400CONCRETE STRUCTURES

FL · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 393–431 Save this section

Ask about Section 400

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

400-1Description

Construct concrete structures and other concrete members, with the exception of pavement and incidental concrete construction (which are specified in other Sections). Refer to Section 450 for prestressed construction requirements additional to the requirements of this Section. For precast concrete structures meet the requirements o f Section 450 for inserts and lifting devices, handling, storage, shipping, and erection. Obtain incidental precast products from a plant that is currently on the Department’s Production Facility Listing. Producers seeking inclusion on the list shall meet the requirements of Section 105.

400-2Materials

Meet the following requirements: Concrete ................................ .............. Sections 346 and 347 Penetrant Sealer ................................ .................. Section 413 High Molecular Weight Methacrylate (HMWM)** ................................ ................................ ............ Section 413 Reinforcing for Concrete ................................ ....Section 415 Water ................................ ................................ ...Section 923 Curing Materials*,** ................................ ..........Section 925 Epoxy Bonding Compounds** ........................... Section 926 Post Installed Anchor Systems** ........................ Section 937 Joint Materials** ................................ ................. Section 932 Bearing Pads ................................ ....................... Section 932 Non-Shrink Grout** ................................ ...........Section 934 Class 5 Applied Finish Coatings** ..................... Section 975 Galvanizing Compound** ................................ ..Section 562 Dowel Bar Assembly** ................................ ......Section 931 Filter Fabric** ................................ ..................... Section 985 *The Engineer will allow clean sand and sawdust for certain curing, when and as specified. **Use products listed on the Department’s Approved Product List ( APL).

400-3Depth of Footing

Refer to Section 455, “D. SPREAD FOOTINGS”.

400-4Falsework

400-4.1Plans: At the Engineer’s request, submit detailed plans for falsework or

centering to the Department. The Contractor is responsible for results obtained by using these plans.

400-4.2Design and Erection: Design and construct all falsework to provide the

necessary rigidity and to support the loads without appreciable settlement or deformation. Use 385 FY 2023-24 Return to Table of Contents screw jacks or hardwood wedges to take up any settlement in th e framework, either before or during the placing of concrete. If any weakness develops and the centering shows undue settlement or distortion, stop the work, remove any affected concrete, and strengthen the falsework before resuming work. Support falsework which cannot be founded on a satisfactory footing on piling. Space, drive, and remove the piling in an approved manner.

400-4.3Camber: Provide camber to correct for settlement and deflection of falsework

Give bridges permanent camber only when shown in the Plans.

400-4.4Bridge Deck Overhang Falsework for Steel I -Girders: Locate the lower

contact point of bridge deck overhang falsework supporting screed rails within 6 inches above the bottom flange. If the lower contact point of the overhang falsework bears more than 6 inches above the bottom flange and/or if the deck overhang is 4 feet or greater, submit shop drawings and calculations to the Engineer in accordance with Section 5 and Chapter 11 of the Structures Design Guidelines (SDG). The de ck overhang is measured from the centerline of the girder supporting the overhang falsework to the outside edge of the concrete deck.

400-5Forms

400-5.1General: Provide forms, either of wood or metal, that are as follows: externally

secured and braced where feasible; substantial and unyielding; of adequate strength to contain the concrete without bulging between supports and without apparent deviation from the neat lines, contours, and shapes shown in the Plans. Design forms to withstand the additional forces of vibration without apparent deviation from the desired shape or position. Assemble forms to be mortar-tight. If using lumber forms, construct them of dressed wood of uniform thickness. Use form liners on wooden forms where Class 3 surface finish i s specified. Construct assembled forms to render a concrete surface of smooth, uniform finish. Make provisions to remove forms without injury to concrete surfaces. Remove blocks and bracing with the forms, and do not leave any portion of the forms in the c oncrete. Use the same form system for a type of work throughout.

400-5.2Inspection and Approval: Do not place concrete in a form until the form has

been inspected and approved. Although the Engineer inspects and approves the forms, the Contractor is resp onsible for obtaining satisfactory concrete surfaces, free from warping, bulging, or other objectionable defects. Pay special attention to the ties and bracing. Where the forms appear to be insufficiently braced or unsatisfactorily built, stop and correct defects to the satisfaction of the Engineer.

400-5.3Non-metallic Form Materials:

400-5.3.1 Lumber: For all surfaces, use lumber that is not less than 3/4 inch in thickness, dressed, and free of knot holes, loose knots, cracks, splits, warps, and other defects. Proportion the spacing of studs, joists, and wales to exclude warps and bulges and to produce true and accurate concrete surfaces. Only use structurally sound lumber. 400-5.3.2 Form Liners: Use form liners of durable, abrasion resistant materials that are unaffected by water. Use liners with a hard surface texture capable of rendering concrete surfaces of a smooth, uniform texture, without grain marks, patterns, or blemishes. Use form liner material of sufficient thickness to eliminate the reflection of irregularities, undesirable patterns, and marks from the forms to the surfaces. Replace liners as necessary to produce a consistent concrete surface texture. Use form liners in large sheets and with true, tight -fitted joints which are logically located. Obtain the Engineer’s approval of the layout of sheets. Do not use liners which have been patched. Use liner material of the same stock throughout. 386 FY 2023-24 Return to Table of Contents 400-5.3.3 Plywood: The Contractor may use plywood of not less than 5/8 inch in thickness manufacture d with waterproof glue or protected with an approved impervious coating. Do not use pieces with bulged plies or raveled, untrue edges.

400-5.4Special Requirements:

400-5.4.1 Re-entrant Angles: Use chamfered forms for exterior concrete corners and filleted forms for interior concrete corners. Use chamfers and fillets that are 3/4 by 3/4 inch and are mill -dressed on all sides to uniform dimensions. The Contractor may use plastic or metal chamfers and fillets provided they perform satisfactorily in produci ng uniform, smooth concrete corner surfaces without honeycomb. 400-5.4.2 Handrails, Concrete Barriers, Traffic Railings, and Parapets: Construct in accordance with Section 521. 400-5.4.3 End -bent Caps: Do not place forms for end -bent caps until the embankment has been constructed to within 12 inches of the bottom of the cap. Place a mass of embankment that is sufficient to produce the subsidence, displacement, and settlement which may result from the co nstruction of the total embankment. 400-5.4.4 Footings: Where footing concrete can be placed in dry excavation, the Contractor may omit cribs, cofferdams, and forms, subject to compliance with the following limitations and conditions:

1.Use this proc edure only in locations not exposed to view from traveled

roadways.

2.Obtain required elevations shown in the Plans.
3.Obtain neat line dimensions shown in the Plans.
4.Fill the entire excavation with concrete to the required elevation of the

top of the footing.

5.The Engineer will determine the volume of footing concrete to be paid

for from the neat line dimensions shown in the Plans.

400-5.5Form Alignment, Bracing, and Ties: Construct forms in such manner that they

may be adequately secu red for alignment, shape, and grade. Use bracing systems, ties, and anchorages that are substantial and sufficient to ensure against apparent deviation from shape, alignment, and grade. Do not drive nails into existing concrete. Do not use bracing systems, ties, and anchorages which unnecessarily deface or mark, or have an injurious or undesirable effect on surfaces that will be a part of the finished surface. If metal ties and anchorages are to remain in the concrete, construct them so as to permit the r emoval of metal to at least 1 inch beneath the finished surface of concrete. Use accessories for metal ties and anchorages that allow the removal of metal to the prescribed depth while leaving the smallest possible repairable cavity. When using wire ties , cut or bend them back from the finished surface of the concrete a minimum of 1 inch. Do not use internal ties of wire when forming surfaces that are exposed to view.

400-5.6Preparation and Cleaning: Meet the following requirements for the condition

of forms at the time of beginning concrete casting:

1.Treat all forms with an approved form -release agent before placing concrete.

Do not use material which adheres to or discolors the concrete.

2.Clean forms of all concrete laitance from previous use a nd all dirt, sawdust,

shavings, loose wire ties and other debris.

3.Close and secure all inspection and cleanout holes.

387 FY 2023-24 Return to Table of Contents

400-5.7Stay-In-Place Metal Forms:

400-5.7.1 General: Utilization of stay -in-place metal forms is permitted in lieu of removable f orms to form concrete bridge decks between beams and between the webs of individual box girders when designated in the Plans. Stay-in-place metal forms may be of the cellular, non-cellular or non-cellular with top cover sheet type. The flutes of non -cellular stay-in- place metal forms may be filled with polystyrene foam or concrete. When polystyrene foam is used to fill the forms, fill form flutes completely; do not allow any portion of the polystyrene foam to extend beyond the limits of the flutes. Ensure that the polystyrene foam remains in its required position within flutes during the entire concrete placement process. Do not use reinforcing supports or other accessories in such a manner as to cause damage to the polystyrene foam. Replace all damaged poly styrene foam to the satisfaction of the Engineer. Apply polymer sheeting to stay -in-place metal forms in accordance with the requirements in the following table. Apply polymer sheeting to all faces and edges (including sheared edges) of support angles used on bridges with Moderately and Extremely Aggressive Superstructure Environmental Classifications (as shown in the Plans). No polymer sheeting is required for beam attachment straps or clips partially embedded in concrete, and for support angles used on bridges with a Slightly Aggressive Superstructure Environmental Classification. Use polymer sheeting materials and application methods as described herein.

Table 400-1 Polymer Sheeting Usage Requirements Form Type Superstructure Environmental Cl assification (as shown in Plans) Slightly Aggressive Moderately Aggressive Extremely Aggressive Non-cellular form with concrete filled flutes No polymer sheeting required Polymer sheeting required on bottom side2 Polymer sheeting required on bottom side2 Non-cellular form with polystyrene foam filled flutes Polymer sheeting

required on top side

Polymer sheeting

required on both sides 1,2

Polymer sheeting

required on both sides 1,2

Non-

cellular

form

with Top

Cover

Sheet

Top

Cover

Sheet

Polymer sheeting

required on bottom side

Polymer sheeting

required on bottom side

Polymer sheeting

required on bottom side

Non-

cellular

form

Polymer sheeting

required on top side

Polymer sheeting

required on both sides

Polymer sheeting

required on both sides

Cellular form No polymer sheeting

allowed or required

Cellular form not

permitted

Cellular form not

permitted

1 Polymer sheeting not required on top side of form when foam filled flutes are used only at interior supports on continuous

decks and the remainder of the flutes are concrete filled.

2 Polymer sheeting not required on bottom side of form located within box girders and U-beams.

Prior to using stay-in-place metal forms, submit detailed plans for

approval of the forming system, including method of support and attachment and method of

protecting the supporting structural steel components from welding effects. Submit design

calculations for the forming system, which have been signed and sealed by the Specialty

Engineer. Detail stay-in-place metal forms such that they in no way infringe upon the concrete 388FY 2023-24Return to Table of Contents

outline of the slab shown on the Plans. Use stay-in-place metal forms that provide and maintain

the dimensions and configuration of the original slab in regards to thickness and slope.

Do not weld stay-in-place metal form supports and connections to the

structural steel components. Do not connect polymer coated angles or other hardware that

support polymer coated metal forms to the beam attachment straps or clips by welding. Electrical

grounding to steel reinforcing or fiber reinforced polymer (FRP) reinforcing is prohibited.

Protect structural steel components from damage by using a shield to

guard against weld splatter, weld overrun, arc strikes, or other damaging effects of the welding

process. Upon completion of welding, rest the metal form support flush on the supporting steel

component. Should any weld spatter, weld overrun, arc strike, or other effects of the welding

process be evident or occur to the structural steel component, immediately stop in-place welding

of the metal form supports for the remainder of the work. In this event, weld all metal form

supports off of the structure and erect the forms after prefabrication, or use an alternate approved

method of attaching the form supports. Remove improper weldment, repair the supporting steel

component for any improper welding. Perform all required verification and testing at no expense

to the Department and to the satisfaction of the Engineer.

Do not use stay-in-place metal forms until the forming system has been

approved by the Engineer. The Contractor is responsible for the performance of the stay-in-place

forms.

Structures designed, detailed, and dimensioned for the use of removable

forms: Where stay-in-place metal forms are permitted, the Contractor is responsible and shall

obtain the approval of the Engineer for any changes in design, etc. to accommodate the use of

stay-in-place forms. The Engineer will compute pay quantities of the various components of the

structure which are paid on a cubic yard basis from the design dimensions shown in the Plans

with no allowance for changes in deflection or dimensions necessary to accommodate the stay-

in-place forms or concrete to fill the form flutes. The Engineer will limit pay quantities of other

Contract items that the Contractor increases to accommodate the use of stay-in-place forms to the

quantity required for the original plan design.

Submit all changes in design details of bridge structural members that

support stay-in-place forms, showing all revisions necessary to enable the supporting

components to withstand any additional weight of the forms and the weight of any extra concrete

that may be required to fill the forms. Include with the design calculations a comparative analysis

of the stresses in the supporting components as detailed on the Plans and as modified to support

the forms. Use the identical method of analysis in each case, and do not allow the stresses in the

modified components to exceed those of the component as detailed in the Plans. Include with the

design the adjusted cambers for any changes in deflection over those shown on the original

Plans. Modify the beams to provide additional strength to compensate for the added dead loads

imposed by the use of stay-in-place forms. Obtain the additional strength by adding strands to the

pre-stressed beams or by adding steel material to increase the section modulus of steel girders.

Substantiate the added strength by the comparative calculations. Do not use stay-in-place forms

until the forming system and all necessary design revisions of supporting members have been

approved by the Engineer.

Structures designed, detailed, and dimensioned for the use of stay-in-place

metal forms:

Prior to using stay-in-place metal forms, submit detailed plans for

approval of the forming system (including method of support and attachment) together with 389FY 2023-24Return to Table of Contents

design calculations. Include an analysis of the actual unit weight of the proposed forming system

over the projected plan area of the metal forms. If the weight thus calculated exceeds the weight

allowance for stay-in-place metal forms and concrete required to fill the forms shown on the

Plans, then modify the supporting components to support the excess weight as specified by the

Contractor’s Specialty Engineer.

