102-1Description
Maintain traffic within the limits of the project for the duration of the construction period, including any temporary suspensions of the work. Construct and maintain detours. Provide facilities for access to residences, businesses, etc., along the project . Furnish, install and maintain traffic control and safety devices during construction. Furnish and install work zone pavement markings for maintenance of traffic (MOT) in construction areas. Provide any other special requirements for safe and expeditious movement of traffic specified in the Temporary Traffic Control Plans. MOT includes all facilities, devices and operations as required for safety and convenience of the public within the work zone. Do not maintain traffic over those portions of the project where no work is to be accomplished or where construction operations will not affect existing roads. Do not obstruct or create a hazard to any traffic during the performance of the work, and repair any damage to existing pavement open to traffic.
102-2Materials
Meet the following requirements: Raised Pavement Marker Adhesive * ...................... Section 706 Paint* ................................ ................................ .. …Section 710 Pavement Marking Materials* ............................ …Section 971 Temporary Raised Pavement Markers * .................. Section 990 Temporary Traffic Control Device Materials * ....... Section 990 Retroreflective and Nonreflective Sheeting for Temporary Traffic Control Devices * ................ Section 994 *Use products listed on the Department’s APL.
102-2.1Temporary Traffic Control Devices: Use only the materials meeting the
requirements of Section 990, Secti on 994, Standard Plans and the Manual on Uniform Traffic Control Devices (MUTCD).
102-2.2Detour: Provide all materials for the construction and maintenance of all
detours.
102-2.3Commercial Materials for Driveway Maintenance: Provide materials of the
type typically used for base, including rec laimed asphalt pavement (RAP) material, and having stability and draina ge properties that will provide a firm surface under wet conditions.
102-3Specific Requirements
102-3.1Beginning Date of Contractor’s Respo nsibility: Maintain traffic starting the
day work begins on the project or on the first day Contract Time is charged, whichever is earlier.
102-3.2Worksite Traffic Supervisor: Provide a Worksite Traffic Supervisor who is
responsible for initiating, installing, and maintaining all temporary traffic control devices as described in this Section and the Contract Documents. Provide all equipment and materials needed to set up, take d own, and maintain temporary traffic control, and handle traffic -related situations. Provide the Worksite Traffic Supervisor or designee with a tablet or smartphone with 115 FY 2023-24 Return to Table of Contents internet access for recording information into the Department’s lane closure notificati on system. Use approved alternate Worksite Traffic Supervisors when necessary. The Worksite Traffic Supervisor must meet the personnel qualifications specified in Section 105. The Worksite Traffic Supervisor is to perform the following duties:
inspection immediately after set up. During operations with lane closures, the Worksite Traffic Supervisor or on -site designee shall record lane closure information into t he Department’s lane closure notification system in accordance with 102 -3.3.
traffic control.
deficiencies that are not immediate safety hazards within 24 hours.
45 minutes after notification of an emergency situation and is prepared to respond to maintain temporary traffic control or to provide alternate traffic arrangements.
with predominately daytime work activities, and daily nighttime and weekly daytime i nspections of projects with predominantly nighttime work activities of all traffic control devices, traffic flow, pedestrian, bicyclist, and business accommodations. Advise the project personnel of the schedule of these inspections and give them the op portunity to join in the inspection as deemed necessary. The Department may disqualify and remove from the project a Worksite Traffic Supervisor who fails to comply with the provisions of this Section. The Department may temporarily suspend all activities, except traffic, erosion control and such other activities that are necessary for project maintenance and safety, for failure to comply with these provisions.
102-3.3Lane Closures: Approval for all lane closures, mobile operations, and traffic
pacing ope rations is required. Submit routine requests to the Engineer 14 calendar days in advance of planned lane closures, mobile operations, and traffic pacing operations. For unforeseen events that require cancelling or rescheduling lane closures, mobile operations, and traffic pacing operations, revise the lane closure request as soon as possible. Record information for planned lane closures, including but not limited to begin and end lane closure times and locations, into the Department’s lane closu re notification system. Closure information is to be recorded within five minutes of placing the first channelizing device and removing the last channelizing device associated with the closure. At the preconstruction conference, submit a request for access to the Department’s lane closure notification system to the Engineer . Include the WTS’s or designees’ name, email address, and a copy of the individual’s certification of training for the Department’s lane closure notification system. For change of access requests, submit a request to the Engineer at least ten calendar days in advance of when the change is needed. Information recorded in Department’s lane closure system is for public information purposes and will not be used for contract administration. 102-3.3.1 Traffic Pacing: In addition to dates and locations, include a pacing plan outlining the expected equipment and number of traffic control officers required, the 116 FY 2023-24 Return to Table of Contents proposed traffic pacing lengths and durations, the available existing egresses in the event of an emergency , and a contingency plan in the event of an equipment failure .
102-3.4Pedestrian and Bicycle Accommodations: Provide accommodations for
pedestrians as shown in the Temporary Traffic Control ( TTC) plans or as directed by the Engineer. Accommodate pedestrians with a safe, accessible travel path around work sites separated from mainline traffic in compliance with the Americans with Disabilities Act (ADA) Standards for Transportation Facilities (i.e., stable, firm, slip -resistant, and free of any obstruction or hazards such as holes, debris, mud, construction equipment, and stored material . When a work operation requires a sidewalk or pedestrian way closure for 60 minutes or greater , provide a pedestri an detour or temporary pedestrian way . Provide and maintain pedestrian detours and temporary pedestrian ways that are ADA -compliant as described above. Provide appropriate signs for advanced notification of sidewalk closures and marked detours. Only approved pedestrian longitudinal channelizing devices may be used to close or delineate a pedestrian walkway. Provide accommodations for the closure of bicycle facilities (i.e., marked bicycle lanes or paved outside shoulders 4 feet or greater in width on non-limited access roadways) as shown in the TTC plans or as directed by the Engineer . Existing businesses in work areas are to be provided with adequate entrances for vehicular and pedestrian traffic during business hours.
102-4Alternative Temporary Traffic Control Plan
The Contractor may propose an alternative Temporary T raffic Control Plan (TTCP) to the plan presented in the Contract Documents. The Contractor’s Engineer of Record must sign and seal the alternative TTCP and submit to the Engineer. Pr epare the alternative T TCP in conformance with and in the form outlined in the current version of the FDOT Design Manual. Provide a TTCP foreach phase of activities. Take responsibility for identifying and assessing any potential impacts to a utility that may be caused by the alternate TTCP proposed by the Contractor, and notify the Department in writing of any such potential impacts to utilities. For projects with nighttime lane closure restrictions where paving is expected to extend into the winter months, the Contractor may propose an alternative TTCP allowing for daytime lane closures for friction course paving. The alternative TTCP must be a lane closure analysis based on actual traffic counts and prepared in accordance with the FDOT Design Manual. The Engineer’s approval of the alternate TTCP does not relieve the Contractor of sole responsibility for all utility impacts, costs, delays or damages, whether direct or indirect, resulting from Contractor initiated changes in the design or construction acti vities from those in the original Contract Documents and which effect a change in utility work different from that shown in the Utility Plans, joint project agreements or utility relocation schedules. The Department reserves the right to reject any altern ative TTCP. Obtain the Engineer’s written approval before beginning work using an alterna tive TTCP. The Engineer’s written approval is required for all modifications to the alternative TTCP. The Engineer will only allow changes to the TTCP in an emergency without the proper documentation. The Contractor may propose to extend lane closure times up to one hour in advance of the lane closure start times shown in the Plans for the following conditions:
hour per lane
per hour per lane. 117 FY 2023-24 Return to Table of Contents To determine traffic count, record the number of vehicles in the direction of the closure during a 15 -minute period. Multiply the number of vehicles by four and divide by the number of lanes in the direction of the closure.
