346-1Description
Use a Department -approved concrete mix design composed of a mixture of portland cement, aggregate, water, admixtures, and supplementary cementitious materials . Deliver the portland cement concrete to the site of placement in a freshly mixed, unhardened state. Obtain concrete from a plant that is cur rently on the Department’s Production Facility Listing. Producers seeking inclusion on the list shall meet the requirements of Section 105. If the concrete production facility’s Quality Control (QC) Plan is suspended, the Contractor is solely responsible t o obtain the services of another concrete production facility with an accepted QC Plan or await the reacceptance of the concrete production facility’s QC Plan prior to the placement of any further concrete on the project. There will be no changes in the Co ntract Time because of the suspension, as described . Bear all delay costs and other costs associated with the concrete production facility’s QC Plan acceptance or reacceptance.
346-2Materials
346-2.1General: Meet the following requirements:
Coarse Aggr egate ................................ ............................ Section 901 Fine Aggregate* ................................ .............................. Section 902 Portland Cement and Blended Cement ........................... Section 921 Water ................................ ................................ ...............Section 923 Admixtures** ................................ ................................ ..Section 924 Supplementary Cementitious Materials .......................... Section 929 *Use only silica sand except as provided in 902 . **Use products listed on the Department’s Approved Product List ( APL). Do not use materials containing hard lumps, crusts , or frozen matter, or that is contaminated with materials exceeding the specified limits in the above listed Sections.
346-2.2Types of Cement: Unless a specific type of cement is designated in the Contract
Documents , use Type I, Type IL, Type IP, Type IT, Type IS, Type II, or Type III cement in all classes of concrete. Use Type IL, Type IT, or Type II for all mass concrete elements. Use only the types of cements designated for each environmental classification in structural concrete as shown in Table 346-1. A mix design for a more aggressive environment may be used in a less aggressive env ironmental condition.
335 FY 2023-24 Return to Table of Contents
Table 346-1 Cement Use by Environmental Classification Component Slightly Aggressive Environment Moderately Aggressive Environment Extremely Aggressive Environment (1) Bridge Superstructures Precast Superstructure and Prestressed Elements Type I or Type III Type I, Type IL, Type II, Type III, Type IP, or Type IS Type II, Type IL, Type III (2), Type IT or Ternary Blend Cast in Place Type I Type I, Type IL, Type II, Type IP, or Type IS Type II, Type IL, Type IT or Ternary Blend Bridge Substructures , Drainage Structures, and other Structures All Elements Type I or Type III Type I, Type IL, Type II, Type IP, or Type IS Type II, Type IL, Type IT or Ternary Blend Notes:
when the ambient temperature at the time of concrete placement is 60°F and below .
346-2.3Supplementary Cementitious Materials : Supplementary cementitious
materials (SCMs) are required in all classes of concrete specified in Table 346-3. Nonreinforced concrete Class I (Seal) and Class I (Pavement), are exempted, and Class II when used in slightly aggressive environments . The quantity of portland cement that is replaced with SCMs must be on an equal weight replacement basis of the total cementitious materials in accordance with Table 346-2. When using Type IP, IS or IT blended cements, the total quantity of SCMs, including the blended cement added separately at the concrete plant shall meet the requirements of Table 346-2. 346-2.3.1 Highly Reactive Pozzolans: Materials that have a very high degree of pozzolanic reactivity due to t heir very fine particle sizes, including silica fume, metakaolin and ultrafine fly ash. 346-2.3.2 Binary Concrete Mixes : Concrete mixes containing portland cement and one SCM. 346-2.3.3 Ternary Concrete Mixes : Concrete mixes containing portland cement and any two SCMs. 336 FY 2023-24 Return to Table of Contents
Table 346-2 Cementitious Materials Concrete Mix Proportions (%) (Environmental classification is extremely aggressive, unless otherwise noted) Application Portland Cement Fly Ash Type F Slag Highly Reactive Pozzolans (4 and 5) Silica Fume Metakaolin Ultra-Fine Fly Ash General Use 50-82 18-50 51-79 18-40 3-9 63-77 15-25 8-12 63-77 15-25 8-12 30-45 10-20 45-60 30-50 50-70 36-43 50-55 7-9 33-42 50-55 8-12 33-42 50-55 8-12 Precast / Prestressed 70-85 (1) 15-30 (1) 50-82 18-50 51-79 18-40 7-9 63-77 15-25 8-12 63-77 15-25 8-12 30-40 10-20 50-60 30-50 50-70 36-43 50-55 7-9 33-42 50-55 8-12 33-42 50-55 8-12 Drilled Shaft 50-82 18-50 38-42 58-62 30-40 10-20 50-60 Mass Concrete 50-82 (2) 18-50 (2) 50-65 (3) 35-50 (3) 66-78 15-25 7-9 63-77 15-25 8-12 63-77 15-25 8-12 30-40 10-20 50-60 30-50 50-70 36-43 50-55 7-9 33-42 50-55 8-12 33-42 50-55 8-12
by the Contract Documents . A minimum concrete Surface Resistivity (SR) value is not required.
346-2.4Aggregates: Produce all concrete using Size No. 57, 67 or 78 coarse aggregates
Use Size No. 8, and Size No. 89 alone, only when approved by the Engineer. 337 FY 2023-24 Return to Table of Contents
Use Size No. 4 or larger blended with smaller size coarse aggregate as two components. 346-2.4.1 Optimized Aggregate Gradation: Improve the aggregate packing density at the Contractor’s option, by adding an intermediate -size coarse aggregate in accordance with FM 5 -621 to produce combined aggregate gradation of fine, intermediate , and coarse aggregate sizes for the concrete mixes. 346-2.4.2 Lightweight fine aggregate (LWFA) for internal curing: At the Contractor’s option, use LWFA to reduce the early -age concrete cracking by replacing some of normal fine aggregate with saturated LWFA.
346-2.5Admixtures : Ensure admixtures are used in accordance with the manufacturer’s
recommend ations and meetin g the requirements of Section 9.2, Volume II of the Materials Manual.
346-3Classification of Concrete
346-3.1General: The classifications of concrete are designated as Class I (Seal), Class I
(Pavement), Class II, Class II (Bridge Deck), Class III, Class IV, Class IV (Drilled Shaft), Class V, Class VI, and Class VII. The 28-day specified minimum compressives trength, maximum water to cementitious materials ratio and target slump of each class are detailed in Table 346-3. The required air content for all classes of concrete is less than or equal to 6.0%. For purposes of this Specification the concrete is further classified as follows:
with a tolerance of ± 1.5 inches.
a tolerance of ± 1.5 inches when a Type F, G, I or II admixture is used .
