General Requirements (100-199)

105CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS

FL · 2024 Standard SpecificationsBook pages 154171View official source ↗

105-1 General.

105-1.1 Quality Control Documentation:

105-1.1 1 Submission of Materials Certification and Reporting Test Results:

Submit certifications prior to placement of materials. Report test results at completion of the test and meet the requirements of the applicable Specifications.

105-1.1 2 Databases: Obtain access to the Department’s databases prior to testing

and material plac ement. Database access information is available through the Department’s website. Enter all required and specified documentation and test results into the Department ’s databases.

105-1.1 3 Worksheets: Make available to the Department, when requested,

worksheets used for collecting test information. Ensure the worksheets at a minimum contain the following:

1.Project Identification Number,2. Time and Date,3. Laboratory Identification and Name,4. Training Identification Numbers (TIN) and init ials,
5.Record details as specified within the test method.

105-1.1 4 Earthwork Records System: Record QC test results directly into the

Earthwork Records System (ERS) section of the Department’s database. If authorized by the Engineer due to ERS ina ccessibility in the field, collect the data in the field on Department approved forms and enter the data in the ERS section of the Department’s database. Submit the original forms by uploading into the Department’s database.

105-1.2 Inspections to Assure Compliance with Acceptance Criteria :

105-1.2 1 General: The Department is not obligated to make an inspection of

materials at the source of supply, manufacture, or fabrication. Provide the Engineer with unrestricted entry at all times to such parts of the facilities that concern the manufacture, fabrication, or production of the ordered materials. Bear all costs incurred in determining whether the material meets the requirements of these Specifications.

105-1.2 2 Quality Control (QC) Inspection: Provide all necessary inspection to

assure effective QC of the operations related to materials acceptance. This includes but is not limited to sampling and testing, production, storage, delivery, construction and placement. Ensure that the equipment used in the production and testing of the materials provides accurate and precise measurements in accordance with the applicable Specifications. Maintain a record of all inspections, including but not limited to, date of inspection, results of inspection, and any subsequent corrective actions taken. Make available to the Department the inspection records, when requested.

105-1.2 3 Notification of Placing Order: Order materials sufficiently in advance

of their incorporation in the work to allow time for sampling, testing and inspection. Notify the Engineer prior to placing orders for materials. Submit to the Engineer a fabrication schedule for all items requiring commercial inspection at least 30 days before beginning fabrication. These items include steel bridge components, moveable bridge components, pedestrian bridges, castings, forgings, structures erected either partially or completely over the travelled roadway or mounted on FY 2023-24 Return to Table of Contents bridges as overhead traffic signs (som e of these may be further classified as cantilevered, overhead trusses, or monotubes) or any other item identified as an item requiring commercial inspection in the Contract Documents.

105-2 Additional Requirements for Lump Sum Projects.

Prepare and submi t to the Engineer a project -specific list of material items and quantities to be used on the project as a Job Guide Schedule in the same format as the current Sampling, Testing, and Reporting Guide 21 calendar days prior to commencement of construction. Su bmit up-to-date quantities for the items on the Job Guide Schedule to the Engineer with each monthly progress estimate. The Department may not authorize payment of any progress estimate not accompanied by updated Job Guide Schedule quantities. Maintain the Job Guide Schedule throughout the project including the quantity placed since the previous submittal, and total to date quantity and any additional materials placed. Do not commence work activities that require testing until the Job Guide Schedule has been reviewed and accepted by the Engineer. At final acceptance, submit a final Job Guide Schedule that includes all materials used on the project in the same format as the monthly reports.

105-3 Quality Control Program.

Certain operations require personnel with specific qualifications. Certain materials require production under an approved Quality Control (QC) Plan to ensure that these materials meet the requirements of the Contract Documents. Applicable materials include hot mix asphalt, portland cement concrete ( structural), earthwork, cementitious materials, timber, steel and miscellaneous metals, galvanized metal products, prestressed and/or precast concrete products , drainage products, and fiber reinforced polymer products . For all applicable materials i ncluded in the Contract, submit a QC Plan prepared in accordance with the requirements of this Section to the Engineer. Do not incorporate any of these materials into the project prior to the Engineer’s approval of the QC Plan. Steel and Miscellaneous Met al products, including aluminum, are defined as the metal components of bridges , including pedestrian and moveable bridges, overhead and cantilevered sign supports, ladders and platforms, bearings, end wall grates, roadway gratings, drainage items, expansion joints, roadway decking, shear connectors, handrails, galvanized products, fencing, guardrail, light poles, high mast light poles, standard mast arm assemblies and Monotube assemblies, stay in -place forms, casing pipe, strain poles, fasteners, connectors and other hardware.

105-4 Producer Quality Control Program.

105-4.1 General: When accreditation or certification is required, make supporting

documents from the two previous inspections performed by the accrediting or certifying agency available to the Department upon request. Obtain Department approval prior to beginning production. Meet and maintain the approved Producer Quality Control Program requirements at all times. Production of these products without the Department’s prior acceptance of the Producer Quality Control Program may result in rejection of the products. Continued approval will be subject to satisfactory results from Department evaluations, including the Independent Assurance program. In cases of non-compliance with th e accepted Producer Quality Control Program, identify all affected material and do not incorporate or supply to the Department projects. The following conditions may result in suspension of a Producer Quality Control Program: FY 2023-24 Return to Table of Contents 1.Failure to timely supply infor mation required.

2.Repeated failure of material to meet Standard Specification requirements.
3.Failure to take immediate corrective action relative to deficiencies in the performance of the Producer Quality Control Program.
4.Certifying m aterials that are not produced under an accepted Producer Quality Control Program for use on Department projects.
5.Failure to correct any deficiencies related to any requirement of the Producer Quality Control Program, having received notice from the Department, within the amount of time defined in the notice.

105-4.2 Producer Quality Control Program Requirements:

105-4.2 1 Hot Mix Asphalt, Portland Cement Concrete (Structural),

Earthwork, Cementitious Materials, Timber, Steel and Miscellaneous Meta ls, Galvanized Metal Products, Prestressed and/or Precast Concrete Products , Drainage Products , and Fiber Reinforced Polymer Products Quality Control Program: Have an accepted Producer Quality Control Program, developed in accordance with this Section, during the production of materials to be used on Department projects.