For all structures utilizing structural steel supporting components, paint

the vertical sides of the top flange prior to installation of the stay-in-place metal forms in

accordance with Section 560.

For non-polymer sheeting form surfaces, use zinc paint coating in

accordance with Section 562 to all accessories cut from galvanized sheets, which are not

embedded in concrete.

400-5.7.2 Design: Meet the following criteria for the design of stay-in-place

bridge deck forms:

1.The maximum self weight of the stay in place metal forms, plus the

weight of the concrete or expanded polystyrene required to fill the form flutes (where used), shall

not exceed 20 psf.

2.Design the forms on the basis of dead load of form, reinforcement, and

plastic concrete plus 50 pounds per square foot for construction loads. Use a unit working stress

in the steel sheet of not more than 0.725 of the specified minimum yield strength of the material

furnished, but not to exceed 36,000 psi.

3.Do not allow deflection under the weight of the forms, reinforcement,

and plastic concrete to exceed 1/180 of the form span or 1/2 inch, whichever is less, for form

spans of 10 feet or less, or 1/240 of the form span or 3/4 inch, whichever is less, for form spans

greater than 10 feet. In all cases, do not use a total loading (psf) that is less than 20 plus the

product of the deck thickness measured in inches times 12.5.

4.Use a design span of the form equal to the clear span of the form plus

2 inches. Measure the span parallel to the form flutes.

5.Compute physical design properties in accordance with requirements of

the AISI Specifications for the Design of Cold Formed Steel Structural Members, latest

published edition.

6.For all reinforcement, maintain the design concrete cover required by

the Plans.

7.Maintain the plan dimensions of both layers of primary deck

reinforcement from the top surface of the concrete deck.

8.Do not consider the permanent bridge deck form as lateral bracing for

compression flanges of supporting structural members.

9.Do not use permanent steel bridge deck forms in panels where

longitudinal deck construction joints are located between stringers.

10.Secure forms to the supporting members by means other than welding

directly to the member.

400-5.7.3 Materials:

400-5.7.3.1 Metal Forms: Fabricate stay-in-place metal forms and

supports from steel meeting the requirements of ASTM A653 having a coating designation

G165. Do not use form materials that are less than 0.03 inch uncoated thickness.

400-5.7.3.2 Polymer Sheeting: Use polymer sheeting comprised of at

least 85% ethylene acrylic acid copolymer capable of being applied to both G165 and G210 steel 390FY 2023-24Return to Table of Contents

sheet as described in ASTM A742. Ensure that the polymer sheeting has a nominal thickness of

12 mils as manufactured and a minimum thickness of 10 mils after lamination to the steel sheet.

Ensure that the polymer sheeting remains free of holes, tears and discontinuities and sufficiently

flexible to withstand the forming process without any detrimental effects to bond, durability or

performance. Ensure that the polymer sheeting is UV stabilized and contains antioxidants.

Ensure that the as-manufactured polymer sheeting (prior to

application) has an Oxidative Induction Time (OIT) of 60 to 75 minutes at 170°C in air when

tested according to ASTM D3895. Perform additional OIT tests on samples taken from the

finished product (polymer sheeting applied to forms) resulting in a minimum OIT according to

ASTM D3895 of 32 minutes at 170°C in air. Ensure that the polymer sheeting adheres to

galvanized metal sufficient to prevent undercutting at penetrations made through the polymer

sheeting or metal forms to the satisfaction of the Engineer. Ensure that edges subjected to shear

cutting are coated by the form manufacturer with two coats of a compatible liquid coating repair

material before delivery to the site. Ensure that steel used to produce polymer laminated metal

forms is appropriately cleaned and prepared per NCCA (National Coil Coating Association)

standard continuous coil coating practices. Ensure that pretreatment for use in conjunction with

the manufacturer’s polymer sheeting material is approved as compatible by the polymer sheeting

manufacturer. Apply pretreatment in accordance with the polymer sheeting manufacturer’s

procedures. Apply polymer sheeting in accordance with the manufacturer’s recommendations

and procedures. Ensure that all steel has the polymer sheeting applied prior to fabrication of the

stay-in-place forms and accessories.

Ensure that the screws to be used in the fastening of the stay-in-

place laminated metal forms have a corrosion resistant cladding that will not have an adverse

effect to the system due to the contact of dissimilar metals.

400-5.7.3.3 Certification: Submit a written certification from the

manufacturer stating the product meets the requirements of this specification along with the

delivery of the coated forms to the jobsite. Ensure that the certification conforms to the

requirements of Section 6. Ensure that the manufacturer has a quality control program

conforming to ISO 9001 2000 standards.

400-5.7.3.4 Polystyrene Foam: Use polystyrene foam comprised of

expanded polystyrene manufactured from virgin resin of sufficient density to support the weight

of concrete without deformation. Extrude the polystyrene foam to match the geometry of the

flutes and provide a snug fit. Use polystyrene foam that has a density of not less than 0.8 pounds

per cubic foot. Use polystyrene foam that has water absorption of less than 2.6% when tested

according to ASTM C272. Submit a written certification from the manufacturer stating the

product meets the requirements of this Specification along with the delivery of the product.

400-5.7.4 Construction: Install all forms in accordance with approved fabrication

and erection plans.

Do not rest form sheets directly on the top of the stringer of floor beam

flanges. Fasten sheets securely to form supports, and maintain a minimum bearing length of

1 inch at each end for metal forms. Place form supports in direct contact with the flange of the

stringer or floor beam. Make all attachments for coated metal forms by bolts, clips, screws, or

other approved means.

400-5.7.4.1 Form Galvanizing Repairs: For any permanent exposed steel

where the galvanized coating has been damaged, thoroughly clean, wire brush, and paint it with 391FY 2023-24Return to Table of Contents

two coats of galvanizing compound in accordance with Section 562 to the satisfaction of the

Engineer. Do not touch up minor heat discoloration in areas of welds.

400-5.7.4.2 Polymer Sheeting Repairs: Inspect and identify areas for

damage to the polymer sheeting and repair with liquid polymer coating similar and compatible

with respect to durability, adhesion and appearance in accordance with ASTM A762, as

furnished by the stay-in-place form manufacturer. Ensure that the inspection includes checking

the polymer sheeting for cuts, tears, cracking, surface pits, peeling, dirt, grease, oil, stains, rust or

bare areas. Reject any panels that show coating blistering, peeling or cracking. Repair all

polymer sheeting damage according to the following:

1.Surface Preparation: Ensure that all surfaces to be repaired are

clean and free of any deleterious substances. Remove all traces of dirt, soil, oil deposits, greases,

and other surface contaminates in accordance with the polymer sheeting and coating

manufacturer’s written specifications prior to touch-up and recoating.

2.Application Procedures: Ensure that the liquid polymer repair

coating is applied to a clean dry surface and in accordance with the manufacturer’s written

specifications. Apply the repair coating using a suitable paintbrush or other means acceptable to

the Engineer. Apply a first coat of product to the surface at 2-4 mils in thickness. Let the first

coat air dry. Apply a second coat to form a complete layer and increase the thickness,

immediately after verifying the first coat is dry to the touch (15 - 25 minutes depending on the

local air drying temperature and atmospheric conditions). Apply the second coat at the same

coating thickness as the first at 2-4 mils. Ensure that the total dry film thickness of the two coats

is not less than 6 mils. Apply additional coats in this same manner until desired coating thickness

is achieved.

400-5.7.5 Placing of Concrete: Vibrate concrete to avoid honeycomb and voids,

especially at construction joints, expansion joints, valleys and ends of form sheets. Use approved

pouring sequences. Do not use calcium chloride or any other admixture containing chloride salts

in the concrete.

400-5.7.6 Inspection: The Engineer will observe the Contractor’s method of

construction during all phases of the construction of the bridge deck slab, including the

installation of the metal form system; location and fastening of the reinforcement; composition

of concrete items; mixing procedures, concrete placement, and vibration; and finishing of the

bridge deck. Should the Engineer determine that the procedures used during the placement of the

concrete warrant inspection of the underside of the deck, remove at least one section of the metal

forms in each span for this purpose. Do this as soon after placing the concrete as practicable in

order to provide visual evidence that the concrete mix and the procedures are obtaining the

desired results. Remove an additional section in any span if the Engineer determines that there

has been any change in the concrete mix or in the procedures warranting additional inspection.

If, in the Engineer’s judgment, inspection is needed to check for defects in

the bottom of the deck or to verify soundness, sound the metal forms with a hammer as directed

by the Engineer after the deck concrete has been in place a minimum of two days. If sounding

discloses areas of doubtful soundness to the Engineer, remove the metal forms from such areas

for visual inspection after the concrete has attained adequate strength. Remove metal bridge deck

forms at no expense to the Department.

At locations where sections of the metal forms have been removed, the

Engineer will not require the Contractor to replace the metal forms. Repair the adjacent metal

forms and supports to present a neat appearance and to ensure their satisfactory retention and 392FY 2023-24Return to Table of Contents

where they are polymer sheeted, coat all exposed surfaces of stay-in-place metal form system

elements that are not coated or are damaged with a field applied liquid polymer coating as

specified in 400-5.7.4.2. As soon as the form is removed, the Engineer will examine the concrete

surfaces for cavities, honeycombing, and other defects. If irregularities are found, and the

Engineer determines that these irregularities do not justify rejection of the work, repair the

concrete as directed, and provide a General Surface Finish in accordance with 400-15. If the

Engineer determines that the concrete where the form is removed is unsatisfactory, remove

additional metal forms as necessary to inspect and repair the slab, and modify the method of

construction as required to obtain satisfactory concrete in the slab. Remove and replace all

unsatisfactory concrete as directed, at no expense to the Department.

If the method of construction and the results of the inspections as outlined

above indicate that sound concrete has been obtained throughout the slabs, the amount of

sounding and form removal may be reduced when approved by the Engineer.

Corrosion of assembly screws will not be considered a structural or

aesthetic problem and is considered acceptable.

Provide the facilities for the safe and convenient conduct of the inspection

procedures.

400-5.8Stay-In-Place Concrete Forms:

400-5.8.1 General: Permanent stay-in-place precast reinforced concrete forms

may be used in lieu of removable forms to form concrete bridge deck slabs subject to the

conditions contained herein. Precast reinforced concrete stay-in-place forms are not permitted to

construct a composite concrete deck. Do not use precast prestressed concrete stay-in-place forms

to form any permanent bridge decks.

When detailed Plans for structures are dimensioned for the use of

removable forms, provide additional slab thickness, elevation changes, changes in design, etc. to

accommodate the use of stay-in-place forms, subject to the Engineer’s approval. The Engineer

will compute pay quantities of the various component members of the structure which are paid

on a cubic yard basis from the design dimensions shown in the Plans with no allowance for

changes in deflection and changes in dimensions necessary to accommodate the stay-in-place

forms. The Engineer will limit pay quantities of other Contract items which are increased to

accommodate the use of stay-in-place forms to the quantity required for the original plan design.

Prior to using stay-in-place forms, submit for approval detailed plans of

the forming system and design calculations. Indicate on the plans the form panel sizes, placing

patterns, type of mastic or felt bearing material and type and method of caulking between panels.

Also, submit appropriate changes in design details of structural members supporting stay-in-

place forms showing any revisions necessary to enable the supporting components to withstand

the additional weight of the forms and perform equally as contemplated in the Plans. All

calculations and details submitted shall be sealed by the Contractor’s Engineer of Record.

Modify the beams to provide additional strength to compensate for the added dead loads imposed

by the use of stay-in-place forms. Obtain this strength by adding additional strands to prestressed

girders or increasing the section modulus for steel girders. Do not use stay-in-place forms until

the forming system and any necessary design revisions of supporting structural members have

been approved by the Engineer. The Department is not responsible for the performance of the

stay-in-place forms by its approval.

400-5.8.2 Materials: Construct permanent concrete forms of precast reinforced

concrete with a Class 3 Surface Finish. As a minimum, use the same class of concrete and 393FY 2023-24Return to Table of Contents

28-day minimum compressive strength as being used to construct the bridge deck. Use welded

steel wire reinforcement meeting the requirements of Section 931.

400-5.8.3 Design: Use the following criteria for the design of permanent bridge

deck forms:

1.Design the forms on the basis of deadload of form, reinforcement, and

plastic concrete plus an unfactored live load of 50 psf for construction loads. Meet the AASHTO

design requirements for service loads and ultimate loads as applicable.

2.Deflection under the weight of the forms, reinforcement, and the plastic

concrete shall not exceed 1/180 of the form span or 1/2 inch, whichever is less. In all cases, do

not use a loading that is less than 120 psf total.

3.Use a design span of the form equal to the clear span of the form

between supports. Measure the span of concrete forms parallel to the centerline of the form

panels.

4.Compute physical design properties of concrete forms in accordance

with current AASHTO design procedures.

5.Ensure that all reinforcement contained in the cast-in-place concrete has

the minimum cover shown in the Plans or not less than one inch, whichever is greater. Measure

the minimum cover normal to the plane of the bottom of the cast-in-place concrete. For stay-in-

place concrete forms with other than plane surfaces in contact with the cast-in-place concrete,

such as regularly spaced geometrical shapes projecting above the plane of the bottom of the cast-

in-place concrete, meet the following special requirements:

a.Space geometrical shapes projecting above the bottom plane of

the cast-in-place concrete used to provide support for reinforcement no closer than 3 feet apart

and of sufficient height to maintain the required concrete cover on the bottom mat of reinforcing

bars.

b.Construct all other geometrical shapes projecting above the

plane of the bottom of the cast-in-place concrete to provide a minimum vertical clearance of

3/4 inch between the closest surface of the projections and the secondary longitudinal reinforcing

bars in the deck slab.

c.Do not allow a minimum horizontal distance from the surface of

any transverse reinforcing bars to surfaces of the stay-in-place form of less than 1 1/2 inches.