1.5 inches. For Class I (Pavement), m eet the requirements of Section 350 .
concrete for cast-in-place applications . The target slump is 9 inches with a tolerance of ± 1.5 inches.
to use SCC for cast-in-place applications The minimum target slump flow is 22.5 inches with a tolerance of ± 2.5 inches.
346-3.2Concrete Class Substituti ons: The Engineer may allow the s ubstitution of a
higher class concrete in lieu of the specified class concrete when the substituted concrete mixes are included as part of the QC Plan, or for precast concrete, the Precast Concrete Producer QC Plan. The sub stituted higher class concrete must meet or exceed the requirements of the specified class concrete. When the average compressive strength is less than the specified minimum compressive strength of the higher class mix design, notify the Engineer. Acceptance is based on the requirements in Table 346-3 for the specified class concrete.
346-3.3Acceptance Requirements : The specified minimum 28 -day strengths,
maximum water to cementitious materials ratio (w/cm), and target slumps for each class of concrete are given in Table 346 -3. For lightweight concrete, acceptance requirements also include the hardened density specified in the Contract Documents . The calculation of the water to cementitious materials ratio (w/cm) is based on the total mass of cementiti ous materials including portland cement and any SCMs used in the mix.
338 FY 2023-24 Return to Table of Contents
Table 346-3 Compressive Strength, w/cm, and Slump of Concrete Classes Class of Concrete 28-day Specified Minimum Compressive Strength (f′c) (psi) Maximum Water to Cementitious Materials Ratio (pounds per pounds) Target Slump Value (inches) I (Seal) 3,000 0.53 8 I (Pavement) (1) 3,000 0.50 1.5 or 3 II (3) 3,400 0.53 3 (2) II (Bridge Deck) 4,500 0.44 3 (2) III 5,000 0.44 3 (2) IV 5,500 0.41(4) 3 (2) IV (Drilled Shaft) 4,000 0.41 8.5 V 6,500 0.37(4) 3 (2) VI 8,500 0.37(4) 3 (2) VII 10,000 0.37(4) 3 (2) Notes:
content will not apply. The maximum allowable slump is 6 inches, except as noted in (2). The Contractor is permitted to use concrete meeting the requirements of ASTM C478 (4,000 psi) in lieu of the specified Class II concrete for precast endwalls, inlets, manholes and junction boxes.
fly ash is used, the maximum water to cementitious material ratio will be 0.30.
346-3.4Acceptance of concrete at 56 days: Use concrete mix designs meeting the
specified compressive strength at 56 days at the Contractor’s option . Submit the request to the Engineer for approval. After the Engineer’s approval, notify the concrete producer to initiate the mix design approval process at least 90 days prior to th e anticipated concrete placement.
346-3.5Durability for Concrete Construction:
346-3.5.1 Minimum Cementitious Materials Content: Ensure that the produced concrete meets the minimum amount of cementitious materials content in Table 346-4. Table 346-4 Minimum Amount of Total Cementitious Materials Content (pounds per cubic yard of concrete) Concrete Class Environmental Classification Extremely Aggressive Moderately Aggressive Slightly Aggressive I (Seal) (1), I (Pavement) (1) , and II, 470
II (Bridge Deck), III (2) , IV, IV (Drilled
Shaft), V, VI and VII 600 550 510
Notes:
mix design must meet the requirements of Section 9.2 Volume II of the Materials Manual.
minimum cementitious materials content may be reduced to 470 pounds per cubic yard. 339FY 2023-24Return to Table of Contents
346-3.5.2 Chloride Content Limits: Use the following maximum allowable
chloride content limits for the concrete application and/or exposure environment shown:
Table 346-5
Chloride Content Limits for Concrete Construction
Application/Exposure Environment
Maximum Allowable
Chloride Content,
(pounds per cubic yard
of concrete)
Non-Reinforced Concrete No Test Needed
Reinforced Concrete Slightly Aggressive Environment 0.70
Moderately or Extremely Aggressive Environment 0.40
Prestressed Concrete 0.40
Suspend concrete placement immediately for every mix design if chloride
test results exceed the limits of Table 346-5 until corrective measures are made. Submit an
Engineering Analysis Scope in accordance with 6-4 by a Specialty Engineer knowledgeable in
the areas of corrosion and corrosion control, to determine if the material meets the intended
service life of the structure on all concrete produced from the mix design failing chloride test
results to the previous passing test results.
346-3.5.3 Surface Resistivity Test: Ensure that the concrete meets or exceeds a
Sr value of 29 kΩcm at 28 days or 56 days if specified, when a highly reactive pozzolan is
specified in the Contract Documents.
346-4Special Types of Concrete
346-4.1Drilled Shaft Concrete: Notify the Engineer at least 48 hours before placing
drilled shaft concrete. Obtain slump loss test results demonstrating that the drilled shaft concrete
maintains a slump of at least 5 inches throughout the concrete elapsed time before drilled shaft
concrete operations begin.
Perform the slump loss test at the anticipated ambient temperature for drilled shaft
placements greater than 30 cubic yards and an elapsed time of greater than five hours.
Obtain slump loss test results from an approved laboratory or from a field
demonstration. Slump loss test results for drilled shafts requiring 30 cubic yards of concrete or
less and a maximum elapsed time of five hours or less may be done in a laboratory. Obtain all
other slump loss test results in the field.
The concrete elapsed time is defined in Section 455. Obtain the Engineer’s
approval for use of slump loss test results including elapsed time before concrete placement
begins.
Test each load of concrete for slump to ensure that it is within the limits of this
Section. Initially cure acceptance cylinders for 48 hours before transporting them to the
laboratory.
If the elapsed time during placement exceeds the slump loss test data, submit an
Engineering Analysis Scope in accordance with 6-4 by a Specialty Engineer knowledgeable in
concrete foundations, to determine if the shaft is structurally sound and free from voids. At the
direction of the Engineer, excavate the drilled shaft for inspection. Obtain approval from the
Engineer before placing any additional shafts. 340FY 2023-24Return to Table of Contents
346-4.2Mass Concrete: When the Contract Documents designate any structure as mass
concrete, use a Specialty Engineer to develop and administer a Mass Concrete Control Plan
(MCCP). Develop the MCCP in accordance with Section 9.4 Volume II of the Materials Manual.
