462POST-TENSIONING

FL · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 672–705 Save this section

Ask about Section 462

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

462-1Description

1.Furnish, test, transport, store, handle, and install all components of Post -Tensioning
(PT)systems, in accordance with the requirements of this Section and the component

manufacturer’s recommendations. Constituent components of PT systems include, but are not limited to, anchorage assemblies, filler containment assemblies, filler material, and related steel reinforcement. Use the most stringent requirements, as determined by the Engineer, of those specified in this Section or the component manufacturer’s recommendations for protecting components from damage due to environmental exposure, improper handling, or improper installation.

2.With the exception of mild reinforcing and prestressing steel, furnish all PT system

components from a single supplier (vendor).

3.Submit PT system shop drawings in accordance with Section 5. Perform PT system

testing in accordance with Section 960. Include in the PT system testing all possi ble combinations of components to be incorporated into the structure.

4.Use only PT systems meeting the requirements of Section 960 and approved by the

Engineer in accordance with Section 5 .

a.Use only PT systems of appropriate type and size required to construct tendons

shown in the Contract Documents.

b.Use only the exact manufacturer and/or model of major components, as defined

in 960-2, that were used in system testing and as listed on the approved PT system shop drawings.

c.With the exceptio n of local zone reinforcement, do not substitute, modify, or

delete any major components , as defined in 960 -2, of a PT system approved by the Engineer for use on the project .

5.Provide a mockup test in accordance with this Section. PT system acceptance testing

may be performed concurrent with mockup testing if performed prior to installation of any PT system hardware .

6.Just prior to PT tendon installation, blow oil -free dry compressed air meeting ASTM

D4285 through the duct . Provide visual confirmatio n that the duct is free of water and moisture.

7.Install the PT tendon (e.g., strands, wires, or bars) in duct. Stress the PT tendon to a

predetermined load, anchor ends directly against hardened concrete and install permanent anchorage caps.

8.Just prior to wax filler injection, blow oil -free dry compressed air meeting ASTM

D4285 through the duct. Provide visual confirmation that the duct and tendon are free of water and moisture.

9.Inject ducts with filler to completely fill voids and install prot ection at anchorages.
10.Submit all required documents in accordance with this Section and Section 5 to the

Engineer for review and written approval.

11.Arches, cable supported and extradosed bridges are not covered by this Specification.
12.Install duct filler. Provide fully filled duct and anchorage assemblies free from leaks,

blockages, and voids. Submit test data to the Engineer to verify that the work meets the requirements of this Section. Perform filler injection operations in accordanc e with 462 -7.4. 664 FY 2023-24 Return to Table of Contents

462-2Materials

462-2.1General:

Approval of any material by the Engineer will not preclude subsequent rejection if material is damaged or otherwise found to not meet the requirements of this Section or

462-2.2Steel Reinf orcing:

462-2.2.1 Mild Steel:

1.Provide reinforcing steel per Section 931.
2.Final design and details of local zone reinforcement are system specific

and are the responsibility of PT system supplier (vendor). Design system specific local zone reinforcement for the number of strands or wires a particular PT system can accommodate at maximum allowable strand or wire force; do not design project specific local zone reinforcement for a reduced system capacity.

3.Submit signed and sealed project specific local zone reinforcement

details to the Engineer for review and written approval. 462-2.2.2 Prestressing: 462-2.2.2.1 Strand:

1.Provide prestressing strands per Section 960.
2.Strand couplers are not permitted.

462-2.2.2.2 Bar:

1.Provide prestressing bars per Section 960.
2.For permanent applications, use and location of bar couplers is

subject to written approval by the Engineer. 462-2.2.2.3 Parallel Wire :

1.Provide prestressing parallel wire assemblies per Section 960.
2.Wire couplers are not permitted.

462-2.3Duct Filler: Use only grout and flexible filler meeting the requirements of

Section 938 and are listed on the Department’s Approved Product List (APL). 462-2.3.1 Grout:

1.Select grout for us e in PT system by application: repair, horizontal, or

vertical.

2.Mix grout per manufacturer’s instructions with potable water meeting

requirements of Section 923.

3.Do not combine different grout products.

462-2.3.2 Flexible Filler: Prepare flexible filler for installation in accordance with the manufacturer’s instructions. Do not combine different flexible filler products.

462-2.4Other Material References:

Meet the requirements of this Section, as well as the following: Class 5 Applied Coating* ................................ ...............Section 975 Elastomeric Coating System* ................................ .........Section 975 Epoxy Compound* ................................ ......................... Section 926 Magnesium Ammonium Phosphate Concrete* ..............Section 930 Methacrylate* ................................ ................................ .Section 413 Water ................................ ................................ ...............Section 923 *Use products listed on the Department’s Approved Product List ( APL).

462-2.5Component Samples:

665 FY 2023-24 Return to Table of Contents 462-2.5.1 Prestressing Steel:

1.Furnish samples per Section 933 from each manufacturer of

prestressing strand, wire, and bar to be used on project.

2.The Engineer will collect sample materials from prestressing steel used

for PT operations on the Project.