102-5Traffic Control
102-5.1MUTCD: Comply with the requirements in Part 6 of the MUTCD
102-5.2Temporary Traffic Control Plan: The Temporary Traffic Control Plan (TTCP)
is the portion of the Plans describing the measures to be used for conveying road users through the work zone. Use the TTCP to maintain traffic for the duration of the work. For situations or field conditions not addressed by the TTCP follow the Standard Plans. For all other applications, comply with the MUTCD and Standard Pla ns, Index 102-600. Device location or the number of devices, may be adjusted as recommended by the Work Zone Traffic Supervisor and approved by the Engineer. 102-5. 3 Maintenance of Roadway Surfaces: Maintain all lanes that are being used for the MOT, including those on detours and temporary facilities, unde r all weather conditions. Keep the lanes reasonably free of dust, potholes and rutting. Provide the lanes with the drainage facilities necessary to maintain a smooth riding surface under all weather conditions. 102-5. 4 Number of Traffic Lanes: Maintain one lane of traffic in each direction. Maintain two lanes of traffic in each direction a t existing four (or more) lane cross roads, where necessary to avoid undue traffic congestion. Do not allow traffic control and warning devices to
encroach on lanes used for MOT.
The Engineer may allow the Contractor to restrict traffic to one-way operation for
short periods of time provided that the Contractor employs adequate means of traffic control and
does not unreasonably delay traffic. When a construction activity requires restricting traffic to
one-way operations, locate the flaggers within view of each other when possible. When visual
contact between flaggers is not possible, equip them with 2-way radios, official, or pilot vehicles,
or use traffic signals.
102-5.5Crossings and Intersections: Provide and maintain adequate accommodations
for intersecting and crossing traffic. Provide signing for the control of traffic entering and leaving
work zones by way of intersecting cross roads to make drivers aware of work zone conditions.
Do not block or unduly restrict any median opening, road or street crossing the project unless
approved by the Engineer. Before beginning any construction, submit to the Engineer the names
and phone numbers of persons that can be contacted when signal operation malfunctions.
102-5.6Access for Residences and Businesses: Provide continuous access to all
residences and all places of business.
102-5.7Protection of the Work from Damage by Traffic: Where traffic would damage
a base course, surface course, or structure constructed as a part of the work, control all traffic to
remain outside the limits of such areas until the potential for damage no longer exists.
102-5.8Flagger: Provide flaggers to control traffic when traffic in both directions must
use a single lane and in other situations as required.
102-5.9Conflicting Pavement Markings: Remove all existing pavement markings
(paint, tape, thermoplastic, raised pavement markers, etc.) that conflict with temporary paths of
vehicles, bicycles or pedestrians when the conflict will exceed 24 hours. Use any method, other
than paint or sprayed asphalt, approved by the Engineer to remove existing pavement markings.
Remove conflicting pavement markings using a method that will not damage the surface texture
of the pavement and which will eliminate the previous marking pattern regardless of weather and
light conditions. 118FY 2023-24Return to Table of Contents
Remove all pavement markings that will conflict with “the next phase of
operation” for vehicle, bicycle, and pedestrian paths as described above, before opening to
vehicle or bicycle traffic or use by pedestrians.
Cost for removing conflicting pavement markings (paint, tape, thermoplastic,
raised pavement markers, etc.) to be included in Maintenance of Traffic, lump sum.
102-5.10Vehicle and Equipment Visibility: Equip all pickups and automobiles used on
the project with a minimum of one Class 2 warning light that meets the Society of Automotive
Engineers Recommended Practice SAE J595, dated November 1, 2008, or SAE J845, dated
December 1, 2007, and incorporated herein by reference. Existing lights that meet SAE J845,
dated March, 1992, or SAE J1318, dated April, 1986, may be used to their end of service life.
The warning lights must be a high intensity amber or white rotating, flashing, oscillating or
strobe light. Lights must be unobstructed by ancillary vehicle equipment such as ladders, racks or
booms and be visible 360 degrees around the vehicle. If the light is obstructed, additional lights
will be required. The lights must be operating when the vehicle is in a work area where a
potential hazard exists, when operating at less than the average speed for the facility while
performing work activities, making frequent stops or called for in the Plans or Standard Plans.
Equip all other vehicles and equipment with a minimum of 4 square feet of
retroreflective sheeting or warning lights.
102-5.11No Waiver of Liability: Conduct operations in such a manner that no undue
hazard results due to the requirements of this Article. The procedures and policies described
herein in no way acts as a waiver of any terms of the liability of the Contractor or his surety.
102-5.12Work Zone Speed: Use the work zone speed in the TTCP. When field
conditions warrant work zone speeds different from those in the TTCP, submit signed and sealed
documentation to justify reducing the work zone speed limit to the Engineer for approval, or the
Engineer may request the District Traffic Operation Engineer to investigate the need.
Sign work zone speed reductions in accordance with Standard Plans, Index 102-
600 and the TTCP.
102-5.13Limited Access Temporary Openings: When required by the Contract
Documents, construct temporary openings in accordance with the Standard Plans. Submit a
written request identifying the specific locations within the project limits to the Engineer.
Locate temporary openings in areas with adequate sight distance. Do not locate
temporary openings with 1.5 miles of interchanges or within 2,000 feet of the acceleration-
deceleration lanes at rest areas, median openings, other access openings, or other highway
service areas. Do not remove existing guardrail or barrier for temporary openings.
Use temporary pavement for the acceleration-deceleration lane surface of the
temporary opening. Commercial material may be used for the driveway surface of the temporary
opening. Install a gate at the limited access fence and keep the gate locked when the temporary
opening is not in use.
Do not use temporary openings to transport materials to or from any other project.
Failure to comply with this Section and the Standard Plans, 102 Series shall be
cause for the Engineer to terminate usage of the temporary opening. When the temporary
opening is no longer needed, remove immediately and restore the area to pre-construction
condition. 119FY 2023-24Return to Table of Contents
102-6Detours
102-6.1General: Construct and maintain detour facilities wherever it becomes necessary
to divert traffic, including pedestrians and bicyclists, from any existing facility, or wherever
construction operations block the flow of traffic.
102-6.2Construction: Plan, construct, and maintain detours for the safe passage of
traffic in all conditions of weather. Provide the detour with all facilities necessary to meet this
requirement.
Install detectable warnings on temporary ramps in accordance with Section 522.
When the Plans call for the Department to furnish detour bridge components,
construct the pile bents in accordance with the Plans, unless otherwise authorized by the
Engineer.
Provide two Contractor representatives, who will be directly involved in the
erection of Department-owned temporary bridging, to attend a mandatory one-day training
session to be conducted at the Department’s storage facility. No bridging will be released to the
Contractor prior to the completion of this training.
Submit the following: company name, phone number, office address, project
contact person, names of the representatives who will attend the training described above, project
number, detour bridge type, bridge length, span length, location and usage time frames, to the
Engineer at least 30 calendar days before the intended pick-up date, to obtain the storage facility
location and list of components for the project. Upon receipt, the Engineer will, within
10 calendar days submit an approved material list to the Contractor and the appropriate
Department storage yard.
Submit the name of the representative with authority to pick up components, to
the Engineer at least 10 calendar days before the proposed pick-up date. The Department is not
obligated to load the bridge components without this notice. Take responsibility and sign for
each item loaded at the time of issuance.
Provide timber dunnage, and transport the bridge components from the designated
storage facility to the job site. Unload, erect, and maintain the bridge, then dismantle the bridge
and load and return the components to the designated storage facility.
Notify the Engineer in writing at least 10 calendar days before returning the
components. Include in this notice the name of the Contractor’s representative authorized to sign
for return of the bridge components. The yard supervisor is not obligated to unload the bridge
components without this notice.
The Department will provide equipment and an operator at the Department’s
storage facility to assist in loading and unloading the bridge components. Furnish all other labor
and equipment required for loading and unloading the components.
The Department’s representative will record all bridge components issued or
returned on the Detour Bridge Issue and Credit Ticket. The tickets must be signed by a
Department and a Contractor representative, after loading or unloading each truck to document
the quantity and type of bridging issued or returned.
Bind together all bridge components to be returned in accordance with the
instructions given by the storage facility. The yard supervisor will repack components that are
not packed in compliance with these instructions. Upon request, written packing instructions will
be made available to the Contractor, before dismantling of the bridge for return to the
Department’s storage facility. 120FY 2023-24Return to Table of Contents
Assume responsibility for any shortage or damage to the bridge components.