105-4.2 2 Prestressed Concrete Quality Control Program: Have a current

certification from a Department approved precast prestressed concrete plant certification agency and a Department accepted Producer Quality Control Plan, meeting the requirements of this Section. The list of Department approved certification agencies is available on the website of the State Materials Office (SMO).

105-4.2 3 Steel and Miscellaneous Metals Quality Control Program : Have an

accepted Producer Quality Control Plan, developed in accordance with this Section and a current American Institute for Steel Construction (AISC) certification, provided that AISC certification program is available for the category of the fabrication products.

105-4.3 Submittal: Depending on the type of products, producers shall submit their

proposed Producer Quality Control Programs to the SMO or to the District Materials Office, as described below:

105-4.3 1 State Materials Office (SMO): Producers of cementitious materials,

steel and miscellaneous metals, galvanized metal products, aggregates, timber, flexible pipe, and fiber reinforced polymer (FRP) products must submit their proposed Producer Quality Control Program to t he SMO for review and acceptance.

105-4.3 2 District Materials Office : Producers of hot mix asphalt, portland

cement concrete ( structural), earthwork, and precast/prestressed concrete products and must submit their proposed Producer Quality Control Program to the local District Materials Office for acceptance. Producers located outside the State must contact the SM O for address information of the District Materials Office responsible for the review of the proposed Quality Control Program.

105-4.4 Compliance with the Materials Manual :

Producers of Polymer Slurry shall meet the requirements of Section 2.4, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/implemented/URLinSpecs/Section24V2.shtm . Produc ers of Asphalt Emulsion shall meet the requirements of Section 3.4 Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/implemented/URLinSpecs/Section34V2.shtm . FY 2023-24 Return to Table of Contents Producers of Asphalt Binder shall meet the requirements of Section 3.5, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/implemented/URLinspecs/Section35V2.shtm . Producers of Flexible Pipe shall meet the requirements of Section 6.1, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section61V2.shtm . Pro ducers of Precast Concrete Pipe shall meet t he requirements of Section 6.2, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section62V2.shtm . Pro ducers of Precast Concrete Drainage Structures shall meet the requirements of Section 6.3, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section63V2.shtm . Pro ducers of Precast Prestressed Concrete Products shall meet the requirements of Sections 8.1 and 8.3, Volume II of the Department’s Materials Manual, which may be viewed at the following URLs: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section81V2.shtm https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section83V2.shtm. Producers of Precast Prestressed Concrete Products using Self Consolidating Con crete shall meet the requirements of Section 8.4, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section84V2.shtm Producers of Precast/Prestressed Concrete Products using Flowing Concrete shall meet the requirements of Section 8.6, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section86V2.shtm Pro ducers of Incidental Precast/Prestressed Concrete Products shall meet the requirements of Section 8.2, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section82V2.shtm . Producers of Portland Cement Concrete shall meet the requirements of Section 9.2, Volum e II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section92V2.shtm . Producers of Paving Concrete produced by Central Mix Plants shall meet the requi rements of Section 9.3, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section93V2.shtm Specialty Engineers preparing, submitting, and implementing Mass Concrete Contr ol Plans shall meet the requirements of Section 9.4 Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section94V2.shtm . Pro ducers of Structural Steel and Miscellaneous Metal Components shall meet the requirements of Sections 11.1, 11.2, 11.3, 11.4, 11.5 and 11.6 of the Department’s Materials Manual, which may be viewed at the following URLs: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section111V2.shtm . FY 2023-24 Return to Table of Contents https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section112V2.shtm . https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section113V2.shtm . https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section114V2.shtm . https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section115V2.shtm . https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section116V2.shtm . Producers of Fiber Reinforced Polymer Composites shall meet the requirements of Se ction 12-1, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section121V2.shtm .

105-4.5 Producer Quality Control (QC) Plan Review and Acceptance: Th e

Department wi ll respond to the producer within 21 calendar days of receipt of the proposed Producer Quality Control Program. The Department may perform evaluation activities to verify compliance with submitted documents prior to acceptance. If the Producer Quality Control Program must be revised for any reason, including non-compliance, submit the revision to the Department. The Department will respond to the producer within seven calendar days of receipt of the revised Producer Quality Control Program.

105-4.6 Producer ’s Quality Control (QC) Plan: Submit detailed policies, methods and

procedures to ensure the specified quality of all applicable materials and related production operations. Include other items in addition to these guidelines as necessary.

105-4.6 1 Personnel:

105-4.6 1.1 Qualifications: Submit the Training Identification Numbers

(TINs) or any other information which will be traceable to the certification agency’s training location and dates for all technicians performing sampling, testing and inspection for both field and laboratory tests. Submit the names of the Construction Training and Qualification Program (CTQP) certifications and other pertinent certifications held and the expiration dates for each certification for each technician. Include employed and subcontracted technicians.

105-4.6 1.2 Level of Responsibility: Identify the primary contact for the

Department. Identify roles and responsibilities of various personnel involved in the QC process.

105-4.6 2 Raw Materials:

105-4.6 2.1 Source: Identify the sources of raw materials. Submit

locations and plant or mine numbers when applicable.

105-4.6 2.2 Certification: Submit methods of verifying compliance of

certification with the Specifications.

105-4.6 2.3 Disposition of Failing Materials: Describe the system for

controlling non-conforming materials, including procedures for identification, isolation and disposition.

105-4.6 3 Storage Facilities for Raw Materials: Describe measures and

methods, including bedding details, for preventing segregation, contamination and degradation. Describe methods of identifying individual materials. Where applicable, submit a site plan showing the locations of various materials.

105-4.6 4 Production Equipment: Describe calibration frequencies, maintenance

schedule and procedures for production equipment.

