures not considered routine. Ensure that the plan includes the Specialty
Engineer’s signature and stamp. Include supporting calculations indicating that the design unit
stresses indicated in the Contract Documents have not been exceeded. Submit this plan or plans
to the Engineer three weeks before erecting the piece or pieces.
Include the following information in the Erection Plan:
foundations; surface roads and railroads; all streams, creeks and rivers; all overhead utilities; and
any underground utilities that could possibly impact, or be adversely affected by, erection
operations as determined by the Specialty Engineer.
and all primary load-carrying member bracing. Note any and all permanent or temporary support
and/or bracing locations, including crane-holding positions.
orientation for all primary load-carrying members.
mats and temporary excavation support.
configuration and boom extension utilized.
contained in the Erection Plan.
460-7.2Special Requirements for Uncoated Weathering Steel:
460-7.2.1 General: Do not use marking materials (grease sticks, crayons) that
leave behind a residual film that may affect the weathering process of the steel. Store the girders
as required for non-weathering steels.
460-7.2.2 Steel Preparations: Prior to erection, perform the following as
appropriate:
Blast clean the exposed fascia of the exterior girders (both I and box) to
meet SSPC-SP10 criteria; blast clean the remaining exposed surfaces of steel trapezoidal girders,
not required to be prepared otherwise, to meet SSPC-SP6 criteria; for steel I-girders, if a non-
uniform mill scale finish has developed, as determined by the Engineer, blast clean all remaining
exposed surfaces, not required to be prepared otherwise, to SSPC-SP6 criteria; coat the inside of
box members including, but not limited to, all bracing members, cross frames and diaphragms in
accordance with Section 560. Coat the exterior face of box girder end diaphragms and all interior 656FY 2023-24Return to Table of Contents
surfaces of box girders extending beyond the end diaphragm with an inorganic zinc coating
system in accordance with Section 560.
460-7.2.3 Concrete Substructure Preparations:
460-7.2.3.1 Substructure Areas Not Receiving Class 5 Finish: Prior to
erection of the girders, cover all exposed substructure concrete surfaces to protect them against
staining from the weathering steel components. Leave the covering in place until after placement
of the concrete deck. As directed by the Engineer, clean all visible stains on concrete in areas not
receiving a Class 5 Finish by sandblasting and follow-on cleaning using a stain remover or
commercial cleaner after completion of the structure in accordance with Section 400.
460-7.2.3.2 Substructure Areas Receiving a Class 5 Finish: If the
Class 5 Finish is to be applied prior to the placement of the concrete deck, cover all finish
concrete surfaces after application and curing of the Class 5 Finish to protect them from staining
from the weathering steel components. Leave the covering in place until after placement of the
concrete deck. Upon removal of the covering, reapply the Class 5 Finish to cover any stains
which may be present.
If the Class 5 Finish is to be applied after placement of the
concrete deck, no substructure covering will be required.
460-7.2.4 Structure and Site Clean Up: Upon the completion of construction,
remove all oil, dirt, grease or other foreign material, including excessive or uneven mill scale
from the steel. Remove lubricants from the exposed surfaces of installed fastener assemblies and
other surfaces in accordance with the manufacturer’s recommendations. Follow procedures
specified in Section 560 as appropriate. Final surface finish is to be an even mill scale as
approved by the Engineer.
460-7.3Coordination with Substructure: Prior to the erection of primary load-carrying
members, conduct a survey to document the vertical, longitudinal and transverse position of all
substructure units and anchor rod locations. Appropriately account for ambient temperature in
the survey.
Should a discrepancy be identified with the Contract Documents, submit the
necessary details to the Engineer for resolution.
460-7.4Placing Anchor Rods: Locate and place anchor rods within the tolerance shown
in the Contract Documents or within 1/4 inch of the theoretical location shown. If anchor rods
cannot be located to the specified tolerance, place only with the approval of the Engineer. Unless
shown otherwise in the Contract Documents, provide galvanized anchor rods, nuts and washers
as follows:
the substructure concrete strength, or as shown elsewhere in the Contract Documents.
recommendations.
coating.
460-7.5Preparation of Bearing Areas and Setting of Bearings: Prior to placing
superstructure bearing units (including but not limited to neoprene pads and masonry plates),
prepare the top of concrete pad (bearing area) in accordance with Section 400. If a discrepancy is
identified, report it to the Engineer for resolution. 657FY 2023-24Return to Table of Contents
For expansion bearings with slotted holes for anchor rods, which allow movement
of the superstructure with respect to the substructure, vary the location of the slotted plate in
relation to the anchor rods, in accordance with the prevailing temperature at the time of setting.
For fixed bearings at multiple adjacent piers, if necessary, horizontally jack the
substructure units to correctly set the centerline of bearing. Adequately account for temperature.