Provide the Specialty Engineer a list of all concrete elements identified. Use a sequential
identification code for each element indicating the bridge or structure number, location and type
of element, least dimension size, and environmental exposure.
Record core and differential temperatures for all structures included in the MCCP
and monitor only the elements specified therein. Ensure that the concrete core temperatures do
not exceed the maximum allowable temperature of 180°F and that the differential temperatures
between the element core and surface do not exceed the maximum allowable temperature
differential of 35°F. Submit the MCCP to the Engineer for approval at least 21 calendar days
prior to the first anticipated mass concrete placement.
Do not place concrete until the proposed MCCP has been approved. Any
modifications must be submitted as addenda to the original MCCP and must be approved in
writing by the Engineer.
Install temperature measuring sensors and recording devices for all mass concrete
elements in accordance with the MCCP. Do not add local additional insulation or external
sources of heat around the surface sensors that affect the temperature readings.
Ensure that, prior to the first concrete placement of each concrete element the
Specialty Engineer or approved designee personally inspects the installation of the temperature
measuring devices and verifies that the temperature data acquisition equipment is properly
functioning. The Specialty Engineer shall be available for immediate consultation during the
monitoring period of any mass concrete element.
Use temperature data acquisition equipment to record temperature readings in
accordance with the MCCP.
Within three workings days of the completion of temperature recording for each
concrete element, submit the Mass Concrete Field Report in accordance with Section 9.4,
Volume II of the Materials Manual.
For a group of elements, the Engineer may approve a monitoring reduction if the
first element placed does not exceed either the maximum temperature or maximum temperature
differential. Request written approval from the Engineer at least 14 calendar days prior to the
anticipated date of the intended reduced monitoring. If approved, monitoring of the recorded
temperatures is not required for the remaining elements meeting all of the following
requirements:
measures (if used).
within minus 10°F of the ambient temperature during placement of the initial element.
monitored element and keep them in place for at least the same length of time as for the initial
element.
Resume monitoring of the temperatures for all elements if directed by the
Engineer. 341FY 2023-24Return to Table of Contents
Instrumentation and temperature monitoring are not required for miscellaneous
drilled shafts supporting sign, signal, lighting or Intelligent Transportation System (ITS)
structures when the as built diameter is six feet or less, and the total cementitious materials
content of the concrete mix design is less than or equal to 752 pounds per cubic yard.
Monitoring of the recorded temperatures is not required for any mass concrete
substructure element meeting all of the following requirements:
feet or less.
72 hours following the completion of concrete placement.
aggressive or moderately aggressive.
requirements of 346-2.3.
less than or equal to 752 pounds per cubic yard.
Implement immediate corrective action as directed by the Specialty Engineer
when either the core temperature or the temperature differential of any mass concrete element
exceeds its maximum allowable value. The approval of the MCCP shall be revoked.
Submit an Engineering Analysis Scope in accordance with 6-4 for approval,
which addresses the structural integrity and durability of any mass concrete element that is not
cast in compliance with the approved MCCP, or which exceeds the allowable core temperature
or temperature differential.
Submit all analyses and test results requested by the Engineer for any
noncompliant mass concrete element. Submit a revised MCCP and do not place any mass
concrete elements until a revised MCCP has been approved in writing by the Engineer.
The Department will not provide compensation for additional costs or loss of time
due to additional analyses, tests, or other impacts on production caused by not monitoring the
recorded temperatures.
346-4.3Flowing Concrete and Self-Consolidating Concrete (SCC): Use Flowing
concrete or SCC when shown in the Contract Documents or to facilitate concrete placement in
structures of complex geometric shape or highly reinforcement.
Perform a field demonstration mockup using an approved mix design. Submit the
mockup design to the Engineer for approval including the location of the sawcut.
Cast a partial or full-scale mockup(s) and demonstrate through the successful
production the ability to produce and place flowing concrete or SCC.
The design, production, and evaluation product must meet the following
requirements:
curing methods, such as the use of ready-mix trucks, pumps, chutes, hopper, consolidation
equipment, etc. The mockup shall contain reinforcing steel, mass concrete cooling pipes if
required during construction, and other embedded items typical of the cast element.
time. 342FY 2023-24Return to Table of Contents
in the Contract Documents.
demonstration.
mockup requires concrete from multiple concrete plants, the concrete from each plant must be
represented in the mockup.
honeycombing, and rock pockets, mix segregation, and other inclusions developed during
placement of the concrete.
FM 5-617.
beginning of concrete placement operations.
Based on the inspection results of the field demonstration mockup, the acceptance
of using flowing concrete or SCC in the structural element or section of the element is at the
Engineer’s discretion.
The required mockup demonstration may be omitted at the Contractor’s request.
Submit documentation indicating successful experience of furnishing and placing flowing
concrete or SCC on similar Department projects. Such documentation must list projects by date
of completion, name or project reference number, structural elements or type of unit placed,
quantity of concrete furnished, names and experience of personnel, and contact information for
verification.
346-4.4Lightweight Concrete: Submit the fresh and hardened concrete density for mix
design approval. The hardened density is the equilibrium density in ASTM C567. Ensure that the
hardened density of the mix design is within ± 2 lb/ft of the hardened density specified in the
Contract Documents.
During production, the freshly mixed concrete density must be within ± 3 lb/ft of
the approved mix design fresh density.