For all reinforcement for the stay-in-place form panels,

provide a minimum of 1 inch concrete cover except that, for construction in a salt or other

corrosive environment, provide a minimum of 1 1/2 inches concrete cover.

6.Maintain the plan dimensions of both layers of primary deck

reinforcement from the top surface of the concrete deck. Measure the minimum cover of the

bottom mat of reinforcement normal to the top of the precast concrete form panel.

7.Do not consider the permanent bridge deck form as lateral bracing for

compression flanges of supporting structural members.

8.Do not use permanent concrete bridge deck forms in panels where

longitudinal deck construction joints are located between stringers.

9.Do not allow the maximum weight of the concrete form to exceed

40 pounds per square foot of form surface.

400-5.8.4 Construction: Install all forms in accordance with approved fabrication

and erection plans. 394FY 2023-24Return to Table of Contents

For concrete forms, provide a minimum bearing length of at least

1 1/2 inches but not exceeding 2 1/2 inches. Support concrete forms on the beams or girders by

continuous layers of an approved mastic or felt bearing material that will provide a mortar tight

uniform bearing. Use a mastic or felt bearing material that has a minimum width of 1 inch and a

maximum width of 1 1/2 inches. Seal joints between concrete form panels with caulking, tape, or

other approved method.

400-5.8.5 Placing of Concrete: Place the concrete in accordance with the

requirements of 400-5.7.5. Immediately prior to placing the slab concrete, saturate concrete stay-

in-place form panels with water.

400-5.8.6 Inspection: Inspect the concrete in accordance with the requirements of

400-5.7.6.

After the deck concrete has been in place for a minimum period of two

days, inspect the forms for cracks and excessive form deflection, and test for soundness and

bonding of the forms by sounding with a hammer as directed by the Engineer. Remove, for

visual inspection, form panels found to be cracked that show evidence of leakage and form

panels which have a deflection greater than adjacent panels by 1/2 inch or more which show

signs of leakage. If sounding discloses areas of doubtful soundness to the Engineer, remove the

form panels from such areas for visual inspection after the concrete has attained adequate

strength. Remove permanent bridge deck form panels at no expense to the Department.

At locations where sections of the forms have been removed, the Engineer

will not require the forms to be replaced. Repair the adjacent forms and supports to present a neat

appearance and to ensure their satisfactory retention. As soon as the form is removed, the

Engineer will examine the concrete surfaces for cavities, honeycombing, and other defects. If

irregularities are found, and the Engineer determines that these irregularities do not justify

rejection of the work, repair the concrete as directed and provide a General Surface Finish in

accordance with 400-15. If the concrete where the form is removed is unsatisfactory, as

determined by the Engineer, additional forms shall be removed as necessary to inspect and repair

the slab, and modify the methods of construction as required to obtain satisfactory concrete in the

slab. Remove and replace all unsatisfactory concrete as directed at no expense to the Department.

If the methods of construction and the results of the inspections as outlined

above indicate that the Contractor has obtained sound concrete throughout the slabs, the

Contractor may moderate the amount of sounding and form removal, when approved.

Provide all facilities for the safe and convenient conduct of the inspection

procedures.

400-6Underdrain and Weep Holes

Provide weep holes in all abutments and retaining walls.

Provide a continuous underdrain for box culverts in accordance with Standard Plans,

Index 400-289. Provide weep holes that are at least 3 inches in diameter and not more than

10 feet apart. Place the outlet ends of the weep holes just above the finish graded surface in front

of abutments and retaining walls. Cover the inlet ends of all weep holes with galvanized wire

mesh and a minimum of 2 cubic feet of clean, broken stone or gravel wrapped in Type D 3 filter

fabric, to allow free drainage but prevent the fill from washing through.

400-7Placing Concrete

400-7.1Weather Restrictions: 395FY 2023-24Return to Table of Contents

400-7.1.1 Concreting in Cold Weather: Do not place concrete when the air

temperature at placement is below 40ºF.

Meet the air temperature requirements for mixing and placing concrete in

cold weather as specified in Section 346. During the curing period, if NOAA predicts the

ambient temperature to fall below 35ºF for 12 hours or more or to fall below 30ºF for more than

4 hours, enclose the structure in such a way that the air temperature within the enclosure can be

kept above 50ºF for a period of 3 days after placing the concrete or until the concrete reaches a

minimum compressive strength of 1,500 psi.

Assume all risks connected with the placing and curing of concrete.

Although the Engineer may give permission to place concrete, the Contractor is responsible for

satisfactory results. If the placed concrete is determined to be unsatisfactory, remove, dispose of,

and replace the concrete at no expense to the Department.

400-7.1.2 Concreting in Hot Weather: Meet the temperature requirements and

special measures for mixing and placing concrete in hot weather as specified in Section 346.

Spray reinforcing bars and metal forms with cool fresh water just prior to

placing the concrete in a method approved by the Engineer.

Assume all risks connected with the placing and curing of concrete.

Although the Engineer may give permission to place concrete, the Contractor is responsible for

satisfactory results. If the placed concrete is determined to be unsatisfactory, remove, dispose of,

and replace the concrete at no expense to the Department.

400-7.1.3 Wind Velocity Restrictions: Do not place concrete for bridge decks if

the forecast of average wind velocity at any time during the planned hours of concrete placement

exceeds 15 mph. Obtain weather forecasts from the National Weather Service “Hourly Weather

Graph” for the city closest to the project site.

400-7.2Lighting Requirements: Provide adequate lighting for all concrete operations

conducted at night. Obtain approval of the lighting system prior to starting the concrete

operations.

400-7.3Inspections before Placing Concrete: Do not place concrete until the depth and

character of the foundation and the adequacy of the forms and falsework have been approved by

the Engineer. Do not deposit any concrete until all reinforcement is in place and has been

inspected and approved by the Engineer.

400-7.4Exposure to Water: Do not expose concrete other than seal concrete in

cofferdams to the action of water before final setting. Do not expose such concrete to the action

of salt or brackish water for a period of seven days after placing the concrete. Protect the

concrete during this period by keeping salt or brackish water pumped out of cofferdams.

400-7.5General Requirements for Placing Concrete: Deposit concrete as nearly as

possible in its final position. Do not deposit large quantities at one point and then run or work it

along the forms. Take special care to fill each part of the forms, to work coarse aggregate back

from the face, and to force concrete under and around reinforcing bars without displacing them.

Use a method and manner of placing concrete that avoids the possibility of

segregation or separation of aggregates. If the Engineer determines that the quality of concrete as

it reaches its final position is unsatisfactory, remove it and discontinue or adjust the method of

placing until the Engineer determines that the quality of the concrete as placed is satisfactory.

Use metal or metal-lined open troughs, chutes, or other means of concrete

conveyance which have no aluminum parts in contact with the concrete. As an exception, chutes

made of aluminum for ready mixed concrete trucks, no longer than 20 feet, may be used. This 396FY 2023-24Return to Table of Contents

exception does not apply to any other means of concrete conveyance. Where steep slopes are

required, use chutes that are equipped with baffles or are in short lengths that reverse the

direction of movement. Where placing operations would involve dropping the concrete freely

more than 5 feet, deposit it through pipes, troughs, or chutes of sheet metal or other approved

material. Use troughs, chutes, or pipes with a combined length of more than 30 feet only with the

Department’s authorization. Keep all troughs, chutes, and pipes clean and free from coatings of

hardened concrete by thoroughly flushing them with water after each run or more often if

necessary.

Place concrete against supporting material that is moist at the time of concrete

placement. If additional water is required, uniformly apply it ahead of the concrete placement as

directed by the Engineer. Do not place concrete on supporting material that is frozen. The

Contractor may use a moisture barrier in lieu of controlling the foundation grade moisture when

approved by the Engineer.

400-7.6Placing Concrete by Belt Conveyor: Place concrete by means of a belt

conveyor system with written Department authorization. Remove conveyor belt systems which

produce unsatisfactory results before continuing operations. Take concrete samples for assurance

testing at the discharge end of the belt conveyor system. Make available to the Engineer the

necessary platform to provide a safe and suitable place for sampling and testing. Remove any

concrete placed in an unsatisfactory manner at no expense to the Department before continuing

operations.

Use conveyor belt systems that do not exceed a total length of 550 feet, measured

from end to end of the total assembly. Arrange the belt assembly so that each section discharges

into a vertical hopper arrangement to the next section. To keep segregation to a minimum, situate

scrapers over the hopper of each section to remove mortar adhering to the belt and to deposit it

into the hopper. Equip the discharge end of the conveyor belt system with a hopper and a chute

or suitable deflectors to cause the concrete to drop vertically to the deposit area.

In order to avoid delays due to breakdowns, provide stand-by equipment with an

alternate power source prior to the beginning of the placement.

After the beginning of the placement, direct the discharge from the belt conveyor

so that the concrete always falls on freshly placed concrete.

400-7.7Placing Concrete by Pumping: In general, use concrete pumping equipment

that is suitable in kind and adequate in capacity for the work proposed. Use a pump discharge

line that has a minimum diameter of 4 inches. Use a pump and discharge lines that are

constructed so that no aluminum surfaces are in contact with the concrete being pumped. Operate

the pump to produce a continuous stream of concrete, without air pockets. When using cement

slurry or similar material to lubricate the discharge line when pumping begins, collect such

material at the point of discharge. Dispose of the collected slurry in areas provided by the

Contractor. Control the pump discharge locations so that the placement locations of the various

LOTs of concrete represented by strength test cylinders can be identified in the event the test

cylinders indicate deficient strength. When concrete is placed by pumping, take all test samples

of concrete at the end of the discharge line, except in accordance with the provisions of

400-7.8Consolidation: Consolidate the concrete by continuous working with a suitable

tool in an acceptable manner, or by vibrating as set forth in 400-7.11. When not using vibrators,

thoroughly work and compact all thin-section work with a steel slicing rod. Spade all faces, and

flush the mortar to the surface by continuously working with a concrete spading implement. 397FY 2023-24Return to Table of Contents

400-7.9Obstructions: In cases where, because of obstructions, difficulty is encountered

in puddling the concrete adjacent to the forms, bring the mortar content of the mix into contact

with the interior surfaces by vibrating the forms. Produce the vibrations by striking the outside

surfaces of the forms with wooden mallets or by other satisfactory means. In placing concrete

around steel shapes place it only on one side of the shape until it flushes up over the bottom

flange of the shape on the opposite side, after which place it on both sides to completion. After

the concrete has taken its initial set, exercise care to avoid jarring the forms or placing any strain

on the ends of projecting reinforcing bars.

400-7.10Requirements for Successive Layers: Place concrete in continuous horizontal

layers, approximately 20 inches thick. To avoid obtaining a plane of separation or a cold joint

between layers, vibrate the concrete in accordance with 400-7.11.

400-7.11Vibration of Concrete:

400-7.11.1 General: Consolidate all concrete except seal, steel pile jackets, and

concrete for incidental construction by the use of mechanical vibrators.

Use minimal mechanical vibration of no more than 3 seconds per insertion for

Self-Consolidating Concrete (SCC), when necessary to consolidate the concrete or to avoid

obtaining a plane of separation or a cold joint between layers.

400-7.11.2 Vibrators: Provide adequate vibrators on the project that are approved

by the Engineer before beginning concrete work. Generally, provide vibrators of the internal

type. For thin sections, where the forms are especially designed to resist vibration, the Contractor

may use external vibrators. Use a vibrator with a minimum frequency of 4,500 impulses per

minute with sufficient intensity and duration to cause complete consolidation of the concrete

without causing segregation of the materials. For vibrating thin, heavily reinforced sections, use

heads of such size to secure proper vibration of the concrete without disturbance of either the

reinforcing bars or the forms.

400-7.11.3 Number of Vibrators Required: Use a sufficient number of vibrators

to secure the compaction of each batch before the next batch is delivered, without delaying the

delivery. In order to avoid delays due to breakdowns, provide at least one stand-by vibrator, with

an appropriate power source.

400-7.11.4 Method of Vibration: Use vibrators to consolidate properly placed

concrete. Do not use them to move concrete about in the forms. Insert the vibrators in the surface

of concrete at points spaced to ensure uniform vibration of the entire mass of the concrete. Insert

the vibrator at points that are no further apart than the radius over which the vibrator is visibly

effective. Allow the vibrator to sink into the concrete by its own weight, and allow it to penetrate

into the underlying layer sufficiently so that the two layers are thoroughly consolidated together.

After thoroughly consolidating the concrete, withdraw the vibrator slowly to avoid formation of

holes.

400-7.11.5 Hand Spading: When necessary in order to secure well-filled forms,

free from aggregate pockets, honeycomb, bubbles, etc., spade the concrete by hand, along the

surfaces of the forms and in all corners, following the vibration.

400-7.12Columns: Place concrete in columns in one continuous operation for each lift

as shown in the Plans.

400-7.13Slabs and Bridge Decks:

400-7.13.1 Bulkheads, Screed Rails, and Screeding Devices: Strike-off the

concrete using an approved metal screed operating on rails or bulkheads. Use devices which do

not contain aluminum parts. Prior to placing concrete, provide an approved screed capable of 398FY 2023-24Return to Table of Contents

striking-off and screeding the surface of the slab or deck to the required shape. Set all necessary

bulkheads and screed rails to the required grade. Use bulkheads, screed rails, and screeding

devices that permit vertical profile adjustment to the grade, satisfactory for providing straight

transverse slopes, differing transverse slopes broken as shown in the Plans and/or transverse

slopes with changing grade along the longitudinal length of slab or deck. Locate the screed rails

so the entire placement surface can be screeded to grade without using intermediate screed rails,

unless approved otherwise by the Engineer.

Use a screed consisting of a truss or heavy beams that will retain it’s shape

under all working conditions, and a set of rotating drums with a diameter sufficient to carry a

2 inch mortar roll in front of and parallel to the axis of the drums, while making an initial pass.