105-4.6 5 Plant Requirements:

105-4.6 5.1 Plant Identification: For those f acilities producing materials

listed in 105-3, submit the mailing address, physical address including county and X,Y ( latitude FY 2023-24 Return to Table of Contents and longitude) coordinates of the plant, telephone and fax numbers, email address, primary contact at the plant, responsible person in charge, facility number provided by the Department, owner information including parent company, vendor number, designed production capacity, and other information as required.

105-4.6 5.2 Process Control System: Describe the methods and measures

established to ensure Contract compliance for the produced materials that are supplemental to the QC sampling and testing program described in the Contract Documents. These methods and measures will include, but are not limited to, inspection schedule, additional sampling and testing, maintenance schedule, etc.

105-4.6 5.3 Loading and Shipping Control: Describe the methods and

measures for preventing segregation, contamination and degradation during loading and shipping operations. Describe the methods established for materials to be in compliance with the Specifications at the point of use.

105-4.6 5.4 Types of Products Generated: Describe the products the

plant is approved to produce under Department guidelines.

105-4.7 Other Requirements:

105-4.7 1 Submittal of Certification: Submit certifications issued by the

plant/Contractor for the applicable products approved by the Department.

105-4.7 2 Statement of Compliance: Include a statement of compliance with all

quality requirements set forth by the Department in the Contract Documents and Department manuals.

105-4.7 3 Documentation Storage: Identify location of document storage to

enable Department review. Include QC charts, qualification and accreditation records, inspection reports, and other pertinent supporting documents.

105-4.8 Final Manufactured Product - Plant Operations: Describe i nspection

schedule and methods for identifying defects and non- compliance with the Specifications. Describe corrective actions and methods to resolve them.

105-4.8 1 Storage: When storage of the produced materials is required and it is

not defined in the Contract Documents, describe the methods and duration for storage. Include measures and methods for preventing segregation, contamination and degradation during storage.

105-4.8 2 Disposition of Failing Materials: When not described in the

Specification s, describe the methods and measures for identifying and controlling the failing materials. Include preventive and corrective measures. Describe disposition of failing materials.

105-4.9 Testing Laboratories: Identify the laboratories performing testing. Ensure that

the testing laboratories comply with the Laboratory Qualification Program requirements of this Section or other applicable requirements. 105-4.10 Department Inspection Access: Include a statement in the Quality Control Plan allowing the Depart ment inspectors access to the production facility to perform the inspections of the production process and the products produced for the Department.

105-5 Contractor Quality Control (QC) Plan.

105-5.1 General: Submit the Contractor QC Plan in the Departm ent’s database seven

days prior to beginning work on any QC material as defined in this Section. The QC Plan may be submitted as a whole or in portions for the work related to the C ontract. Update the QC Plan at least five working days prior to the implementation of any changes. FY 2023-24 Return to Table of Contents If at any time the Work is not in compliance with the Contract Documents, the Engine er may suspend operations in accordance with 8-6.1.

105-5.2 Personnel Qualification: Submit the Training Identification Numbers for all

technicians performing sampling, testing and inspection for field tests. Include employed and subcontracted technicians.

105-5.3 Production Facilities: Identify the producers of materials listed in 105-4.4 for

the project. Include the Department’s facility ID number as part of the identification. All producers must have accepted Producer’s Quality Control Program and be listed on the Department’s Production Facility Listing .

105-5.3 1 Structural Concrete Mix Designs: Identify the approved structural

concrete mix designs for each structural concrete production facility for review and approval by the Engineer. Do not begin work on the material without the Engineer’s approval. The Engineer will review and respond within five calendar days of s ubmittal.

105-5.4 Testing Laboratories: Identify the laboratories performing testing. Ensure that

the testing laboratories comply with the Laboratory Qualification Program requirements of this Section.

105-6 Contractor Certification of Compliance.

Provide the Engineer with a notarized monthly certification of compliance with the Contract Documents, to accompany each progress estimate, on a form provided by the Engineer. The Department may not authorize payment of any progress estimate not accompanied by an executed certification document. Final payment in accordance with 9- 8 will not be made until a final notarized certification summarizing all QC exceptions has been submitted.

105-7 Lab Qualification Program.

Testing laboratories participating in the De partment’s Acceptance Program must have current Department qualification when testing materials that are used on Department projects. In addition, they must have one of the following:

1.Current AASHTO (AAP) accreditation.2. Inspected on a regular bas is per ASTM D3740 for earthwork, ASTM D3666 for asphalt and ASTM C1077 for concrete for test methods used in the Acceptance Program, with all deficiencies corrected, and under the supervision of a Specialty Engineer.
3.Current Construction Materials Engineering Council (CMEC) program accreditation or other independent inspection program accreditation acceptable to the Engineer and equivalent to (1) or (2) above. After meeting the criteria described above, submit a Lab oratory Qualification Application to the Department. The application is available from the Department’s website : https://www.fdot.gov/materials/quality/programs/laboratoryqualification/index.shtm. Obtain the Department’s qualification prior to beginning testing. The Department may inspect the laboratory for compliance with the accreditation requirements prior to issuing qualification. Meet and maintain the qualification requirements at all times. Testing without Department’s qualification may result in a rejection of the test results. Continued qualifications are subject to satisfactory results from Department evaluations, including Independent Assurance evaluations. In case of suspension or disqualification, prior to resumption of testing, resolve the issues to the Department’s satisfaction and obtain reinstatement of qualification. The following conditions may result in suspension of a laboratory’s qualified status: FY 2023-24 Return to Table of Contents
1.Failure to timely supply required information.
2.Loss of accredit ed status. 3.Failure to correct deficiencies in a timely manner.4. Unsatisfactory performance.5. Changing the laboratory’s physical location without notification to the accrediting agency and the Engineer. 6.Delays in reporting the test data in the Department’s database.
7.Incomplete or inaccurate reporting.8. Using unqualified technicians performing testing. Should any qualified laboratory falsify records, the laboratory qualification will be subject to revocation by the Engineer. Falsification of project- related documentation will be subject to further investigation and penalty under S tate and Federal laws. It is prohibited for any contract laboratory or staff to perform Contractor QC testing and any other Acceptance Program testing on the same contract.

105-8 Personnel Qualifications.