3.Samples, properly identified and tagged per 462 -6, will be stored by the

Engineer. 462-2.5.2 Grout:

1.The Engineer may sample grout packages at random, not to exceed a

total quantity of one bag per L OT or shipment. A LOT is defined as a quantity of material from a single production batch or shipment

2.Grout sample may be virgin package mix, liquefied state, or solid state;

Engineer will determine at what frequency, interval, sample phase (powder, liquid or solid) and location those samples will be recovered from the project.

3.Sample, properly identified and tagged per 462 -6, will be stored by the

Engineer.

4.Submit the following samples from each manufacturer per each

production LOT of gro ut to be used on the project. These samples will be used by the State Materials Office for product testing.

a.Submit three 2” x2” x2” hardened grout cube samples from a

trial batch using the same water source and grout to be used for production grouti ng.

b.One bag of grout.

Submit samples a minimum of four weeks prior to initial production grouting. Do not commence grouting operations until grout test results are available and approved by the Engineer. Mock -up testing per section 462 -7.4.1.1 (5) m ay proceed prior to grout approval. 462-2.5.3 Flexible Filler:

1.The Engineer may sample flexible filler at random, not to exceed a total

quantity of one gallon per LOT. A LOT is defined as a quantity of material from a single production batch or shipment not to exceed 1,000 gallons.

2.Sample may be virgin product in liquefied state or solid state. The

Engineer will determine at what frequency, interval, sample phase (liquid or solid) and location those samples will be recovered from the projec t.

3.Sample, properly identified and tagged per 462 -6, will be stored by the

Engineer.

462-3Alternate PT System Designs

Designs using a PT scheme different from that shown in the Contract Documents may be submitted for the Engineer’s approval provided proposed scheme fulfills the design requirements, and the Contractor demonstrates compliance with these requirements:

1.PT system type and size meets all requirements of this Section.
2.Net compressive stress in the concrete after all prestress lo sses is equivalent to

or greater than that provided by the PT scheme shown in original Contract Documents.

3.Distribution of individual tendons at each cross section generally conform to

the distribution shown in original Contract Documents.

4.Proposed PT scheme meets the ultimate strength requirements of the American

Association of State Highway and Transportation Officials Load and Resistance Factor Design, 666 FY 2023-24 Return to Table of Contents AASHTO LRFD Bridge Design Specifications Section 5, and is equivalent to or greater than service and strength limit states provided in original Contract Documents.

5.Stresses in concrete and PT steel at all sections and at all stages of construction

meet requirements of the Design Criteria shown in original Contract Documents.

6.All Design C riteria provisions noted in original Contract Documents are

satisfied.

7.Show complete design and detail of all elements for proposed locations of

alternate PT scheme.

8.Submit the following for the Engineer’s approval:
a.design calculations incl uding short and long term prestress losses
b.complete shop drawings including PT scheme and system, reinforcing

steel, and concrete cover

9.Any alternate PT system approved by the Engineer resulting in a change in

quantity from that shown in the Co ntract Documents is paid based on comparison of the following:

a.quantity actually used and accepted or original plan quantity, whichever

is less, and

b.unit bid price.

If approved alternate PT scheme or system is under a Cost Savings Initiative Proposal (CSIP), method of payment will be in compliance with CSIP agreement.

10.Submit alternate PT scheme signed and sealed by the Contractor’s Engineer of

Record.

462-4Qualifications

Provide all project personnel and crew foreman in accordance wi th Section 105.

462-5Submittals

1.Submit to the Engineer all necessary information, Plans, shop and working

drawings, and manuals in accordance with this Section and Section 5. Submit to the Engineer signed and sealed PT related shop drawings designed by the Contractor’s Engineer of Record.

2.Prepare shop drawings addressing all requirements stated in the Contract

Documents and requirements of this Section. Show details of PT hardware components, tendon geometry and locations complying with the Cont ract Documents and limitations of selected PT system. Include all inlets, outlets, high point inspection port details, anchorage inspection details, permanent anchorage caps, protection system materials, and application limits. If applicable, include detai ls of the duct dehumidification system.

462-6Transport, Handling and Storage

462-6.1General:

Store all materials in a weatherproof building, shed, covering, or container until time of use.

462-6.2LOT Identification:

1.Assign an individual LOT number and tag items shipped to project in a manner

that allows each LOT to be clearly identified at project site for all PT system components, filler, bars of each size from each mill heat of steel, and all strands from each manufactured re el.

2.Submit records to the Engineer identifying assigned LOT numbers with heat or

reel of material represented if applicable. 667 FY 2023-24 Return to Table of Contents

3.All unidentified prestressing components, strands, wires, bars, or filler received

at the site will be rejected.

4.Loss of positive identification of these items at any time will be cause for

rejection.

5.Submit filler Quality Control Data Sheets from the manufacturer, to the

Engineer for each LOT of filler on the project.