Adjust the drums to prevent mortar buildup forming behind the trailing edges of the drums. For

long bridges, as defined in 400-15.2.5.1, provide a device that automatically smoothes the

concrete surface to an untextured finish and that is attached to, and is moved by, the rolling drum

screed. As an alternate to the drum type screed, a mechanical screed with a metal strike-off may

be used. Equip the mechanical screed with mechanical vibrators to provide continuous uniform

vibration to the entire length unless otherwise authorized by the Engineer. Small and irregularly

shaped areas that cannot be mechanically screeded may be screeded in a manner approved by the

Engineer.

400-7.13.2 Screed Demonstration: Subsequent to the placement of all

reinforcing bars and prior to placing any slab or deck concrete, demonstrate that the proposed

equipment and methods can finish the concrete to the specified grades while maintaining the

specified cover over the reinforcement. Provide the demonstration over the entire length and

width of the spans to be placed.

400-7.13.3 Screeding Operations: Perform concrete placement and screeding as

independently controlled mechanical operations. Ensure that the passing of the screed and

forward movement of the screeding equipment are independent of the movement of concrete

placement equipment.

Level the concrete in front of the screed as near to the finished grade as

possible to prevent the screed from rising off the rail and forming uneven ridges behind the

screed. Pass the screed over the slab or deck as many times as necessary to obtain a satisfactory

surface and provide a concrete surface true to grade and crown, and free of irregularities.

Do not add water to the concrete surface to assist in finishing operations

unless specifically authorized by the Engineer. If the Engineer permits the addition of water,

apply only a fog mist, above the concrete surface, by means of approved power driven spray

equipment.

For long bridges, as defined in 400-15.2.5.1, do not manually or

mechanically float the concrete surface or apply a texture by broom or any other device to the

concrete surface produced by the screeding process. Correct isolated surface irregularities in

accordance with 400-15.2.5.3.

400-7.13.4 Placing Operations: Select an approved concrete design mix which

ensures complete placement of all slab or deck concrete between construction joints before initial

set begins in the plastic concrete. On placements of 50 yd or less, the minimum placement rate

is 20 cubic yards per hour. On placements of greater than 50 cubic yards, the minimum

placement rate is 30 cubic yards per hour.

The Engineer will not permit slab or deck placements until an acceptable

plan for meeting the minimum placement rate is approved. 399FY 2023-24Return to Table of Contents

400-7.13.5 Concrete Decks on Steel Spans: Where concrete decks are placed on

steel spans, release the temporary supports under the bridge before placing any concrete.

400-7.13.6 Concrete Decks on T-Beams: For cast-in-place T-beam construction,

cast the slabs and beams in one continuous operation. As an exception, where special shear

anchorage or keys are provided for in the Plans or approved by the Engineer, the beams and slabs

may be constructed in successive placements.

400-7.13.7 Diaphragms: Place concrete diaphragms at least 48 hours before the

bridge deck slabs are placed unless otherwise indicated in the Plans.

400-7.13.8 Weather Protection: Provide an approved means of protecting

unhardened concrete from rain. Position the protection system to shield the concrete from rain

and running water. Provide a shield impervious to water over the slab or deck concrete, of

sufficient size to protect all areas of slab or deck concrete subject to water damage, and include a

means of intercepting and diverting water away from freshly placed concrete. Arrange the

equipment so that the weather protection system can be erected over unhardened concrete. When

there is a possibility of rain during concrete placement operations, place the weather protection

system in stand-by readiness, capable of being deployed in a timely manner. Use the weather

protection immediately when rain begins so that slab or deck concrete damage will not occur. Do

not place concrete during rain.

Assume responsibility for damage to the slab or deck in the case of failure

of the weather protection system.

400-7.14Concrete Box Culverts: In general, place the base slab or footing of concrete

box culverts, and allow them to set before constructing the remainder of the culvert. In this case,

make suitable provision for longitudinal keys. Construct bottom slabs, footings, and apron walls

as a monolith if practicable. Where transverse construction joints are necessary, place them at

right angles to the culvert barrel, and make suitable provision for keys.

In the construction of box culverts having walls 6 feet or less in height, the

sidewalls and top slab may be constructed as a monolith or may place the concrete in the walls

and allow it to set before placing the top slab concrete.

Where the height of the box culvert walls exceed 6 feet, place the walls, and allow

the concrete to set at least 12 hours before placing the top slab concrete. In such cases, form keys

in the sidewalls.

When casting the walls and top slabs of box culverts as a monolith, ensure that

any necessary construction joints are vertical. Design all construction joints with formed keys.

Provide keys that are beveled as shown in the Plans or as directed, but do not allow the edge of

the beveled material forming the key to be less than 1 1/2 inches from the edge of the concrete.

Construct each wingwall, if possible, as a monolith. Ensure that construction

joints, where unavoidable, are horizontal and so located that no joints will be visible in the

exposed face of the wing above the finished graded surface.

Precast box culvert sections may be used in lieu of cast-in-place box culvert

construction provided the provisions in Section 410 are satisfied.

400-8Seals

400-8.1General: Wherever practicable, dewater all foundation excavations, and deposit

the concrete in the dry as defined in 455-15.2. Where conditions are encountered which render it

impracticable to dewater the foundation before placing concrete, the Engineer may authorize the

construction of a concrete foundation seal of the required size. Then, dewater the foundation, and

place the balance of the concrete in the dry. 400FY 2023-24Return to Table of Contents

When required to place seal concrete, the Contractor is responsible for the

satisfactory performance of the seal in providing a watertight excavation for placing structural

concrete. The Department will provide and pay for the seal concrete as an aid to the construction

of the structure. Repair seal concrete as necessary to perform its required function at no expense

to the Department.

400-8.2Method of Placing: Carefully place concrete deposited under water in the space

in which it is to remain by means of a tremie, a closed-bottom dump bucket of not less than

1 cubic yard capacity, or other approved method. Do not disturb the concrete after depositing it.

Deposit all seal concrete in one continuous placement. Do not place any concrete in running

water, and ensure that all form work designed to retain concrete under water is watertight.

400-8.3Use of Tremie: Use a tremie consisting of a tube having a minimum inside

diameter of 10 inches, constructed in sections having water-tight joints. Do not allow any

aluminum parts to have contact with the concrete. Ensure that the discharge end is entirely seated

at all times, and keep the tremie tube full to the bottom of the hopper. When dumping a batch

into the hopper, keep the tremie slightly raised (but not out of the concrete at the bottom) until

the batch discharges to the bottom of the hopper. Stop the flow by lowering the tremie. Support

the tremie such as to permit the free movement of the discharge end over the entire top surface of

the work and to permit its being lowered rapidly when necessary to choke off or retard the flow.

Provide a continuous, uninterrupted flow until completing the work. Exercise special care to

maintain still water at the point of deposit.

400-8.4Time of Beginning Pumping: Do not commence pumping to dewater a sealed

cofferdam until the seal has set sufficiently to withstand the hydrostatic pressure, and in no case

earlier than 72 hours after placement of the concrete.

400-9Construction Joints

400-9.1Location: Make construction joints only at locations shown in the Plans or in the

placement schedule, unless otherwise approved in writing. If not detailed in the Plans or

placement schedule, or in case of emergency, place construction joints as directed.

400-9.2Provisions for Bond and Transmission of Shear: Use shear key reinforcement

where necessary to transmit shear or to bond the two sections together.

400-9.3Preparations of Surfaces: Before depositing new concrete on or against

concrete which has hardened, re-tighten the forms. Roughen the surface of the hardened concrete

in a manner that will not leave loosened particles, aggregate, or damaged concrete at the surface.

Thoroughly clean the surface of foreign matter and laitance, and saturate it with water.

400-9.4Placing Concrete: Continuously place concrete from joint to joint. Carefully

finish the face edges of all joints which are exposed to view true to line and elevation.

400-9.5Joints in Sea Water or Brackish Water: For concrete placed in sea water or

brackish water, do not place any construction joints between points 2 feet below the mean low

water elevation and 6 feet above the mean high water elevation.

400-9.6Joints in Long Box Culverts: For long concrete box culverts, vertical

construction joints may be placed at a spacing not less than 30 feet. When using transverse

construction joints, ensure that longitudinal reinforcing is continuous through the joint and that

the joint is vertical.

400-9.7Crack Control Grooves in Concrete Bridge Decks: When the Plans require

crack control grooves in the top surface of decks, either install a tooled “V” groove prior to

initial concrete set or saw a groove using an early entry dry cut saw. When using an early entry

dry cut saw, operate in accordance with the manufacturer’s recommendations. Commence 401FY 2023-24Return to Table of Contents

sawing as soon as the concrete has hardened enough to permit standing on the surface without

leaving visible tracks or impressions and before uncontrolled concrete cracks occur.

400-10Expansion Joints

400-10.1General: After meeting the smoothness criteria in 400-15, construct expansion

joints to permit absolute freedom of movement. Carefully remove all loose or thin shells of

mortar likely to cause a spall with movement at a joint from all expansion joints as soon as

possible.

400-10.2Sealed Joints: Fill expansion joints with a preformed joint filler. Cut the filler

to conform to the cross-section of the structure, and furnish it in as few pieces as practicable,

using only a single piece in each curb section. Do not use small pieces that would tend to come

loose. Prepare joints to be sealed and apply the sealer in accordance with approved

manufacturer’s directions.

400-10.3Joint System Installation: Install expansion joints before or after the deck

planing required by 400-15.2.5.5 following the manufacturer’s instructions. When installed after

deck planing, install the edge rail assemblies in the blockouts on a profile tangent between the

ends of the deck and/or approach slab to within a plus 0 and minus1/4 inch variation.

When installed before deck planing, install the edge rail assemblies 3/8 inch, plus

or minus 1/16 inch, below the top surface of the deck or approach slab to compensate for

concrete removal during planing.

400-11Contact and Bearing Surfaces

400-11.1Separation of Surfaces: In general, separate all contact surfaces between

superstructure and substructure or end walls and between adjacent superstructure sections by a

layer of ASTM D6380 ClassS, Type III organic felt. When an organic felt bond breaker is

specified for other structures, use either one layer of ASTM D6380 ClassS, Type III or two

layers of ASTM D226 Type II organic felt.

400-11.2Finishing of Bearing Surfaces: Construct bearings surfaces (areas) to the

tolerances as specified herein and in the other parts of the Contract Documents. When using

neoprene bearing pads, finish the concrete surface to a uniform ‘rough’ texture using a burlap

drag, fine bristle broom or float. For metal or high load rotational bearings, fill minor

depressions, 1/8 inch maximum, caused by finishing, bush hammering, or grinding with a low-

viscosity epoxy meeting the requirements of 926-1, Type F-2, applied by the use of a squeegee.

Bearing surfaces may be ground to final position with carborundum. Check all bearing surfaces

with a metallic straightedge prior to setting bearings or neoprene pads.

400-11.2.1 Deviation from Specified Elevations for Steel Beam

Superstructures: Construct to the elevation shown on the Plans plus or minus 0.01 feet and do

not exceed a 0.01 feet difference between specified elevations of bearing areas of adjacent

bearings measured between the centerlines of bearing areas.

400-11.2.2 Deviation from Specified Elevations for Concrete Beam

Superstructures: Construct to the elevation shown on the Plans plus or minus 0.02 feet.

400-11.2.3 Projecting Irregularities: Projecting irregularities will not exceed

1/16 inch.

400-11.2.4 Variations in Flatness for Neoprene Pads: In any direction, the pad

is to be flat to within 1/16 inch. Pads designated to be sloped are not to deviate from the

theoretical slope by the same amount. 402FY 2023-24Return to Table of Contents

400-11.2.5 Variations in Flatness for Metal or High Load Rotational

Bearings: Construct the bearing area to the tolerance indicated for the measured length along the

orthogonal axes.

Bearing area length up to 30 inches long to plus or minus 1/16 inch.

Bearing area length over 30 inches up to 45 inches long to plus or minus

3/32 inch.

Bearing area length over 45 inches long to plus or minus 1/8 inch.

400-11.3Bearing Pads: Use bearing pads for seating bridge shoes, ends of beams, and

slabs of the types specified or required in the Plans.

Furnish and install neoprene pads as detailed in the Plans. Place neoprene pads,

where specified or required, directly on concrete surfaces finished in accordance with the

requirements of this Article. Ensure that pads, bearing areas of bridge seats, and metal bearing

plates are thoroughly cleaned and free from oil, grease, and other foreign materials.

Exercise care in fabrication of related metal parts to avoid producing conditions

detrimental to the performance of the pads, such as uneven bearing, excessive bulging, etc.

The Engineer will evaluate the degree of deformation and condition of bearing

pads in the completed bridge on or before the final inspection required by 5-10 or when

requested by the Contractor. As directed by the Engineer, correct horizontal bearing pad

deformations that at the time of inspection exceed 50% of the bearing pad thickness or that the

Engineer predicts will exceed 50% of the bearing pad thickness during future high or low

temperature periods. Payment for this correction effort will be considered extra work in

accordance with 4-3.

400-12Anchor Bolts and Dowels

Set anchor bolts and dowels as specified in Section 460.

Galvanize all anchor bolts as specified in Section 962.

400-13Epoxy Bonding Compounds

Where epoxy bonding compounds for bonding concrete are specified or required, apply

the epoxy bonding materials only to clean, dry, structurally sound concrete surfaces. Provide

surface preparation, application, and curing of epoxy bonding compound in strict accordance

with the manufacturer’s recommendations for each particular application.

400-14Removal of Forms

Use the table below as the criterion for minimum time or compressive strength required

before removal of forms or supports.

When using the time period criterion, include in the time period all days except days in

which the temperature falls below 40ºF.

Use the specified 28-day minimum compressive strength value as stated in 346-3.1 for

each Class of Concrete utilized.