Monies due the Contractor will be reduced at the rate of $35.00 per hour plus materials for
repacking, repairs or replacement of bridge components.
The skid resistance of open steel grid decking on the detour bridge may decrease
gradually after opening the bridge to traffic. The Department will furnish a pneumatic floor
scabbler machine for roughening the roadway surface of the detour bridge decking. Provide an
air compressor at the job site with 200 cubic feet per minute capacity, 90 psi air pressure for the
power supply of the machine, and an operator. Transport the scabbler machine to and from the
Department’s structures shop. Repair any damage to the scabbler machine caused by operations
at no expense to the Department. Perform scabbling when determined necessary by the Engineer.
The Department will pay for the cost of scabbling as Unforeseeable Work in accordance with
4-4.
Return the bridge components to the designated storage facility beginning no later
than 10 calendar days after the date the detour bridge is no longer needed, the date the new
bridge is placed in service, or the date Contract Time expires, whichever is earliest. Return the
detour bridging at an average of not less than 200 feet per week. Upon failure to return the bridge
components to the Department within the time specified, compensate the Department for the
bridge components not returned at the rate of $5.00 per 10 feet, per day, per bridge, for single
lane; and $10.00 per 10 feet, per day, per bridge, for dual lane until the bridge components are
returned to the Department.
102-6.3Construction Methods: Select and use construction methods and materials that
provide a stable and safe detour facility. Construct the detour facility to have sufficient durability
to remain in good condition, supplemented by maintenance, for the entire period that the detour
is required.
102-6.4Removal of Detours: Remove detours when they are no longer needed and
before the Contract is completed. Take ownership of all materials from the detour and dispose of
them, except for the materials on loan from the Department with the stipulation that they are
returned.
102-6.5Detours Over Existing Roads and Streets: When the Department specifies that
traffic be detoured over roads or streets outside the project area, do not maintain such roads or
streets. However, maintain all signs and other devices placed for the purpose of the detour.
102-6.6Operation of Existing Movable Bridges: The Department will maintain and
operate existing moveable bridges that are to be removed by the Contractor until such time as
they are closed to traffic. During this period, make immediate repairs of any damage to such
structures caused by use or operations related to the work at no expense to the Department, but
do not provide routine repairs or maintenance. In the event that use or operations result in
damage to a bridge requiring repairs, give such repairs top priority to any equipment, material, or
labor available.
102-6.7Special Detour: A special detour is defined as a diversion or lane shift for
vehicular traffic that requires temporary pavement.
102-6.8Pedestrian or Bicycle Special Detour: A pedestrian or bicycle special detour is
defined as a temporary pedestrian or bicycle way that requires temporary pavement or other
stable, firm, slip-resistant surface. 121FY 2023-24Return to Table of Contents
102-7Traffic Control Officer
Provide uniformed law enforcement officers, including marked law enforcement
vehicles, to assist in controlling and directing traffic in the work zone when the following types
of work is necessary on projects:
toll roads, and expressways) for work within the travel lane.
facilities, when called for in the TTCP or approved by the Engineer.
posted speed limits 55 mph or greater.
At no additional cost to the Department, traffic control officers may be used for
operations other than those listed above.
The Department will not consider any claim arising from the failure of a traffic control
officer to be present or available on the project. A noncompensable time extension may be
granted when a state or local emergency requires all area law enforcement officers to be on-duty
and not available for hire.
102-8Driveway Maintenance
102-8.1General: Ensure that each residence and business has safe, stable, and
reasonable access.
102-8.2Construction Methods: Place, level, manipulate, compact, and maintain the
material, to the extent appropriate for the intended use.
As permanent driveway construction is accomplished at a particular location, the
Contractor may salvage and reuse previously placed materials that are suitable for reuse on other
driveways.
102-9Temporary Traffic Control Devices
102-9.1General: Use only devices that are listed on the APL and use in conformance
with the APL drawings. Immediately remove or cover, using any method of covering approved
by the Engineer, any existing or temporary devices (e.g., signs) that do not apply to current
conditions.
The use of NCHRP Report 350 Recommended Procedures for the Safety
Performance Evaluation of Highway Features devices purchased prior to January 1, 2020 is
permitted on projects let prior to January 1, 2030. All devices manufactured or purchased on or
after January 1, 2020, must be MASH compliant in accordance with Section 990.
The APL number is to be permanently marked on the device at a readily visible
location. Sheeting used on devices and pavement markings are exempt from this requirement.
Notify the Engineer in writing of any scheduled operation that will affect traffic
patterns or safety sufficiently in advance of commencing such operation to permit review of the
plan for the proposed installation of temporary traffic control devices.
Assign an employee the responsibility of maintaining the position and condition
of all temporary traffic control devices throughout the duration of the Contract. Keep the
Engineer advised at all times of the identification and means of contacting this employee on a
24-hour basis. 122FY 2023-24Return to Table of Contents
Maintain temporary traffic control devices in the correct position, properly
oriented, clearly visible and clean, at all times. All applicable temporary traffic control devices
must meet the classification category of Acceptable as defined in the American Traffic Safety
Services Association (ATSSA) Quality Guidelines for Temporary Traffic Control Devices and
Features. Temporary concrete barriers must meet the classification category of Acceptable
defined in the Department’s Temporary Concrete Barrier Evaluation Guide, which may be
viewed at the following URL:
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-
source/programmanagement/implemented/urlinspecs/files/docs/default-source/content-
docs/programmanagement/implemented/urlinspecs/files/temporaryconcretebarrierguide.pdf.pdf?
sfvrsn=343b4c97_10. Pedestrian Longitudinal Channelizing Devices (LCDs) must meet the
classification category of Acceptable as defined in the Pedestrian LCD Evaluation Guide, which
may be viewed at the following URL:
https://fdotwww.blob.core.windows.net/sitefinity/docs/default-
source/programmanagement/implemented/urlinspecs/files/lcdevaluationguide.pdf?sfvrsn=166e0f
16_2. Immediately repair, replace or clean damaged, defaced or dirty devices. Traffic control
devices must not be cleaned while installed/used. Use of warning lights on any temporary traffic
control device is prohibited, with the exception of the trailer mounted portable regulatory signs.
Employ an approved independent Channelizing Device Supplier (CDS) to provide
and maintain the condition of the following non-fixed channelizing devices: drums, cones,
vertical panels, barricades, temporary tubular markers, and pedestrian longitudinal channelizing
devices. Cones may be provided and maintained by the Contractor.
The CDS shall not be affiliated with the Contractor and must be approved by the
Department. Department approved CDSs are listed on the State Construction Office website.
CDSs seeking inclusion on the list must meet the requirements of 102-9.1.1. The CDS shall
submit a monthly certification on letterhead that the channelizing devices mentioned above
installed/used within the work zone meet classification category of Acceptable as defined in the
Pedestrian LCD Evaluation Guide and the ATSSA Quality Guidelines for Temporary Traffic
Control Devices and Features. The CDS shall submit the monthly certification on letterhead for
channelizing devices installed/used within the work zone. The CDS certification shall include the
following statement, “I certify that I have provided and maintained the following devices <list
devices covered under the certification> in accordance with Pedestrian LCD Evaluation Guide
and the ATSSA Quality Guidelines for Temporary Traffic Control Devices and Features.” If the
Contractor chooses to provide and maintain cones, the Contractor must submit a monthly
Contractor certification on letterhead that all cones installed/used within the work zone meet
acceptable standards as outlined in the ATSSA Quality Guidelines for Temporary Traffic
Control Devices and Features. The Contractor certification shall include the following statement,
“I certify that I have provided and maintained cones in accordance with the ATSSA Quality
Guidelines for Temporary Traffic Control Devices and Features.”
102-9.1.1 Approved Independent Channelizing Device Supplier (CDS)
Requirements: Submit the following documents to the State Construction Office for review and
approval
company or company officer with the following information and statements:
123FY 2023-24Return to Table of Contents
CDS on any project where there is common ownership, directly or indirectly, between the
company and the Contractor.
maintain the condition of all channelizing devices with the exception of cones as required in 102-
9.1 with its own forces.
providing channelizing device supplier services, with its own inventory of channelizing devices.
company’s experience as a channelizing device supplier for the five years declared in item 1(d)
above including the following information:
work performed,
area code,
for and phone number with area code.
frequency and methods for maintaining the condition of all channelizing devices, except cones
owned and maintained by the Contractor, installed/used in the work zone.
