105-1General
105-1.1Quality Control Documentation:
105-1.1.1 Submission of Materials Certification and Reporting Test Results: Submit certifications prior to placement of materials. Report test results at completion of the test and meet the requirements of the applicable Specifications. 105-1.1.2 Databases: Obtain access to the Department’s databases prior to testing and material plac ement. Database access information is available through the Department’s website. Enter all required and specified documentation and test results into the Department ’s databases. 105-1.1.3 Worksheets: Make available to the Department, when requested, worksheets used for collecting test information. Ensure the worksheets at a minimum contain the following:
105-1.1.4 Earthwork Records System: Record QC test results directly into the Earthwork Records System (ERS) section of the Department’s database. If authorized by the Engineer due to ERS ina ccessibility in the field, collect the data in the field on Department approved forms and enter the data in the ERS section of the Department’s database. Submit the original forms by uploading into the Department’s database.
105-1.2Inspections to Assure Compliance with Acceptance Criteria :
105-1.2.1 General: The Department is not obligated to make an inspection of materials at the source of supply, manufacture, or fabrication. Provide the Engineer with unrestricted entry at all times to such parts of the facilities that concern the manufacture, fabrication, or production of the ordered materials. Bear all costs incurred in determining whether the material meets the requirements of these Specifications. 105-1.2.2 Quality Control (QC) Inspection: Provide all necessary inspection to assure effective QC of the operations related to materials acceptance. This includes but is not limited to sampling and testing, production, storage, delivery, construction and placement. Ensure that the equipment used in the production and testing of the materials provides accurate and precise measurements in accordance with the applicable Specifications. Maintain a record of all inspections, including but not limited to, date of inspection, results of inspection, and any subsequent corrective actions taken. Make available to the Department the inspection records, when requested. 105-1.2.3 Notification of Placing Order: Order materials sufficiently in advance of their incorporation in the work to allow time for sampling, testing and inspection. Notify the Engineer prior to placing orders for materials. Submit to the Engineer a fabrication schedule for all items requiring commercial inspection at least 30 days before beginning fabrication. These items include steel bridge components, moveable bridge components, pedestrian bridges, castings, forgings, structures erected either partially or completely over the travelled roadway or mounted on 146 FY 2023-24 Return to Table of Contents bridges as overhead traffic signs (som e of these may be further classified as cantilevered, overhead trusses, or monotubes) or any other item identified as an item requiring commercial inspection in the Contract Documents.
105-2Additional Requirements for Lump Sum Projects
Prepare and submi t to the Engineer a project -specific list of material items and quantities to be used on the project as a Job Guide Schedule in the same format as the current Sampling, Testing, and Reporting Guide 21 calendar days prior to commencement of construction. Su bmit up-to-date quantities for the items on the Job Guide Schedule to the Engineer with each monthly progress estimate. The Department may not authorize payment of any progress estimate not accompanied by updated Job Guide Schedule quantities. Maintain the Job Guide Schedule throughout the project including the quantity placed since the previous submittal, and total to date quantity and any additional materials placed. Do not commence work activities that require testing until the Job Guide Schedule has been reviewed and accepted by the Engineer. At final acceptance, submit a final Job Guide Schedule that includes all materials used on the project in the same format as the monthly reports.
105-3Quality Control Program
Certain operations require personnel with specific qualifications. Certain materials require production under an approved Quality Control (QC) Plan to ensure that these materials meet the requirements of the Contract Documents. Applicable materials include hot mix asphalt, portland cement concrete ( structural), earthwork, cementitious materials, timber, steel and miscellaneous metals, galvanized metal products, prestressed and/or precast concrete products , drainage products, and fiber reinforced polymer products . For all applicable materials i ncluded in the Contract, submit a QC Plan prepared in accordance with the requirements of this Section to the Engineer. Do not incorporate any of these materials into the project prior to the Engineer’s approval of the QC Plan. Steel and Miscellaneous Metal products, including aluminum, are defined as the metal components of bridges , including pedestrian and moveable bridges, overhead and cantilevered sign supports, ladders and platforms, bearings, end wall grates, roadway gratings, drainage items, expansion joints, roadway decking, shear connectors, handrails, galvanized products, fencing, guardrail, light poles, high mast light poles, standard mast arm assemblies and Monotube assemblies, stay in -place forms, casing pipe, strain poles, fasteners, connectors and other hardware.
105-4Producer Quality Control Program
105-4.1General: When accreditation or certification is required, make supporting
documents from the two previous inspections performed by the accrediting or certifying agency available to the Department upon request. Obtain Department approval prior to beginning production. Meet and maintain the approved Producer Quality Control Program requirements at all times. Production of these products without the Department’s prior acceptance of the Producer Quality Control Program may result in rejection of the products. Continued approval will be subject to satisfactory results from Department evaluations, including the Independent Assurance program. In cases of non-compliance with th e accepted Producer Quality Control Program, identify all affected material and do not incorporate or supply to the Department projects. The following conditions may result in suspension of a Producer Quality Control Program: 147 FY 2023-24 Return to Table of Contents 1.Failure to timely supply infor mation required.
requirements.
performance of the Producer Quality Control Program.
Quality Control Program for use on Department projects.
Producer Quality Control Program, having received notice from the Department, within the amount of time defined in the notice.
105-4.2Producer Quality Control Program Requirements:
105-4.2.1 Hot Mix Asphalt, Portland Cement Concrete (Structural), Earthwork, Cementitious Materials, Timber, Steel and Miscellaneous Meta ls, Galvanized Metal Products, Prestressed and/or Precast Concrete Products , Drainage Products , and Fiber Reinforced Polymer Products Quality Control Program: Have an accepted Producer Quality Control Program, developed in accordance with this Section, during the production of materials to be used on Department projects. 105-4.2.2 Prestressed Concrete Quality Control Program: Have a current certification from a Department approved precast prestressed concrete plant certification agency and a Department accepted Producer Quality Control Plan, meeting the requirements of this Section. The list of Department approved certification agencies is available on the website of the State Materials Office (SMO). 105-4.2.3 Steel and Miscellaneous Metals Quality Control Program : Have an accepted Producer Quality Control Plan, developed in accordance with this Section and a current American Institute for Steel Construction (AISC) certification, provided that AISC certification program is available for the category of the fabrication products.