Table 400-2

Location of Concrete Placement

Minimum Time for Form

Removal for any Strength

Concrete*

Minimum (%) of 28-day

Compressive Strength for

Form Removal

(1)Deck slabs, top slabs of culverts and bottom of caps, forms under sidewalks, and safety curb

overhangs extending more than 2 feet 403FY 2023-24Return to Table of Contents

Table 400-2

Location of Concrete Placement

Minimum Time for Form

Removal for any Strength

Concrete*

Minimum (%) of 28-day

Compressive Strength for

Form Removal

(a)Class II Bridge Deck 7 days** 75**
(b)Class II (Other than Bridge Deck) 7 days 75
(c)Class III 7 days 70
(d)Class IV 7 days 60
(e)Class V 7 days 50
(2)Walls, piers, columns, sides of beams

and other vertical surfaces 24 hours*** 50***

(3)Front face form of curbs 6 hours 70

* For mass concrete, remove forms in accordance with Section346.

** Reference 400-16.4

***Do not place additional load on the section until 70% of the specified 28-day concrete strength is attained. Also, refer to

400-7.4.

When using the percent of required strength, cast test cylinders for each mix for

compressive strength determination, develop a curing concrete strength versus time curve (S/T

Curve) or a strength-maturity curve. Either curve may be used in lieu of multiple test cylinders to

determine when the percent of required strength has been met.

Prior to use, obtain the Engineer’s approval of the S/T Curve and its supporting data. An

approved testing laboratory may be used to provide this information with approval of the

Engineer. PlotS/T Curves using at least three different elapsed times that begin once test

cylinders are cast; however, one of the elapsed times must be prior to the Contractor’s intended

form removal. Each elapsed time plotted must have a corresponding compressive strength

computed by averaging the compressive strength of two test cylinders.

Cure such test cylinders as nearly as practical in the same manner as the concrete in the

corresponding structural component, and test them in accordance with ASTM C39 and

ASTM C31. Perform cylinder casting, curing, and testing at no expense to the Department and

under the observation of the Engineer. When the S/T Curve indicates a compressive strength

equal to or greater than the percentage of specified strength shown in the table above for form

removal, the Contractor may remove the forms. When the ambient air temperature falls 15ºF or

more below the ambient air temperature that existed during development of a S/T Curve, use a

S/T Curve that corresponds to the lower temperature and that is developed in accordance with

this section.

Prior to using the strength-maturity method, obtain the Engineer’s approval of the

strength-maturity curve and its supporting data. Estimate the strength development of concrete

using the strength-maturity method in accordance with ASTM C1074. An approved testing

laboratory may be used to provide this information with approval of the Engineer. Develop the

strength-maturity curves at no expense to the Department.

Do not remove forms at any time without the consent of the Engineer. Even when the

Engineer provides consent to remove the forms, the Contractor is responsible for the work.

400-15Finishing Concrete

400-15.1General Surface Finish (Required for All Surfaces): After placing and

consolidating the concrete, strike-off all exposed surfaces to the lines and grades indicated in the 404FY 2023-24Return to Table of Contents

Plans in a manner that will leave a surface of uniform texture free of undesirable surface

irregularities, cavities, and other defects. Cut back metal ties supporting reinforcement, conduit,

and other appurtenances a minimum of 1 inch from finished surface. After removing excess

mortar and concrete and while the concrete is still in a workable state, carefully tool all

construction and expansion joints. Leave joint filler exposed for its full length with clean edges.

Ensure that finished work in addition to that specified above is compatible and complementary to

the class of surface finish required.

Remove all laitance, loose material, form oil and curing compound from exposed

surfaces that do not require forming and from exposed surfaces requiring forming, after form

removal. Remove fins and irregular projections flush with the surface. Clean, saturate with

water, and fill all holes, tie cavities, honeycomb, chips and spalls. Prior to filling, prepare the

surface to ensure that patching mortar will bond to the existing concrete. Exercise care during the

roughening process to prevent excessive defacement and damage to the surface of the existing

concrete. Use patching mortar blended from the mix ingredients of the existing concrete. Ensure

the patching mortar closely matches the color of the existing concrete when fully cured. As an

alternative, mortar consisting of the following materials may be used: 4 parts of ordinary gray

portland cement, 1/2 part of white portland cement, 1 part of fly ash and 2 to 4 parts of sand. The

blended mortar must closely match the color of the filled element once fully cured and the

proportion of white portland cement may be adjusted to achieve as close a match as possible.

Regardless of the type patching mortar used, provide a mortar surface closely resembling the

existing surface.

Cure the newly placed mortar using a curing blanket or a Type I clear curing

compound at a uniform coverage as recommended by the manufacturer, but not less than

0.06 gallon per square yard.

In the event unsatisfactory surfaces are obtained, repair these surfaces by methods

approved by the Engineer or the affected concrete will be rejected. Repair any surface or remove

rejected concrete at no expense to the Department.

400-15.2Surface Finishes:

400-15.2.1 General: In addition to the general surface work specified for all

exposed concrete surfaces, the Engineer may require one of the classes of surface finish listed

below. For all such exposed surfaces, begin finish work for the applicable class specified, along

with the general finish work, immediately after removal of the forms. In order to further ensure

the required quality of the finish, remove forms no later than the minimum time specified for the

forms to remain in place. Satisfactorily repair finished concrete surfaces which are subsequently

disfigured or discolored at no expense to the Department.

Provide the required class of surface finish for the various items of

structural concrete as shown in the Plans.

400-15.2.2 Class 1 Surface Finish: As soon as the pointing has sufficiently set,

thoroughly saturate the exposed surfaces with water, and rub them with a medium coarse

carborundum stone. Continue rubbing until the surface has been ground to a paste and remove all

form marks, irregularities, and projections. In this process, do not introduce any additive material

other than water. After the rubbing has produced a smooth surface of uniform color, allow the

material which has been ground to a paste to reset under proper curing conditions. Subsequently,

as a second operation, re-saturate the concrete surfaces with water, and thoroughly rub them with

a fine carborundum stone. Continue this rubbing until the surface has a smooth, fine grain texture

of uniform color. 405FY 2023-24Return to Table of Contents

The Contractor may substitute a Class 5 applied finish coating in

accordance with 400-15.2.6 as an alternate surface finish on all areas where Class 1 surface

finish is specified.

400-15.2.3 Class 2 Surface Finish: As soon as pointing has sufficiently set,

thoroughly saturate the exposed concrete surfaces with water and rub them with a medium coarse

carborundum stone. Continue rubbing until the surface has been ground to a paste and remove all

form marks, irregularities, and projections. In this process, do not introduce any additive material

other than water.

After rubbing has produced a smooth surface finish, of uniform color,

carefully brush the material which has been ground to a paste to a uniform texture, and allow it

to reset under proper curing conditions. Carefully protect these surfaces from disfigurement and

discoloration during subsequent construction operations.

400-15.2.4 Class 3 Surface Finish: Where this surface finish is specified, use

forms with a form liner. Where specified or required on the Plans, use No. 89 coarse aggregate

for concrete.

After concrete has been placed in the forms and compacted, finish all

exposed surfaces which are not contained by the forms to produce a surface texture as nearly

equal to that produced by the form as practicable. Generally, finish unformed surfaces to a

smooth, dense surface with a steel trowel.

Perform all work, including general surface finish work, in a manner that

will preserve the same surface texture and color produced by the form liner. Pointed areas may

be rubbed with a dry carborundum stone.

400-15.2.5 Class 4 Deck Finish:

400-15.2.5.1 General: Apply a Class 4 finish on bridge decks and

concrete approach slabs. On Short Bridges (bridges having a length less than or equal to

100 feet), and on Miscellaneous Bridges (Pedestrian, Trail and Movable Spans) regardless of

length, meet the finish and smoothness requirements of 400-15.2.5.2 and 400-15.2.5.4. On Long

Bridges (bridges having a length greater than 100 feet) meet the finish and smoothness

requirements of 400-15.2.5.3 and 400-15.2.5.5. When an existing bridge deck is widened, see the

Plans for the finish and smoothness requirements of the existing bridge deck and its new

widened section. After meeting the screeding requirements of 400-7.13 and curing requirements

of 400-16 and the smoothness requirements, herein, groove the bridge deck and approach slabs.

Regardless of bridge length, finish decks with less than

2 1/2 inches of top cover in accordance with the requirements for Short Bridges.

400-15.2.5.2 Plastic Surface Finish for Short and Miscellaneous

Bridges: After screeding is completed, check the surface of the plastic concrete with a 10 foot

straightedge, positioning and half-lapping the straightedge parallel to the centerline to cover the

entire surface. Immediately correct deficiencies of more than 1/8 inch, measured as an ordinate

between the surface and the straightedge.

Finish the concrete surface to a uniform texture using a burlap

drag, fine bristle broom or float. Finish the deck to a smooth surface having a sandy texture

without blemishes, marks or scratches deeper than 1/16 inch.

400-15.2.5.3 Plastic Surface Finish for Long Bridges: Do not moisten,

manually float or apply texture to the concrete surface after the screed, with attached smoothing

device, has passed unless correction of isolated surface irregularities is warranted and this should 406FY 2023-24Return to Table of Contents

be done as soon as possible after screeding while the concrete is plastic. Correct all flaws such as

cavities, blemishes, marks, or scratches that will not be removed by planing.

If the Engineer permits the addition of water when correcting

flaws, apply moisture to the concrete surface only if required and only in the immediate vicinity

of the isolated irregularity. Apply a quantity of moisture not greater than what is needed to

facilitate correction of the irregularity and apply only a fog mist, above the concrete surface, by

power driven spray equipment approved by the Engineer.

400-15.2.5.4 Smoothness Requirements for Short Bridges and

Miscellaneous Bridges (including approach slabs): Perform a final straightedge check with a

10 foot straightedge, positioning and half-lapping the straightedge parallel to the centerline,

approximately 5 feet apart to cover the entire surface. Correct all irregularities greater than

3/16 inch measured as an ordinate to the straightedge, by grinding. Perform grinding by the

abrasive method using hand or power tools or by machine, to leave a smooth surface within a

1/8 inch tolerance.

400-15.2.5.5 Smoothness Evaluation and Concrete Surface Planing,

Long Bridges (including approach slabs): Prior to planing, provide a smoothness evaluation of

the completed bridge deck and exposed concrete surfaces of approach slabs by a computerized

Cox California-type profilograph in accordance with the criteria herein and FM 5-558E. Furnish

this evaluation through an independent provider approved by the Engineer, using equipment

calibrated by the Engineer. All bridge deck and concrete approach slab surfaces to within 2 feet

of gutter lines are subject to this smoothness evaluation.

Prior to initial profilograph testing, complete work on the bridge

deck and approach slabs. Thoroughly clean and clear the bridge deck and approach slab areas to

be evaluated for smoothness of all obstructions and provide the smoothness evaluation. Ensure

that no radio transmissions or other activities that might disrupt the automated profilograph

equipment are allowed during the evaluation.

Average the Profile Index Value for the bridge deck, including the

exposed concrete surfaces of the approach slabs, for the left and right wheel path of each lane.

The maximum allowable Profile Index Value for acceptable smoothness is 10 inches per mile

utilizing the 0.2 inch blanking band. Apply these criteria to a minimum of 100 feet of each lane.

Additionally, correct individual bumps or depressions exceeding a cutoff height of 0.3 inch from

a chord of 25 feet (see ASTM E1274) on the profilograph trace. Ensure that the surface meets a

1/4 inch in 10 feet straightedge check made transversely across the deck and approach slabs if

determined necessary by the Engineer. Provide additional profilograph testing as necessary

following longitudinal planing and any other actions taken to improve smoothness, until a profile

meeting the acceptance criteria is obtained.

Regardless of whether expansion joints are installed before or after

deck planing is complete, plane off the concrete deck surface to a minimum depth of 1/4 inch

and also meet or exceed the profilograph smoothness criteria. Longitudinally plane the entire

bridge deck and exposed concrete surfaces of the approach slabs using a self-propelled planing

machine with gang mounted diamond saw cutting blades specifically designed for such work.

Use the profilograph generated smoothness data, to establish the optimum planing machine

settings. Plane the deck surface to within 2 feet of the gutter line so that there is a smooth

transition, without vertical faces or sudden surface discontinuities, from the fully planed surface

to the unplaned surface. Use a machine with a minimum wheel base length of 15 feet,

constructed and operated in such manner that it does not cause strain or damage to deck or 407FY 2023-24Return to Table of Contents

approach slab surfaces, excessive ravels, aggregate fractures or spalling. The equipment shall be

approved by the Engineer. Perform longitudinal planing parallel to the roadway centerline, and

provide a consistent, textured surface. Clean the surface of all slurry/debris generated during this

work concurrently with operation of the machine.

After the deck has been planed the minimum 1/4 inch, reevaluate

the surface smoothness using the profilograph testing described above. Perform cycles of planing

and profilograph retesting as necessary until the deck and exposed concrete surfaces of approach

slabs are in compliance with the smoothness criteria but do not exceed the maximum concrete

removal depth of 1/2 inch.

400-15.2.5.6 Grooving: After the concrete surface profile, as required by

400-15.2.5, has been accepted by the Engineer, and prior to opening the bridge to traffic, groove

the bridge deck and approach slabs perpendicular to the centerline of the structure. Do not

groove the deck surface of pedestrian or trail bridges unless otherwise shown in the Contract

Documents. Cut grooves into the hardened concrete using a mechanical saw device which will

leave grooves nominally 1/8 inch wide and 3/16 inch deep. Space the grooves apart in random

spacing center of grooves in the following sequence: 3/4 inch, 1-1/8 inch, 5/8 inch, 1 inch,

5/8 inch, 1-1/8 inch, 3/4 inch in 6 inch repetitions across the width to be grooved in one pass of

the mechanical saw device. One 6 inch sequence may be adjusted by 1/4 sequence increments to

accommodate various cutting head widths provided the general pattern is carried out. The

tolerance for the width of the grooves is plus 1/16 inch to minus 0 inch and the tolerance for the

depth of grooves is plus or minus1/16 inch. The tolerance for the spacing of the grooves is plus

or minus1/16 inch.