105-8.1 General: Provide qualified personnel for sampling, testing and inspection of

materials and construction activities. Ensure that qualifications are maintained during the course of sampling, testing and inspection. Construction operations that require a qualified technician must not begin until the Department verifies that the technician is on the CTQP list of qualified technicians. The CTQP lists are subject to satisfactory results from periodic I ndependent Assurance evaluations.

105-8.2 Quality Control ( QC) Manager: Designate a QC Manager who has full

authority to act as the Contractor’s agent to institute any and all actions necessary to administer, implement, monitor, and as necessary, adjust quality control processes to ensure compliance with the Contract Documents. The QC Manager must speak and understand English. The QC Manager must be on-site at the project on a daily basis or always available upon four hours’ notice. Ensure that the QC Manager is qualified as such through the Construction Training and Qualification Program. The QC Manager and the Superintendent must not be the same individual. Under the direction of the QC Manager, e nsure that the QC test data is entered into the Departmen t’s database on a daily basis. Use Department approved programs to generate the plots for the ERS. Maintain all QC related reports and documentation for a period of three years from final acceptance of the project. Make copies available for review by the D epartment upon request.

105-8.3 Temporary Traffic Control (Maintenance of Traffic) Personnel : Worksite

Traffic Supervisors, flaggers, and other personnel responsible for work zone related transportation management and traffic control must obtain training and certification in accordance with the Department’s Temporary Traffic Control (Maintenance of Traffic) Training Handbook located at the following URL address: https://www.fdot.gov/roadw ay/TTC/Default.shtm. Worksite Traffic Supervisor s or de signees must obtain training and certification for the Department’s lane closure notification system available at the following URL address: https://info.one.network/fdot- live-link-resources .

105-8.4 Earthwork Quality Control (QC) Personnel:

105-8.4 1 E

arthwork Level 1: Ensure the technician who samples the soil and earthwork materials from the roadway project, takes earthwork moisture and density readings, FY 2023-24 Return to Table of Contents and records those data in to the ERS section of the Department’s database, holds a CTQP Earthwork Construction Inspe ction Level 1 qualification.

105-8.4 2 Earthwork Level 2: Ensure the technician responsible for determining

the disposition of soil and earthwork materials on the roadway, and for interpreting and meeting Contract Document requirements holds a CTQP Earthwork Construction Inspection Level 2 qualification.

105-8.5 Asphalt Quality Control (QC) Personnel:

105-8.5 1 Plant Technicians: For asphalt plant operations, provide a QC

technician, qualified as a CTQP Asphalt Plant Level 2 Technician, available at the asphalt plant at all times when producing mix for the Department. Perform all asphalt plant related testing with a CTQP Asphalt Plant Level 1 Technician. As an exception, measurements of temperature may be performed by someone under the supervision of a CTQP Plant Level 2 technician.

105-8.5 2 Paving Technicians: For paving operations (with the exception of

miscellaneous or temporary asphalt), keep a qualified CTQP Asphalt Paving Level 2 T echnician on the roadway at all times when placing asphalt mix for the Department, and perform all testing with a CTQP Asphalt Paving Level 1 Technician. As an exception, measurements of cross-slope, temperature, and yield (spread rate) can be performed by someone under the supervision of a CTQP Paving Level 2 T echnician at the roadway.

105-8.5 3 Mix Designer: Ensure all mix designs are developed by individuals

who are CTQP qualified as an Asphalt Hot Mix Designer.

105-8.5 4 Documentation: Document all QC procedures, inspection, and all test

results and make them available for review by the Engineer throughout the life of the Contract. Identify in the asphalt producer’s QC Plan the QC Managers and Asphalt Plant Level 2 technicians responsible for the decision to resume production after a quality control failure.

105-8.6 Concrete QC Personnel:

105-8.6 1 Concrete Field Technician - Level 1: Ensure technicians performing

plastic property testing on concrete for materials acceptance are qualified CTQP Concrete Field Technicians Level 1. Plastic property testing will include but not be limited to slump, temperature, air content, water -to-cementitious materials ratio calculation, and making and curing concrete cylinders. Duties will include initial sampling and testing to confirm specification compliance prior to beginning concrete placements, ensuring timely placement of initial cure and providing for the transport of compressive strength samples to the designated laboratories. Ensure that personnel performing plastic property testing on self-consolidating concrete (SCC) possess an ACI Self -Consolidating Concrete Testing Technician Certification.

105-8.6 2 Concrete Field Inspector - Level 2: Ensure field inspectors

responsible for the quality of concrete being placed on the following structure types are qualified CTQP Concrete Field Inspectors Level 2:

1.Moveable bridges2. Bridges over a water opening of 1,000 feet or more3. Bridges with a span of 190 feet or more4. Cable supported or cable stayed bridges5. Post-tensioned bridges6. Steel girder or steel truss bridges7. Multi-l evel roadways With the exception of concrete traffic railing and bridge approach slab placements, a Level 2 Inspector must be present on the jobsite during all concrete placements. FY 2023-24 Return to Table of Contents Prior to the placement of concrete, the inspector will inspect the element to be cast to ensure compliance with Contract Documents. A Level 2 Inspector's duties may include ensuring that concrete testing, inspection, and curing in the field are performed in accordance with the Contract Documents. The QC Inspector will inform the Verification Inspector of anticipated concrete placements and LOT sizes.

105-8.6 3 Concrete Laboratory T echnician – Level 1: Ensure technicians

testing cylinders and recording concrete strength for material acceptance are qualified CTQP Concrete Laboratory Technicians Level 1. Duties include final curing, compressive strength testing, and the recording/repor ting of all test data.

105-8.7 Structural Concrete Production Facility Quality Control (QC) Personnel:

Ensure that each portland cement structural concrete production facility (plant), has designated personnel including plant manager of QC, concrete mix designer, concrete batch plant operator, and testing technicians to provide QC inspections and testing. Upon Department approval, the functions of the above positions may be performed by the same person when it can be demonstrated that the plant’s operation and quality of concrete will not be detrimentally affected and personnel have the qualifications required herein.