105-4.3Submittal: Depending on the type of products, producers shall submit their
proposed Producer Quality Control Programs to the SMO or to the District Materials Office, as described below: 105-4.3.1 State Materials Office (SMO): Producers of cementitious materials, steel and miscellaneous metals, galvanized metal products, aggregates, timber, flexible pipe, and fiber reinforced polymer (FRP) products must submit their proposed Producer Quality Control Program to t he SMO for review and acceptance. 105-4.3.2 District Materials Office : Producers of hot mix asphalt, portland cement concrete ( structural), earthwork, and precast/prestressed concrete products and must submit their proposed Producer Quality Control Program to the local District Materials Office for acceptance. Producers located outside the State must contact the SM O for address information of the District Materials Office responsible for the review of the proposed Quality Control Program.
105-4.4Compliance with the Materials Manual :
Producers of Polymer Slurry shall meet the requirements of Section 2.4, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/implemented/URLinSpecs/Section24V2.shtm . Producers of Asphalt Emulsion shall meet the requirements of Section 3.4 Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/implemented/URLinSpecs/Section34V2.shtm . 148 FY 2023-24 Return to Table of Contents Producers of Asphalt Binder shall meet the requirements of Section 3.5, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/implemented/URLinspecs/Section35V2.shtm . Producers of Flexible Pipe shall meet the requirements of Section 6.1, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section61V2.shtm . Pro ducers of Precast Concrete Pipe shall meet t he requirements of Section 6.2, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section62V2.shtm . Pro ducers of Precast Concrete Drainage Structures shall meet the requirements of Section 6.3, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section63V2.shtm . Pro ducers of Precast Prestressed Concrete Products shall meet the requirements of Sections 8.1 and 8.3, Volume II of the Department’s Materials Manual, which may be viewed at the following URLs: https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section81V2.shtm https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section83V2.shtm. Producers of Precast Prestressed Concrete Products using Self Consolidating Con crete shall meet the requirements of Section 8.4, Volume II of the Department’s Materials Manual, which may be viewed at the following URL: https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section84V2.shtm Producers of Precast/Prestressed Concrete Products using Flowing Concrete shall
meet the requirements of Section 8.6, Volume II of the Department’s Materials Manual, which
may be viewed at the following URL:
https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section86V2.shtm
Producers of Incidental Precast/Prestressed Concrete Products shall meet the
requirements of Section 8.2, Volume II of the Department’s Materials Manual, which may be
viewed at the following URL:
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section82V2.shtm.
Producers of Portland Cement Concrete shall meet the requirements of Section
9.2, Volume II of the Department’s Materials Manual, which may be viewed at the following
URL:
https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section92V2.shtm.
Producers of Paving Concrete produced by Central Mix Plants shall meet the
requirements of Section 9.3, Volume II of the Department’s Materials Manual, which may be
viewed at the following URL:
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section93V2.shtm
Specialty Engineers preparing, submitting, and implementing Mass Concrete
Control Plans shall meet the requirements of Section 9.4 Volume II of the Department’s
Materials Manual, which may be viewed at the following URL:
https://www.fdot.gov/programmanagement/Implemented/URLinspecs/Section94V2.shtm.
Producers of Structural Steel and Miscellaneous Metal Components shall meet the
requirements of Sections 11.1, 11.2, 11.3, 11.4, 11.5 and 11.6 of the Department’s Materials
Manual, which may be viewed at the following URLs:
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section111V2.shtm. 149FY 2023-24Return to Table of Contents
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section112V2.shtm.
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section113V2.shtm.
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section114V2.shtm.
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section115V2.shtm.
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section116V2.shtm.
Producers of Fiber Reinforced Polymer Composites shall meet the requirements
of Section 12-1, Volume II of the Department’s Materials Manual, which may be viewed at the
following URL:
https://www.fdot.gov/programmanagement/Implemented/URLinSpecs/Section121V2.shtm.
105-4.5Producer Quality Control (QC) Plan Review and Acceptance: The
Department will respond to the producer within 21 calendar days of receipt of the proposed
Producer Quality Control Program. The Department may perform evaluation activities to verify
compliance with submitted documents prior to acceptance.
If the Producer Quality Control Program must be revised for any reason,
including non-compliance, submit the revision to the Department. The Department will respond
to the producer within seven calendar days of receipt of the revised Producer Quality Control
Program.
105-4.6Producer’s Quality Control (QC) Plan: Submit detailed policies, methods and
procedures to ensure the specified quality of all applicable materials and related production
operations. Include other items in addition to these guidelines as necessary.
105-4.6.1 Personnel:
105-4.6.1.1 Qualifications: Submit the Training Identification Numbers
location and dates for all technicians performing sampling, testing and inspection for both field
and laboratory tests. Submit the names of the Construction Training and Qualification Program
certification for each technician. Include employed and subcontracted technicians.
105-4.6.1.2 Level of Responsibility: Identify the primary contact for the
Department. Identify roles and responsibilities of various personnel involved in the QC process.
105-4.6.2 Raw Materials:
105-4.6.2.1 Source: Identify the sources of raw materials. Submit
locations and plant or mine numbers when applicable.
105-4.6.2.2 Certification: Submit methods of verifying compliance of
certification with the Specifications.
105-4.6.2.3 Disposition of Failing Materials: Describe the system for
controlling non-conforming materials, including procedures for identification, isolation and
disposition.
105-4.6.3 Storage Facilities for Raw Materials: Describe measures and
methods, including bedding details, for preventing segregation, contamination and degradation.
