570-1Description

Establish a growing, healthy turf over all areas designated in the Plans. Use sod in areas designated in the Plans to be sodded. Use seed, hydroseed, bonded fiber matrix, or sod in all other areas. Maintain performance turf areas until final acceptance of all C ontract work in accordance with Section 5-11 and the establishment requirements of 570 -4 have been met .

570-2Materials

Meet the following requirements: Turf Materials ................................ ................................ .Section 981 Fertilizer ................................ ................................ ..........Section 982 Water ................................ ................................ ...............Section 983

570-3Construction Methods

570-3.1General: Remove all construction debris in performance turf areas. Install

performance turf at the ea rliest practical time for erosion control and establishment . Shape the areas to be planted to the plan typical sections and lines and grade shown in the Plans. Except in areas where the Contract Documents requires specific types of turf to match adjoining private property, any species of turf designated in Section 981 may be used. All of the permanent performance turf material shall be in place prior to final acceptance. The Department will only pay for replanting as necessary due to factors determine d by the Engineer to be beyond control of the Contractor. Install all performance turf on shoulder areas prior to the placement of the friction course on adjacent pavement.

570-3.2Seeding: At the Contractor’s option, wildflower seed may be included in the

performance turf seeding operation or performed separately from the performance turf seeding. Seed must produce visible seedlings within 45 days of planting. Use of compost meeting the requirements of Section 987 as mulch is acceptabl e unless otherwise specified.

570-3.3Sod: Place the sod on the prepared surface, with edges in close contact. Do not

use sod which has been cut for more than 48 hours. Place the sod to the edge of all landscape areas as shown in the Plans and the Standard Plans. Place rolled sod parallel with the roadway and cut any exposed netting even with the sod edge. Monitor placed sod for growth of exotic or invasive pest plants and noxious weeds. If exotic or invasive pest plants and/or noxious weeds manifest themselves within 30 days of placement of the sod during the months April through October, within 60 days of placement of the sod during the months of November through March treat affected areas by means acceptable to the Department at no expense to the D epartment. If pest plants and/or noxious weeds manifest themselves after the time frames described above from date of placement of sod, the Engineer, at hi s sole option, will determine if treatment is required and 811 FY 2023-24 Return to Table of Contents whether or not the Contractor will be comp ensated for such treatment. If compensation is provided, payment will be made as Unforeseeable Work as described in 4 -4. Remove and replace any sod as directed by the Engineer.

570-3.4Hydroseeding: Use equipment specifically designed for mixing the mulch, seed,

fertilizer, tackifier and dye, and applying the slurry uniformly over the areas to be hydroseeded. Use mulch that does not contain reprocessed wood or paper fibers. Ensure that 50% of the fibers will be retained on a twenty -five mesh screen. Mix fertilizer as required into the hydroseeding slurry. Ensure that the dye does not contain growth or germination inhibiting chemicals. When polyacrylamide is used as part of hydroseeding mix, only anionic polymer formulation with free acrylamide mon omer residual content of less than 0.05% is allowed. Cationic polyacrylamide shall not be used in any concentration. Do not spray polyacrylamide containing mixtures onto pavement. These may include tackifiers, flocculants or moisture - holding compounds.

570-3.5Bonded Fiber Matrix (BFM): Meet the minimum physical and performance

criteria of this Specification for use of BFM in hydroseeding operations or temporary non - vegetative erosion and sediment control methods. Provide evidence of product performance testing, manufacturer’s certification of training and material samples to the Engineer at least 7 calendar days prior to installation. Provide documentation to the Engineer of manufacturer’s testing at an independent laboratory, demonstrating superior pe rformance of BFM as measured by reduced water runoff, reduced soil loss and faster seed germination in comparison to erosion control blankets. Use only BFMs that contain all components pre -packaged by the manufacturer to assure material performance. Deli ver materials in UV and weather resistant factory labeled packaging. Store and handle products in strict compliance with the manufacturer’s directions. When polyacrylamide is used as part of hydroseeding mix, only anionic polymer formulation with free ac rylamide monomer residual content of less than 0.05% is allowed. Cationic polyacrylamide shall not be used in any concentration. Do not spray polyacrylamide containing mixtures onto pavement. These may include tackifiers, flocculants or moisture - holding co mpounds. Meet the following requirements after application of the formed matrix: Ensure that the tackifier does not dissolve or disperse upon re -wetting. Ensure that the matrix has no gaps between the product and the soil and that it provides 100% coverage of all disturbed soil areas after application. Ensure that the matrix has no germination or growth inhibiting properties and does not form a water -repelling crust. Ensure that the matrix is comprised of materials which are 100% biodegradable and 100% beneficial to plant growth. Mix and apply the BFM in strict compliance with the manufacturer’s recommendations. Apply the BFM to geotechnically stable slopes at the manufacturer’s recommended rates. Degradation of BFM will occur naturally a s a result of chemical and biological hydrolysis, UV exposure and temperature fluctuations. Re -application, as determined by the 812 FY 2023-24 Return to Table of Contents Engineer, will be required if BFM -treated soils are disturbed or water quality or turbidity tests show the need for an additional application.