Unless specified elsewhere in the Contract Documents, locate the theoretical
centerline of bearings to within 1/16 inch transverse to longitudinal girder lines; and in the
direction parallel to the longitudinal girder line locate the theoretical centerline of bearing within
1/4 inch of the theoretical centerline of bearing.
After setting the bearings and installing anchor rod nuts, washers and any other
associated hardware specified in the Contract Documents, clean the protruding/exposed surfaces
of the assembly of all deleterious material. Finish-coat metal parts in accordance with 460-
4.3.4.9.
460-7.6Tightening of Anchor Bolt/Rod Nuts:
460-7.6.1 Fixed and Expansion Pot Bearing: Tighten anchor bolts or rod nuts to
a ‘snug tight’ condition such that the different mating surfaces (such as the top of concrete,
neoprene and steel) are in firm contact. The nut or bolt is to be tight enough to develop friction
between surfaces to prevent sliding, but not over-tightened that bulging or damage occurs in any
of the mating materials.
460-7.6.2 Fixed and Expansion Bearings with Elastomeric Bearing Pads:
Draw down the lower nut such that a total gap of 1/2 inch exists between the nut and bearing
plate. Tighten a second nut of the same specification to a snug tight condition against the lower
nut maintaining the required gap.
460-7.7Bolted Connections: For splice connections of primary members, as well as
connections of diaphragms or crossframes, fill at least 50% of the holes prior to crane release.
The 50% may be either erection bolts in a snug tight condition or full size erection pins, but at
least half (25% of all holes) shall be bolts, and sufficient pins shall be used near outside corners
of splice plates and at member ends near splice plate edges to ensure alignment. Filled holes
should be uniformly distributed between the web and flange connections for primary members
such that approximately 50% of the web connections are filled and approximately 50% of the
flange connections are filled. For diaphragms or cross-frames, the filled holes should be
uniformly distributed between all the bolt groups connecting the diaphragm or crossframe to the
primary member. The 50% requirement may be waived if a reduced percentage is calculated as
sufficient and shown on the approved Erection Plan. Primary member splice connections that are
made up on the ground (prior to erection) shall be 100 percent complete prior to any lifting
operation. Fully tighten all bolts prior to installation of deck forming for each unit.
460-7.8Final Position of Girder Webs: Unless shown elsewhere in the Contract
Documents, detail the girders and cross frames as directed by the Engineer. The final condition is
to be defined as with the deck and parapets cast, but without any future wearing surface. A web
will be considered plumb if it is within a tolerance horizontally between the top and bottom of
the web of 3/32 inch per foot of web depth compared against the theoretical position as required
in the Contract Documents. Measure the out-of-plumb perpendicular to the face of the web. Erect
trapezoidal girders to the geometry shown in the Contract Documents to the same 3/32 inch per
foot of web depth tolerance.
460-7.9Inspection and Final Acceptance:
658FY 2023-24Return to Table of Contents
460-7.9.1 General: Perform Quality Control inspections of all phases of the
work. The inspection frequency and depth shall be sufficient to ensure that all materials and
workmanship incorporated into the work meet the requirements of the Contract Documents and
that the processes are controlled to ensure that the final finished product(s) conform to the
physical characteristics and dimensions required by the Contract Documents. The Quality
Control Manager shall be responsible for all inspection operations. An adequate number of
Quality Control Inspectors shall be available to ensure review of all materials and fabrication
processes are preformed in accordance with the Producer QC Plan. Weekly meetings shall be
held with the Engineer to review inspection findings. The review of this information is to
identify any refinements and/or improvements in the process being utilized in the work. The
frequency of the meetings may be altered by the Engineer.
460-7.9.2 Inspection/Final Acceptance: Ensure the final alignment, profile and
fastening of the erected steel is in accordance with the Contract Documents.
460-8Method of Measurement
460-8.1General: The quantities to be paid for will be the items covered by this Section,
following acceptance by the Engineer. Partial payments may be made for fabricated components
yet to be assembled into larger components, members and assemblies as allowed for elsewhere in
the Contract Documents.
460-8.2Deductions and Allowances: No deductions from the computed weight of rolled
or fabricated structural steel or miscellaneous components will be made for sheared edges,
punchings, holes, milling, plaining or other items of waste associated with the finished
components or parts.
460-8.3Weights of Structural Steel and Miscellaneous Materials: The weights of
structural steel will be taken as nominal weights as reported in the AASHTO LRFD Bridge
Construction Specifications and ASTM Specifications, in that order of precedence, using the
dimensions shown in the Contract Documents.
460-8.4Structural Steel and Miscellaneous Metals: The quantity of structural steel and
miscellaneous metals becoming part of the completed structure and accepted by the Engineer
will be paid for at the plan quantity shown in the Contract Documents, or as modified by the
Engineer, measured in pounds, or by the Contract lump sum price for Structural Steel.