Describe methods of identifying individual materials. Where applicable, submit a
site plan showing the locations of various materials.
105-4.6.4 Production Equipment: Describe calibration frequencies, maintenance
schedule and procedures for production equipment.
105-4.6.5 Plant Requirements:
105-4.6.5.1 Plant Identification: For those facilities producing materials
listed in 105-3, submit the mailing address, physical address including county and X,Y (latitude 150FY 2023-24Return to Table of Contents
and longitude) coordinates of the plant, telephone and fax numbers, email address, primary
contact at the plant, responsible person in charge, facility number provided by the Department,
owner information including parent company, vendor number, designed production capacity, and
other information as required.
105-4.6.5.2 Process Control System: Describe the methods and measures
established to ensure Contract compliance for the produced materials that are supplemental to the
QC sampling and testing program described in the Contract Documents. These methods and
measures will include, but are not limited to, inspection schedule, additional sampling and
testing, maintenance schedule, etc.
105-4.6.5.3 Loading and Shipping Control: Describe the methods and
measures for preventing segregation, contamination and degradation during loading and shipping
operations. Describe the methods established for materials to be in compliance with the
Specifications at the point of use.
105-4.6.5.4 Types of Products Generated: Describe the products the
plant is approved to produce under Department guidelines.
105-4.7Other Requirements:
105-4.7.1 Submittal of Certification: Submit certifications issued by the
plant/Contractor for the applicable products approved by the Department.
105-4.7.2 Statement of Compliance: Include a statement of compliance with all
quality requirements set forth by the Department in the Contract Documents and Department
manuals.
105-4.7.3 Documentation Storage: Identify location of document storage to
enable Department review. Include QC charts, qualification and accreditation records, inspection
reports, and other pertinent supporting documents.
105-4.8Final Manufactured Product - Plant Operations: Describe inspection
schedule and methods for identifying defects and non-compliance with the Specifications.
Describe corrective actions and methods to resolve them.
105-4.8.1 Storage: When storage of the produced materials is required and it is
not defined in the Contract Documents, describe the methods and duration for storage. Include
measures and methods for preventing segregation, contamination and degradation during storage.
105-4.8.2 Disposition of Failing Materials: When not described in the
Specifications, describe the methods and measures for identifying and controlling the failing
materials. Include preventive and corrective measures. Describe disposition of failing materials.
105-4.9Testing Laboratories: Identify the laboratories performing testing. Ensure that
the testing laboratories comply with the Laboratory Qualification Program requirements of this
Section or other applicable requirements.
105-4.10Department Inspection Access: Include a statement in the Quality Control
Plan allowing the Department inspectors access to the production facility to perform the
inspections of the production process and the products produced for the Department.
105-5Contractor Quality Control (QC) Plan
105-5.1General: Submit the Contractor QC Plan in the Department’s database seven
days prior to beginning work on any QC material as defined in this Section. The QC Plan may be
submitted as a whole or in portions for the work related to the Contract.
Update the QC Plan at least five working days prior to the implementation of any
changes. 151FY 2023-24Return to Table of Contents
If at any time the Work is not in compliance with the Contract Documents, the
Engineer may suspend operations in accordance with 8-6.1.
105-5.2Personnel Qualification: Submit the Training Identification Numbers for all
technicians performing sampling, testing and inspection for field tests. Include employed and
subcontracted technicians.
105-5.3Production Facilities: Identify the producers of materials listed in 105-4.4 for
the project. Include the Department’s facility ID number as part of the identification. All
producers must have accepted Producer’s Quality Control Program and be listed on the
Department’s Production Facility Listing.
105-5.3.1 Structural Concrete Mix Designs: Identify the approved structural
concrete mix designs for each structural concrete production facility for review and approval by
the Engineer. Do not begin work on the material without the Engineer’s approval. The Engineer
will review and respond within five calendar days of submittal.
105-5.4Testing Laboratories: Identify the laboratories performing testing. Ensure that
the testing laboratories comply with the Laboratory Qualification Program requirements of this
Section.
105-6Contractor Certification of Compliance
Provide the Engineer with a notarized monthly certification of compliance with the
Contract Documents, to accompany each progress estimate, on a form provided by the Engineer.
The Department may not authorize payment of any progress estimate not accompanied by an
executed certification document.
Final payment in accordance with 9-8 will not be made until a final notarized certification
summarizing all QC exceptions has been submitted.
105-7Lab Qualification Program
Testing laboratories participating in the Department’s Acceptance Program must have
current Department qualification when testing materials that are used on Department projects. In
addition, they must have one of the following:
for asphalt and ASTM C1077 for concrete for test methods used in the Acceptance Program,
with all deficiencies corrected, and under the supervision of a Specialty Engineer.
accreditation or other independent inspection program accreditation acceptable to the Engineer
and equivalent to (1) or (2) above.
After meeting the criteria described above, submit a Laboratory Qualification Application
to the Department. The application is available from the Department’s website:
https://www.fdot.gov/materials/quality/programs/laboratoryqualification/index.shtm. Obtain the
Department’s qualification prior to beginning testing. The Department may inspect the
laboratory for compliance with the accreditation requirements prior to issuing qualification.
Meet and maintain the qualification requirements at all times. Testing without
Department’s qualification may result in a rejection of the test results. Continued qualifications
are subject to satisfactory results from Department evaluations, including Independent Assurance
evaluations. In case of suspension or disqualification, prior to resumption of testing, resolve the
issues to the Department’s satisfaction and obtain reinstatement of qualification. The following
conditions may result in suspension of a laboratory’s qualified status: 152FY 2023-24Return to Table of Contents
accrediting agency and the Engineer.
Should any qualified laboratory falsify records, the laboratory qualification will be
subject to revocation by the Engineer. Falsification of project-related documentation will be
subject to further investigation and penalty under State and Federal laws.
It is prohibited for any contract laboratory or staff to perform Contractor QC testing and
any other Acceptance Program testing on the same contract.