346-5Sampling and Testing Methods
Perform concrete sampling and testing in accordance with the following methods:
Table 346-7
Concrete Sampling and Testing Methods
Description Method
Slump of Hydraulic Cement Concrete ASTM C143
Air Content of Freshly Mixed Concrete by the Pressure Method (1) ASTM C231
Air Content of Freshly Mixed Concrete by the Volumetric Method (1) ASTM C173
Making and Curing Test Specimens in the Field (2) ASTM C31
Compressive Strength of Cylindrical Concrete Specimens (3) ASTM C39
Obtaining and Testing Drilled Core and Sawed Beams of Concrete ASTM C42
Density of Structural Lightweight Concrete ASTM C567
Initial Sampling of Concrete from Revolving Drum Truck Mixers or Agitators FM 5-501 343FY 2023-24Return to Table of Contents
Table 346-7
Concrete Sampling and Testing Methods
Description Method
Low Levels of Chloride in Concrete and Raw Materials FM 5-516
Density (Unit Weight), Yield and Air Content (Gravimetric) of Concrete ASTM C138
Temperature of Freshly Mixed Portland Cement Concrete ASTM C1064
Sampling Freshly Mixed Concrete (4) ASTM C172
Static Segregation of Self-Consolidating Concrete using Column Techniques ASTM C1610
Slump Flow of Self-Consolidating Concrete ASTM C1611
Relative Viscosity of Self-Consolidating Concrete ASTM C1611
Visual Stability Index of Self-Consolidating Concrete ASTM C1611
Passing Ability of Self-Consolidating Concrete by J-Ring ASTM C1621
Rapid Assessment of Static Segregation Resistance of Self-Consolidating
Concrete Using Penetration Test ASTM C1712
Aggregate Distribution of Hardened Self-Consolidating Concrete FM 5-617
Hardened Visual Stability Index of Self-Consolidating Concrete AASHTO R 81
Fabricating Test Specimens with Self-Consolidating Concrete ASTM C1758
Concrete Resistivity as an Electrical Indicator of its Permeability AASHTO T 358
meters, use an aggregate correction factor determined by the concrete producer for each mix design to be tested. Record and
certify test results for correction factors for each type of aggregate at the concrete production facility.
initial curing. Cylinders will be delivered to the testing laboratory in their molds. The laboratory will remove the specimens from
the molds and begin final curing.
the density.
portions, as described in ASTM C172.
346-6Quality Control
346-6.1General: Perform QC activities to ensure materials, methods, techniques,
personnel, procedures and processes utilized during production meet the specified requirements.
For precast/prestressed concrete operations, ensure that the QC testing is performed by the
producer.
Accept the responsibility for QC inspections on all phases of work. Ensure all
materials and workmanship incorporated into the project meet the requirements of the Contract
Documents.
346-6.2Concrete Mix Design: Provide concrete that has been produced in accordance
with a Department approved mix design, in a uniform mass free from balls and lumps.
For slump target values in excess of 6 inches, including flowing concrete and
SCC, utilize a grate over the conveyance equipment to capture any lumps or balls that may be
present in the mix. The grate must cover the entire opening of the conveyance equipment and
have an opening that is a maximum of 2-1/2 inches in any one direction. Remove the lumps and
balls from the grate and discard them. Discharge the concrete in a manner satisfactory to the
Engineer. Perform demonstration batches to ensure complete and thorough placements in
complex elements, when requested by the Engineer.
Do not place concretes of different compositions such that the plastic concretes
may combine, except where the Plans require concrete with a surface resistivity value of 344FY 2023-24Return to Table of Contents
29 kΩcm or below and one with higher than 29 kΩ-cm values in a continuous placement.
Produce these concretes using separate mix designs. For example, designate the mix with
calcium nitrite as the original mix and the mix without calcium nitrite as the redesigned mix.
Ensure that both mixes contain the same cement, fly ash or slag, coarse and fine aggregates and
admixtures. Submit both mixes for approval as separate mix designs, both meeting all
requirements of this Section. Ensure that the redesigned mix exhibits plastic and hardened
qualities which are additionally approved by the Engineer as suitable for placement with the
original mix. The Engineer will approve the redesigned mix for commingling with the original
mix and for a specific project application only. Alternately, place a construction joint at the
location of the change in concretes as approved by the Engineer.
346-6.3Delivery Certification: Ensure that an electronic delivery ticket is furnished
with each batch of concrete before unloading at the placement site. The delivery ticket may be
proprietary software or in the form of an electronic spreadsheet, but shall be printed. Ensure that
the materials and quantities incorporated into the batch of concrete are printed on the delivery
ticket. Include the following information on the delivery ticket:
Items (3) through (6) do not apply to non-agitating concrete transporting vehicles.
Ensure the batcher responsible for production of the batch of concrete signs the
delivery ticket, certifying the batch of concrete was produced in accordance with the Contract
Documents.
Sign the delivery ticket certifying that the design mix maximum specified water to
cementitious materials ratio was not exceeded due to any jobsite adjustments to the batch of
concrete, and that the batch of concrete was delivered and placed in accordance with the Contract
Documents.
346-6.4Plastic Property Tolerances: Reject concrete with slump or air content that
does not fall within the specified tolerances, except as noted below, and immediately notify the
concrete production facility that an adjustment of the concrete mixture is required.
If a load does not fall within the tolerances, test each subsequent load and the first
adjusted load. If failing concrete is not rejected or adjustments are not implemented, the Engineer
may reject the concrete and terminate further production until the corrections are implemented.
At the Contractor’s risk, water may be added at the placement site immediately
after completion of the initial slump or slump flow test, either to correct a low slump or slump
flow, or to increase the concrete workability, provided the addition of water does not exceed the
water to cementitious materials ratio as defined by the mix design.
After adding water at the placement site depending on the type of concrete,
perform the following tests:
the slump tolerance range. If the slump is outside the tolerance range, reject the load.
segregation resistance. Do not reject SCC exceeding the high-end slump flow tolerance if it has
passed the rapid assessment of static segregation resistance test. Reject the load if the slump flow 345FY 2023-24Return to Table of Contents
is below the low-end tolerance. As an exception, the Engineer may accept the concrete if the
rejection compromises the structural integrity of the element or produces other detrimental
effects. Minimum vibration may be needed in accordance with Section 400.
If an adjustment is made at the concrete production facility, perform a slump test
on the next load to ensure the concrete is within the slump tolerance ranges.
Except for SCC, do not place concrete represented by slump test results outside of
the tolerance range. Include water missing from the water storage tanks upon arrival at the
project site in the jobsite water added.
Do not allow concrete to remain in a transporting vehicle to reduce slump.
346-7Mixing and Delivering Concrete
346-7.1General Requirements: Operate all concrete mixers at speeds and volumes per
the manufacturer’s design or recommendation as stipulated on the mixer rating plate.
346-7.2Transit Truck Mixing: Produce a completely uniform mixed concrete in a truck
mixer for a minimum of 70 revolutions at the mixing speed designated by the truck
manufacturer.
` Prior to starting the discharge of the concrete at the jobsite, when water is added,
record the added quantity and mix the concrete 30 additional drum mixing revolutions. Do not
make more than two mix adjustments. Seek approval from the Engineer prior to using a central
mixer and depositing the batch into a truck mixer.