462-6.3Prestressing Steel:

1.Protect all prestressing steel against physical damage and corrosion at all times.
a.Package prestressing steel in containers for protection against physical

damage and corrosion during shipping and storage.

b.Place a corrosion inhibitor, which prevents rust, in package or

incorporate it into a corrosion inhibitor carrier type packaging material.

c.Corrosion inhibitor must have no deleterious effect on steel, filler,

concrete, or bond strength of steel to concrete.

d.Inhibitor carrier type packaging material must conform to provisions of

Federal Specification MIL-P-3420.

e.Immediately replace or restore damaged packaging to original

condition.

f.Clearly mark shipping package with a statement that package contains

high-strength prestressing steel, care to be used in handling, include type, kind, and amount of

corrosion inhibitor used, date when placed, safety orders, and instructions for use.

2.The Engineer will reject prestressing steel that has sustained physical damage.
3.Remove and discard lengths of strand found to contain broken wires.
4.Wire must be bright and uniformly colored, with no foreign matter or pitting on

its surface.

462-6.4Filler:

1.Maintain filler in environmental exposure conditions (e.g., temperature,

humidity) in strict conformance with manufacturer’s recommendations at all times from

manufacture to installation.

2.Storage in the open must be on a raised platform with adequate waterproof

covering to protect the filler.

3.On site storage of grout filler on a raised and covered platform is limited to a

maximum period of one week. The allowable on site storage time may be extended by the

Engineer if the grout filler is in a climate-controlled structure. Grout filler material with a total

time from manufacturer in excess of six months must be removed from the jobsite and replaced

with new material.

4.Flexible filler may be stored on site on a raised and covered platform up to the

manufacturer’s expiration date. Do not use flexible filler that has exceeded the manufacturer’s

recommended usage date. Remove all such filler from the jobsite and replace with new material.

462-6.5Duct and Pipe:

1.Protect ducts against ultraviolet degradation, crushing, excessive bending, dirt

contamination, corrosive elements, or any other damage or contamination during transport,

storage, and handling.

2.Furnish ducts with end caps to prevent contamination inside duct. Do not

remove duct end caps until duct is incorporated into the bridge component.

3.Ship capped duct in bundles that are covered during transport and storage.

668FY 2023-24Return to Table of Contents

4.Store on a raised platform and completely covered to prevent contamination.
5.If contamination is discovered, immediately flush duct with potable water per

462-7.2.4 before use.

462-7Construction

462-7.1General:

1.Prior to installing any PT system hardware:
a.Submit to the Engineer a list of all PT systems chosen for the project.
b.For each PT system, submit a package to the Engineer meeting the

requirements of Section 960-3.6.

c.For each PT system, submit to the Engineer written certification that all

major components, as defined in 960-2, furnished to the project and shown on the approved PT

system shop drawings exactly match the major components used in PT system testing.

2.Use methods to place and consolidate concrete that will not displace or damage

any PT ducts, anchorage assemblies, splices and connections, reinforcement, or other embedded

items.

3.Conduct all stressing and filler injection operations in the presence of the

Engineer.

462-7.2System Installation:

Accurately and securely fasten all PT anchorages, ducts, inlet and outlet pipes,

miscellaneous hardware, reinforcing bars, and other embedded items at locations shown in the

Contract Documents or on approved shop or working drawings or as otherwise approved by the

Engineer in writing.

462-7.2.1 Ducts:

1.Construct tendon ducts using the minimum number of splices as

practical.

2.Accurately position and align ducts at locations shown in the Contract

Documents, or according to approved shop or working drawings, or as approved in writing by

the Engineer.

3.Securely fasten all internal ducts at regular intervals not exceeding

30 inches for steel pipes, 24 inches for round plastic ducts, and 12 inches for flat ducts to prevent

movement, displacement, or damage from concrete placement and consolidation operations.

4.Show method and spacing of duct supports on appropriate shop

drawings.

5.Ensure external tendon ducts are straight between connections to

internal ducts at anchorages, diaphragms, and deviation saddles and are supported at intermediate

locations according to the Contract Documents including approved shop drawings.

6.Ensure all alignments, including curves and straight portions, are

smooth and continuous with no lips, kinks, or dents. This also applies to curves in pre-bent steel

pipe.

7.Check and repair all ducts in accordance with 462-7.5 as necessary

before placing any concrete.

8.Ensure ducts at end connections to anchorages, splices, inlets, outlets,

drains, and all other duct openings are sealed at all times after installing ducts and until tendon

installation is complete.

9.Provide an absolute seal of anchorage and duct termination locations

per the approved system drawings. 669FY 2023-24Return to Table of Contents

10.Use of tape, caulking, epoxy or other sealants is not permitted to make

connections or sealing for any reason.

11.Use heat welding techniques, in accordance with duct manufacturer’s

instructions, to make splices between sections of smooth plastic duct or make connection with

electrofusion duct coupler as shown on the approved PT system shop drawings.

12.When connecting steel pipe to plastic pipe with a boot, use a

3/8 inches wide power seated band and clamps in accordance with 960-2.2 on each end of a duct

boot to seal against filler leakage. Install band per manufacturer’s instructions.

13.Ducts for prestressing used exclusively for temporary erection where

PT will be removed from structure are not required to be coupled across segment joints.

14.Briefly open low point drains to allow for drainage of any water that

may be present within the duct.