105-8.7 1 Plant Manager of QC: Ensure that the plant manager of QC has at

least three years of concrete related experience and the following training certifications:

1.CTQP Concrete Laboratory Technician - Level 1 certificate.2. CTQP Concrete Field Technician - Level 1 certificate. 3.Concrete Batch Plant Operator certification in accordance with 105 - 8.7.4. As alternatives to these certifications, the Department will accept, one of the following: a.Prestressed Concrete Institute (PCI) QC Personnel Certification Level III.
b.Precast Concrete Pipe, Box Culverts, Drainage Structures or Incidental Precast Concrete Plants Level II QC Inspector Certifications.
c.National Ready Mixed Concrete Association (NRMCA) Certified Concrete Technologist Level 2.

105-8.7 2 Concrete Mix Designer: Ensure that the concrete mix designer has the

CTQP Concrete Laboratory Technician Level 2 certification. As an alternative, the Department will accept any of the following qualifications:

1.PCI QC Personnel Level III Certificatio n, for concrete mix designs of prestressed concrete products.
2.National Ready Mix Concrete Association (NRMCA) Certified Concrete Technologist Level 3.
3.Any of the Level II QC certifications in accordance with 105-8.9.2.2.

105-8.7 3 Qualified T esting Technicians: Ensure that the testing technicians

have the following certifications , as appropriate:

1.ACI Concrete Field Testing Technician Grade I, for personnel performing concrete plastic property tests and ACI Self-Consolidating Concrete Testing Technician if testing self- consolidating concrete (SCC).
2.ACI Concrete Strength Testing Technicia n, for personnel performing tests on hardened properties of concrete. FY 2023-24 Return to Table of Contents

105-8.7 4 Concrete Batch Plant Operator: Ensure t hat the concrete batch plant

operator has a CTQP Concrete Batch Plant Operator Certification. As an alternative, the Department will accept the following certifications: Operator, 1. Precast Concrete Structures Association (PCSA) Batch Plant

2.NRMCA Certified Concrete Technologist Level 3, or
3.NRMCA Plant Manager Certification. For dry cast concrete p ipe and dry cast drainage structures/box culverts, the Department will accept American C oncrete Pipe Association (ACPA) Concrete Pipe/Precast Box Culvert Batch Plant Operator or Quality School Certification.

105-8.8 Prestressed C oncrete Plant Quality Control (QC) Personnel: Obtain

personnel certifications from Department accredited training providers. The list of Department approved courses and their accredited providers is available on t he SMO website at the following URL:https://www.fdot.gov/materials/administration/resources/training/structural/concrete - prestressed.shtm . Ensure each prestressed concrete plant has an onsite production manager, an onsite plant QC manager, a plant engineer, and adequate onsite QC testing personnel to provide complete QC inspections and testing.

105-8.8 1 Plant QC Manager: Ensure the plant QC manager has at least five

years of related experience and the following certifications:

1.ACI Concrete Field Testing Technician Grade I certification.
2.PCI QC Personnel Certification Level III. 3.CTQP Prestressed Concrete Field Inspector/Technician certificate .

105-8.8 2 QC Inspector/Technician: Ensure that the QC inspector/te chnician has

the following certifications:

105-8.8 3 QC Concrete Central Mix Testing Technician: Ensure that QC

testing personnel meet the requirement of 105-8.7.3.

105-8.8 4 Batch Plant Operator: Ensure that the batch plant operator meets the

requirement of 105-8.7.4. 105- 8.9 Pipe and Precast Concrete Products Manufacturing Facilities Quality Control (QC) Personnel:

105-8.9 1 G eneral: Obtain personnel certifications from Department a ccredited

training providers. The list of Department approved courses and their accredited providers is available on the SMO website at the following URL: https://www.fdot.gov/materials/administration/resources/training/structural/index.shtm.

105-8.9 2 Precast Concrete Drainage Structures, Precast Concrete Box

Culvert, Precast Concrete Pipe, and Incidental Precast Concrete Manufacturing Facilities Quality Control (QC) Personnel:

105-8.9 2.1 Level I Quality Control Inspectors: Ensure that the Level I

Inspectors have the following certifications:

105-8.9 2.1.1 Precast C

oncrete Drainage Technician Level I: PCI Quality Control Technician Level I certification. As an alternative, a current Precast FY 2023-24 Return to Table of Contents1.ACI Concrete Field Testing Technician Grade I certification. 2.PCI QC Personnel Certification Level II. 3.CTQP Prestressed Concrete Field Inspector/Technician certificate. Concrete Quality Control Technician Level I certification in the respective work area will be accepted.

105-8.9 2.1.2 Incidental Precast Concrete Technician Level I:

PCI Quality Control Technician Level I certification. As an alternative, a current Precast Concrete Quality Control Technician Level I certification in the respective work area will be accepted.

105-8.9 2.1.3 Precast Concrete Pipe Technician Level I: Precast

Concrete Pipe Technician Level I certification.

105-8.9 2.2 Level II Quality Control Inspectors: Ensure that Level II

Inspectors have the following certifications:

105-8.9 2.2.1 Precast Concrete Drainage Technician Level II:

1.Precast Concrete Drainage Technician Level I, in accordance with 105 -8.9.2.1.1.

2.PCI Quality Control Technician Level II certification. As an alternative, a current Precast Concrete Quality Control Technician Level II certification in the respective wor k area will be accepted.
3.CTQP Concrete Field Technician Level 1, if the plant produces structural concrete in accordance with Section 346.

105-8.9 2.2.2 Incidental Precast Concrete Technician Level II:

1.Incidental Precast Concrete Techni cian Level I, in accordance with 105 -8.9.2.1.2.

2.PCI Quality Control Technician Level II certification. As an alternative, a current Precast Concrete Quality Control Technician Level II in the respective work area will be accepted. 3.CTQP Concrete Field Technician Level 1. 4.Level II technicians who will perform quality control of incidental prestressed products must have a current certificate of completion of Section 450 Specification examination.

105-8.9 2.2.3 Precast Concrete P ipe Technician Level II:

1.Precast Concrete Pipe Technician Level I, in accordance with 105-8.9.2.1.3. 2.Precast Concrete Pipe Technician Certification Level II.