102-9.2Work Zone Signs: Use work zone signs in accordance with the TTCP and
Standard Plans.
102-9.2.1 Post Mounted Signs: Meet the requirements of 990-8.
102-9.2.2 Portable Signs: Portable signs may be used when the work zone
condition will be in place for 24 hours or less, or as approved by the Engineer.
102-9.2.3 Barrier-Mounted Signs: If post mounting criteria cannot be achieved
and a barrier or traffic railing exists, attach work zone signs to barrier or traffic railing in
accordance with the Standard Plans. Use Standard Plans, Index 700-012 only when mounting the
sign to the top of the barrier or traffic railing places the sign panel closer than two feet from the
traveled way.
102-9.3Business Signs: Use business signs in accordance with the TTCP and Standard
Plans. Furnish signs having retroreflective sheeting meeting the requirements of Section 990.
102-9.4Channelizing Devices: Use channelizing devices in accordance with the TTCP,
Standard Plans, and MUTCD.
102-9.4.1 Cones: Use cones in active work zones where workers are present.
Use cone collars at night designed to properly fit the taper of the cone when
installed. Collars may be removeable or attached permanently. Place the upper 6-inch collar a
uniform 3-1/2 inches distance from the top of the cone and the lower 4-inch collar a uniform
2 inches distance below the bottom of the upper 6-inch collar.
102-9.4.2 Pedestrian Longitudinal Channelizing Devices (LCDs): Use LCDs
listed on the APL for pedestrian use and meeting the requirements of Section 990 and the
Standard Plans. Pedestrian LCDs must be interlocked except for the stand-alone unit placed
perpendicular to a sidewalk. Ballast pedestrian LCDs as shown on the APL. 124FY 2023-24Return to Table of Contents
Ensure that joints on the pedestrian LCDs are free of sharp edges and have
a maximum offset of 1/2 inch in any plane.
102-9.5Temporary Barrier: Use temporary barrier in accordance with the TTCP and
Standard Plans. Obtain and use precast temporary concrete barrier from a manufacturing plant
that is on the Department’s Production Facility Listing. Temporary concrete barrier must meet
the material and construction requirements of Section 521 unless noted otherwise in the Standard
Plans. Proprietary temporary concrete, steel, or water filled barrier used must be listed on the
APL.
The maximum allowable height increase between consecutive temporary barrier
units in the direction of traffic is one inch.
Temporary barrier must comply with Standard Plans, Index 102-100 or 102-120.
Install temporary barriers as either anchored or freestanding as shown in the TTCP or the
Standard Plans. An anchored unit is defined as having at least one stake or bolt into the
underlying pavement or bridge deck. All other units, including those with keeper pins, are
considered freestanding.
Remove temporary asphalt pads and repair all attachment scars to permanent
structures and pavements after barrier removal. Make necessary repairs due to defective material,
work, or Contractor operations at no cost to the Department. Restore barrier damaged by the
traveling public within 24 hours after notification as authorized by the Engineer.
Trailer mounted barriers listed on the APL may be used in lieu of temporary
barriers or positive protection the option of the Contractor. Trailer mounted barriers listed on the
APL must have an FHWA eligibility letter and be successfully crash tested in accordance with
MASH TL-3 criteria. All trailer mounted barriers must be equipped with an APL listed truck
mounted attenuator, an APL listed vehicle mounted arrow board and vehicle warning lights in
accordance with this Section.
102-9.5.1 Temporary Barrier Meeting the Requirements of Standard Plans,
Index 102-120 and 102-110: Ensure the marking requirements of the respective Index are met.
102-9.5.1.1: Proprietary Precast Temporary Concrete Barrier
Fabricated prior to 2005: Submit a certification stating that all unmarked barrier units meet the
requirements of the Specifications and the Standard Plans. Certifications will be project specific
and non-transferable.
102-9.5.1.2 Proprietary Precast Temporary Concrete Barrier
Fabricated in 2005 or later: Ensure each barrier unit has permanent clear markings, showing
the manufacture date, serial number, manufacturer’s name or symbol, and the APL number.
Label the markings on a plate, plaque, or cast in the unit. Proprietary barrier fabricated prior to
2016 and marked with the “INDX 521” in lieu of the APL number will be permitted.
102-9.5.1.3 Temporary Concrete Barrier Repair: Before beginning the
repair, remove all laitance, loose material, and any other deleterious matter to sound concrete or
a minimum depth of one inch. Additionally, when reinforcing bars, inserts or weldments are
exposed, remove the concrete to provide a minimum one-inch clearance all around. Fill the
repair area with an approved high performance concrete repair material in accordance with 930-5
and the manufacturer’s recommendations. Restore surfaces and edges to the original dimensions
and shape of the barrier.
Repairs are not allowed on barrier units that have one or more of the
following deficiencies: structural cracking or cracks that exist through the entire cross-section;
unit-to-unit connection assemblies or anchor slots are broken or no longer in a fixed position. 125FY 2023-24Return to Table of Contents
Do not paint repaired barriers.
102-9.6Barrier Delineators: Use barrier delineators on top of temporary barriers in
accordance with the Standard Plans and the requirements of Section 705.
102-9.7Temporary Glare Screen: Use temporary glare screens listed on the APL that
meet the requirements of Section 990.Use screen systems in conjunction with temporary barrier
at locations identified in the Plans.
When glare screen is utilized on temporary barrier, barrier delineators will not be
required.
102-9.8Temporary Crash Cushion (Redirective or Gating): Use temporary crash
cushions in accordance with the details and notes shown in the TTCP, Standard Plans, and
requirements of the pre-approved alternatives listed on the APL.
Temporary crash cushions can be either new or used functionally sound
refurbished devices. Performance of intended function is the only condition for acceptance. All
metallic components must be galvanized in accordance with Section 967.
Anchor abutting temporary barrier in accordance the Standard Plans or APL
drawings, as required. Bidirectional installations must have a transition panel installed between
the crash cushion and the abutting barrier. Delineate the crash cushion in accordance with
materials or equipment within the length of the crash cushion.
Remove temporary asphalt or concrete pads and repair all attachment scars to
permanent structures and pavements after crash cushion removal. Make necessary repairs due to
defective material, work, or Contractor operations at no cost to the Department. Restore crash
cushions damaged by the traveling public within 24 hours after notification as authorized by the
Engineer.
102-9.9Temporary Guardrail: Use temporary guardrail in accordance with the TTCP
and Standard Plans. Install the temporary guardrail in accordance with the Section 536.
102-9.10Trailer Mounted Devices:
102-9.10.1 Arrow Board: Use arrow boards in accordance with the TTCP,
Standard Plans, and that meet the requirements of Section 990. Ensure that the arrow board
display panel is raised to a fully upright position and is fully visible to motorists. Use Type B
arrow boards on roadways with an existing posted speed of 45 MPH or less for maintenance and
mobile operations on any speed facility. Use Type C arrow boards for all other operations on
roadways with an existing posted speed of 50 MPH or greater, and may be substituted for
Type B arrow boards on any speed facility.
102-9.10.2 Portable Changeable Message Sign (PCMS): Use PCMSs or truck
mounted changeable message signs in accordance with the TTCP, Standard Plans and
Section 990 to supplement other temporary traffic control devices used in work zones. Ensure
that the PCMS display panel is raised to a fully upright position and is fully visible to motorists.
Reduce the intensity of the flashers when using PCMS at night. Use PCMS with a minimum
letter height of 18 inches. For facilities with posted speed limits of 45 mph or less, PCMS with a
minimum letter height of 12 inches may be used.
For roadways with speed limits greater than 45 mph, the message displayed on the
PCMS must be unobstructed from 800 feet. For roadways with speed limits of 45 mph or less,
the message displayed must be unobstructed from 650 feet. 126FY 2023-24Return to Table of Contents
Messages must have no more than two phases. The display time for each phase
must be at least two seconds but no more than three seconds. The sum of the display time must
be a maximum of six seconds.