105-8Personnel Qualifications
105-8.1General: Provide qualified personnel for sampling, testing and inspection of
materials and construction activities. Ensure that qualifications are maintained during the course
of sampling, testing and inspection.
Construction operations that require a qualified technician must not begin until
the Department verifies that the technician is on the CTQP list of qualified technicians. The
CTQP lists are subject to satisfactory results from periodic Independent Assurance evaluations.
105-8.2Quality Control (QC) Manager: Designate a QC Manager who has full
authority to act as the Contractor’s agent to institute any and all actions necessary to administer,
implement, monitor, and as necessary, adjust quality control processes to ensure compliance with
the Contract Documents. The QC Manager must speak and understand English. The
QC Manager must be on-site at the project on a daily basis or always available upon four hours’
notice. Ensure that the QC Manager is qualified as such through the Construction Training and
Qualification Program. The QC Manager and the Superintendent must not be the same
individual.
Under the direction of the QC Manager, ensure that the QC test data is entered
into the Department’s database on a daily basis. Use Department approved programs to generate
the plots for the ERS. Maintain all QC related reports and documentation for a period of three
years from final acceptance of the project. Make copies available for review by the Department
upon request.
105-8.3Temporary Traffic Control (Maintenance of Traffic) Personnel: Worksite
Traffic Supervisors, flaggers, and other personnel responsible for work zone related
transportation management and traffic control must obtain training and certification in
accordance with the Department’s Temporary Traffic Control (Maintenance of Traffic) Training
Handbook located at the following URL address:
https://www.fdot.gov/roadway/TTC/Default.shtm.
Worksite Traffic Supervisors or designees must obtain training and certification for the
Department’s lane closure notification system available at the following URL address:
https://info.one.network/fdot-live-link-resources.
105-8.4Earthwork Quality Control (QC) Personnel:
105-8.4.1 Earthwork Level 1: Ensure the technician who samples the soil and
earthwork materials from the roadway project, takes earthwork moisture and density readings, 153FY 2023-24Return to Table of Contents
and records those data into the ERS section of the Department’s database, holds a CTQP
Earthwork Construction Inspection Level 1 qualification.
105-8.4.2 Earthwork Level 2: Ensure the technician responsible for determining
the disposition of soil and earthwork materials on the roadway, and for interpreting and meeting
Contract Document requirements holds a CTQP Earthwork Construction Inspection Level 2
qualification.
105-8.5Asphalt Quality Control (QC) Personnel:
105-8.5.1 Plant Technicians: For asphalt plant operations, provide a QC
technician, qualified as a CTQP Asphalt Plant Level 2 Technician, available at the asphalt plant
at all times when producing mix for the Department. Perform all asphalt plant related testing
with a CTQP Asphalt Plant Level 1 Technician. As an exception, measurements of temperature
may be performed by someone under the supervision of a CTQP Plant Level 2 technician.
105-8.5.2 Paving Technicians: For paving operations (with the exception of
miscellaneous or temporary asphalt), keep a qualified CTQP Asphalt Paving Level 2 Technician
on the roadway at all times when placing asphalt mix for the Department, and perform all testing
with a CTQP Asphalt Paving Level 1 Technician. As an exception, measurements of cross-slope,
temperature, and yield (spread rate) can be performed by someone under the supervision of a
CTQP Paving Level 2 Technician at the roadway.
105-8.5.3 Mix Designer: Ensure all mix designs are developed by individuals
who are CTQP qualified as an Asphalt Hot Mix Designer.
105-8.5.4 Documentation: Document all QC procedures, inspection, and all test
results and make them available for review by the Engineer throughout the life of the Contract.
Identify in the asphalt producer’s QC Plan the QC Managers and Asphalt Plant Level 2
technicians responsible for the decision to resume production after a quality control failure.
105-8.6Concrete QC Personnel:
105-8.6.1 Concrete Field Technician - Level 1: Ensure technicians performing
plastic property testing on concrete for materials acceptance are qualified CTQP Concrete Field
Technicians Level 1. Plastic property testing will include but not be limited to slump,
temperature, air content, water-to-cementitious materials ratio calculation, and making and
curing concrete cylinders. Duties will include initial sampling and testing to confirm
specification compliance prior to beginning concrete placements, ensuring timely placement of
initial cure and providing for the transport of compressive strength samples to the designated
laboratories. Ensure that personnel performing plastic property testing on self-consolidating
concrete (SCC) possess an ACI Self-Consolidating Concrete Testing Technician Certification.
105-8.6.2 Concrete Field Inspector - Level 2: Ensure field inspectors
responsible for the quality of concrete being placed on the following structure types are qualified
CTQP Concrete Field Inspectors Level 2:
With the exception of concrete traffic railing and bridge approach slab
placements, a Level 2 Inspector must be present on the jobsite during all concrete placements. 154FY 2023-24Return to Table of Contents
Prior to the placement of concrete, the inspector will inspect the element to be cast to ensure
compliance with Contract Documents. A Level 2 Inspector's duties may include ensuring that
concrete testing, inspection, and curing in the field are performed in accordance with the
Contract Documents. The QC Inspector will inform the Verification Inspector of anticipated
concrete placements and LOT sizes.
105-8.6.3 Concrete Laboratory Technician – Level 1: Ensure technicians
testing cylinders and recording concrete strength for material acceptance are qualified CTQP
Concrete Laboratory Technicians Level 1. Duties include final curing, compressive strength
testing, and the recording/reporting of all test data.
105-8.7Structural Concrete Production Facility Quality Control (QC) Personnel:
Ensure that each portland cement structural concrete production facility (plant),
has designated personnel including plant manager of QC, concrete mix designer, concrete batch
plant operator, and testing technicians to provide QC inspections and testing.
Upon Department approval, the functions of the above positions may be
performed by the same person when it can be demonstrated that the plant’s operation and quality
of concrete will not be detrimentally affected and personnel have the qualifications required
herein.