105-8.9 2.3 Plant Quality Control Manager: Ensure that the QC

manager has a minimum of two years construction related experience in the specific work area and has the following certifications:

105-8.9 2.3.1 Precast Concrete Drainage Facilities:

Precast Concrete Drainage Technician Level II in accordance with 105 -8.9.2.2.1.

105-8.9 2.3.2 Incidental Precast Concrete Facilities:

1.Incidental Precast Concrete Technician Level II in accordance with 105 -8.9.2.2.2. 2.Section 450 Specification Certification if the plant produces incidental prestressed products.

105-8.9 2.3.3 Precast Concrete Pipe Facilities:

Precast Concrete Pipe Technician Level II in accordance with 105-8.9.2.2.3. FY 2023-24 Return to Table of Contents

105-8.9 2.4 Additional Requirements for Quality Control (QC)

Personnel of Precast Concrete Drainage Structures and Box Culverts, Precast Concrete Pipe, and Incidental Precast Concrete Manufacturing Facilities:

105-8.9 2.4.1 Testing Personnel: Ensure test ing technicians meet

the requirement of 105-8.7.3. 105-8.9.2.4.2 Batch Plant Operator: Ensure the batch plant operator meets the requirement of 105-8.7.4.

105-8.10 Supervisory Personnel – Post-Tensioned and Movable Bridge Structures:

105-8.10 1 General: Provide supervisory personnel meeting the qualification

requirements only for the post-tensioned and movable bridge types detailed in this Article. Submit qualifications to the Engineer at the pre-construction conference. Do not begin construction until the qualifications of supervisory personnel have been approved by the Engineer. 105-8.10.2 Proof of License or Certification: Submit a copy of the Professional Engineer license current and in force issued by the state in which registration is held. The li cense must be for the field of engineering that the construction work involves such as Civil, Electrical or Mechanical. Under certain circumstances Florida registration may be required. Submit a copy of the license issued by the State of Florida for tra desmen that require a license indicating that the license is in force and is current. Submit a copy of the certification issued by the International Society of Automation for each Certified Control Systems Technician.

105-8.10 3 Experience Record: Submit the following information for

supervisory personnel to substantiate their experience record. The supervisor (project engineer, superintendent/manager or foreman) seeking approval must provide a notarized certification statement attesting to the completene ss and accuracy of the information submitted. Submit the following experience information for each individual seeking approval as a supervisor: Project owner’s name and telephone number of an owner’s representative, project identification number, state, city, county, highway number and feature intersected. D etailed description s of each bridge construction experience and the level of supervisory authority during that experience. Report the duration in weeks, as well as begin and end dates, for each experience period. The name, address and telephone number of an individual that can verify that the experience being reported is accurate. This individual should have been an immediate supervisor unless the supervisor cannot be contacted in which case another individual with direct knowledge of the experience is acceptable.

105-8.10 4 Concrete Post- Tensioned Segmental Box Girder Construction:

Ensure the individuals filling the following positions meet the minimum requirements as follows: 105-8.10.4.1 P roject Engineer- New Construction: Ensure the project engineer is a registered Professional Engineer with five years of bridge construction experience. Ensure a minimum of three years of experience is in segmental box girder construction engineering and includes a minimum of one year in segmental casting yard operations and related surveying, one year in segment erection and related surveying, including post-tensioning and grouting of longitudinal tendons and a minimum of one year as the pr oject engineer in responsible charge of s egmental box girder construction engineering. Ensure this individual is present at the site of construction, at all times while segmental box girder construction or segment erection is in progress. FY 2023-24 Return to Table of Contents

105-8.10 4.2 P roject Engineer-Repair and Rehabilitation: Ensure the

project engineer is a registered Professional Engineer with five years of bridge construction experience. Ensure a minimum of three years of experience is in s egmental box girder construction engineering and includes one year of post-tensioning and grouting of longitudinal tendons and a minimum of one year as the p roject engineer in responsible charge of s egmental box girder rehabilitation engineering or s egmental box girder new construction engineering.

105-8.10 4.3 Project Superintendent/Manager- New Construction:

Ensure the project superintendent/manager has a minimum of ten years of bridge construction experience or is a registered Professional Engineer with five years of bridge construction experience. Ensure that a minimum of three years of experience is in s egmental box girder construction operations and includes a minimum of one year in the casting yard operations and related surveying, one year in segment erection and related surveying including post-tensioning and grouting of longitudinal tendons and a minimum of one year as the project superintendent/manager in responsible charge of s egmental box girder construction operations. Ensure this individual is present at the site of construction, at all times while segmental box girder construction or segment erection is in progress. 105-8.10.4.4 Project Superintendent/Manager- Repair and Rehabilitation: Ensure the project superintendent/manager has a minimum of five years of bridge construction experience or is a registered Professional Engineer with three years of bridge construction experience. Ensure that a minimum of two years of experience is in s egmental box girder construction operations and includes a minimum of one year of experience performing post-tensioning and grouting of longitudinal tendons and a minimum of one year as the project superintendent/manager in responsible charge of s egmental box girder rehabilitation operations or segmental box girder new construction operations.

105-8.10 4.5 Foreman- New Construction: Ensure that the f oreman has a

minimum of five years of bridge construction experience with two years of experience in segmental box girder operations and a minimum of one year as the foreman in responsible charge of segmental box girder new construction operations. Ensure this individual is present at the site of construction, at all times while segmental box girder construction or segment erection is in progress. 105-8.10.4.6 Foreman- Repair and Rehabilitation: Ensure the f oremen has a minimum of five years of bridge construction experience with two years of experience in segmental box girder operations and a minimum of one year as the foreman in responsible charge of segmental box girder rehabilitation operations or s egmental box girder new construction operations.