462-7.2.1.1 Installation Tolerances:

1.Ensure final position of PT ducts is within the tolerances in the

following table:

Table 462-1

Duct Installation Tolerances

Type Vertical Position (inches) Horizontal Position (inches)

Horizontal tendons in slabs or in slab

regions of larger members ±1/4 ±1/2

Longitudinal draped superstructure

tendons in webs: Tendon over supports

or in middle third of span

±1/4 ±1/4

Tendon in middle half of web depth ±1/2 ±1/4

Longitudinal, generally horizontal,

superstructure tendons usually in top or

bottom of member

±1/4 ±1/4

Horizontal tendons in substructures and

foundations ±1/2 ±1/2

Vertical tendons in web Longitudinal

Position ±1

Transverse

Position ±1/4

Vertical tendons in pier shafts ±1/2 ±1/4

All other cases ±1/4 ±1/4

2.Ensure entrance and exit angles of tendon paths at anchorages,

duct joints, and/or at faces of concrete are within plus or minus 3 degrees of desired angle

measured in any direction.

3.Accomplish any deviations in alignment with smooth unkinked

transitions.

4.Locate anchorages within plus or minus 1/4 inch of desired

position laterally and plus or minus 1 inch along tendon except that minimum cover requirements

must be maintained.

5.Position local zone anchorage confinement reinforcement in the

form of spirals, multiple U-shaped bars, or links centered around duct and anchorage

(±1/4 inch tolerance) and starting within 1/2 inch of the back of the main anchorage plate. 670FY 2023-24Return to Table of Contents

6.If conflicts exist between reinforcement and a PT

duct/anchorage and other non-local zone reinforcement, the position of duct prevails. Adjust the

non-local zone reinforcement with the Engineer’s written approval.

462-7.2.2 Splices and Joints:

1.All splices, joints, couplings, connections (inlet and outlet), and valves

are part of approved PT system.

2.Fabricate all duct splices to prevent duct kinks during concrete

placement.

3.Use mandrels as needed to maintain duct alignment and shape.

462-7.2.3 Inlets, Outlets, Drains and Ports:

1.Place filler inlets, outlets, drains and ports at locations shown in the

Contract Documents including approved shop drawings.

2.Equip all filler inlets, outlets, drains and ports with approved positive

shut-off devices (e.g., valves).

3.At a minimum, place filler inlets, outlets or ports in the following

positions and those shown in Standard Plans, Index 462-001:

a.Top of tendon anchorage;
b.Top and bottom of anchorage cap;
c.At high points of duct profile when vertical distance between

highest and lowest point is more than 2 feet;

d.At major change in duct cross section; and,
e.At other locations required by the Engineer.
4.For all tendons other than grouted top slab transverse tendons in box

girders, place drains at the geometric low points of all duct profiles, or as close as is practical to

the geometric low points of all duct profiles, except where an inlet, outlet or anchorage that can

serve as a drain is located at a low point. Locate drains, and inlets and outlets serving as drains,

at the bottom of the duct cross section. Do not locate drains within the limits of diabolos.

5.Extend filler and drain tubes a sufficient distance out of concrete

member to allow for proper closing of valves.

6.Direct inlets, outlets, drains and ports exiting on vertical or

predominantly vertical surfaces of box and I-girders toward the inside face of exterior I-girders

or toward the interior of box girders.

462-7.2.4 Tendons:

1.Store the PT tendon in such a way that it remains completely dry and

free of moisture prior to installation within the duct.

2.Do not exceed 14 calendar days between first installation of PT strand

within duct and completion of the stressing and filler injection operation.

3.Do not exceed 21 calendar days between the first installation of PT bars

within duct and completion of the stressing and filler injection operations.

4.With written approval of the Engineer, the maximum number of

calendars days allowed between the first installation of the PT tendon within the duct and

completion of the stressing and filler injection operations is 30 for PT strand and 45 for PT bars

by monitoring and continuously maintaining the relative humidity of air within the duct below

40%. Use a closed dehumidification system or other means approved by the Engineer. The

dehumidification system must be installed and operational within 24 hours of first installation of

the PT tendon within the duct and remain operational until just prior to filler injection. 671FY 2023-24Return to Table of Contents

5.The use of temporary corrosion inhibitor powder is not permitted as a

method to increase the allowed number of calendar days between the first installation of the PT

tendon within the duct and completion of the stressing and filler injection operations.

6.Any light surface corrosion forming during the period of time described

in (1), (2), (3) or (4) of this Article will not be cause for rejection of the PT tendon.

7.Failure to inject filler into duct within the number of calendar days

specified, will result in stoppage of work, except when waived by the Engineer in writing.

8.Just prior to PT tendon installation, briefly open low point drains to

allow for drainage of any water that may be present within the duct. Close all low point drains

and ports except the inlet and outlet ports at the anchorage caps. Blow oil-free dry compressed

air meeting ASTM D4285 through one of the anchorage cap ports until the relative humidity

measured at the inlet and outlet ends are less than 40% and continuing blowing for an additional

30 minutes. Stop blowing, wait a minimum of 15 minutes, and take humidity measurements at

the inlet and outlet ends of blowing. Further blowing is not required if both humidity readings

are less than 40%. If the humidity readings are 40% or greater, then repeat the process of

blowing and waiting for 15 minutes until the humidity measurements at the inlet and outlet end

of blowing are less than 40%. Take humidity measurements of air within the duct at the inlet end

and outlet end of blowing using separate humidity meters. Use humidity meters approved by the

Engineer.