105-8.7.1 Plant Manager of QC: Ensure that the plant manager of QC has at
least three years of concrete related experience and the following training certifications:
8.7.4.
As alternatives to these certifications, the Department will accept, one of
the following:
Level III.
Incidental Precast Concrete Plants Level II QC Inspector Certifications.
Certified Concrete Technologist Level 2.
105-8.7.2 Concrete Mix Designer: Ensure that the concrete mix designer has the
CTQP Concrete Laboratory Technician Level 2 certification. As an alternative, the Department
will accept any of the following qualifications:
prestressed concrete products.
Concrete Technologist Level 3.
105-8.7.3 Qualified Testing Technicians: Ensure that the testing technicians
have the following certifications, as appropriate:
performing concrete plastic property tests and ACI Self-Consolidating Concrete Testing
Technician if testing self-consolidating concrete (SCC).
tests on hardened properties of concrete. 155FY 2023-24Return to Table of Contents
105-8.7.4 Concrete Batch Plant Operator: Ensure that the concrete batch plant
operator has a CTQP Concrete Batch Plant Operator Certification. As an alternative, the
Department will accept the following certifications:
Operator,
For dry cast concrete pipe and dry cast drainage structures/box culverts,
the Department will accept American Concrete Pipe Association (ACPA) Concrete Pipe/Precast
Box Culvert Batch Plant Operator or Quality School Certification.
105-8.8Prestressed Concrete Plant Quality Control (QC) Personnel: Obtain
personnel certifications from Department accredited training providers. The list of Department
approved courses and their accredited providers is available on the SMO website at the following
URL:https://www.fdot.gov/materials/administration/resources/training/structural/concrete-
prestressed.shtm.
Ensure each prestressed concrete plant has an onsite production manager, an
onsite plant QC manager, a plant engineer, and adequate onsite QC testing personnel to provide
complete QC inspections and testing.
105-8.8.1 Plant QC Manager: Ensure the plant QC manager has at least five
years of related experience and the following certifications:
105-8.8.2 QC Inspector/Technician: Ensure that the QC inspector/technician has
the following certifications:
105-8.8.3 QC Concrete Central Mix Testing Technician: Ensure that QC
testing personnel meet the requirement of 105-8.7.3.
105-8.8.4 Batch Plant Operator: Ensure that the batch plant operator meets the
requirement of 105-8.7.4.
105-8.9Pipe and Precast Concrete Products Manufacturing Facilities Quality
Control (QC) Personnel:
105-8.9.1 General: Obtain personnel certifications from Department accredited
training providers. The list of Department approved courses and their accredited providers is
available on the SMO website at the following URL:
https://www.fdot.gov/materials/administration/resources/training/structural/index.shtm.
105-8.9.2 Precast Concrete Drainage Structures, Precast Concrete Box
Culvert, Precast Concrete Pipe, and Incidental Precast Concrete Manufacturing Facilities
Quality Control (QC) Personnel:
105-8.9.2.1 Level I Quality Control Inspectors: Ensure that the Level I
Inspectors have the following certifications:
105-8.9.2.1.1 Precast Concrete Drainage Technician Level I:
PCI Quality Control Technician Level I certification. As an alternative, a current Precast 156FY 2023-24Return to Table of Contents
Concrete Quality Control Technician Level I certification in the respective work area will be
accepted.
105-8.9.2.1.2 Incidental Precast Concrete Technician Level I:
PCI Quality Control Technician Level I certification. As an alternative, a current Precast
Concrete Quality Control Technician Level I certification in the respective work area will be
accepted.
105-8.9.2.1.3 Precast Concrete Pipe Technician Level I: Precast
Concrete Pipe Technician Level I certification.
105-8.9.2.2 Level II Quality Control Inspectors: Ensure that Level II
Inspectors have the following certifications:
105-8.9.2.2.1 Precast Concrete Drainage Technician Level II:
accordance with 105-8.9.2.1.1.
an alternative, a current Precast Concrete Quality Control Technician Level II certification in the
respective work area will be accepted.
produces structural concrete in accordance with Section 346.
105-8.9.2.2.2 Incidental Precast Concrete Technician Level II:
accordance with 105-8.9.2.1.2.
an alternative, a current Precast Concrete Quality Control Technician Level II in the respective
work area will be accepted.
incidental prestressed products must have a current certificate of completion of Section 450
Specification examination.
105-8.9.2.2.3 Precast Concrete Pipe Technician Level II:
with 105-8.9.2.1.3.
105-8.9.2.3 Plant Quality Control Manager: Ensure that the QC
manager has a minimum of two years construction related experience in the specific work area
and has the following certifications:
105-8.9.2.3.1 Precast Concrete Drainage Facilities:
Precast Concrete Drainage Technician Level II in
accordance with 105-8.9.2.2.1.
105-8.9.2.3.2 Incidental Precast Concrete Facilities:
accordance with 105-8.9.2.2.2.
produces incidental prestressed products.
105-8.9.2.3.3 Precast Concrete Pipe Facilities:
Precast Concrete Pipe Technician Level II in accordance
with 105-8.9.2.2.3. 157FY 2023-24Return to Table of Contents
105-8.9.2.4 Additional Requirements for Quality Control (QC)
Personnel of Precast Concrete Drainage Structures and Box Culverts, Precast Concrete
Pipe, and Incidental Precast Concrete Manufacturing Facilities:
105-8.9.2.4.1 Testing Personnel: Ensure testing technicians meet
the requirement of 105-8.7.3.
105-8.9.2.4.2 Batch Plant Operator: Ensure the batch plant
operator meets the requirement of 105-8.7.4.
105-8.10Supervisory Personnel – Post-Tensioned and Movable Bridge Structures:
105-8.10.1 General: Provide supervisory personnel meeting the qualification
requirements only for the post-tensioned and movable bridge types detailed in this Article.
Submit qualifications to the Engineer at the pre-construction conference. Do not begin
construction until the qualifications of supervisory personnel have been approved by the
Engineer.