105-8.10 4.7 Geometry Control Engineer/Manager: Ensure that the

geometry control engineer/manager for construction of cast- in-place box segments is a r egistered Professional Engineer with one year of experience, a non- registered Engineer with three years of experience or a registered Professional Land Surveyor with three years of experience in geometry control for casting and erection of cast- in-place box segments. Credit for experience in cast-in-place box girder geometry control will be given for experience in precast box girder geometry control but not vice versa. Ensure that the geometry control engineer/manager for precast box segments is a registered P rofessional Engineer with one year of experience or non- registered with three years of experience in casting yard geometry control of concrete box segments. FY 2023-24 Return to Table of Contents The geometry control engineer/manager must be responsible for and experienced at implementing the method for establishing and maintaining geometry control for segment casting yard operations and segment erection operations and must be experienced with the use of computer programs for monitoring and adjusting theoretical segment casting curves and geometry. This individual must be experienced at establishing procedures for assuring accurate segment form setup, post-tensioning duct and rebar alignment and effective concrete placement and curing operations as well as for verifying that casting and erection field survey data has been properly gathered and recorded. Ensure this individual is present at the site of construction, at all times while cast- in-place segmental box girder construction is in progress or until casting yard operations and segment ere ction is complete.

105-8.10 4.8 Surveyor: Ensure that the surveyor in charge of geometry

control surveying for box segment casting and/or box segment erection has a minimum of one year of bridge construction surveying experience. Ensure this individual is present at the site of construction, at all times while segmental box girder construction or segment erection is in progress. 105-8.10.5 Movable Bridge Construction: Ensure the individual filling the following positions meet the minimum requirements a s follows:

105-8.10 5.1 Electrical Journeyman: Ensure the e lectrical journeyman

holds, an active journeyman electrician’s license and has at least five years ’ experience in industrial electrical work, or is a certified control systems technician. A certified control systems technician will not be permitted to perform electrical power work including, but not limited to, conduit and wire-way installation or power conductor connection. Ensure the electrical journeyman has successfully completed the installation of one similar movable bridge electrical system during the last three years. 105-8.10.5.2 Control Systems Engineer and Mechanical Systems Engineer: Ensure the control systems engineer and m echanical systems engineer are both registered Professional Engineers with a minimum of 10 years supervisory experience each in movable bridge construction. Ensure the engineers have working knowledge of the movable bridge leaf motion control techniques, mechanical equipment and arrangements specified for this project. Ensure that each engineer has been in responsible control of the design and implementation of at least three movable bridge electrical control and machiner y systems within the past 10 years of which, at least one of the three bridges was within the last three years. Ensure that a minimum of one of the three bridge designs incorporated the same type of leaf motion control and machinery systems specified for this project. 105-8.10.6 Concrete Post- Tensioned Other Than Segmental Box Girder Construction: Ensure the individual filling the following positions meet the minimum requirements as follows: 105-8.10.6.1 Project Engineer: Ensure the project engineer is a registered Professional Engineer with five years of bridge construction experience. Ensure that a minimum of three years of experience is in concrete post -tensioned construction. Ensure that the three years of experience includes experience in girder erection, safe use of cranes, stabilization of girders; design of false work for temporary girder support, post-tensioning and grouting operations, and a minimum of one year as the project engineer in responsible charge of post- tensioning related engineering responsibilities.

105-8.10 6.2 Project Superintendent/Manager: Ensure the project

superintendent/manager has a minimum of ten years of bridge construction experience or is a FY 2023-24 Return to Table of Contents registered Professional Engineer with five years of bridge construction experi ence and has a minimum of three years of supervisory experience in girder erection, safe use of cranes, stabilization of girders; design of falsework for temporary girder support post-tensioning, grouting operations and a minimum of one year as the project superintendent/m anager in responsible charge of post-tensioning related operations. 105-8.10.6.3 Foreman: Ensure the foremen has a minimum of five years of bridge construction experience with two years of experience in post-tensioning related operations and a minimum of one year as the foreman in responsible charge of post-tensioning related operations. 105-8.10.7 Post- Tensioning (PT) and Filler Injection Personnel Qualifications: Perform all stressing and filler injection operations in the presence o f the Engineer and with personnel meeting the qualifications of this article. Coordinate and schedule all PT and filler injection activities to facilitate inspection by the Engineer .

105-8.10 7.1 Post- Tensioning: Perform all PT field operations under the

direct supervision of a Level 2 CTQP Qualified PT Technician who must be present at the site of the post-tensioning work during the entire duration of the operation. For the superstructures of bridges having concr ete post-tensioned box or I girder construction, provide at least two CTQP Qualified PT Technicians, Level 1 or 2, on the work crew. The supervisor of the work crew, who must be a Level 2 CTQP Qualified PT Technician, may also be a work crew member, in which case, the supervisor shall count as one of the two CTQP qualified work crew members. For PT operations other than the superstructures of post-tensioned box or I girder construction, perform all PT operations under the direct supervision of a Level 2 CTQ P Qualified PT Technician who must be present at the site of the PT work during the entire duration of the operation. Work crew members are not required to be CTQP qualified. 105-8.10.7.2 Grouting: Perform all grouting field operations under the direct supervision of a Level 2 CTQP Qualified Grouting Technician who must be present at the site of the grouting work during the entire duration of the operation. For the superstructures of bridges having concrete post-tensioned box or I girder construction, pr ovide at least two CTQP Qualified Grouting T echnicians, Level 1 or 2, on the work crew. The supervisor of the work crew, who must be a Level 2 CTQP Qualified Grouting Technician, may also be a work crew member, in which case, the supervisor shall count as one of two CTQP qualified work crew members. For grouting operations other than the superstructures of post-tensioned box or I girder construction, perform all grouting operations under the direct supervision of a Level 2 CTQP Qualified Grouting Technician who must be present at the site of the grouting work during the entire duration of the operation. Work crew members are not required to be CTQP qualified. Perform all vacuum grouting operations under the direct supervision of a crew foreman who has been trained and has experience in the use of vacuum grouting equipment and procedures. Submit the crew foreman’s training and experience records to the Engineer for approval prior to performing any vacuum grouting operation. 105-8.10.7.3 Flexible Fille r Injection: Perform all filler injection operations under the direct supervision of a f iller injection foreman who has American Segmental Bridge Institute (ASBI) certification in the flexible filler process. Provide at least two CTQP Qualified Grouting Te chnicians with ASBI certification in the flexible filler process, one of whom must be a Level 2 CTQP Qualified Grouting Technician. Both technicians must be present at the site of the flexible filler injection work during the entire duration of the operation. FY 2023-24 Return to Table of Contents Provide a f iller injection quality control (QC) inspector who has ASBI certification in the flexible filler process. The filler injection QC inspector must be present at the site of the flexible filler injection work during the entire duration of the operation. Verifiable experience performing injection of similar flexible filler on at least two projects is acceptable in lieu of ASBI certification in the flexible filler process. Perform all flexible filler repair operations unde r the direct supervision of a crew foreman who has been trained and has verifiable experience in the use of vacuum flexible filler repair equipment and procedures. Submit the crew foreman’s training and experience records to the Engineer prior to performing any flexible filler operation. 105-8.10.8 Failure to Comply with Bridge Qualification Requirements: Make an immediate effort to reestablish compliance. If an immediate effort is not put forth as determined by the Engineer, payment for the bridge construction operations requiring supervisors to be qualified under this Specification will be withheld up to 60 days. Cease all bridge construction and related activities (casting yard, etc.) if compliance is not met within 60 days, regardless of how much effort is put forth. Resume bridge construction operations only after written approval from the Engineer stating that compliance is reestablished.