9.Provide visual confirmation that the duct is free of water, moisture, and

debris at the anchorages and low points of the tendon profile before installing the PT tendon

within the duct.

10.Flushing of filler is not permitted without written approval of the

Engineer and is only permitted as defined in this Article.

11.For grouted operations, vacuum injection is required to repair all voids

and blockages as subject to provisions of 462-8.3.2. For flexible filler operations, use the repair

procedure described in the approved Wax Injection Operations Plan.

12.For tendon ducts subjected to contamination with chlorides (e.g.,

uncapped ducts that have been subjected to salt spray), flush duct with potable water containing

slack lime (i.e., calcium hydroxide) or quicklime (i.e., calcium oxide) in the amount of

0.17 pounds per gallon.

a.Test for presence of chlorides and oils in discharged water

before placing tendon.

b.If chloride levels in flush water outflow exceed 300 ppm,

continue to flush duct until chloride level in flush water outflow is below 250 ppm.

c.After the chloride level of flush water is below 250 ppm, open

low point drains to allow for drainage of flush water within the duct. Perform the blowing

process described in (8) of this Article. Provide visual confirmation that the duct is free of water

and moisture for its entire length before installing the PT tendon within the duct.

13.Push or pull strands and wires through ducts to make up a tendon

using methods that will not snag on any lips or joints in ducts.

14.Round off end of strands and wires that are pushed or fit advancing

end with smooth protective cap.

15.Do not intentionally rotate strands or wires by any mechanical means

during installation of PT strand into duct. 672FY 2023-24Return to Table of Contents

16.For superstructure tendons, provide sufficient strand and wire length

beyond dead end anchorages to allow for second end stressing as needed for reconciliation of

jacking force versus measured elongation.

17.Alternatively, tendons may be pulled through duct using a special steel

wire sock or other device attached to advancing end. Strands may be brazed together for pulling

as long as one foot of strand from the brazed end is removed by cutting after installation. Do not

electric arc weld strand ends together for this purpose.

18.Cut tendons in accordance with 462-7.3.2.7.
19.Strand installation aids (i.e. wire/nylon ties around strand bundle,

strand spacers, etc.) must be removed prior to stressing

20.Do not install permanent tendons before completion of testing as

required by this Section or the Contract Documents. The only two exceptions are:

a.Tendon to be tested by “Theoretical Elongation Verification”

may be installed for test; and,

b.Transverse tendons may be pre-installed in precast segmental

boxes prior to concrete casting such that they meet 462-8.3.1.

462-7.3Post-Tensioning Operations:

1.Do not apply PT forces until concrete has attained compressive strength

specified in the Contract Documents.

2.Conduct all stressing operations in presence of the Engineer.
3.With the written approval of the Engineer, revise PT operations so final tendon

force is in agreement with the Contract Documents.

462-7.3.1 Stressing Equipment:

Only use equipment furnished by supplier of PT system.

462-7.3.1.1 Jacks and Gauges:

Equip each jack with pressure gauge for determining jacking

pressure that has a minimum dial diameter of six inches.

462-7.3.1.2 Calibration:

1.Calibrate each jack and its gauges as a unit.
2.Calibration must consist of three test cycles with cylinder

extension of jack in various positions (e.g., two-inch, four-inch, eight-inch stroke).

3.At each pressure increment, average forces from each test cycle

to obtain an average force.

4.Perform calibration with equipment (e.g., jack, pump, hoses,

etc.) setup in same configuration intended for use on Project.

5.Jack and gauge calibration is to be initially performed by PT

supplier or an independent laboratory.

6.Use load cells calibrated within the past 12 months to calibrate

stressing equipment.

7.Supply documentation denoting the load cells calibration date

and tractability to National Institute of Standards and Technology (NIST) along with jack/gauge

calibration.

8.Submit to the Engineer certified calibration charts and curves for

each jack and gauge unit used on the project prior to start of work and every six months

thereafter or as requested by the Engineer. 673FY 2023-24Return to Table of Contents

9.Calibrations subsequent to initial calibration with a load cell

may be accomplished with use of a master gauge. Supply master gauge to the Engineer in a

protective waterproof container capable of protecting calibration of gauge during shipment to a

laboratory. Provide a quick-attach hydraulic manifold to enable quick and easy installation of

master gauge to verify permanent readings. Master gauge will remain in the possession of the

Engineer for duration of project and will be returned to the Contractor after final acceptance of

project by the Engineer.

10.Any jack repair, such as replacing seals or changing length of

hydraulic lines, requires recalibration using a load cell.

11.No extra compensation will be allowed for initial or any

subsequent calibrations or use of master gauge required by the Engineer.

462-7.3.2 Stressing Tendons:

1.Tension all PT steel so PT force is not less than that required by the

Contract Documents or as otherwise approved by the Engineer in writing.