105-8.10.2 Proof of License or Certification: Submit a copy of the Professional
Engineer license current and in force issued by the state in which registration is held. The license
must be for the field of engineering that the construction work involves such as Civil, Electrical
or Mechanical. Under certain circumstances Florida registration may be required.
Submit a copy of the license issued by the State of Florida for tradesmen
that require a license indicating that the license is in force and is current. Submit a copy of the
certification issued by the International Society of Automation for each Certified Control
Systems Technician.
105-8.10.3 Experience Record: Submit the following information for
supervisory personnel to substantiate their experience record. The supervisor (project engineer,
superintendent/manager or foreman) seeking approval must provide a notarized certification
statement attesting to the completeness and accuracy of the information submitted. Submit the
following experience information for each individual seeking approval as a supervisor:
Project owner’s name and telephone number of an owner’s representative,
project identification number, state, city, county, highway number and feature intersected.
Detailed descriptions of each bridge construction experience and the level
of supervisory authority during that experience. Report the duration in weeks, as well as begin
and end dates, for each experience period.
The name, address and telephone number of an individual that can verify
that the experience being reported is accurate. This individual should have been an immediate
supervisor unless the supervisor cannot be contacted in which case another individual with direct
knowledge of the experience is acceptable.
105-8.10.4 Concrete Post-Tensioned Segmental Box Girder Construction:
Ensure the individuals filling the following positions meet the minimum requirements as follows:
105-8.10.4.1 Project Engineer-New Construction: Ensure the project
engineer is a registered Professional Engineer with five years of bridge construction experience.
Ensure a minimum of three years of experience is in segmental box girder construction
engineering and includes a minimum of one year in segmental casting yard operations and
related surveying, one year in segment erection and related surveying, including post-tensioning
and grouting of longitudinal tendons and a minimum of one year as the project engineer in
responsible charge of segmental box girder construction engineering. Ensure this individual is
present at the site of construction, at all times while segmental box girder construction or
segment erection is in progress. 158FY 2023-24Return to Table of Contents
105-8.10.4.2 Project Engineer-Repair and Rehabilitation: Ensure the
project engineer is a registered Professional Engineer with five years of bridge construction
experience. Ensure a minimum of three years of experience is in segmental box girder
construction engineering and includes one year of post-tensioning and grouting of longitudinal
tendons and a minimum of one year as the project engineer in responsible charge of segmental
box girder rehabilitation engineering or segmental box girder new construction engineering.
105-8.10.4.3 Project Superintendent/Manager-New Construction:
Ensure the project superintendent/manager has a minimum of ten years of bridge construction
experience or is a registered Professional Engineer with five years of bridge construction
experience. Ensure that a minimum of three years of experience is in segmental box girder
construction operations and includes a minimum of one year in the casting yard operations and
related surveying, one year in segment erection and related surveying including post-tensioning
and grouting of longitudinal tendons and a minimum of one year as the project
superintendent/manager in responsible charge of segmental box girder construction operations.
Ensure this individual is present at the site of construction, at all times while segmental box
girder construction or segment erection is in progress.
105-8.10.4.4 Project Superintendent/Manager-Repair and
Rehabilitation: Ensure the project superintendent/manager has a minimum of five years of
bridge construction experience or is a registered Professional Engineer with three years of bridge
construction experience. Ensure that a minimum of two years of experience is in segmental box
girder construction operations and includes a minimum of one year of experience performing
post-tensioning and grouting of longitudinal tendons and a minimum of one year as the project
superintendent/manager in responsible charge of segmental box girder rehabilitation operations
or segmental box girder new construction operations.
105-8.10.4.5 Foreman-New Construction: Ensure that the foreman has a
minimum of five years of bridge construction experience with two years of experience in
segmental box girder operations and a minimum of one year as the foreman in responsible
charge of segmental box girder new construction operations. Ensure this individual is present at
the site of construction, at all times while segmental box girder construction or segment erection
is in progress.
105-8.10.4.6 Foreman-Repair and Rehabilitation: Ensure the foremen
has a minimum of five years of bridge construction experience with two years of experience in
segmental box girder operations and a minimum of one year as the foreman in responsible
charge of segmental box girder rehabilitation operations or segmental box girder new
construction operations.
105-8.10.4.7 Geometry Control Engineer/Manager: Ensure that the
geometry control engineer/manager for construction of cast-in-place box segments is a registered
Professional Engineer with one year of experience, a non-registered Engineer with three years of
experience or a registered Professional Land Surveyor with three years of experience in
geometry control for casting and erection of cast-in-place box segments. Credit for experience in
cast-in-place box girder geometry control will be given for experience in precast box girder
geometry control but not vice versa.
Ensure that the geometry control engineer/manager for precast box
segments is a registered Professional Engineer with one year of experience or non-registered
with three years of experience in casting yard geometry control of concrete box segments. 159FY 2023-24Return to Table of Contents
The geometry control engineer/manager must be responsible for
and experienced at implementing the method for establishing and maintaining geometry control
for segment casting yard operations and segment erection operations and must be experienced
with the use of computer programs for monitoring and adjusting theoretical segment casting
curves and geometry. This individual must be experienced at establishing procedures for
assuring accurate segment form setup, post-tensioning duct and rebar alignment and effective
concrete placement and curing operations as well as for verifying that casting and erection field
survey data has been properly gathered and recorded. Ensure this individual is present at the site
of construction, at all times while cast-in-place segmental box girder construction is in progress
or until casting yard operations and segment erection is complete.
105-8.10.4.8 Surveyor: Ensure that the surveyor in charge of geometry
control surveying for box segment casting and/or box segment erection has a minimum of one
year of bridge construction surveying experience. Ensure this individual is present at the site of
construction, at all times while segmental box girder construction or segment erection is in
progress.