Cut grooves continuously across the deck or approach slab to

within 18 inches of gutter lines at traffic railing, curb line and median divider. At skewed metal

expansion joints in bridge deck surfaces, adjust groove cutting by using narrow width cutting

heads so that all grooves of the bridge deck surface or approach slab surface end within 6 inches,

measured normal to centerline of the joint, leaving no ungrooved surface adjacent to each side of

the joint greater than 6 inches in width. Ensure that the minimum distance to the first groove,

measured normal from the edge of the concrete joint or from the junction between the concrete

and the metal leg of the armored joint angle, is 1 inch. Produce grooves that are continuous

across construction joints or other joints in the concrete surface less than 1/2 inch wide. Apply

the same procedure described above where the gutter lines at traffic railing, curb lines and

median dividers are not parallel to the centerline of the bridge to maintain the 18 inches

maximum dimension from the grooves to the gutter line. Cut grooves continuously across

formed concrete joints.

400-15.2.6 Class 5 Applied Finish Coating:

400-15.2.6.1 General: Place an applied finish coating upon all concrete

surfaces where the Plans indicate Class 5 applied finish coating. Apply the finish coating after

completion of the general surface work specified for all exposed concrete surfaces.

400-15.2.6.2 Material: For the coating material, use a commercial

product designed specifically for this purpose. Use only coating material that is manufactured by

one manufacturer and delivered to the job site in sealed containers bearing the manufacturer’s

original labels. Submit the manufacturer’s written instructions to the Engineer.

400-15.2.6.3 Surface Preparation: Prepare the surface prior to the

application of an applied finish coating by providing a surface finish in accordance with the

requirements of 400-15.1. The Engineer will not require surface voids that are 1/4 inch or less in 408FY 2023-24Return to Table of Contents

width and depth to be grouted prior to application of the finish coating. Fill surface void larger

than 1/4 inch in width and depth an approved high strength, non metallic, non shrink grout

meeting the requirements of Section 934, mixed and applied in accordance with the

manufacturer’s recommendations. Apply the grout by filling the surface voids using burlap pads,

float sponges, or other acceptable methods. As soon as the grout has taken its initial set, brush

the surface to remove all loose grout, leaving the surface smooth and free of any voids. Ensure

that the surface to be coated is free from efflorescence, flaking coatings, curing compound, dirt,

oil, and other substances deleterious to the applied finish coating. Prior to application of the

finish coating onto precast or cast-in-place concrete surfaces, test the concrete surface at 30 foot

intervals for the presence of curing compound using one or two drops of muriatic acid placed on

the concrete surface. If curing compound is present, there will be no reaction between the acid

and the concrete. If there is no reaction, remove the compound by pressure washing the concrete

surfaces. Prepare the surfaces in accordance with the manufacturer’s recommendations, and

ensure that they are in a condition consistent with the manufacturer’s requirements. Clean

surfaces of existing structures in accordance with 400-19.

400-15.2.6.4 Application: Apply the finish coating utilizing a method

recommended by the manufacturer. When applying the finish coating by spraying, supply heavy

duty spray equipment capable of maintaining a constant pressure necessary for proper

application. Mix and cure all coating materials in accordance with the manufacturer’s written

instructions. Apply the finished coating at a rate of 50, plus or minus 10 square feet per gallon.

400-15.2.6.5 Finished Product: Produce a texture of the completed finish

coat that is generally similar to that of rubbed concrete. Ensure that the completed finished

coating is tightly bonded to the structure and presents a uniform appearance and texture. If

necessary, apply additional coats to produce the desired surface texture and uniformity.

Upon failure to adhere positively to the structure without chipping,

flaking, or peeling, or to attain the desired surface appearance, remove coatings entirely from the

structure, and reapply the finish coating after surface preparation until achieving the desired

finished product. Do not allow the average thickness of the completed finish coating to exceed

1/8 inch.

400-15.2.6.6 Material Tests and Certification: Before any portion of any

shipment of finish coating is applied on the project, submit to the Engineer a certificate from the

manufacturer attesting that the commercial product furnished conforms to the same formula as

that previously subjected to the tests specified in Section 975. In addition, submit the following

product analysis, obtained from the manufacturer, for each batch of the material used:

1.Weight per gallon.
2.Consistency (Krebs Units).
3.Weight percent pigment.
4.Weight percent vehicle solids.
5.Infra-red spectra of vehicle solution.

400-15.2.7 Final Straightedging for Surfaces to Receive Asphalt Concrete

Surface: Test the slab surfaces of poured-in-place decks which are to be surfaced with an asphalt

concrete wearing course for trueness with a 10 foot straightedge, as specified above. As an

exception, correct only irregularities of more than 1/4 inch measured as an ordinate (either above

or below the general contour of the surface). The Engineer will not require belting or brooming

of slabs that are to be surfaced with an asphalt concrete wearing course. For curing, meet the

requirements specified for other deck slabs. 409FY 2023-24Return to Table of Contents

400-15.2.8 Finishing Bridge Sidewalks: Finish bridge sidewalks in accordance

with the applicable requirements of Section 522.

400-16Curing Concrete

400-16.1Internal curing: At the Contractor’s option use internal curing in

combination with one or more of the external curing methods listed in this Section. Use

lightweight fine aggregates from Department-approved sources meeting the requirements of

ASTM C1761.

400-16.2External curing: Cure cast-in-place and precast (non-prestressed)

concrete as required herein for a minimum duration of 72 hours. If forms are loosened or

removed before the 72 hour curing period is complete, expand the curing to cover these surfaces

by either coating with curing compound or extending the continuous moist cure area.

Until curing has begun, retain concrete surface moisture at all times by

maintaining a surface moisture evaporation rate less than 0.1 pound per square foot per hour.

Periodically, at the site of concrete placement prior to and during the operation, measure the

ambient air temperature, relative humidity and wind velocity with industrial grade weather

monitoring instruments to determine the on-site evaporation rate. If the evaporation is, or is

likely to become 0.1 pound per square foot per hour or greater, employ measures to prevent

moisture loss such as application of evaporation retarder, application of supplemental moisture

by fogging or reduction of the concrete temperature during batching. Compute the evaporation

rate by using the nomograph in the ACI manual of Concrete Practice Part 2, Section 308R Guide

to Curing Concrete, or by using an evaporation rate calculator approved by the Engineer.

400-16.2.1 Methods: Except where other curing methods are specified, select

from the following options the chosen method(s) for curing all concrete components.

1.Continuous Moisture: Place burlap on the surface and keep it

continuously saturated for the curing period by means of soaker hoses or automatic sprinklers.

Water flow may be metered to cycle repetitively for five minutes on and five minutes off during

the 72 hour curing period. Do not apply moisture manually. If side forms are loosened or

removed during the curing period, extend the burlap so as to completely shield the sides of the

members.

2.Membrane Curing Compound: Apply a white Type 2 curing compound

to all surfaces at a uniform coverage as recommended by the manufacturer but not less than

0.06 gallon per square yard. Allow surfaces covered by the membrane curing compound to

remain undisturbed for the curing period. Recoat any cracks, checks or other defects in the

membrane seal which are detected during the curing period within one hour. If side forms are

loosened during the curing period, maintain surface moisture and remove the forms within one

hour and immediately coat the formed surfaces with a membrane curing compound. Bottom

surfaces shall be similarly coated after removal of or from the forms.

If curing compound is to be applied by spraying, use a compressor

driven sprayer of sufficient size to provide uniform mist. Standby equipment is required in case

of mechanical failure and hand held pump-up sprayers may be used only as standby equipment.

3.Curing Blankets: Curing blankets may be used for curing the top

surfaces of members while the member side forms remain in place. Do not use curing blankets

which have been torn or punctured. Securely fasten all edges to provide as tight a seal as

practical. Should the system fail to maintain a moist condition on the concrete surface,

discontinue use of the blankets and continue curing using another method. Keep curing blankets

in place for the duration of the curing period. 410FY 2023-24Return to Table of Contents

4.Accelerated Cure:
a.General: Accelerated curing of the concrete can be achieved by

use of either low pressure steam curing, radiant heat curing or continuous moisture and heat

curing. If accelerated curing is completed before the 72 hour curing period has elapsed, continue

curing for the remaining part of the 72 hour curing period in accordance with one of the curing

methods listed above.

If accelerated curing is used, furnish temperature recording

devices that will provide accurate, continuous and permanent records of the time and temperature

relationship throughout the entire curing period. Provide one such recording thermometer for

each 200 feet of placement length or part thereof. Initially calibrate recording thermometers and

recalibrate at least annually.

The preheating period shall equal or exceed the time of

initial set as determined by ASTM C403 and shall not be less than 4 hours. When the ambient air

temperature is above 50ºF, allow the member to remain undisturbed in the ambient air for the

preheating period. If the ambient air temperature is below 50ºF, apply heat during the preheating

period to hold the air surrounding the member at a temperature of 50 to 90ºF.

To prevent moisture loss from exposed surfaces during the

preheating period, enclose members as soon as possible after casting or keep the surfaces wet by

fog mist or wet blankets. Use enclosures for heat curing that allow free circulation of heat about

the member with a minimum moisture loss. The use of tarpaulins or similar flexible covers may

be used provided they are kept in good repair and secured in such a manner to prevent the loss of

heat and moisture. Use enclosures that cover the entire placement.

During the application or removal of the heat, do not allow

the temperature rise or fall within the enclosure to exceed 40ºF per hour. Do not allow the curing

temperature throughout the enclosure to exceed 160ºF. Maintain the curing temperature within a

temperature range of 130 to 160ºF until the concrete has reached the required form removal

strength for precast and cast-in-place components or the required release strength for prestressed

concrete components.

b.Low-Pressure Steam: The steam used shall be in a saturated

condition. Do not allow steam jets to impinge directly on the concrete, test cylinders, or forms.

Cover control cylinders to prevent moisture loss and place them in a location where the

temperature is representative of the average temperature of the enclosure.

c.Curing with Radiant Heat: Apply radiant heat by means of pipes

circulating steam, hot oil or hot water, or by electric heating elements. Do not allow the heating

elements to come in direct contact with the concrete or the forms. Distribute sources of heat in a

manner that will prevent localized high temperatures above 160ºF. To prevent moisture loss

during curing, keep the exposed surfaces wet by fog mist or wet blankets.

d.Continuous Moisture and Heat: This method consists of heating

the enclosure in combination with the continuous moisture method described above.

In addition to the curing blankets, an auxiliary cover for

retention of the heat will be required over the entire placement. Support this cover at a sufficient

distance above the placement being cured to allow circulation of the heat.

400-16.3Silica Fume Concrete: Cure silica fume concrete a minimum of 72 hours using

continuous moisture cure. No substitution of alternative methods nor reduction in the time period

is allowed. After completion of the 72 hour curing period, apply a membrane curing compound

to all concrete surfaces. Apply curing compound according to 400-16.2. 411FY 2023-24Return to Table of Contents

400-16.4Bridge Decks and Approach Slabs: Cure bridge decks and approach slabs for

a duration of seven days. Apply a membrane curing compound to the top surface in accordance

with 400-16.2 using a compressor driven sprayer. In general, apply curing compound when the

surface is damp and after all pooled water has evaporated. For Short bridges, begin applying

curing compound immediately after the initially placed concrete has been floated, straightedged,

textured and a damp surface condition exists and continue applying compound as concrete

placement progresses with as little interruption as possible until the entire top surface has been

coated with compound. For Long bridges, begin applying curing compound to the initially

placed concrete as soon as a damp surface condition exists and continue applying compound as

concrete placement progresses with as little interruption as possible until the entire top surface

has been coated with compound. For all bridges, the elapsed time between the initial placement

of deck or approach slab concrete and the completed application of curing compound must not

exceed 120 minutes. The 120 minute limit may be extended by the Engineer if project specific

factors (cool temperatures, high humidity, retarding admixtures, etc.) prolong wet surface

conditions.

Prior to the first deck or approach slab placement, submit to the Engineer the

method that will be used to periodically measure the rate of application of curing compound in,

gallons per square foot as the concrete placement progresses. Prior to the placement of each deck

or approach slab, submit to the Engineer the anticipated quantity of curing compound in gallons

along with the corresponding square feet of concrete to be covered to meet the coverage rate in

400-16.2. Compute the actual quantity of curing compound applied at the conclusion of each

concrete placement and submit the quantity to the Engineer. Apply the curing compound from a

work platform.

Place curing blankets on all exposed surfaces which are not formed as soon as

possible with minimal effect on the surface texture. Place the curing blankets with sufficient

overlapping seams to form an effective moisture seal. Before using curing blankets, mend tears,

splits, or other damage that would make them unsuitable. Discard curing blankets that are not

repairable. Wet all curing blankets immediately after satisfactorily placing them and maintain

them in a saturated condition throughout the seven-day curing period. Supply sufficient quantity

of water meeting the requirements of Section 923 at the job site for wetting the blankets.

Where a bridge deck or approach slab is to be subjected to walking, wheeling or

other approved construction traffic within the seven-day curing period, protect the curing

blankets and the concrete surface from damage by placing wooden sheeting, plywood or other

approved protective material in the travel areas.

When the ends of the curing blankets are rolled back to permit screeding of

adjacent concrete, keep the exposed surfaces wet throughout the period of exposure.

Bridge deck bottom and side forms may be removed after 72 hours upon

compliance with 400-14. Approach slab side forms may be removed after 72 hours. Apply

membrane curing compound to all surfaces stripped of forms within one hour of loosening.

Apply curing compound according to 400-16.2.

400-16.5Construction Joints: Cure construction joint areas using either the continuous

moisture or curing blankets method.