2.Do not use monostrand jacks to stress straight tendons with five or more

strands or wires, or for curved tendons with two or more strands or wires.

3.4-strand curved top slab transverse tendons in box girders are permitted

to use a monostrand jack.

4.Use of curved stressing noses or chairs is not permitted.

462-7.3.2.1 Jacking Maximum Stress:

Maximum temporary stress (i.e., jacking stress) in PT steel must

not exceed 80% and 75% of Guaranteed Ultimate Tensile Strength (GUTS) for PT strands and

bars, respectively. The maximum temporary jacking stress must not exceed 50% of GUTS for PT

bars that will be reused.

462-7.3.2.2 Initial and Permanent Stresses:

1.PT steel must be anchored at initial stresses resulting in long

term retention of permanent stresses or forces of no less than those shown in the Contract

Documents.

2.Unless otherwise approved by the Engineer in writing, initial

stress after anchor set must not exceed 70% of GUTS at anchorages and 74% of GUTS at all

other locations between anchorages.

3.Permanent stress and permanent force are stress and force

remaining in PT steel after all losses, including long term creep and shrinkage of concrete, elastic

shortening of concrete, relaxation of steel, losses in PT steel from sequence of stressing, friction,

and unintended wobble of ducts, anchor set, friction in anchorages, and all other losses particular

to the specific PT system.

462-7.3.2.3 Stressing Sequence:

1.Permanent PT tendons must be stressed from both ends, except

as noted in the Contract Documents.

2.Required force may be applied at one end and subsequently at

other end or simultaneously at both ends.

462-7.3.2.4 Elongation:

1.Ensure forces being applied to tendon and resulting elongation

of tendon can be measured at all times.

2.Measure elongations to nearest 1/16 inch.

674FY 2023-24Return to Table of Contents

3.For required tendon force, observed elongation must agree

within 7% of theoretical elongation or entire operation must be halted, checked, and source of

error determined and remedied to satisfaction of the Engineer before proceeding.

4.Do not overstress tendon to achieve theoretical elongation.
5.If agreement between observed and theoretical elongations at the

required force falls outside acceptable tolerances, additional tests may be required, at the

Engineer’s discretion and without additional compensation to the Contractor, for Tendon

Modulus of Elasticity and/or In Place Wobble and Friction Test, or Lift-Off Test.

462-7.3.2.5 Friction:

1.Provide actual expected friction and wobble coefficients and

anchor set in the shop drawings; submit calculations and show a typical tendon force diagram on

shop drawings based upon expected actual coefficients and values for the PT system to be used.

2.Graphite may be used as a lubricant when friction must be

reduced, subject to written approval of the Engineer.

462-7.3.2.6 Tendon Wire Failure:

1.Multi-strand PT tendons with wires which fail by breaking or

slipping during stressing may be accepted provided these conditions are met:

a.Completed structure has a final PT force of at least 98%

of original total design PT force;

b.PT force across a mating joint is at least 98% of PT force

required by the Contract Documents for that mating joint for that stage of construction for

precast or cast-in-place segmental construction. This 98% minimum PT force requirement

applies to segmental construction, or any similar construction, that has members post-tensioned

together across a common joint face at any stage of construction; and,

c.Any single tendon must have no more than a 5%

reduction in cross-sectional area of PT steel due to wire failure.

2.When conditions permit the Contractor to propose acceptable

alternative means of restoring PT force lost due to wire failure, any of the above conditions may

be waived at discretion of and with approval of the Engineer in writing.

462-7.3.2.7 Cutting of PT Steel:

1.Cut PT steel using an abrasive saw or plasma torch within

3/4 inches to 1-1/2 inches away from the anchorage.

2.Flame cutting of PT steel is not permitted.
3.Do not cut tendon to final length prior to acceptance.

462-7.3.2.8 Post-Tensioning Operations Record:

1.Keep a record of these PT operations for each tendon installed:
a.Project name, Financial Project ID (FPID);
b.Contractor and/or subcontractor;
c.Tendon location, size, and type;
d.Date tendon was first installed in duct;
e.Reel number for strands and wires and heat number for

bars;

f.Tendon cross-sectional area;
g.Modulus of elasticity;
h.Date stressed;
i.Jack and Gauge numbers per tendon end;

675FY 2023-24Return to Table of Contents

j.Required jacking force;
k.Gauge pressures at the pump and at the inlet;
l.Elongations (theoretical and actual);
m.Anchor sets (anticipated and actual);
n.Stressing sequence (i.e., sequential order of tendon

stressing by number);

o.Stressing mode (single-end, dual-end, simultaneous);
p.Witnesses to stressing operations (Contractor and

Inspector);

q.Any other relevant information.
2.Submit to the Engineer a complete set of stressing operation

records within five days of completed tendon installation.

462-7.3.3 System Protection:

462-7.3.3.1 Tendon:

1.Seal all other duct openings other than installing anchorage caps

within four hours after tendon stressing.

2.Install anchorage caps after tendon has been accepted. If

acceptance of tendon will be delayed more than four hours after stressing, immediately provide

temporary weatherproofing of tendons at open ends of anchorages. If tendons and anchorages are

temporarily weatherproofed, install anchorage caps within 1 day of tendon being accepted.