105-8.10.5 Movable Bridge Construction: Ensure the individual filling the
following positions meet the minimum requirements as follows:
105-8.10.5.1 Electrical Journeyman: Ensure the electrical journeyman
holds, an active journeyman electrician’s license and has at least five years’ experience in
industrial electrical work, or is a certified control systems technician. A certified control systems
technician will not be permitted to perform electrical power work including, but not limited to,
conduit and wire-way installation or power conductor connection. Ensure the electrical
journeyman has successfully completed the installation of one similar movable bridge electrical
system during the last three years.
105-8.10.5.2 Control Systems Engineer and Mechanical Systems
Engineer: Ensure the control systems engineer and mechanical systems engineer are both
registered Professional Engineers with a minimum of 10 years supervisory experience each in
movable bridge construction. Ensure the engineers have working knowledge of the movable
bridge leaf motion control techniques, mechanical equipment and arrangements specified for this
project. Ensure that each engineer has been in responsible control of the design and
implementation of at least three movable bridge electrical control and machinery systems within
the past 10 years of which, at least one of the three bridges was within the last three years.
Ensure that a minimum of one of the three bridge designs incorporated the same type of leaf
motion control and machinery systems specified for this project.
105-8.10.6 Concrete Post-Tensioned Other Than Segmental Box Girder
Construction: Ensure the individual filling the following positions meet the minimum
requirements as follows:
105-8.10.6.1 Project Engineer: Ensure the project engineer is a registered
Professional Engineer with five years of bridge construction experience. Ensure that a minimum
of three years of experience is in concrete post-tensioned construction. Ensure that the three
years of experience includes experience in girder erection, safe use of cranes, stabilization of
girders; design of false work for temporary girder support, post-tensioning and grouting
operations, and a minimum of one year as the project engineer in responsible charge of post-
tensioning related engineering responsibilities.
105-8.10.6.2 Project Superintendent/Manager: Ensure the project
superintendent/manager has a minimum of ten years of bridge construction experience or is a 160FY 2023-24Return to Table of Contents
registered Professional Engineer with five years of bridge construction experience and has a
minimum of three years of supervisory experience in girder erection, safe use of cranes,
stabilization of girders; design of falsework for temporary girder support post-tensioning,
grouting operations and a minimum of one year as the project superintendent/manager in
responsible charge of post-tensioning related operations.
105-8.10.6.3 Foreman: Ensure the foremen has a minimum of five years
of bridge construction experience with two years of experience in post-tensioning related
operations and a minimum of one year as the foreman in responsible charge of post-tensioning
related operations.
105-8.10.7 Post-Tensioning (PT) and Filler Injection Personnel
Qualifications: Perform all stressing and filler injection operations in the presence of the
Engineer and with personnel meeting the qualifications of this article. Coordinate and schedule
all PT and filler injection activities to facilitate inspection by the Engineer.
105-8.10.7.1 Post-Tensioning: Perform all PT field operations under the
direct supervision of a Level 2 CTQP Qualified PT Technician who must be present at the site of
the post-tensioning work during the entire duration of the operation. For the superstructures of
bridges having concrete post-tensioned box or I girder construction, provide at least two CTQP
Qualified PT Technicians, Level 1 or 2, on the work crew. The supervisor of the work crew, who
must be a Level 2 CTQP Qualified PT Technician, may also be a work crew member, in which
case, the supervisor shall count as one of the two CTQP qualified work crew members. For PT
operations other than the superstructures of post-tensioned box or I girder construction, perform
all PT operations under the direct supervision of a Level 2 CTQP Qualified PT Technician who
must be present at the site of the PT work during the entire duration of the operation. Work crew
members are not required to be CTQP qualified.
105-8.10.7.2 Grouting: Perform all grouting field operations under the
direct supervision of a Level 2 CTQP Qualified Grouting Technician who must be present at the
site of the grouting work during the entire duration of the operation. For the superstructures of
bridges having concrete post-tensioned box or I girder construction, provide at least two CTQP
Qualified Grouting Technicians, Level 1 or 2, on the work crew. The supervisor of the work
crew, who must be a Level 2 CTQP Qualified Grouting Technician, may also be a work crew
member, in which case, the supervisor shall count as one of two CTQP qualified work crew
members. For grouting operations other than the superstructures of post-tensioned box or I girder
construction, perform all grouting operations under the direct supervision of a Level 2 CTQP
Qualified Grouting Technician who must be present at the site of the grouting work during the
entire duration of the operation. Work crew members are not required to be CTQP qualified.
Perform all vacuum grouting operations under the direct
supervision of a crew foreman who has been trained and has experience in the use of vacuum
grouting equipment and procedures. Submit the crew foreman’s training and experience records
to the Engineer for approval prior to performing any vacuum grouting operation.
105-8.10.7.3 Flexible Filler Injection: Perform all filler injection
operations under the direct supervision of a filler injection foreman who has American
Segmental Bridge Institute (ASBI) certification in the flexible filler process. Provide at least two
CTQP Qualified Grouting Technicians with ASBI certification in the flexible filler process, one
of whom must be a Level 2 CTQP Qualified Grouting Technician. Both technicians must be
present at the site of the flexible filler injection work during the entire duration of the operation. 161FY 2023-24Return to Table of Contents
Provide a filler injection quality control (QC) inspector who has
ASBI certification in the flexible filler process. The filler injection QC inspector must be present
at the site of the flexible filler injection work during the entire duration of the operation.
Verifiable experience performing injection of similar flexible filler
on at least two projects is acceptable in lieu of ASBI certification in the flexible filler process.
Perform all flexible filler repair operations under the direct
supervision of a crew foreman who has been trained and has verifiable experience in the use of
vacuum flexible filler repair equipment and procedures. Submit the crew foreman’s training and
experience records to the Engineer prior to performing any flexible filler operation.