102-9.10.3 Portable Regulatory Signs (PRS): Use PRSs in accordance with the
TTCP, Standard Plans, and. Section 990. Ensure that the PRS sign panel is raised to a fully
upright position and is fully visible to motorists.
Activate portable regulatory signs only during active work activities and
deactivate when no work is being performed.
102-9.10.4 Radar Speed Display Unit (RSDU): Use RSDUs in accordance with
the TTCP, Standard Plans and Section 990 to inform motorists of the posted speed and their
actual speed. Ensure that the RSDU display panel is mounted in accordance with the
manufacturer’s recommendations.
Activate the radar speed display unit only during active work activities and
deactivate when no work is being performed.
102-9.11Temporary Signalization and Maintenance: Provide and maintain temporary
signals and signalization at existing, temporary, and new intersections including, but not limited
to, the following:
the TTCP,
devices. Coordination timing will require maintaining functionality of system communications.
Phase and time signals in accordance with the Plans. Obtain approval from the
District Traffic Operations Engineer for any timing changes that are either reoccurring or last
longer than 24 hours.
Restore any loss of operation within 12 hours after notification. Provide alternate
temporary traffic control until the signalization is restored.
Provide temporary pedestrian signalization in accordance with the TTCP, and
maintain pedestrian signalization at existing, temporary, and new intersections.
Provide traffic signal equipment that meets the requirements of the Standard Plans
and 603-2. The Engineer may approve used signal equipment if it is in acceptable condition.
Replacement components for traffic signal cabinet assemblies will be provided by the
maintaining agency.
102-9.11.1 Temporary Signals for Lane Closures on Two-Lane, Two-Way
Roadways: Temporary signals may be used, at the Contractor’s option, as an alternate to
flaggers for lane closure operations on two-lane, two-way roadways in accordance with Standard
Plans, Index 102-606. The Contractor’s Engineer of Record must provide the signal timing for
the temporary signals. The District Traffic Operations Engineer must approve the installation and
timing of temporary signals prior to beginning work. Adjust timing based on changing field
conditions as approved by the Worksite Traffic Supervisor. Submit to the Engineer any timing
changes that are reoccurring or last longer than 24 hours for District Traffic Operations
Engineer’s approval Temporary signals can either be portable signals or span wire signals and
must be listed on the APL. Provide two signal faces for each approach. 127FY 2023-24Return to Table of Contents
102-9.12Temporary Traffic Detection and Maintenance: Provide and maintain
temporary traffic detection at existing, temporary, and new signalized intersections. Ensure that
vehicle detectors and systems can detect vehicles in each movement on each approach and call
the correct vehicle phase when vehicle demand is present. Ensure adjacent lanes and opposing
movements do not place false calls. Provide temporary pedestrian detection in accordance with
the TTCP, and maintain pedestrian detection at existing, temporary, and new intersections.
Ensure pedestrian detectors call the correct pedestrian phase when pedestrian demand is present.
Provide temporary traffic detection equipment listed on the APL.
Restore any loss of detection within 12 hours. If permanent traffic detection cannot be
restored within 12 hours, provide temporary detection. Ensure 90% accuracy per signal phase,
measured at the initial installation and after any lane shifts, by comparing sample data collected
from the detection system with ground truth data collected by human observation. Collect the
sample and ground truth data for a minimum of five minutes during a peak and five minutes
during an off-peak period with a minimum three detections for each signal phase. Perform the
test in the presence of the Engineer.
102-9.13Existing ITS Maintenance: Provide maintenance at existing ITS locations
Diagnose any loss of functionality within 8 hours. Restore any loss of functionality within
24 hours. The Engineer may extend the allowable downtime beyond 24 hours. Configure and
install Department furnished equipment as necessary. Ensure that all stand-alone functions of
replaced ITS devices are tested as detailed in the Contract Documents and as approved by the
Engineer. Perform the test in the presence of the Engineer.
102-9.14Truck Mounted Attenuators and Trailer Mounted Attenuators: Use truck
mounted and trailer mounted attenuators in accordance with the manufacturer’s
recommendations and Standard Plans.
For existing posted speeds of 50 mph or greater, use either truck mounted
attenuators or trailer mounted attenuators that meet TL-3 criteria. For existing posted speeds of
45 mph or less, use either truck mounted attenuators or trailer mounted attenuators that meet
TL-2 or TL-3 criteria.
102-9.15Temporary Raised Rumble Strip Set: Use temporary raised rumble strips per
the manufacturer’s recommendations and in accordance with Standard Plans, Index 102-603.
The temporary raised rumble strip may be either a removable striping type or a
portable type. Use a consistent type and color throughout the work zone.
102-9.16Automated Flagger Assistance Devices (AFAD): Furnish, install, maintain,
remove, and relocate AFADs in accordance with the Plans, Standard Plans, Index 102-603, and
APL vendor drawings.
Position AFADs where they are clearly visible to oncoming traffic. AFADs may
be placed on the centerline if they have been successfully crash tested in accordance with
MASH TL-3 criteria. A gate arm is required in accordance with Section 990 if a single AFAD is
used on the shoulder to control one direction of traffic.
The devices may be operated either by a single flagger at one end of the traffic
control zone, from a central location, or by a separate flagger near each device location. Use only
flaggers trained in accordance with Section 105 and in the operation of the AFAD. When in use,
each AFAD must be in view of, and attended at all times by, the flagger operating the device.
Provide two flaggers on-site and use one of the following methods in the
deployment of AFADs:
128FY 2023-24Return to Table of Contents
flagger at the opposite end.
A single flagger may simultaneously operate two AFADs as described in (1) or a
single AFAD as described in (2) if all of the following conditions are met:
directions,
operations with flaggers or immediately cease the flagging operation and reopen the roadway.
AFADs may be either a remotely controlled Stop/Slow AFAD mounted on either
a trailer or a movable cart system, or a remotely controlled Red/Yellow Lens AFAD.
Illuminate the flagging station when the AFAD is used at night. When the AFAD
is not in use, remove or cover signs and move the AFAD device outside the clear zone or shield
it with a barrier.
AFADs will not be paid for separately. AFADs may be used as a supplement or
an alternate to flaggers in accordance with the Plans, Standard Plans, Index 102-603, and the
APL vendor drawings. Include the cost for AFADs in Maintenance of Traffic, Lump Sum.
102-9.17Temporary Lane Separator: Use temporary lane separators (asphalt or
portable) in accordance with the TTCP and Standard Plans.
When using portable temporary lane separators, anchor the portable temporary
lane separator with a removable anchor bolt. Use epoxy on bridge decks where anchoring is not
allowed. Remove the epoxy from the bridge deck by hydroblasting or other method approved by
the Engineer.
Repair any damage to the existing pavement caused by the removal of temporary
lane separator.
102-9.18Type III Barricades: Use type III barricades in accordance with the TTCP and
Standard Plans. Ensure stripes are sloping downward in the direction road users are to pass.
Mount sign panels in accordance with the manufacturer’s instructions. Do not place ballast on
any rails, or higher than 13 inches above the driving surface. Do not splice the retroreflective
sheeting.
102-10Work Zone Pavement Marking
102-10.1Description: Furnish and install work zone pavement markings for MOT in
construction areas and in close conformity with the lines and details shown in the Plans and
Standard Plans.
Centerlines, lane lines, edge lines, stop bars, standard crosswalks, and turn arrows
will be required in work zones prior to opening the road to traffic.
102.10.2 Painted Pavement Markings:
102-10.2.1 General: Use painted pavement markings meeting the requirements of
Section 710. Use standard paint unless otherwise identified in the Plans or approved by the
Engineer.
102-10.3Removable Tape:
102-10.3.1 Application: Apply removable tape with a mechanical applicator to
provide pavement lines that are neat, accurate and uniform. Equip the mechanical applicator with
a film cut-off device and with measuring devices that automatically and accumulatively measure
the length of each line placed within an accuracy tolerance of plus or minus 2%. Ensure 129FY 2023-24Return to Table of Contents
removable tape adheres to the road surface. Removable tape may be placed by hand on short
sections, 500 feet or less, if it is done in a neat accurate manner.