346-7.2.1 Transit Time: Ensure compliance with Table 346-8 between the initial
introduction of water into the mix and completely discharging all the concrete from the truck.
Reject concrete exceeding the maximum transit time. The Engineer may approve an extension of
the transit time which will be identified on the approved mix design.
Table 346-8
Maximum Allowable Transit Time
Non-Agitator Trucks Agitator Trucks
45 minutes 60 minutes
75 minutes (1) 90 minutes (1)
Note:
346-7.2.2 Placement Time: All the concrete in a load must be in its final
placement position a maximum of 15 minutes after the transit time or cutoff time has expired
unless a time extension is approved by the Engineer. As an exception, the Engineer may accept
concrete that exceeds the transit time or cutoff time if the load passes the slump or slump flow
tests. Place concrete in continuous manner in accordance with Section 400.
For Class IV (Drilled Shaft) mixes, placement time may be extended
provided the slump loss time of the first concrete placed is not exceeded throughout the elapsed
time.
The Engineer may perform Independent Verification (IV) testing to verify
the plastic and hardened properties of the concrete when a time extension is granted.
346-7.3On-site Batching and Mixing: Use a mixer of sufficient capacity to prevent
delays that may be detrimental to the quality of the work. Ensure that the accuracy of batching
equipment is in accordance with requirements of this Section. 346FY 2023-24Return to Table of Contents
346-7.4Concreting in Cold Weather: Do not mix or place concrete when the air
temperature is below 40ºF. Protect the fresh concrete from freezing in accordance with
concrete mixing and placement operations occurring in a temperature controlled environment.
346-7.5Concreting in Hot Weather: Hot weather concreting is defined as the
production, placing and curing of concrete when the concrete temperature at placing exceeds
85ºF but is 100ºF or less.
Unless the specified hot weather concreting measures are in effect, reject concrete
exceeding 85ºF at the time of placement. Regardless of special measures taken, reject concrete
exceeding 100ºF. Predict the concrete temperatures at placement time and implement hot
weather measures to avoid production shutdown.
346-7.6Sample Location: Obtain acceptance samples from the point of final placement
Where concrete buckets are used to discharge concrete directly to the point of
final placement or into the hopper of a tremie pipe, samples will be obtained from the discharge
of the bucket. When the concrete is discharged directly from the mixer into the bucket and the
bucket is discharged within 20 minutes, samples may be obtained from the discharge of the
mixer.
Where conveyor belts, troughs, pumps, or chutes are used to transport concrete
directly to the point of final placement or into the hopper of a tremie pipe, samples will be
obtained from the discharge end of the entire conveyor belt, trough, pump, or chute system.
Where concrete is placed in a drilled shaft or other element using a tremie pipe
and a concrete pump, samples will be obtained from the discharge of the pump line at the
location of the tremie hopper.
For all other placement methods, prior to each placement, obtain Department
approval for sampling at the discharge of the mixer in lieu of sampling at the point of final
placement. Submit the sampling correlation procedure to the Engineer for approval prior to the
placement of the concrete. Once the comparative sampling correlation is approved by the
Engineer, apply this correlation to the plastic properties tolerances for samples obtained from the
discharge of mixer.
Where a concrete pump is used to deposit concrete directly into a drilled shaft
which is a wet excavation without the use of a tremie, or other applications as approved by the
Engineer, ensure the discharge end of the pump line remains immersed in the concrete at all
times after starting concrete placement.
346-8Plastic Concrete Sampling and Testing
QC tests include air content, temperature, slump, and preparing cylinders for testing at
later dates with the following exceptions:
with the following exceptions:
For Class I (Pavement), the air content testing is not required.
For Lightweight concrete, tests also include the plastic density (unit weight).
For SCC, QC tests also include slump flow in lieu of slump, visual stability index, and
rapid assessment of static segregation.
In addition, calculate the water to cementitious materials ratio in accordance with
FM 5-501 for compliance to the approved mix design.
Ensure that each truck has a rating plate and a valid mixer identification card issued by
the Department. Ensure that the revolution counter on the mixer is working properly, and
calibration of the water dispenser has been performed within the last twelve months. Reject any 347FY 2023-24Return to Table of Contents
concrete batches that are delivered in trucks that do not have mixer identification cards. Remove
the mixer identification card when a truck mixer is discovered to be in noncompliance and the
mixer deficiencies cannot be repaired immediately. When the mixer identification card is
removed for noncompliance, make note of the deficiency or deficiencies found, and forward the
card to the District Materials and Research Engineer who has Producer QC Plan acceptance
authority.
Perform plastic concrete tests on the initial delivery from each plant of each concrete
design mix each day. Ensure QC technicians meeting the requirements of Section 105 are present
and performing tests throughout the placement operation. Ensure a technician is present and
performing tests throughout the placement operation at each placement site. If a project has
multiple concrete placements at the same time, identify the technicians in the QC Plan to ensure
minimum sampling and testing frequencies are met. Ensure that the equipment used for delivery,
placement and finishing meets the requirements of this Specification.
When a truck designated for QC testing arrives at the discharge site, a subsequent truck
may also discharge once a representative sample has been collected from the QC truck and while
awaiting the results of QC testing. Reject non-complying loads at the jobsite. Ensure that
corrections are made on subsequent loads. Immediately cease concrete discharge of all trucks if
the QC truck has failing test. Perform plastic properties tests of concrete on all trucks prior to the
first corrected truck and the corrected truck. When more than one truck is discharging into a
pump simultaneously, only the truck designated for QC testing may discharge into the pump to
obtain a representative sample of concrete from the QC truck only.
Furnish sufficient concrete of each design mix as required by the Engineer for
verification (VT) testing. When the Engineer’s VT test results do not compare with the QC
plastic properties test results, within the limits defined by the Independent Assurance (IA)
checklist comparison criteria, located in Materials Manual Chapter 5, disposition of the concrete
will be at the option of the Contractor.
On concrete placements consisting of only one load of concrete, perform initial sampling
and testing in accordance with this Section. The acceptance sample and plastic properties tests
may be taken from the initial portion of the load.
If any of the QC plastic properties tests fail, reject the remainder of that load, and any
other loads that have begun discharging, terminate the LOT and notify the Engineer. Make
cylinders representing that LOT from the same sample of concrete.