105-8.10.8 Failure to Comply with Bridge Qualification Requirements: Make
an immediate effort to reestablish compliance. If an immediate effort is not put forth as
determined by the Engineer, payment for the bridge construction operations requiring
supervisors to be qualified under this Specification will be withheld up to 60 days. Cease all
bridge construction and related activities (casting yard, etc.) if compliance is not met within
60 days, regardless of how much effort is put forth. Resume bridge construction operations only
after written approval from the Engineer stating that compliance is reestablished.
105-8.11Signal Installation Inspector: Provide an inspector trained and certified by the
International Municipal Signal Association (IMSA) as a traffic signal inspector to perform all
signal installation inspections. Use only Department approved signal inspection report forms
during the signal inspection activities. Ensure all equipment, materials, and hardware is in
compliance with Department Specifications and verify that all equipment requiring certification
is listed on the Department’s Approved Product List (APL). Submit the completed signal
inspection report forms, certified by the IMSA traffic signal inspector to the Engineer.
The Department’s approved inspection report forms are available at the following
URL: http://www.fdot.gov/traffic/.
105-8.12Structural Steel and Miscellaneous Metals Fabrication Facility Quality
Control Personnel: Ensure each fabrication facility has an onsite production manager, an onsite
facility manager for QC, a plant engineer, and onsite QC inspectors/technicians to provide
complete QC inspections and testing.
Ensure that the facility manager for QC and QC inspectors/technicians meet the
certification requirements set forth in the latest version of AASHTO/NSBA Steel Bridge
CollaborationS 4.1, Steel Bridge Fabrication QC/QA Guide Specification, including the years of
experience required in Table 105-1 below. The facility manager for QC must meet the
requirements of Table 105-1 for every structural steel member type produced by a plant with QC
being managed by the facility manager for QC. The facility manager for QC will report directly
to the plant manager or plant engineer and must not be the plant production manager nor report
to or be the subordinate of the plant production manager. QC inspectors/technicians must be the
employees of and must report directly to the facility manager for QC.
Table 105-1
Experience Requirements for QC Inspectors/Technicians
And Facility Manager for Quality Control
Structural Steel Member Type Minimum Years of Experience Required
QC Inspector/Technician Facility Manager for QC
Rolled beam bridges 1 year 3 years 162FY 2023-24Return to Table of Contents
Table 105-1
Experience Requirements for QC Inspectors/Technicians
And Facility Manager for Quality Control
Structural Steel Member Type Minimum Years of Experience Required
QC Inspector/Technician Facility Manager for QC
Welded plate girders (I sections,
box sections, etc.) 2 years 4 years
Complex structures, such as trusses,
arches, cable stayed bridges, and
moveable bridges
3 years 5 years
Fracture critical (FC) members 3 years 5 years 163FY 2023-24Return to Table of Contents LITTER REMOVAL AND MOWING
107-1Description
Provide pickup, removal and disposal of litter within the project limits from the outside edge of travel way to the right of way line. Include the median on divided highways, from the inside edge of travel way to the inside edge of travel way. Litter inclu des but is not limited to, bottles, cans, paper, tires, tire pieces, lumber, vehicle parts, metal junk, and brush debris. Mow turf or vegetation within the project limits. Turf consists of grasses planted in accordance with Section 570. Vegetation consis ts of planted and natural grasses, weeds, and other natural vegetation that have been previously mowed.
107-2Operation
107-2.1Frequency : Begin litter removal and mowing when directed by the Engineer and
continue every 30 days, unless otherwise directe d by the Engineer. Continue litter removal and mowing u ntil final acceptance in accordance with 5 -11. Mow all areas to obtain a uniform height of 6 inches. After final acceptance, perform litter removal and mowing until new turf is established in accorda nce with 570 -4 at no cost to the Department . Maintain turf and vegetation height between 6 inches and 12 inches. Do not include seed stalk or wildflowers when measuring height. Perform litter removal prior to and in conjunction with mowing; however, the Engineer may direct litter pickups in addition to those performed in conjunction with mowing. Do not mow new turf until a healthy root system is established. In designated wildflower areas, a void cutting wildflowers when in bloom and when re -seeding.
107-2.2General: Mow shoulders and medians concurrently so that not more than one
mile will be left partially mowed at the conclusion of the working day. Mow turf and vegetation on slopes or around appurtenances concurrent with the mowing operation. In areas saturated with standing water, mow or cut to the surface of the water using hand labor or other specialized equipment when standard equipment will cause damage. Do not remove turf or other vegetation cuttings from the right -of-way, or rake or pick up the cuttings unless the cuttings are in the traveled ways, bike lanes, or sidewalk; are obstructing drainage structures; or are the result of cleaning the equipment.
107-2.3Limitations: Maintain traffic in accordance with Section 102. When mowing
within four feet of a travel lane, operate the equipment in the same direction of traffic, unless the adjacent lane is closed to traffic due to construction operations. Perform all work during daylight hours.
107-2.4Disposal of Litter and Debris : During each litter removal cycle, bag and
remove all litter or piles at the end of each working day. Dispose of litter in accordance with applicable local and state laws. Do not store or stockpile litter within the project l imits.
107-3Method of Measurement
The quantity to be paid will be the project area shown in the Contract Documents, in acres, for each litter removal or mowing cycle completed and accepted. No adjustments will be made to the project area quantity. 164 FY 2023-24 Return to Table of Contents
- 962STRUCTURAL STEEL AND MISCELLANEOUS METAL ITEMS (OTHER THAN ALUMINUM)
- 346STRUCTURAL PORTLAND CEMENT CONCRETE
- 948OPTIONAL DRAINAGE PRODUCTS AND REPAIR SYSTEMS
- 407THREE-SIDED PRECAST CONCRETE CULVERT
- 449PRECAST CONCRETE DRAINAGE PRODUCTS
- 450PRECAST PRESTRESSED CONCRETE CONSTRUCTION
- 320HOT MIX ASPHALT - PLANT METHODS AND EQUIPMENT
- 334SUPERPAVE ASPHALT CONCRETE
Get an email when 105 changes
Florida revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.