102-10.3.2 Retroreflectivity: Apply white and yellow removable tape pavement
markings that will attain an initial retroreflectivity of not less than 300 mcd/lx·m for white and
not less than 250 mcd/lx·m for yellow markings. Black portions of contrast tapes and black
masking tapes must have a retroreflectance of less than 20 mcd/lx·m .
Measure, record and certify on the Department approved form and submit
to the Engineer, the retroreflectivity of white and yellow removable tape pavement markings in
accordance with FM 5-541.
102-10.3.3 Removability: Provide removable tape capable of being removed
from bituminous concrete and portland cement concrete pavement intact or in substantially large
strips after being in place for a minimum of 90 days, either manually or by a mechanical roll-up
device, at temperatures above 40ºF, without the use of heat, solvents, grinding or blasting.
102-10.4Temporary Raised Pavement Markers (RPMs): Use Class B RPMs except
for work that consists of ground-in rumble strips at centerline locations. For ground-in rumble
strips at centerline locations, use temporary RPMs in accordance with Section 710. Install all
markers in accordance with the manufacturer’s recommendations, the Standard Plans, and
Section 706. After initial installation, replace broken or missing temporary RPMs in locations
where more than three consecutive temporary RPMs are broken or missing at no expense to the
Department.
102-11Method of Measurement
102-11.1General: Devices installed/used on the project on any calendar day or portion
thereof, within the Contract Time, including time extensions which may be granted, will be paid
for at the Contract unit price for the applicable pay item. Include the cost of any work that is
necessary to meet the requirements of the Contract Documents for MOT under Maintenance of
Traffic, lump sum when separate payment is not provided.
102-11.2Traffic Control Officers: The quantity to be paid for traffic control officers
will be at the Contract unit price per hour (4 hour minimum) for the actual number of officers
certified to be on the project site, including any law enforcement vehicles and all other direct and
indirect costs. Payment will be made only for those traffic control officers specified in the Plans
and authorized by the Engineer.
102-11.3Special Detours: When a special detour is shown in the Plans, the work of
constructing, maintaining, and subsequently removing such detour facilities will be paid for
under Special Detour, lump sum. However, traffic control devices, warning devices, barriers,
signing, pavement markings, and restoration to final configuration will be paid for under their
respective pay items.
102-11.4Commercial Material for Driveway Maintenance: The quantity to be paid
for will be the certified volume, in cubic yards, of all materials authorized by the Engineer,
acceptably placed and maintained for driveway maintenance. The volume, which is authorized to
be reused, and which is acceptably salvaged, placed, and maintained in other designated
driveways will be included again for payment. Commercial Material used for Temporary
Openings will not be included for separate payment.
102-11.5Work Zone Signs: The number of temporary post-mounted signs (temporary
regulatory, warning and guide) certified as installed/used on the project will be paid for at the
Contract unit price for work zone signs. When multiple signs are located on single or multiple 130FY 2023-24Return to Table of Contents
posts, each sign panel will be paid individually. Signs greater than 20 square feet and detailed in
the Plans will be paid for under Maintenance of Traffic, lump sum.
Temporary portable signs (excluding mesh signs) and vehicular mounted signs
will be included for payment under work zone signs, only if used in accordance with the
Standard Plans.
The number of temporary barrier mounted signs (temporary regulatory, warning
and guide) certified as installed/used on the project will be paid for at the Contract unit price for
barrier mounted work zone signs.
Work zone signs may be installed fourteen days prior to the start of Contract Time
with the approval of the Engineer and at no additional cost to the Department.
102-11.6. Business Signs: The number of business signs certified as installed/used on the
project will be paid for at the Contract unit price for business signs.
102-11.7Channelizing Devices: The number of drums, vertical panels, and Type I,
Type II, or direction indicator barricades, certified as installed/used on the project meeting the
requirements of Standard Plans, Index 102-600 and have been properly maintained will be paid
for at the Contract unit prices for channelizing device.
Payment for drums, vertical panels, and Type I, Type II, and direction indicator
barricades will be paid per each per day.
Payment for vehicular LCDs will be paid as the length in feet installed divided by
the device spacing for barricades, vertical panels, and drums and certified as installed/used on the
project meeting the requirements of Standard Plans, Index 102-600 and have been properly
maintained will be paid for at the Contract unit price for channelizing device.
Payment for pedestrian LCDs, certified as installed/used on the project and
properly maintained, will be paid per linear foot per day. Placement of pedestrian LCDs at
locations not shown in the TTCP, or not authorized by the Engineer, will be at the Contractor’s
expense. Payment for pedestrian LCD mounted signs will be made under Work Zone Signs.
Payment will not be made for channelizing devices unsatisfactorily maintained, as
determined by the Engineer. Payment will be made for each channelizing device that is used to
delineate trailer mounted devices. Payment will be made for channelizing devices delineating
portable changeable message signs during the period beginning 14 working days before Contract
Time begins as authorized by the Engineer.
102-11.8Temporary Barrier: The quantity to be paid for will be the length, in feet, of
freestanding units or anchored units certified as installed/used on the project. The quantity to be
paid for relocating barrier will be based on the relocated installation type. No separate payment
will be made for the asphalt pad. For freestanding units transitioned to a crash cushion, the cost
of anchoring the transition units will be included in the cost of the temporary crash cushion in
accordance with 102-11.11.
102-11.9Barrier Delineators: No separate payment will be made for barrier delineators
installed on top of temporary barrier . Include the cost for barrier delineators in the cost of the
barrier.
102-11.10Temporary Glare Screen: The certified quantity to be paid for will be
determined by the number of sections times the nominal length of each section.
102-11.11Temporary Crash Cushions: No separate payment will be made for the
concrete or asphalt pad.
102-11.11.1 Redirective: The quantity to be paid for will be the number of
temporary crash cushions (redirective) certified as installed/used and maintained on the project, 131FY 2023-24Return to Table of Contents
including anchoring of temporary barrier necessary for transition to the crash cushion and
delineation.
102-11.11.2 Gating: The quantity to be paid for will be the number of temporary
crash cushions (gating) certified as installed/used and maintained on the project, including
anchoring of temporary barrier necessary for transition to the crash cushion and delineation.
102-11.12Temporary Guardrail: The quantity to be paid for will be the length, in feet,
of temporary guardrail constructed and certified as installed/used on the project. The length of a
run of guardrail will be determined as a multiple of the nominal panel lengths.
102-11.13Arrow Board: The quantity to be paid at the contract unit price will be for the
number of arrow boards certified as installed/used on the project on any calendar day or portion
thereof within the Contract Time. Payment will be made for up to two inactive days where the
arrow board is used on the two days preceding and following the inactive days as authorized by
the Engineer. Payment for additional days may be authorized by the Engineer due to inclement
weather.
102-11.14Portable Changeable Message Sign: The quantity to be paid at the Contract
unit price will be for the number of PCMSs or truck mounted changeable message signs certified
as installed/used on the project on any calendar day or portion thereof within the Contract Time.
Payment will be made for each portable changeable message sign that is used during the period
beginning 14 working days before Contract Time begins as authorized by the Engineer. Payment
will be made for up to two inactive days where the portable changeable message sign is used on
the two days preceding and following the inactive days as authorized by the Engineer. Payment
for additional days may be authorized by the Engineer due to inclement weather.
102-11.15Portable Regulatory Signs: The quantity to be paid for will be the number of
portable regulatory signs certified as installed/used on the project on any calendar day or portion
thereof within the Contract Time, will be paid for the Contract unit price for portable regulatory
sign. Payment will be made for up to two inactive days where the portable regulatory sign is used
on the two days preceding and following the inactive days as authorized by the Engineer.
Payment for additional days may be authorized by the Engineer due to inclement weather.
102-11.16Radar Speed Display Unit: The quantity to be paid for will be the number of
radar speed display units certified as installed/used on the project on any calendar day or portion
thereof within the Contract Time, will be paid for the Contract unit price for radar speed display
unit. Payment will be made for up to two inactive days where the radar speed display unit is used
on the two days preceding and following the inactive days as authorized by the Engineer.