Following termination of a LOT, obtain samples from a new load, and perform plastic
properties tests until the water to cementitious materials ratio, air content, temperature and slump
comply with the Specification requirements. Initiate a new LOT once the testing indicates
compliance with Specification requirements.
Suspend production when any five loads in two days of production of the same design
mix are outside the specified tolerances. Increase the frequency of QC testing to one per load to
bring the concrete within allowable tolerances. After production resumes, obtain the Engineer’s
approval before returning to the normal frequency of QC testing.
If concrete placement stops for more than 90 minutes, perform initial plastic properties
testing on the next batch and continue the LOT. Cylinders cast for that LOT will represent the
entire LOT.
When the Department performs Independent Verification (IV), the Contractor may
perform the same tests on the concrete at the same time. The Department will compare results
based on the Independent Assurance (IA) Checklist tolerances. 348FY 2023-24Return to Table of Contents
346-9Acceptance Sampling and Testing
346-9.1General: Perform plastic properties tests in accordance with 346-8 and cast a set
of three QC cylinders, for all structural concrete incorporated into the project. Take these
acceptance samples randomly as determined by a random number generator acceptable to the
Department. The Department will independently perform VT plastic properties tests and cast a
set of VT cylinders. The VT cylinders will be the same size cylinder selected by the Contractor,
from a separate sample from the same load of concrete as the Contractor’s QC sample.
For each set of QC cylinders verified by the Department, cast two additional
cylinders from the same sample, and identify them as the quality control resolution (QR) test
cylinders. The Department will also cast two additional verification resolution (VR) test
cylinders from each VT sample. All cylinders will be clearly identified as outlined in the
Sample/LOT Numbering System instructions located on the State Materials Office website.
Deliver the QC samples, including the QR cylinders to the final curing facility in accordance
with ASTM C31. Concurrently, the Department will deliver the VT samples, including the VR
cylinders, to their final curing facility.
Test the QC laboratory cured samples for compressive strength at the age of
28 days, in a laboratory meeting and maintaining at all times the qualification requirements listed
in Section 105.
Ensure the QC testing laboratory input the compressive strength test results into
the Department’s Materials Acceptance and Certification (MAC) system within 24 hours after
testing. Notify the Engineer when results cannot be inputted into MAC.
The Department will compare the VT sample compressive strength test results
with the corresponding QC sample test results.
346-9.2Sampling Frequency: As a minimum, sample and test concrete of each mix
design for water to cementitious materials ratio, air content, temperature, slump and compressive
strength once per LOT as defined by Table 346-9. The Engineer will randomly verify one of
every four consecutive LOTs of each mix design based on a random number generator. The
Department may perform Independent Verification (IV) testing to verify compliance with
specification requirements. All QC activities, calculations, and inspections will be randomly
confirmed by the Department.
Table 346-9
Sampling Frequency
Class Concrete (1) LOT Size
I (Seal) Each seal placement
I (Pavement) According to Section 350
II, II (Bridge Deck), III, IV, V, VI, VII 50 cubic yards, or one day’s production, whichever is
less
IV (Drilled Shaft) 50 cubic yards, or one day’s production, whichever is
less (2)
production, whichever is less.
beginning of the next drilled shaft placement. 349FY 2023-24Return to Table of Contents
346-9.2.1 Reduced Frequency for Acceptance Tests: Except for Class I
(Pavement), the LOT size may represent 100 cubic yards when produced with the same mix
design at the same concrete production facility for the same prime Contractor and subcontractor
on a given Contract. As an exception, the requirements for the precast/prestressed production
facility will only include the same mix design at the same concrete production facility. The
reduced testing frequency of Class I (Pavement) is described in the Section 350.
Submit strength test results indicating that the two following criteria are
met:
or greater than the specified minimum compressive strength (f′c) plus 2.33 standard deviations
minus:
exceeds the f′c plus 1.34 standard deviations.
Base calculations on a minimum of ten consecutive strength test results for
a Class IV or higher; or a minimum of five consecutive strength results for a Class III or lower.
The average of the consecutive compressive strength test results, based on
the class of concrete, can be established using historical data from a previous Department
project. The tests from the previous Department project must be within the last calendar year or
may also be established by a succession of samples on the current project. Only one sample can
be taken from each LOT. Test data must be from a laboratory meeting the requirements of
Section 105. Obtain Department approval before beginning reduced frequency LOTs.
If at any time a strength test is not verified or the average strength of the
previous ten or five consecutive samples based on the class of concrete from the same mix
design and the same production facility does not conform to the above conditions, return to the
frequency represented by the LOT as defined in Table 346-9. Notify the Engineer that the initial
frequency is reinstated. In order to reinitiate reduced frequency, submit a new set of strength test
results.
346-9.3Strength Test Definition: The strength test of a LOT is defined as the average
compressive strength tests of at least two companion cylinders cast from the same sample of
concrete and tested at the same age.
346-9.4Acceptance of Concrete: The Engineer will accept the concrete of a given LOT
when the compressive strength test results are verified and meets the minimum specified
compressive strength in Table 346-3. Ensure that the hardened concrete strength test results are
obtained in accordance with 346-9.3.
The process of concrete compressive strength verification and acceptance consists
of the following steps:
Do not discard a cylinder strength test result based on low strength (strength
below the specified minimum strength as per the provisions of this Section).
When one of the three QC cylinders from a LOT is lost, missing, damaged or
destroyed, determination of compressive strength will be made by averaging the remaining two
cylinders. If more than one QC cylinder from a LOT is lost, missing, damaged or destroyed, the 350FY 2023-24Return to Table of Contents
Contractor will core the structure at no additional expense to the Department to determine the
compressive strength. Prior to coring, obtain Engineer’s approval for coring the structure and its
proposed coring location. Acceptance of LOT may be based on VT data at the discretion of the
Engineer.
For each QC and each QR cylinder that is lost, missing, damaged or destroyed,
payment for that LOT will be reduced by $750.00 per 1,000 psi of the specified design strength
[Example: loss of two Class IV (Drill Shaft) QC cylinders that has no VT data will require the
element to be cored and a pay reduction will be assessed (4,000 psi / 1,000 psi) x $750 x 2 =
$6,000]. This reduction will be in addition to any pay adjustment for low strength.