460-8.5High-Strength Fastener Assemblies: The weight of high-strength fastener
assemblies (including nuts and washers) installed by the Contractor and accepted by the
Engineer will be computed on the basis of an average length in accordance with Table 460-9:
Table 460-9
Weights of High-Strength Fastener Assemblies
Diameter of High-
Strength
Fasteners, inch
3/4 inch 7/8 inch 1 inch 1-1/8 inches 1-1/4 inches
Weight per 100,
pounds 52 100 135 182 238
The weight of high-strength fastener assemblies will be included in the
determination of the weight of the completed structure in determining the quantity paid when 659FY 2023-24Return to Table of Contents
payment is not by Lump Sum. The Engineer will determine values for sizes of high-strength
fastener assemblies not shown.
460-8.6Welding and Welds; Fasteners Not Designated as High-Strength; Anchor
Rods, Nuts, Bolts and Associated Washers; Transporting; Handling; and Erection:
Welding and welds; fastener assemblies not designated as high-strength; anchor rods, nuts, bolts
and associated washers; transporting; handling; and erection are considered incidental to the
work and will not be paid for separately.
460-8.7Shims and Fill Plates: The quantity of shims and fill plates will be included in
the determination of the weight of the completed structure in determining the quantity paid when
payment is not by Lump Sum.
460-8.8Coatings: The preparation, application, clean-up and the consumables used in
the coatings process are considered incidental to the work and will not be paid for separately.
460-8.9Weathering Steel Preparation, Handling and/or Clean-up: The preparation,
handling, and/or clean-up of weathering steel or the “rust" marks on other items (concrete units,
etc.) caused by the development of the patina are considered incidental to the work and will not
be paid for separately.
460-8.10Shear Connectors: Shear connectors are considered incidental to the work and
will not be paid for separately.
460-8.11Span Jacking (Fixed Bridge): Jacking of substructure units of adjacent fixed
piers required to set bearing in accordance with the Contract Documents is considered incidental
to the work and will not be paid for separately.
460-9Basis of Payment
460-9.1General: Prices and payments will be for full compensation for all work
specified in this Section completed and accepted, including but not limited to testing, bolting,
welding, cleaning and coating, temporary works and erection. No separate payment will be made
for falsework or other erection expense.
460-9.2Payment Items: Payment will be made under:
Item No. 460- 1- Structural Steel - Rehab - per pound.
Item No. 460- 2- Structural Steel - New/Widening - lump sum.
Item No. 460- 6- Ladders & Platforms - lump sum or per pound.
Item No. 460- 71- Metal Traffic Railing - per linear foot.
Item No. 460- 81- Rivet or High-Strength Bolt Replacement - each.
Item No. 460- 95- Structural Steel Repair - per pound.
Item No. 460- 98- Pipe Hanger - each.
Item No. 460-112- Anchor Bolt Replacement - each. 660FY 2023-24Return to Table of Contents MULTIROTATIONAL BEARINGS
461-1Description
Furnish and install multirotational bearings in accordance with the recommendations of the manufacturer and details shown in the Plans. Obtain all multirotational bearings from a fabricator that is currently on the Department’s Production Facility Listing. Provide bearings on each bridge from the same manufacturer. This Section covers the following types of multirotational bearings:
461-2Materials
Provide materials in accordance with the AASHTO LRFD Bridge Design Specifications and as follows.
461-2.1Structural Steel:
Furnish structural steel conforming to ASTM A709 Grade 50W.
461-2.2Stainless Steel:
Furnish stainless steel conformin g to ASTM A240, Type 316, 16 gage minimum thickness.
461-2.3Metalizing Wire:
Furnish metalizing wire in accordance with ASTM B833, having an 85% zinc/15% aluminum (Z30700) composition.
461-2.4Anchor Rods, Nuts and Washers:
Furnish galvanized anchor rods, nuts and washers in accordance with Section 962.
461-3Design
Design bearings in accordance with the AASHTO LRFD Bridge Design Specifications. Design bearing connections to allow for bearing replacement without having to remove the masonry plate o r sole plate. Detail all steel bearing components with sliding surfaces (e.g., stainless-steel plates or PTFE plates), masonry plates and elastomeric components to be replaceable. Welded attachments are not considered a replaceable connection. Design guided bearings for the lateral load shown in the Plans or 10% of the vertical load capacity of the bearing shown in the Plans, whichever is greater. For disc bearings, provide steel limiting rings around the top and bottom of the polyether urethane disc except if using the following: a minimum 62 Type (Shore) D durometer disc, a shear restraint device, and surface friction between the disc and steel plates.
461-4Shop Drawings
Submit shop drawings in accordance with Section 5. Include design calculations, s igned and sealed by a Specialty Engineer, confirming that all components are in conformance with the requirements of this Section. Include the following information on the shop drawings:
Article 18.1.1.
proper positioning settings for a minimum 100°F temperature range.
661 FY 2023-24 Return to Table of Contents
STRUCTURAL STEEL AND MISCELLANEOUS METALS in other states
Get an email when 460 changes
Florida revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.