Payment for additional days may be authorized by the Engineer due to inclement weather.
102-11.17Temporary Signalization and Maintenance: For existing intersections, the
certified quantity to be paid for will be the number of signalized intersections per day for the full
duration of the Contract. For temporary intersections, the certified quantity to be paid for will be
the number of signalized intersections per day for the duration of the temporary intersection. No
separate payment will be made for temporary signalization and maintenance at new intersections.
102-11.18Temporary Traffic Detection and Maintenance: For existing intersections,
the certified quantity to be paid for will be the number of signalized intersections per day
beginning the day Contract Time begins and ending on the day the permanent detection is
operational and the final lane configuration is in place. For temporary and new intersections, the
certified quantity to be paid for will be the number of signalized intersections per day beginning
the day the temporary detection is functional and ending the day: the permanent detection is 132FY 2023-24Return to Table of Contents
operational and the final lane configuration is in place for a new intersection; or, when the
detection is removed for a temporary intersection.
102-11.19Existing ITS Maintenance: For existing ITS locations, the certified quantity
to be paid for will be the number of calendar days from Contract Time start to Final Acceptance.
102-11.20Work Zone Pavement Markings: Painted pavement markings will be paid as
specified in 710-10. The quantity of removable tape to be paid for solid, 10’-30’ skip, 3’-9’
dotted, 6’-10’ dotted, and 2’-4’ dotted lines will be the length, in gross miles, authorized and
acceptably applied under this Section and certified as installed/used on the project. The quantity
of removable tape to be paid for transverse lines will be the length, in linear feet, authorized and
acceptably applied under this Section and certified as installed/used on the project. The quantity
of removable tape to be paid for pavement messages, symbols, and arrows will be per each,
authorized and acceptably applied under this Section and certified as installed/used on the
project. The quantity of temporary RPMs to be paid will be the number of RPMs authorized and
acceptably applied. No separate payment will be made for the cost of removing conflicting
pavement markings. Payment for removing conflicting pavement markings (paint, tape,
thermoplastic, raised pavement markers, etc.) will be included in Maintenance of Traffic, lump
sum.
102-11.21Temporary Raised Rumble Strips: The quantity to be paid for will be the
number of calendar days, or portions thereof, that temporary raised rumble strips are certified as
installed/used on the project within the Contract Time. No adjustment will be made to the per
day measurement for the number of strips or sets used, or for the number of times the sets are
relocated.
102-11.22Temporary Lane Separator: The quantity to be paid for will be the field
measure, in feet, of temporary lane separator certified as installed/used on the project, including
drainage gaps, completed and accepted. The cost of any pavement repairs due to removal is
included in the cost of Maintenance of Traffic, lump sum.
102-11.23Temporary Signals for Lane Closures on Two-Lane, Two-Way
Roadways: The quantity to be paid for will be the number of temporary signals per day
installed/used at the locations shown in the TTCP. Temporary signals installed/used at the
Contractor’s option as an alternative to flaggers will be included in Maintenance of Traffic, lump
sum.
102-11.24Temporary Highway Lighting: When temporary highway lighting is
required by the Plans, the work of constructing, maintaining, and removing the temporary
highway lighting, including all materials and any necessary design work, will be paid for under
temporary highway lighting, lump sum.
102-11.25Pedestrian or Bicycle Special Detours: When a pedestrian or bicycle special
detour is shown in the Plans, the work of constructing, maintaining, and subsequently removing
such detour facilities will be paid for under pedestrian or bicycle special detour, lump sum.
However, traffic control devices, warning devices, barriers, signing, pavement markings, and
restoration to final configuration will be paid for under their respective pay items.
102-11.26Type III Barricades: The number of type III barricades certified as
installed/used on the project will be paid for at the Contract unit price for type III barricades.
102-11.27Limited Access Temporary Openings: Include all construction,
maintenance, removal, and restoration costs of temporary openings in Maintenance of Traffic,
lump sum. No separate payment will be made for commercial material, gates, or fence. 133FY 2023-24Return to Table of Contents
102-12Submittals
102-12.1Submittal Instructions: Prepare a certification of quantities, using the
Department’s current approved form, for certified MOT payment items for each project in the
Contract. Submit the certification of quantities to the Engineer. The Department will not pay for
any disputed items until the Engineer approves the certification of quantities.
102-12.2Contractor’s Certification of Quantities: Request payment by submitting a
certification of quantities no later than Twelve O’clock noon Monday after the estimate cut-off
date or as directed by the Engineer, based on the amount of work done or completed. Ensure the
certification consists of the following:
the period that the certification represents.
previously made and less an amount previously retained or withheld. The basis will include a
detail breakdown provided on the certification of items of payment in accordance with the Basis
of Payment. After the initial setup of the MOT items and counts, the interval for recording the
counts will be made weekly on the certification sheet unless there is a change. This change will
be documented on the day of occurrence. Some items may necessitate a daily interval of
recording the counts.
102-13Basis of Payment
102-13.1Maintenance of Traffic (General Work): When an item of work is included
in the proposal, price and payment will be full compensation for all work and costs specified
under this Section except as may be specifically covered for payment under other items.
102-13.2Traffic Control Officers: Price and payment will be full compensation for the
services of the traffic control officers.
102-13.3Special Detours: Price and payment will be full compensation for providing all
detour facilities shown in the Plans and all costs incurred in carrying out all requirements of this
Section for general MOT within the limits of the detour, as shown in the Plans.
102-13.4Commercial Materials for Driveway Maintenance: Price and payment will
be full compensation for all work and materials specified for this item, including specifically all
required shaping and maintaining of driveways.
102-13.5Work Zone Signs: Price and payment will be full compensation for all work
and materials for furnishing signs, supports and necessary hardware, installation, relocating,
maintaining, covering, and removing signs.
102-13.6. Business Signs: Price and payment will be full compensation for all materials
and labor required for furnishing, installing, relocating, maintaining, and removing the signs as
well as the cost of installing any logos provided by business owners.
102-13.7Channelizing Devices: Prices and payment will be full compensation for
furnishing, installing, relocating, maintaining and removing the channelizing devices.
102-13.8Temporary Barrier: Price and payment will be full compensation for
furnishing, installing, maintaining, and removing the barrier and asphalt pad. When called for,
temporary barrier (relocate) will be full compensation for relocating the barrier.
102-13.9Temporary Glare Screen: Price and payment will be full compensation for
furnishing, installing, maintaining, and removing the glare screen certified as installed/used on
the project. When called for, glare screen (relocate) will be full compensation for relocating the
glare screen. 134FY 2023-24Return to Table of Contents
102-13.10Temporary Crash Cushion (Redirective or Gating): Price and payment will
be full compensation for furnishing, installing, maintaining, and removing crash cushions, object
markers, and concrete or asphalt pads.
102-13.11Temporary Guardrail: Price and payment will be full compensation for
furnishing all materials required for a complete installation, including end anchorage assemblies
and any end connections to other structures and for installing, maintaining and removing
guardrail.
102-13.12Arrow Board: Price and payment will be full compensation for furnishing,
installing, operating, relocating, maintaining and removing arrow boards.
102-13.13Portable Changeable Message Sign: Price and payment will be full
compensation for furnishing, installing, operating, relocating, maintaining and removing portable
changeable message signs.
102-13.14Portable Regulatory Signs: Price and payment will be full compensation for
furnishing, installing, relocating, operating, maintaining and removing a completely functioning
system as described in these Specifications.
Payment will include all labor, materials, incidentals, repairs and any actions
necessary to operate and maintain the unit at all times that work is being performed or traffic is
being affected by construction and/or MOT operations.
102-13.15Radar Speed Display Unit: Price and payment will be made only for a
completely functioning system as described in these Specifications. Payment will include all
labor, hardware, accessories, signs, and incidental items necessary for a complete system.
Payment will include any measurements needed to ensure that the unit conforms to all
Specification requirements.
Payment will include all labor, materials, incidentals, repairs and any actions
necessary to operate and maintain the unit at all times that work is being performed or traffic is
being affected by construction and MOT operations. Price and payment will be full
compensation for furnishing, installing, operating, relocating, maintaining and removing radar
speed display unit.