570-3.6Watering: Water all performance turf areas as necessary to produce a healthy

and vigorous stand of turf. Ensure that the water used for turf irrigation meets the requirements of Section 983.

570-3.7Fertilizing: Fertilize as necessary to promote turf growth and establishment

based on soil testing . Refer to Section 982 for fertilizer rates. For bid purposes, base estimated quantities on an initial application of 265 lb/acre and one subsequent application of 135 lb/acre of 16 -0-8.

570-3.8Shoulder Treatment: Provide soil for shoulder treatment in accordance with

Standard Plans, Index 570-010. Soil needed for these purposes will be included in the corresponding Pay Item.

570-4Turf Establishment

Perform all work necessary, including watering and fertilizing, to sustain an established turf, free of noxious weeds , at no additional expense to the Department. Provide the filling, leveling, and repairing of any washed or eroded areas, as necessary. Established turf is defined as follows:

1.An established root system (leaf blades break before seedlings or sod can be

pulled from the soil by hand).

2.No bare spots larger than one square foot.
3.No continuouss od seams running perpendicular to the face of the slope.
4.No bare areas comprising more than 1% of any given 1,000 square foot area.
5.No deformation of the performance turf areas caused by mowing or other

Contractor equipment.

6.No exposed sod netting.
7.No competing vegetati on, exotic or invasive pest plants or noxious weeds.

Monitor turf areas and remove all competing vegetation, exotic or invasive pest plants, and noxious weeds (as listed by the Florida Exotic Pest Plant Council, Category I “List of Invasive Species”, Curr ent Edition, https://www.fleppc.org ). Remove such vegetation regularly by manual, mechanical, or chemical control means, as necessary. When selecting herbicides, pay particular attenti on to ensure use of chemicals that will not harm desired turf or wildflower species. Use herbicides in accordance with 7 -1.7. If at the time that all other work on the project is completed, but all turf areas have not met the requirements for established turf set forth in 570 -4, continuously maintain all turf areas until the requirements for established turf set forth in 570 -4 have been met. During establishment and until the performance turf is established in accordance with this Section, continue the inspection , maintenance , and documentation of erosion and sedimentation control items in accordance with Section 104. Remove and dispos e of all erosion and sedimentation control items after the performance turf has been established. Notify the Engineer, with a minimum of seven calendar days advance notice, to conduct inspections of the performance turf at approximate 90 -day intervals during the establishment period to determine establishment . Results of such inspections will be made available to the Contractor within seven calendar days of the date of inspection. Determination of an established turf will be based on the entire project and not in sections. Upon the determination by the Engineer that the requirements of 570 -4 have been met and an established turf has been achieved and all erosion and sedimentation control items have 813 FY 2023-24 Return to Table of Contents been removed, the Engineer will release the Contractor from any further responsibility provided for in this Speci fication. The Contractor’s establishment obligations of this specification will not apply to deficiencies due to the following factors, if found by the Engineer to be beyond the control of the Contractor, his subcontractors, vendors or suppliers:

1.Determination that the deficiency was due to the failure of other features of the

Contract.

2.Determination that the deficiency was the responsibility of a third party

performing work not included in the Contract or its actions. The Department will only p ay for replanting as necessary due to factors determined by the Department to be beyond the control of the Contractor.

570-5Responsible Party

For the purposes of this Specification, the Contractor shall be the responsible party throughout construction a nd establishment periods. Upon final acceptance of the Contract in accordance with 5 -11, the Contractor’s responsibility for maintenance of all the work or facilities within the project limits of the Contract will terminate in accordance with 5 -11; with t he sole exception that the facilities damaged due to lack of established turf and the obligations set forth in this Specification for performance turf shall continue thereafter to be responsibility of the Contractor as otherwise provided in this Section.