400-16.6Concrete Barriers, Traffic Railings, Parapets and End Post: Ensure

concrete is cured in accordance with 400-16.2(2), except that a clear Type 1-D curing compound

that must contain a fugitive dye may be used in lieu of Type 2. If Type 1-D is used, its removal

per 400-15.1 during finishing is not required. When construction is by the slip form method, coat 412FY 2023-24Return to Table of Contents

all concrete surfaces with a curing compound that meets the requirements of 925-2, either within

30 minutes of extrusion or before the loss of water sheen, whichever occurs first. Ensure a curing

compound coating period of not less than seven days after application. Prior to each concrete

placement, submit to the Engineer the method that will be used to periodically measure the rate

of application in gallons per square foot. Also, prior to each placement, submit to the Engineer

the anticipated quantity of curing compound in gallons that will be used to meet the coverage

rate specified in 400-16.2 along with the corresponding square footage of concrete barriers,

traffic railings, parapets and end posts to be coated with that quantity. Measure the actual

quantity of curing compound that is applied during each concrete placement and submit the

quantity to the Engineer. Applied finish coatings that are flagged as permitted for use as a curing

compound, may be used in lieu of a curing compound. If an applied finish coating is used in lieu

of a curing compound, have a backup system that is in full compliance with 400-16.2(2)

available at all times to ensure that an effective alternative system will be immediately available

if the applied finish coating cannot be applied within 30 minutes of extrusion or before the loss

of water sheen.

400-16.7Removal of Membrane Curing Compounds: Provide the longest possible

curing duration; however, remove curing compound on portions of members to be bonded to

other concrete. Compounds may be removed by either sand or water blasting. Water blasting

requires the use of water meeting the requirements of Section 923 and a minimum nozzle

pressure of 2,900 psi.

400-17Protection of Concrete

400-17.1Opening to Traffic: Do not open concrete bridge decks, approach slabs, or

culverts to traffic for at least 14 days after concrete placement. During placement operations,

concrete may be wheeled across previously placed slabs after they have set for 24 hours and

plank runways are used to keep the loads over the beams.

400-17.2Storing Materials on Bridge Slabs: Do not store heavy equipment or material,

other than light forms or tools, on concrete bridge slabs or approach slabs until 14 days after they

have been placed. Obtain approval from the Engineer prior to storing materials, tools or

equipment on bridge decks at any time. Disperse any such loads to avoid overloading the

structure.

400-17.3Time of Placing Superstructure: Do not place the weight of the superstructure

or beams on concrete substructure elements for at least 10 days after placement.

400-17.4Alternate Procedure: As an alternative to the time delay periods set forth in

and 400-17.3, test cylinders may be prepared and tested by the Contractor in

accordance with 346-5 and a determination made using one of the following methods:

1.When the cylinder test results indicate the minimum 28 day compressive

strength shown in the Plans, concrete bridge decks, approach slabs, and culverts may be opened

to traffic or the superstructure and beams may be placed on caps.

2.Submit signed and sealed calculations, prepared by a Specialty Engineer,

demonstrating that the concrete caps can safely support the weight of the girders for the current

concrete strength to the Engineer for approval.

In any event, comply with the curing provisions of 400-16.

400-18Precast Planks, Slabs, and Girders

400-18.1General: Where so shown in the Contract Documents, the Contractor may

construct concrete planks, slabs, girders, and other structural elements by precasting. In general, 413FY 2023-24Return to Table of Contents

use a method that consists of casting structural elements in a casting yard, curing as specified in

400-16, transporting them to the site of the work, installing them on previously prepared supports

and, where so shown in the Plans, joining them with poured-in-place slabs or keys. Handle and

install precast prestressed members as specified in Section 450.

400-18.2Casting: Cast precast elements on unyielding beds or pallets. Use special care

in casting the bearing surfaces on both the elements and their foundations in order that these

surfaces shall coincide when installing the elements. Check bearing surfaces on casting beds with

a level and a straightedge prior to the casting. Similarly check corresponding surfaces on the

foundations during finishing operations.

400-18.3Poured-in-Place Keys: Where precast elements are to be joined with poured-

in-place keys, carefully align the elements prior to pouring the keys.

400-18.4Surface Finish: Finish the surface as specified in 400 15, except that where

precast slabs and poured-in-place keys form the riding surface, give the entire surface a broomed

finish.

400-18.5Moving, Placing, and Opening to Traffic: Reinforced precast members may

be moved from casting beds, placed in the structure, and opened to traffic at the ages shown in

the following table:

Handling from casting beds to storage areas .............. 7 days

Placing in structure ................................................... 14 days

Opening to traffic:

Precast elements ........................................................ 14 days

Cast-in-place slabs over precast girders .................... 14 days

Cast-in-place keys joining precast slabs ..................... 7 days

As an alternate procedure, in lieu of the time delay periods set forth above, test

beams may be cast from representative concrete, and cure them identically with the concrete in

the corresponding structural component. Test the test beams in accordance with ASTM C31 and

ASTM C78. When the test results indicate a flexural strength of 550 psi, or more, any of the

operations listed above may proceed without completing the corresponding time delay period.

400-18.6Setting Prestressed Slabs: Before permitting construction equipment on the

bridge to erect slab units, submit sketches showing axle loads and spacing and a description of

the intended method of setting slab units to the Engineer for approval. Do not use axle loads,

spacing, and methods of setting which produce stresses in the slab units greater than the

allowable stress.

400-18.7Protection of Precast Elements: The Contractor is responsible for the safety of

precast elements during all stages of construction. The Engineer will reject any precast elements

that become cracked, broken, seriously spalled, or structurally impaired. Remove rejected precast

elements from the work at no expense to the Department.

400-18.8Form Material: Form material used to form hollow cores may be left in place

Ensure that the form material is neutral with respect to the generating of products harmful to the

physical and structural properties of the concrete. The Contractor is responsible for any

detrimental effects resulting from the presence of the form material within the precast element.

400-19Cleaning and Coating Concrete Surfaces of Existing Structures

For the purposes of this article, an existing structure is one that was in service prior to the

start of the project to which this specification applies. For existing structures, clean concrete

surfaces that are designated in the Contract Documents as receiving Class 5 applied finish

coating by pressure washing prior to the application of coating. Use pressure washing equipment 414FY 2023-24Return to Table of Contents

producing a minimum working pressure of 2,500 psi when measured at or near the nozzle. Do

not damage or gouge uncoated concrete surfaces or previously coated concrete surfaces during

cleaning operations. Remove all previously applied coating that is no longer adhering to the

concrete or that is peeling, flaking or delaminating. Ensure that after the pressure wash cleaning

and the removal of non-adherent coating, that the cleaned surfaces are free of efflorescence,

grime, mold, mildew, oil or any other contaminants that might prevent proper adhesion of the

new coating. After cleaning has been successfully completed, apply Class 5 Applied Finish

Coating in accordance with 400-15.2.6 or as otherwise specified in the Plans.

400-20Approach Slabs

Construct approach slabs at the bridge ends in accordance with the applicable

requirements of Section 350 using Class II (Bridge Deck) concrete. Place the reinforcement as

specified in 350-7 and Section 415.

400-21Disposition of Cracked Concrete

400-21.1General: The disposition of cracked concrete is described in this Article and

applies to all cast-in-place concrete members, and once installed, to the precast and prestressed

concrete members that are produced in accordance with 410, 450, 521, 534, 548 and 641.

400-21.2Investigation, Documentation and Monitoring: The Engineer will inspect

concrete surfaces as soon as surfaces are fully visible after casting, with the exception of surfaces

of precast concrete products produced in offsite plants, between 7 and 31 days after the

component has been burdened with full dead load, and a minimum of 7 days after the bridge has

been opened to full unrestricted traffic. The Engineer will measure the width, length and depth of

each crack and establish the precise location of the crack termination points relative to permanent

reference points on the member. The Engineer will determine if coring of the concrete is

necessary when an accurate measurement of crack depth cannot be determined by use of a

mechanical probe. The Engineer will monitor and document the growth of individual cracks at

an inspection interval determined by the Engineer to determine if cracks are active or dormant

after initial inspection. The Engineer will perform all final bridge deck crack measurements once

the deck is free of all debris and before transverse grooves are cut and after planing is complete

for decks that require planing.

Provide the access, equipment and personnel needed for the Engineer to safely

perform this work at no expense to the Department. Core cracks for use by the Engineer in

locations and to depths specified by the Engineer at no expense to the Department.

400-21.3Classification of Cracks: The Engineer will classify cracks as either

nonstructural or structural. In general, nonstructural cracks are cracks 1/2 inch or less deep from

the surface of the concrete; however, the Engineer may determine that a crack greater than

1/2 inch deep is nonstructural. In general, structural cracks are cracks that extend deeper than

1/2 inch. As an exception, all cracks in concrete bridge decks that are supported by beams or

girders will be classified as nonstructural and repair will be in accordance with 400-21.5.1.

However, if the Engineer determines that repair under 400-21.5.1 is unacceptable, repair in

accordance with 400-21.5.2.

A crack that is fully or partially underwater at any time during its service life will

be classified as a structural crack unless the Environment note on the General Notes sheet in the

Plans categorizes the substructure as slightly aggressive, in which case, the nonstructural crack

criteria may apply as determined by the Engineer. 415FY 2023-24Return to Table of Contents

Review and comment on the Engineer’s crack classification; however, the

Engineer will make the final determination.

400-21.4Nonstructural Cracking Significance: The Engineer will determine the

Cracking Significance. The Cracking Significance will be determined on the basis of total crack

surface area as a percentage of total concrete surface area. Cracking significance will be

categorized as Isolated, Occasional, Moderate or Severe according to the criteria in Tables 400-3

and 400-4. Cracking Significance will be determined on a LOT by LOT basis. A LOT will

typically be made up of not more than 100 square feet and not less than 25 square feet of

concrete surface area for structures other than bridge decks or typically not more than 400 square

feet or not less than 100 square feet for bridge decks. A LOT will not extend beyond a single

Elevation Range as shown in Table 400-3 or 400-4.

Review and comment on the Engineer’s determination of Cracking Significance;

however, the Engineer will make the final determination.

400-21.5Repair Method: Repair or remove and replace cracked concrete as directed by

the Engineer. Additional compensation or time will not be granted for repair or removal and

replacement of cracked concrete when the Engineer determines the cause to be the responsibility

of the Contractor.

400-21.5.1 Nonstructural Cracks: Repair each crack using the method as

determined by the Engineer for each LOT in accordance with Table 400-3 or 400-4. When

further investigation is required to determine repair or rejection, submit an Engineering Analysis

Scope in accordance with 6-4, signed and sealed by a Specialty Engineer, to determine the

strength and durability of the proposed repair. Upon approval of the Engineering Analysis Report

(EAR)and final determination of the Engineer, repair or remove and replace the cracked

concrete in accordance with the EAR.

400-21.5.2 Structural Cracks: Submit an Engineering Analysis Scope in

accordance with 6-4, signed and sealed by the Contractor’s Engineer of Record, to determine the

strength and durability of the proposed repair. Upon approval of the EAR and final determination

of the Engineer, repair or remove and replace the cracked concrete in accordance with the

approved EAR. 416FY 2023-24Return to Table of Contents

Table 400-3

DISPOSITION OF CRACKED CONCRETE OTHER THAN BRIDGE DECKS

[see separate Key of Abbreviations and Footnotes for Tables 400-3 and 400-4]

Elev.

Range

Crack Width

Range (inch)

(2)

x = crack

width

Cracking Significance Range per LOT (1)

Isolated

Less than 0.005%

Occasional

0.005%

to<0.017%

Moderate

0.017%

to<0.029%

Severe

0.029% or gtr.

Environment Category

SA MA EA SA MA EA SA MA EA SA MA EA

Elevation: 0 to 6 ft AMHW

x ≤ 0.004 NT NT PS

(6)

NT PS

(6)

PS

(6)

PS

(6)

PS

(6)

0.004< x ≤

0.008

NT PS

(6)

EI

(3)

PS

(6)

EI

(3)

EI

(3)

PS

(6)

0.008< x ≤

0.012

NT PS

(6)

EI

0.012< x ≤

0.016

PS

(6)

0.016< x ≤

0.020

0.020< x ≤

0.024

0.024< x ≤

0.028

x > 0.028

Elev.: More Than

ft to

ft AMHW

Crack Width SA MA EA SA MA EA SA MA EA SA MA EA

x ≤ 0.004 NT NT PS

(6)

NT PS

(6)

PS

(6)

PS

(6)

PS

(6)

PS

(6)

PS

(6)

0.004< x ≤

0.008

NT PS

(6)

EI

(3)

PS

(6)

PS

(6)

EI

(3)

PS

(6)

EI

(3)

0.008< x ≤

0.012

NT PS

(6)

EI EI EI

0.012< x ≤

0.016

PS

(6)

EI EI EI

0.016< x ≤

0.020

EI

0.020< x ≤

0.024

0.024< x ≤

0.028

x > 0.028

Elev.: Over Land or More Than 12 ft AMHW

Crack Width SA MA EA SA MA EA SA MA EA SA MA EA

x ≤ 0.004 NT NT NT NT PS

(6)

PS

(6)

PS

(6)

PS

(6)

PS

(6)

PS

(6)

0.004< x ≤

0.008

NT PS

(6)

PS

(6)

PS

(6)

PS

(6)

EI

(3)

PS

(6)

EI

(3)

EI

(3)

PS

(6)

Investigate to Determine Appropriate

Repair (4, 5) or Rejection

Reject and Replace

Reject and ReplaceInvestigate to Determine Appropriate

Repair (4, 5) or Rejection 417FY 2023-24Return to Table of Contents

0.008< x ≤

0.012

NT PS

(6)

EI EI EI EI EI EI

0.012< x ≤

0.016

PS

(6)

EI EI EI EI EI

0.016< x ≤

0.020

EI EI EI EI

0.020< x ≤

0.024

EI

0.024< x ≤

0.028

x > 0.028

Investigate to Determine Appropriate

Repair (4, 5) or Rejection

Reject and Replace 418FY 2023-24Return to Table of Contents

Table 400-4

DISPOSITION OF CRACKED CONCRETE BRIDGE DECKS

[see separate Key of Abbreviations and Footnotes for Tables 400-3 and 400-4]

Elev.

Range

Crack Width

Range (inch) (2)

x = crack width

Cracking Significance Range per LOT (1)

Isolated

less than 0.005%

Occasional

0.005%

to<0.017%

Moderate

0.017% to<0.029%

Severe

0.029% or

gtr.