102-13.16Temporary Signalization and Maintenance: Price and payment will
constitute full compensation for furnishing, installing, operating, maintaining and removing
temporary traffic control signals including all equipment and components necessary to provide
an operable traffic signal. Payment will be withheld for each day at each intersection where the
temporary signalization is not operational within 12 hours after notification.
102-13.17Temporary Traffic Detection and Maintenance: Price and payment will
constitute full compensation for furnishing, installing, operating, maintaining and removing
temporary traffic detection including all equipment and components necessary to provide an
acceptable signalized intersection. Take ownership of all equipment and components. Payment
will be withheld for each day at each intersection where the temporary detection is not
operational within 12 hours after notification.
102-13.18Existing ITS Maintenance: Price and payment will constitute full
compensation for diagnosing, troubleshooting, configuring, installing, operating, maintaining,
and removing existing ITS devices including all auxiliary equipment and device components.
Payment will be withheld for each day where the ITS device is not operational within the
allowable downtime, beginning at the time of notification. Payment will not be withheld for days
of delay when the Department or Maintaining Agency is unable to furnish the replacement ITS
device to the Contractor. 135FY 2023-24Return to Table of Contents
102-13.19Work Zone Pavement Markings: Price and payment will be full
compensation for all work specified including, all cleaning and preparing of surfaces, furnishing
of all materials, application, curing and protection of all items, protection of traffic, furnishing of
all tools, machines and equipment, and all incidentals necessary to complete the work. Final
payment will be withheld until all deficiencies are corrected.
Removable tape or durable paint may be substituted for standard paint at no
additional cost to the Department.
Payment for temporary RPMs used to supplement line markings will be paid for
under temporary raised pavement markers. Install these RPMs as detailed in the Standard Plans.
102-13.20Temporary Raised Rumble Strips: Price and payment will be full
compensation for all work and materials described in this Section, including all cleaning and
preparing of surfaces, disposal of all debris, furnishing of all materials, application, curing,
removal, reinstalling and protection of all items, protection of traffic, furnishing of all tools,
machines and equipment, and all incidentals necessary to complete the work.
102-13.21Temporary Lane Separator: Price and payment will be full compensation
for all work specified in this Section.
102-13.22Temporary Signals for Lane Closures on Two-Lane, Two-Way
Roadways: Price and payment will be full compensation for furnishing, installing, operating,
maintaining and removing temporary traffic signal including all equipment and components
necessary to provide an operable portable traffic signal.
102-13.23Temporary Highway Lighting: Price and payment will be full compensation
for providing all temporary highway lighting shown in the Plans.
102-13.24Pedestrian or Bicycle Special Detours: Price and payment will be full
compensation for providing all pedestrian or bicycle special detours shown in the Plans.
102-13.25Type III Barricades: Prices and payment will be full compensation for
furnishing, installing, relocating, maintaining and removing the type III barricades.
102-13.26Payment Items: Payment will be made under:
Item No. 102- 1- Maintenance of Traffic - lump sum.
Item No. 102- 2- Special Detour - lump sum.
Item No. 102- 3- Commercial Material for Driveway Maintenance - per
cubic yard.
Item No. 102- 4- Pedestrian or Bicycle Special Detour - lump sum.
Item No. 102- 14- Traffic Control Officer - per hour.
Item No. 102- 30- Temporary Highway Lighting - lump sum.
Item No. 102- 60- Work Zone Sign - per each per day.
Item No. 102- 61- Business Sign - each.
Item No. 102- 62- Barrier Mounted Work Zone Sign – per each per day
Item No. 102- 71- Temporary Barrier - per foot.
Item No. 102- 75- Temporary Lane Separator - per foot
Item No. 102- 73- Temporary Guardrail - per foot.
Item No. 102- 74- Channelizing Devices
Item No. 102- 76- Arrow Board - per each per day.
Item No. 102- 78- Temporary Raised Pavement Markers - each.
Item No. 102- 81- Temporary Crash Cushion, Gating - per location.
Item No. 102- 89- Temporary Crash Cushion, Redirective - per location.
Item No. 102- 94- Glare Screen - per foot. 136FY 2023-24Return to Table of Contents
Item No. 102- 99- Portable Changeable Message Sign - per each per day.
Item No. 102-104- Temporary Signalization and Maintenance - per
intersection per day.
Item No. 102-107- Temporary Traffic Detection and Maintenance - per
intersection per day.
Item No. 102-ABC- Existing ITS Maintenance – per day
Item No. 102-115- Type III Barricade - per each per day.
Item No. 102-120- Temporary Signal for Lane Closures on Two-Lane,
Two-Way Roadways – per each per day.
Item No. 102-150- Portable Regulatory Sign - per each per day.
Item No. 102-150- Radar Speed Display Unit - per each per day.
Item No. 102-909- Temporary Raised Rumble Strips - per day.
Item No. 102-913- Removable Tape.
Item No. 710- Painted Pavement Markings.
Item No. 711- Thermoplastic Pavement Markings. 137FY 2023-24Return to Table of Contents TEMPORARY WORK STRUCTURES
103-1Description
103-1.1Scope of Work: Construct temporary work structures used solely to support
construction equipment. Temporary structures include but are not limited to work bridges, elevated platforms, floating platforms, and rail systems. Items such as mats, falsework or scaffolding are not included in this Section. If a temporary structure type other than the structure type shown in the plans is chosen, assume responsibility for obtaining all necessary permit revisions and the Engineer’s approval. Conform to any limitations contained in the plans and permits. Do not place embankment outside the limits shown in the plans. The cost of the embankment, placing, compaction, and removal will be included in the lump sum price for Temporary Work Structure.
103-1.2Materials: Construct the tempo rary work structure using materials sufficient to
handle the anticipated loads. Assume responsibility for the design of the temporary structure.
103-1.3Navigation Requirements: Submit drawings showing the location of the
temporary work structures relativ e to the navigable waterway to the Coast Guard at least 60 days prior to beginning construction of the structure, or as required by conditions of the permit. Provide adequate lighting of the structure during the duration of construction as required by the Coast Guard or local authorities.
103-2Basis of Payment
103-2.1General: The unit price for the temporary work structure will include all costs
associated with the design, materials, labor, installation, removal and disposal of the structure.
103-2.2Partial Payments: When the plans include a separate pay item for temporary
work structure, 75% of the lump sum price will be paid upon completion of the temporary work structure, and 25% will be paid upon complete removal of the temporary work structure fro m the project site. When the project requires numerous structures or multiple setups (leap frog type) of the same system, the 75% will be split evenly between the various structures or setups. Partial payments for any project will be limited to 5% of the o riginal Contract amount for that project. Any remaining amount will be paid upon completion of all work on the project. When more than one project is included in the Contract, the above percentages will apply separately to each project which has a separa te pay item for temporary work structures. Payment will be made under: Item No. 103 - 1- Temporary Work Structures - lump sum.
138 FY 2023-24 Return to Table of Contents
- 706RAISED PAVEMENT MARKERS AND MARKER ADHESIVE
- 710PAINTED PAVEMENT MARKINGS
- 971PAVEMENT MARKING MATERIALS
- 990TEMPORARY TRAFFIC CONTROL DEVICE MATERIALS
- 994RETROREFLECTIVE AND NONREFLECTIVE SHEETING AND SIGN PANEL FABRICATION
- 105CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS
- 522CONCRETE SIDEWALKS AND DRIVEWAYS
- 521CONCRETE BARRIERS, TRAFFIC RAILINGS, AND PARAPETS
- 330HOT MIX ASPHALT - GENERAL CONSTRUCTION REQUIREMENTS
- 8PROSECUTION AND PROGRESS
- 105CONTRACTOR QUALITY CONTROL GENERAL REQUIREMENTS
- 107LITTER REMOVAL AND MOWING
- 560COATING NEW STRUCTURAL STEEL
- 561COATING EXISTING STRUCTURAL STEEL
- 706RAISED PAVEMENT MARKERS AND MARKER ADHESIVE
- 970MATERIALS FOR RAISED PAVEMENT MARKERS AND ADHESIVE