3.If tendon contamination occurs and if directed by the Engineer,

remove tendon, flush duct with potable water per 462-7.2.4, and replace with new tendon.

462-7.3.3.2 Anchorage:

1.Provide the following at anchorages as shown on Standard

Plans, Index 462-002:

a.Temporary drain holes at the bottom of open top

blockouts.

b.Temporary weatherproof plugs for upwardly oriented

access or vent holes.

2.Cap all filler inlets/outlets with plugs meeting the requirements

of Section 960.

3.Construct anchorage pour-backs and place elastomeric coatings

at anchorages as indicated in the Contract Documents and as shown on Standard Plans,

Index 462-002 within seven days of completing filler injection operations (see 462-7.4 for filler

injection operations). For anchorages which require acrylic aliphatic polyurethane top coating,

apply the acrylic aliphatic polyurethane top coating after the elastomeric coating has fully cured.

See Standard Plans Index 462-002 and the Contract Documents for details on anchorages which

require acrylic aliphatic polyurethane top coating. Construct anchorage pour-backs using

reinforced concrete, magnesium ammonium phosphate concrete, or a Type Q epoxy grout

meeting the requirements of Section 926.

a.Remove all laitance, grease, curing compounds, surface

treatments, coatings, and oils by grit blasting or water blasting. Flush surface with water and

blow dry. Surfaces must be clean, sound, and without any standing water. Test substrate at all

pour-back locations using ACI 503 and develop a minimum of 175 psi tension (e.g., pull-off

value). Testing frequency may be reduced, as determined by the Engineer, after the Contractor 676FY 2023-24Return to Table of Contents

has demonstrated an ability to prepare substrate surfaces for bonding as indicated by the result of

the ACI 503 test.

b.Mix and apply epoxy grout and magnesium ammonium

phosphate concrete in accordance with the manufacturer’s current standard technical guidelines.

Construct all pour-backs in leak proof forms creating neat lines. Epoxy grout may require

pumping for proper installation. Construct forms to maintain a liquid head to ensure intimate

contact with concrete surface. Use vents as needed to provide for escape of air to ensure

complete filling of forms.

4.Coat exposed surfaces of pour-backs and anchorage caps as

shown on Standard Plans, Index 462-002 with an elastomeric coating system meeting the

requirements of Section 975 and having a thickness of 30 mils to 45 mils. Apply the acrylic

aliphatic polyurethane top coating to a dry film thickness of 5 to 6 mils. Ensure concrete,

anchorage caps, or other substrates are structurally sound, clean, and dry. Concrete must be a

minimum of 28 days old. Remove all laitance, grease, curing compounds, surface treatments,

coatings, and oils by grit blasting or water blasting using a minimum 3,000 psi nozzle pressure.

Blow surface with compressed air to remove dust or water. Apply the elastomeric coating within

90 days of filler injection. Apply the acrylic aliphatic polyurethane top coat and the

manufacturer’s approved primer over the elastomeric coating before applying Class 5 coating, if

required.

5.Prior to application of elastomeric coating, construct a 2 foot x

4 foot concrete test block with a similar surface texture to surfaces to be coated. Coat a vertical

face with chosen elastomeric coating system. Determine number of coats required to achieve the

specified thickness without runs and drips. Mix and apply elastomeric coating as per

manufacturer’s current standard technical specifications. Spray application is preferred; roller

application is permitted. Have coating manufacturer representative on site to supervise and

comment on application of elastomeric coating onto test block. Apply coating using approved

and experienced personnel with a minimum of three years experience applying similar

polyurethane systems. Submit credentials of these persons to the Engineer for review and

consideration for approval.

462-7.4Filler Injection Operations:

462-7.4.1 Grouting Operations: Conduct all grouting operations in the presence

of the Engineer.

462-7.4.1.1 Grout Injection Operations Plan:

1.Submit a Grouting Operations Plan to the Engineer for approval at least

six weeks in advance of any scheduled grouting operation.

2.Written approval of Grouting Operations Plan by the Engineer is

required before any grouting of permanent structure takes place.

3.At minimum, Grouting Operations Plan will address and provide:
a.Names and proof of training for grouting crew and crew

supervisor in conformance with this Specification;

b.Type, quantity, and brand of materials to be used in grouting,

including all required certifications;

c.Type of equipment to be used, including capacity in relation to

demand and working conditions, as well as, standby equipment and spare parts;

d.General grouting procedure;

677FY 2023-24Return to Table of Contents

f.If applicable, procedures for monitoring and continuously

maintaining less than 40% relative humidity of air within the duct;

g.Method to be used to control rate of flow within ducts;
h.Theoretical grout volume calculations;
i.Mixing and pumping procedures in accordance with the

manufacturer’s recommendations;

j.Direction of grouting accounting for grade and/or slope of

tendon;

k.Sequence of inlet and outlet pipes use;
l.Procedures for handling blockages;
m.Procedures for possible post grouting repair.
4.Conduct a joint meeting of the Contractor, grouting crew, and the

Engineer before grouting operations begin. Discuss Grouting Operations Plan, required testing,

corrective procedures, and any other relevant issues at the meeting.