Environment Category

S

A

MA EA SA M

A

EA SA MA EA S

A

M

A

E

A

Elevation: 12 feet or Less

AMHW

x ≤ 0.004 N

T

NT NT NT NT NT NT NT NT

0.004< x ≤

0.008

N

T

NT EI/

M

NT NT EI/M EI/

M

EI/

M

EI/M

0.008< x ≤

0.012

N

T

NT EI/

M

NT EI/

M

EI/M EI/

M

EI/

M

0.012< x ≤

0.016

N

T

NT EI/

M

NT EI/

M

0.016< x ≤

0.020

EI

/M

EI/

M

EI EI

0.020< x ≤

0.024

EI

/M

EI EI

0.024< x ≤

0.028

EI

/M

EI

x > 0.028

Elevation: Over Land or More Than 12 feet AMHW

Crack WidthS

A

MA EA SA M

A

EA SA MA EA S

A

M

A

E

A

x ≤ 0.004 N

T

NT NT NT NT NT NT NT NT

0.004< x ≤

0.008

N

T

NT NT NT NT EI/M NT EI/

M

EI/M

0.008< x ≤

0.012

N

T

NT EI/

M

NT NT EI/M EI/

M

EI/

M

0.012< x ≤

0.016

N

T

NT EI/

M

NT EI/

M

0.016< x ≤

0.020

N

T

EI/

M

EI EI/

M

0.020< x ≤

0.024

N

T

EI/

M

EI

0.024< x ≤

0.028

N

T

EI/

M

x > 0.028

Reject and

Replace

Investigate to Determine

Appropriate Repair (4, 5) or

Rejection

Reject and

Replace

Investigate to Determine

Appropriate Repair (4, 5) or

Rejection 419FY 2023-24Return to Table of Contents

Key of Abbreviations and Footnotes for Tables 400-3 and 400-4

Type Abbreviation Abbreviation Definition

Repair Method

EI Epoxy Injection

M Methacrylate

NT No Treatment Required

PS Penetrant Sealer

Environment Category

EA Extremely Aggressive

MA Moderately Aggressive

SA Slightly Aggressive

Reference Elevation AMHW Above Mean High Water

Footnotes

(1)Cracking Significance Range is determined by computing the ratio of Total Cracked Surface Area (TCSA) to Total Surface Area
(TSA)per LOT in percent [(TCSA/TSA) x 100] then by identifying the Cracking Significance Range in which that value falls.

TCSA is the sum of the surface areas of the individual cracks in the LOT. The surface area of an individual crack is determined

by taking width measurements of the crack at 3 representative locations and then computing their average which is then

multiplied by the crack length.

(2)Crack Width Range is determined by computing the width of an individual crack as computed in (1) above and then identifying

the range in which that individual crack width falls.

(3)When the Engineer determines that a crack in the 0.004 inch to 0.008 inch width range cannot be injected then for Table 400-3

use penetrant sealer unless the surface is horizontal, in which case, use methacrylate if the manufacturer's recommendations

allow it to be used and if it can be applied effectively as determined by the Engineer.

(4)(a) Perform epoxy injection of cracks in accordance with Section 411. Seal cracks with penetrant sealer or methacrylate as per

Section 413. (b) Use only methacrylate or penetrant sealer that is compatible, according to manufacturer's recommendations,

with previously applied materials such as curing compound or paint or remove such materials prior to application.

(5)When possible, prior to final acceptance of the project, seal cracks only after it has been determined that no additional growth

will occur.

(6)Methacrylate shall be used on horizontal surfaces in lieu of penetrant sealer if the manufacturer's recommendations allow it to

be used and if it can be applied effectively as determined by the Engineer.

(7)Unless directed otherwise by the Engineer, repair cracks in bridge decks only after the grinding and grooving required by 400-

15.2.5 is fully complete.

400-22Method of Measurement

400-22.1General: The quantities of concrete to be paid for will be the volume, in cubic

yards, of each of the various classes shown in the Plans, in place, completed and accepted. The

quantity of precast anchor beams to be paid for will be the number in place and accepted. The

quantity of bridge deck grooving to be paid for will be the area, in square yards of bridge deck

and approach slab, completed and accepted. The quantity of bridge deck grooving and planing to

be paid for will be the area, in square yards of bridge deck and approach slab, completed and

accepted.

Except for precast anchor beams, for any item of work constructed under this

Section and for which measurement for payment is not to be made by the volume of concrete,

measurement and payment for such work will be as specified in the Section under which the

work is specified in detail.

No separate payment will be made for obtaining the required concrete finish.

400-22.2Calculation of Volume of Concrete:

400-22.2.1 Dimensions: The quantity will be computed by the plan dimensions of

the concrete, within the neat lines shown in the Plans, except that no deduction will be made for

weep holes, deck drains, or encroachment of inlets and pipes in box culverts, and no chamfers,

scorings, fillets, or radii 1 1/2 in or less in cross-sectional area will be taken into account.

400-22.2.2 Pay Quantity: The quantity to be paid for will be the original plan

quantity, measured as provided in 400-22.2.1. 420FY 2023-24Return to Table of Contents

400-22.2.3 Items not Included in Measurement for Payment: No

measurements or other allowances will be made for work or material for forms, falsework,

cofferdams, pumping, bracing, expansion-joint material, etc. The volume of all materials

embedded in the concrete, such as structural steel, pile heads, etc., except reinforcing bars or

mesh, will be deducted when computing the volume of concrete to be paid for. For each foot of

timber pile embedded, 0.8 cubic feet of concrete will be deducted. The cost of furnishing and

placing dowel bars shall be included in the Contract unit price for the concrete.

400-22.2.4 Deck Girders and Beam Spans: In computing the volume of

concrete in deck girders and beam spans, the thickness of the slab will be taken as the nominal

thickness shown on the drawings and the width will be taken as the horizontal distance measured

across the roadway. The volume of haunches over beams will be included in the volume to be

paid for.

400-22.2.5 Stay-in-Place Metal Forms: When using stay-in-place metal forms to

form the slab of deck girder and beam spans, the volume of concrete will be computed in

accordance with the provisions of 400-22.2.4 except that the thickness of the slab over the

projected plan area of the stay-in-place metal forms will be taken as the thickness shown on the

drawings above the top surface of the forms. The concrete required to fill the form flutes will not

be included in the volume of concrete thus computed.

400-22.3Bridge Deck Grooving: The quantity to be paid for will be plan quantity in

square yards, computed, using the area bound by the gutter lines (at traffic railings, curbs and

median dividers) and the beginning and end of the bridge or the end of approach slabs,

whichever is applicable, constructed, in place and accepted.

400-22.4Bridge Deck Grooving and Planing: The quantity to be paid for will be plan

quantity in square yards, computed, using the area bound by the gutter lines (at traffic railings,

curbs and median dividers) and the beginning and end of the bridge or the end of approach slabs,

whichever is applicable, constructed, in place and accepted.

400-22.5Composite and Plain Neoprene Bearing Pads: The quantity to be paid for

will be the original plan quantity, computed using the dimensions of the pads shown in the Plans.

400-22.6Cleaning and Coating Concrete Surfaces: The quantity to be paid for will be

the plan quantity in square feet for the areas shown in the Plans.

400-23Basis of Payment

400-23.1Concrete:

400-23.1.1 General: Price and payment will be full compensation for each of the

various classes of concrete shown in the Contract Documents.

400-23.1.2 Concrete Placed below Plan Depth: Authorized concrete placed in

seal or footings 5 feet or less below the elevation of bottom of seal or footing as shown in the

Plans will be paid for at the Contract price set forth in the Contract Documents under the pay

items for substructure concrete.

Authorized concrete used in seal (or in the substructure where no seal is

used) at a depth greater than 5 feet below the bottom of seal or footing as shown in the Plans will

be paid for as Unforeseeable Work.

Such payment will be full compensation for the cofferdam construction,

for excavation, and for all other expenses caused by the lowering of the footings.

400-23.1.3 Seal Concrete Required but Not Shown in Plans: When seal

concrete is required as provided in 400-8 and there is no seal concrete shown in the Plans, it will

be paid for as Unforeseeable Work. 421FY 2023-24Return to Table of Contents

400-23.2Precast Anchor Beams: Price and payment will be full compensation for the

beams, including all reinforcing and materials necessary to complete the beams in place and

accepted.

No separate prices will be allowed for the various types of anchor beams.

400-23.3Reinforcing: Reinforcing bars, wires and mesh will be measured and paid for

as provided in Section 415, except that no separate payment will be made for the welded wire

reinforcement used in concrete jackets on steel piles or reinforcement contained in traffic

railings, concrete barriers, traffic separators or parapets. Where so indicated in the Plans, the

Department will not separately pay for reinforcing used in incidental concrete work, but the cost

of such reinforcement shall be included in the Contract unit price for the concrete.

400-23.4Bridge Deck Grooving: Price and payment will be full compensation for all

grooving, equipment, labor, and material required to complete the work in an acceptable manner.

400-23.5Bridge Deck Planing: Price and payment will be full compensation for all

planing, equipment, labor, and material required to complete the work in an acceptable manner.

400-23.6Composite and Plain Neoprene Bearing Pads: Price and payment will be full

compensation for all work and materials required to complete installation of the pads, including

sampling and testing.

400-23.7Cleaning and Coating Concrete Surfaces: Price and payment will be full

compensation for all work and materials required. The cost of coating new concrete will not be

paid for separately, but will be included in the cost of the item to which it is applied.

400-23.8General: The above prices and payments will be full compensation for all work

specified in this Section, including all forms, falsework, joints, weep holes, drains, pipes,

conduits, bearing pads, setting anchor bolts and dowels, surface finish, and cleaning up, as

shown in the Plans or as directed. Where the Plans call for water stops, include the cost of the

water stops in the Contract unit price for the concrete.

Unless payment is provided under a separate item in the Contract Documents, the

above prices and payments will also include all clearing and grubbing; removal of existing

structures; excavation, as provided in Section 125; and expansion joint angles and bolts.

The Department will not change the rate of payment for the various classes of

concrete in which steel or FRP may be used due to the addition or reduction of reinforcing.

The Department will not make an allowance for cofferdams, pumping, bracing, or

other materials or equipment not becoming a part of the finished structure. The Department will

not pay for concrete placed outside the neat lines as shown in the Plans.

When using stay-in-place metal forms to form bridge decks, the forms, concrete

required to fill the form flutes, attachments, supports, shoring, accessories, and all miscellaneous

items or work required to install the forms shall be included in the Contract unit price of the

superstructure concrete.

400-23.9Payment Items:

Payment will be made under:

Item No. 400- 0- Class NS Concrete – per cubic yard.

Item No. 400- 2- Class II Concrete - per cubic yard.

Item No. 400- 3- Class III Concrete - per cubic yard.

Item No. 400- 4- Class IV Concrete - per cubic yard.

Item No. 400- 6- Precast Anchor Beams - each.

Item No. 400- 7- Bridge Deck Grooving - per square yard.

Item No. 400- 8- Class V Concrete - per cubic yard. 422FY 2023-24Return to Table of Contents

Item No. 400- 9- Bridge Deck Planing - per square yard.

Item No. 400- 16- Class VI Concrete - per cubic yard.

Item No. 400-143- Cleaning and Coating Concrete Surfaces - per square foot.

Item No. 400-147- Composite Neoprene Pads - per cubic foot.

Item No. 400-148- Plain Neoprene Bearing Pads - per cubic foot. 423FY 2023-24Return to Table of Contents

THREE-SIDED PRECAST CONCRETE CULVERT

407-1Description

Design and construct a three -sided precast concrete culvert for the three -sided concrete culvert structure shown in the Contract Documents. Three -sided precast concrete culverts are defined as monolithic arched segments, frame segments with vertical walls and either horizontal or arched top slabs, or three -sided proprietary precast concrete bridge systems. Meet the requirements of 449 -1.

407-2Materials

Ensure that the materials used for the construction of precast culverts have certification statements from each source, showing that they meet the applicable requirements of the following : Portland Cement Concrete ................................ ..............Section 346 Reinforcing for Concrete ................................ ................ Section 415 Precast Concrete Drainage Products ............................... Section 449 Riprap ................................ ................................ ..............Section 530 Coarse Aggregate * ................................ .......................... Section 901 Fine Aggregate * ................................ .............................. Section 902 Curing Materials ................................ ............................. Section 925 Materials for Concrete Repair ................................ .........Section 930 Non-Shrink Grout ................................ ........................... Section 934 Geotextile Fabrics ................................ ........................... Section 985 *The gradation requirements of aggregates are not applicable when using dry -cast concrete.

407-3Limitations on Use

Do not use three -sided precast culverts in lieu of four -sided culverts described in Section 410, however they may be considered as a Cost Savings Initiative Proposal (CSIP) in accordance with Section 4. Provide the required Section 346 concrete class and concrete cover in accordance with the Structures Design Guideline for the environmental classification shown in the Plans for the culvert location. Do not use a three -sided precast culvert to extend the inlets of existing multi -cell culverts due to the potential for clogging with debris.

407-4Materials Acceptance and Testing

407-4.1General : Meet concrete materials, te sting, inspection, and acceptance

requirements of Section 346, as modified herein: Precast culverts are produced using certification -acceptance criteria; therefore, assume responsibility for performance of all quality control testing and inspections in a ccordance with Section 346. Prepare, cure, and test the test cylinders in accordance with ASTM C31 and ASTM C39 test methods . Follow the alternative method of concrete compaction, in accordance with ASTM C497, if the consistency of concrete is too stiff for compaction by rodding or internal vibrations. Expose shipping strength test cylinders to the same curing conditions as the precast concrete sections. The 28-day test cylinders shall be cured in accordance with Section 346. 424 FY 2023-24 Return to Table of Contents

Get an email when 400 changes

Florida revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Florida Standard Specifications for Road and Bridge Construction, 2024 Edition. Pages 393–431 of 1,299. View official source ↗