105-8.11 Signal Installation Inspector: Provide an inspector trained and certified by the

International Municipal Signal Association (IMSA) as a traffic signal inspector to perform all signal installation inspections. Use only Department approved signal inspection report forms during the signal inspection activities. Ensure all equipment, materials, and hardware is in compliance with Department Specifications and verify that all equipment requiring certification is listed on the Department’s Approved Product List (APL). Submit the completed signal inspection report forms, certified by the IMSA t raffic signal inspector to the Engineer. The Department’s approved inspection report forms are available at the following URL: http://www.fdot.gov/traffic/ .

105-8.12 Structural Steel and Miscellaneous Metals Fabrication Facility Quality

Control Personnel: Ensure each fabrication facility has an onsite production manager, an onsite facility manager for QC, a plant engineer, and onsite QC inspectors/technicians to provide complete QC inspections and testing. Ensure that the f acility manager for QC and QC inspectors/technicians meet the certification requirements set forth in the latest version of AASHTO/NSBA Steel Bridge Collaboration S 4.1, Steel Bridge Fabrication QC/QA Guide Specification, including the years of experience required in Table 105-1 below. The f acility manager for QC must meet the requirements of Table 105-1 for every structural steel member type produced by a plant with QC being managed by the f acility manager for QC . The facility manager for QC will report directly to the plant manager or plant engineer and must not be the plant production manager nor report to or be the subordinate of the plant production manager. QC inspectors/technicians must be the employees of and must report directly to the f acility manager for QC. Table 105-1 Experience Requirements for QC Inspectors/Technicians And Facility Manager for Quality Control Structural Steel Member Type Minimum Years of Experience Required QC Inspector/Technician Facility Manager for QC Rolled beam bridges 1 year 3 years FY 2023-24 Return to Table of Contents Table 105-1 Experience Requirements for QC Inspectors/Technicians And Facility Manager for Quality Control Structural Steel Member Type Minimum Years of Experience Required QC Inspector/Technician Facility Manager for QC Welded plate girders (I sections, box sections, etc.) 2 years 4 years Complex structures, such as trusses, arches, cable stayed bridges, and moveable bridges 3 years 5 years Fracture critical (FC) members 3 years 5 years FY 2023-24 Return to Table of Contents SECTION 107 LITTER REMOVAL AND MOWING

107-1 Description.

Provide pickup, removal and disposal of litter within the project limits from the outside edge of travel way to the right of way line. Include the median on divided highways, from the inside edge of travel way to the inside edge of travel way. Litter inclu des but is not limited to, bottles, cans, paper, tires, tire pieces, lumber, vehicle parts, metal junk, and brush debris. Mow turf or vegetation within the project limits. Turf consists of grasses planted in accordance with Section 570. Vegetation consis ts of planted and natural grasses, weeds, and other natural vegetation that have been previously mowed.

107-2 Operation.

107-2.1 Frequency : Begin litter removal and mowing when directed by the Engineer and

continue every 30 days, unless otherwise directe d by the Engineer. Continue litter removal and mowing u ntil final acceptance in accordance with 5 -11. Mow all areas to obtain a uniform height of 6 inches. After final acceptance, perform litter removal and mowing until new turf is established in accorda nce with 570 -4 at no cost to the Department . Maintain turf and vegetation height between 6 inches and 12 inches. Do not include seed stalk or wildflowers when measuring height. Perform litter removal prior to and in conjunction with mowing; however, the Engineer may direct litter pickups in addition to those performed in conjunction with mowing. Do not mow new turf until a healthy root system is established. In designated wildflower areas, a void cutting wildflowers when in bloom and when re -seeding.

107-2.2 General: Mow shoulders and medians concurrently so that not more than one

mile will be left partially mowed at the conclusion of the working day. Mow turf and vegetation on slopes or around appurtenances concurrent with the mowing operation. In areas saturated with standing water, mow or cut to the surface of the water using hand labor or other specialized equipment when standard equipment will cause damage. Do not remove turf or other vegetation cuttings from the right -of-way, or rake or pick up the cuttings unless the cuttings are in the travel ed ways, bike lanes, or sidewalk; are obstructing drainage structures; or are the result of cleaning the equipment.

107-2.3 Limitation s: Maintain traffic in accordance with Section 102. When mowing

within four feet of a travel lane, operate the equipment in the same direction of traffic, unless the adjacent lane is closed to traffic due to construction operations. Perform all work during daylight hours.

107-2.4 Disposal of Litter and Debris : During each litter removal cycle, bag and

remove all litter or piles at the end of each working day. Dispose of litter in accordance with applicable local and state laws. Do not store or stockpile litter within the project l imits.

107-3 Method of Measurement.

The quantity to be paid will be the project area shown in the Contract Documents, in acres, for each litter removal or mowing cycle completed and accepted. No adjustments will be made to the project area quantity. FY 2023-24 Return to Table of Contents