346-9.4.1 Small Quantities of Concrete: When a project has a total plan quantity
of less than 50 cubic yards, that concrete will be accepted based on the satisfactory compressive
strength of the QC cylinders. Submit certification to the Engineer that the concrete was batched
and placed in accordance with the Contract Documents. Submit a QC Plan for the concrete
placement operation in accordance with Section 105. The Engineer may perform IV testing as
identified in 346-9 and evaluate the concrete in accordance with 346-9.7.
346-9.5Verification: The results of properly conducted test by QC and VT laboratories
on specimens prepared from the same sample of concrete are not to differ by more than 14%.
Difference (%) = ABS ( QC−VT
QC ) 100
Where:
Difference (%) is the absolute percentage difference between QC
and VT average compressive strength.
The procedure consists of verifying if the QC and VT compressive strengths data
meet the established comparison criteria:
and the average compressive strength of VT is less than or equal to 14%, the QC test results are
upheld and verified. The Engineer will accept at full pay only LOTs of concrete represented by
plastic property results which meet the requirements of the approved mix design and strength test
results which equal or exceed the respective specified minimum strength.
and the average compressive strength of VT data exceeds 14%, the compressive strength results
are not verified and the Engineer will initiate the resolution procedure.
Maintain the QR and VR cylinders for a minimum of 30 days following the
testing date of the specified strength.
346-9.6Resolution: The Engineer will perform the resolution process to identify the
reliability of the compressive strength results when the difference between the average
compressive strength of QC and the average compressive strength of VT data exceeds 14% as
described in 346-9.5(2).
The Engineer will estimate the 28-day strengths (VR28 and QR28) for the VR and
QR cylinders using the following equation:
Estimated 28-Day Compressive Strength (psi) = ( Average Strength at (t) days
-17.8 + 46.3[ln (t)] − 3.3[ln (t)] ) 100
Where: 351FY 2023-24Return to Table of Contents
cylinders testing.
ln (t) is the natural logarithm of (t).
The Engineer will compare:
Comparison results must not be greater than 17.5%. Core samples of the hardened
concrete may be required.
V D (%) = ABS ( VT − VR
VT ) 100
Q D (%) = ABS ( QC − QR
QC ) 100
Where:
VD (%) is the absolute percentage difference between VT and VR28.
QD (%) is the absolute percentage difference between QC and QR28.
Perform the resolution with the concrete compressive strength data at 56 days in
lieu of the 28 days when the acceptance of concrete is at 56 days.
The resolution procedure will use the above equations. The Engineer will
determine through the resolution procedure whether the QC strength test results or the VT
strength test are deemed to be the most accurate, LOTs will then be considered to be verified.
The Engineer will inform the QC and VT laboratories within three calendar days
of the acceptance compressive strength test to transport their QR and VR cylinders to the
resolution laboratory. The QC and VT laboratories will transport their own hold cylinders to the
resolution testing laboratory within three calendar days after the Engineer notifies the Contractor
that a resolution procedure is required. In addition, the Engineer will ensure that the QR and VR
cylinders are tested within 14 calendar days of the acceptance strength tests.
The Engineer will determine the most accurate strength test result to represent the
four or fewer consecutive LOTs as follows:
deemed accurate and the QC strength will represent the LOTs. The Department will pay for cost
of the resolution testing.
the QC strength is deemed as most accurate and will represent the LOTs. The Department will
pay for the cost of the resolution testing.
the VT strength is deemed as most accurate and will represent the LOTs. The Department will
assess a $1,000 pay reduction for the cost of the Resolution Investigation.
Engineer, with input from the DMO, will determine if any Department IA evaluations are
required and which test results are most accurate. The Department will pay for the cost of the
resolution testing.
When the Engineer cannot determine which strength test results are the most
accurate, the concrete represented by the four consecutive LOTs will be evaluated based on the
QC data. 352FY 2023-24Return to Table of Contents
The results of the resolution procedure will be forwarded to the Contractor within
five working days after completion of the investigation.
346-9.7Structural Adequacy: The Engineer will evaluate the structural adequacy for
verified concrete that does not meet the minimum specified compressive strength of Table 346-3.
For structural adequacy, with standard molded and cured compressive strength
cylinders, the compressive strength of concrete is satisfactory provided that the two following
criteria are met:
minimum compressive strength by more than:
to or less than 5,000 psi.
specified minimum compressive strength is greater than 5,000 psi.
to or exceeds the specified minimum compressive strength. This condition only applies if there
are two or more previous LOTs to calculate the average.
The Engineer will consider the concrete for a given LOT as structurally adequate
and coring will not be allowed when a concrete compressive strength test result falls below the
specified minimum strength but has met the above conditions.
346-9.7.1 Lightweight concrete: The Engineer may require an Engineering
Analysis Scope in accordance with 6-4 to establish structural and durability adequacy when the
lightweight concrete plastic density (unit weight) is outside of the specified tolerances.
346-10Investigation of Low Compressive Strength Concrete
When a verified concrete compressive strength test result falls below the specified
minimum strength, and does not meet the structural adequacy described in 346-9.7, perform one
of the following options:
structural and durability adequacy. When the scope is approved by the Engineer, submit an
Engineering Analysis Report (EAR) in accordance with 6-4 that includes a full structural
analysis. If the results of the structural analysis indicate adequate strength to serve its intended
purpose with adequate durability, and is approved by the Engineer, the Contractor may leave the
concrete in place subject to the requirements of 346-11, otherwise, remove and replace the LOT
of concrete in question at no additional expense to the Department.
Section to determine the in-place strength of the LOT of concrete in question, at no additional
expense to the Department. The Engineer will determine whether to allow coring of the in-place
concrete or require an engineering analysis based on the compressive strength of the test
cylinders.
346-10.1Coring for Determination of Structural Adequacy: Core strength test results
obtained from the structure will be accepted by both the Contractor and the Department as the in-
place strength of the LOT of concrete in question. The core strength test results will be used in
lieu of the cylinder strength test results for determination of structural adequacy. The Department
will calculate the strength value to be the average of the compressive strengths of the three
individual cores. This will be accepted as the actual measured value.
Obtain and test the cores in accordance with ASTM C42.The Engineer will select
the size and location of the drilled cores so that the structure is not impaired and does not sustain 353FY 2023-24Return to Table of Contents
permanent damage after repairing the core holes. Obtain the Engineer’s written approval before
taking any concrete core sample. Notify the Engineer 48 hours prior to taking core samples.