570-6Statewide Disputes Review Board

The Statewide Disputes Review Board in effect for this Contract will resolve any and all disputes that may arise involving administration and enforcement of this Specification related to the remedial work performed du ring the warranty period. The Responsible Party and the Department acknowledge that use of the Statewide Disputes Review Board is required, and the determinations of the Statewide Disputes Review Board for disputes arising out of this Specification will be binding on both the Responsible Party and the Department, with no right of appeal by either party. Meet the requirements of 8-3.

570-7Failure to Perform

Should the Contractor fail to timely submit any dispute to the Statewide Disputes Review

Board, refuse to submit any dispute to the Statewide Disputes Review Board, fail to provide an

established turf in accordance with 570-4 within six months of final acceptance of the Contract

in accordance with 5-11, or fail to compensate the Department for any remedial work performed

by the Department in establishing a turf and other remedial work associated with lack of an

established turf, including but not limited to, repair of shoulder or other areas due to erosion and

removal of sediments deposited in roadside ditches and streams, as determined by the Statewide

Disputes Review Board to be the Contractor’s responsibility, the Department shall suspend,

revoke or deny the Contractor’s certificate of qualification under the terms of

full and complete payment for the remedial work performed by the Department. In no case shall

the period of suspension, revocation, or denial of the Contractor’s certificate of qualification be

less than six months. Should the Contractor choose to challenge the Department’s notification of

intent for suspension, revocation or denial of qualification and the Department’s action is upheld, 814FY 2023-24Return to Table of Contents

the Contractor shall have its qualification suspended for a minimum of six months or until the

remedial action is satisfactorily performed, whichever is longer.

570-8Method of Measurement

The quantities to be paid for will be plan quantity in square yards based on the area

shown in the Plans, completed and accepted.

570-9Basis of Payment

Prices and payments will be full compensation for all work and materials specified in this

Section.

Payment will be made under:

Item No. 570- 1- Performance Turf - per square yard. 815FY 2023-24Return to Table of Contents

PLASTIC EROSION MAT

571-1Description

Furnish and install plastic erosion mat on areas as shown in the Plans. Conduct this work in conjunction with the performance turf work as specified in Section 570.

571-2Materials

Use a plastic erosion mat consisting of continuous or fused synthetic polymer fibers, which are entangled to form a three -dimensional matrix (netting or distorted netting may be included as part of the matrix). Ensure that the mat is capable of maintaining its shape throughout installation. Ensure that the mat is inert to chemicals encountered in a natural soil environment, and meets the requirement of Section 985 according to its application.

571-3Installation of Plastic Erosion Mat

Before installing the plastic erosion mat , submit to the Engineer certified test reports from the manufacturer certifying that the geotextile to be incorporated into this project meets the requirements of Section 985. Also, submit the manufacturer’s written instal lation instructions. Install a plastic erosion mat of uniform thickness, not less than 1/4 inch or more than 3/4 inch on the prepared soil surface in accordance with these Specifications, the manufacturer’s recommendations and in conformity with the lines , grades and dimensions as shown in the Plans. Ensure that all joints are shingle lapped such that the bottom of each section fits over the top of the section below to prevent uplift of the ends or edges by water flow. Overlap ends of adj acent rolls a mini mum of 3 feet. Overlap edges of adjacent rolls a minimum of 4 inches. Stake all edges at 3 to 5 feet intervals with staples as recommended by the manufacturer unless otherwise directed by the Engineer. Ensure that overlaps and anchor trenches are in confor mance with the Plans and the manufacturer’s installation recommendations. Ensure that after installation there are no protrusions, projections or exposures of the plastic erosion mat. Do not compact the installed plastic erosion mat with any type of equipment employing a foot or grid. The Engineer will reject any material having defects, tears, punctures, flaws, deterioration or other damage before, during or after installation. Remove and replace all rejected plastic erosion mat at no additional expense to the Department. Fill all voids in the mat with soil meeting the requirements of Section 987. Establish performance turf meeting the requirements of Section 570.

571-4Method of Measurement

The quantity to be paid for will be the surface area of plastic erosion mat installed and accepted in square yards with no allowance for overlaps. Performance turf will be paid for separately in accordance with Section 570.

571-5Basis of Payment

Price and payment will be full compensation for all work specified in this Section, including furnishing, handling, placement of plastic erosion mat, all labor, equipment, and miscellaneous materials necessary for a complete and accepted installation. Payment will be made under: Item No. 571 - 1- Plastic Erosion Mat - per square yard. 816 FY 2023-24 Return to Table of Contents

Get an email when 570 changes

Florida revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Florida Standard Specifications for Road and Bridge Construction, 2024 Edition. Pages 819–823 of 1,299. View official source ↗