Sample three undamaged cores taken from the same approximate location where
the questionable concrete is represented by the low strength concrete test cylinders. Repair core
holes after samples are taken with a product in compliance with Section 930 or 934 and meeting
the approval of the Engineer. Report the test results to the Engineer within two calendar days of
testing the core samples.
The Engineer, with input from the DMO, will consider the concrete as structurally
adequate, in the area represented by core tests at the actual test age, if the average compressive
strength of cores does not fall below the specified minimum compressive strength (f′c) by more
than:
The Engineer may also require the Contractor to perform additional testing as
necessary to determine structural adequacy of the concrete.
346-11Pay Adjustments for Low Compressive Strength Concrete
346-11.1General: For any LOT of concrete failing to meet the f′c as defined in 346-3,
346-9, and satisfactorily meeting all other requirements of the Contract Documents, including
structural adequacy, the Engineer will individually reduce the price of each low strength LOT in
accordance with this Section.
346-11.2Basis for Pay Adjustments: The Engineer will determine payment reductions
based on the 28-day compressive strength, represented by either acceptance compressive strength
or correlated cores strength test results based on the following criteria:
minimum compressive strength, but no more than the limits established in 346-9.7 below the
specified minimum strength, do not core hardened concrete for determining pay adjustments.
Use the acceptance compressive strength test results.
minimum compressive strength by more than the limits established in 346-9.7, the structure may
be cored for determination of structural adequacy as directed by the Engineer. Use the result of
the 28-day correlated core compressive strength or the acceptance compressive strength test,
whichever is less.
A price adjustment will be applied to the certified invoice price the Contractor
paid for the concrete or the precast product.
The Engineer will relate the strength at the actual test age to the 28-day strength
for the design mix represented by the cores using appropriate strength time correlation equations.
In precast concrete operations, excluding prestressed concrete, ensure that the
producer submits acceptable core sample test results to the Engineer. The producer may elect to
use the products in accordance with this Section. Otherwise, replace the concrete in question at
no additional cost to the Department. For prestressed concrete, core sample testing is not allowed
for pay adjustment. The results of the cylinder strength tests will be used to determine material
acceptance and pay adjustment.
346-11.3Calculating Pay Adjustments: The Engineer will determine payment
reductions for low strength concrete accepted by the Department. The 28-day strength is
represented by either cylinders or correlated cores strength test results in accordance with
346-11.2. 354FY 2023-24Return to Table of Contents
Reduction in Pay is equal to the reduction in percentage of concrete compressive
strength below the specified minimum strength:
Reduction in Pay (%) = ( f ′ c−28 day Strength
f ′ c ) 100
For the elements that payments are based on the per foot basis, the Engineer will
adjust the price reduction from cubic yards basis to per foot basis, determine the total linear feet
of the elements that are affected by low strength concrete samples and apply the adjusted price
reduction accordingly.
Use the concrete compressive strength data at 56 days in lieu of the 28 days when
the acceptance of concrete is at 56 days.
346-12Pay Reduction for Plastic Properties
A rejected load in accordance with 346-6.4 is defined as the entire quantity of concrete
contained within a single ready-mix truck or other single delivery vehicle regardless of what
percentage of the load was placed. If concrete fails a plastic properties test and is thereby a
rejected load but its placement continues after completion of a plastic properties test having a
failing result, payment for the concrete will be reduced.
The pay reduction for cast-in-place concrete will be twice the certified invoice price per
cubic yard of the quantity of concrete in the rejected load.
The pay reduction for placing a rejected load of concrete into a precast product will be
applied to that percentage of the precast product that is composed of the concrete in the rejected
load. The percentage will be converted to a reduction factor which is a numerical value greater
than zero but not greater than one. The precast product payment reduction will be twice the
Contractor’s billed price from the producer for the precast product multiplied by the reduction
factor.
If the Engineer authorizes placement of the concrete, even though plastic properties
require rejection, there will be no pay reduction based on plastic properties failures; however,
any other pay reductions will apply. 355FY 2023-24Return to Table of Contents
PORTLAND CEMENT CONCRETE - CLASS NS
347-1Description
The requirements of this Section are applicable to concrete designated as nonstructural portland cement concrete, ( Class NS) hereinafter referred to as concrete. Use concrete composed of a mixture of portland cement, aggregates, water ; and where specified chemical admixtures, or supplementary cementitious materials. Deliver concrete to placement site in a freshly mixed, unhardened state. Ensure the concrete is placed and cured in a manner to ensure that the strength and durability of the concrete is maintained.
347-2Materials
347-2.1General: Certify that all materials used in concrete are from Department
approved sources, and free from detrimental matter. Meet the following requirements: Portland Cement ................................ ......Section 921 Coarse Aggregate* ................................ ..Section 901 Fine Aggregate* ................................ ......Section 902 Water ................................ ....................... Section 923 Chemical Admixtures ............................. Section 924 Supplementary Cementitious Materials ..Section 929 * Recycled Asphalt Pavement (RAP) may replace up to 20% of the total aggregate in the design mix. Use RAP from a Department approved stockpile.
347-3Production, Mixing and Delivery
347-3.1Concrete Production Requirements: Obtain concrete from a plant that i s
currently on the Department’s Nonstructural Concrete Production Facility Listing. Producers seeking inclusion on the list must contact the local District Materials Office for approval. When Volumetric Mixers are used, deliver concrete in accordance wit h the Volumetric Mixer Standards of the Volumetric Mixer Manufacture rs Bureau (VMMB ) VMMB 100-01. Substitution of structural concrete in lieu of non -structural concrete may be used if approved by the Engineer. If structural concrete is used in lieu of n on-structural concrete, obtain the concrete from a production facility meeting the requirements of Section 346. Acceptance is based on the requirements of Section 347. The Engineer may disqualify any concrete production facility for non -compliance with Specification requirements.
347-3.2Delivery: The maximum allowable mixing, agitation, and placement time of
concrete is 120 minutes.
347-3.3Small Quantities of Concrete: With approval of the Engineer, small quantities
of concrete, less than 3 cubic yards placed in one day and less than 0.5 cubic yards placed in a single placement may be accepted using a pre -bagged mixture.
347-4Certification and Acceptance
347-4.1General: Furnish a delivery ticket with each batch of concrete before
discharging concrete at the placement site. Ensure the delivery ticket includes material quantities 356 FY 2023-24 Return to Table of Contents
STRUCTURAL PORTLAND CEMENT CONCRETE in other states
Get an email when 346 changes
Florida revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.