5.Prior to production grouting, demonstrate to the Engineer’s satisfaction

successful grout injection by injecting full-scale mockups that are constructed with all associated

PT system components using the mockup tendon profiles shown in the Plans and the proposed

Grouting Operations Plan. Utilize smooth duct and associated couplers and fittings meeting the

requirements of Section 960 for all mockups. Utilize smooth duct for the mockups which has an

inside diameter required for a given mockup tendon size. If the mockup is also being used to

perform PT system acceptance testing, use the duct type appropriate for the PT system location.

Place the mockup tendons specified in the Plans inside the ducts to simulate the in-place PT

tendons. Stress mockup tendons to the minimum values shown in the Plans by using jacks or

other methods approved by the Engineer. Perform pressure tests on the mockups in accordance

with 462-8.2.1 prior to grout injection. For the grout injection operations, utilize the same grout

material and types and sizes of grout injection equipment that will be used on the project

including but not limited to mixers, pumps, hoses, valves and pressure gauges. Inject grout into

the mockups using the proposed Grouting Operations Plan. Allow the grout to harden a

minimum of 24 hours after injection before inspecting the mockup. Inspect the mockup in

accordance with the requirements of 462-8.3.2.1 and then carefully cut open the duct at all high

points and other locations as directed by the Engineer to check for voids. Prepare a report

documenting the findings and submit it to the Engineer. If voids are found, determine the cause

and revise the proposed Grouting Operations Plan accordingly. If directed by the Engineer,

construct additional mockups and repeat the grout injection operation using the revised Grouting

Operations Plan as many times as are required until the results are acceptable.

462-7.4.1.2 Inlets and Outlets:

1.Ensure connections from grout pump hose to inlets are free of

dirt and are air-tight.

2.Inspect valves to ensure they can open and close properly.

462-7.4.1.3 Supplies:

Provide an adequate supply of water and compressed air for

clearing and testing ducts, as well as, mixing and pumping grout before grouting operations start.

462-7.4.1.4 Equipment:

1.Provide grouting equipment consisting of measuring devices for

water, a high-speed shear colloidal mixer, a storage hopper (e.g., holding reservoir) and pump

with all necessary connecting hoses, valves, and pressure gauge. 678FY 2023-24Return to Table of Contents

2.Provide pumping equipment with sufficient capacity to ensure

PT ducts can be filled and vented in not more than 30 minutes without interruption.

3.Provide an air compressor and hoses with sufficient output to

perform required functions.

4.Have vacuum grouting equipment (i.e., volumetric measuring type)

and experienced operators available to meet the timeframe requirements of 462-8.3.2.1-6.

462-7.4.1.4.1 Mixer and Storage Hopper:

1.Provide colloidal grout machinery with a charging tank

for blending and a holding tank. Blending tank must be equipped with a high speed shear

colloidal mixer capable of continuous mechanical mixing producing a homogeneous and stable

grout free of lumps and un-dispersed cement. Holding tank must be kept agitated and at least

10% full at all times during pumping operations to prevent air from being drawn into duct.

2.Add water during primary mixing phase in the colloidal

mixer by use of a flow meter or calibrated water reservoir with measuring accuracy equal to 1%

of total water volume.

462-7.4.1.4.2 Pumps:

1.Provide pumping equipment capable of:
a.continuous operation which includes a system for

circulating and agitating grout when actual grouting is not in progress,

b.maintaining pressure on grouted ducts,
c.fitted with a valve that can be closed off without loss of

pressure in duct.

2.Grout pumps will:
a.be positive displacement type,
b.provide a continuous grout flow
c.be able to maintain a discharge pressure of at least

145 psi.

3.Use pumps constructed with seals to prevent oil, air, or other

foreign substances from contaminating grout and prevent loss of grout or water.

4.Specify pump capacity adequate to maintain the specified

grouting rate.

5.Place pressure gauges with full scale reading of no more than

300 psi at the pump and at the duct inlet.

6.Grout hoses to be compatible with pump output (diameter and

pressure rating).

462-7.4.1.4.3 Vacuum Grouting: Provide vacuum grouting

equipment meeting these minimum requirements:

1.Volumeter for measurement of void volume;
2.Vacuum pump with a minimum capacity of ten cubic

feet per minute and equipped with a flow-meter, graduated hopper, or other acceptable means

approved by the Engineer capable of measuring the amount of grout being injected.

3.Manual colloidal mixers, manual high speed shear

mixers, or other mixing methods recommended and approved by the grout manufacturer, in

writing, for the specific project covered by this Section for voids less than 5.5 gallons in volume.

However, mix a minimum of one full bag of grout regardless of the size void to be grouted. 679FY 2023-24Return to Table of Contents

4.Standard colloidal mixers for voids 5.5 gallons and

greater in volume.

462-7.4.1.4.4 Standby Equipment: Provide a standby colloidal

grout mixer and pump during grouting operations.

462-7.4.1.5 Grouting:

1.Maintain grout fluidity in strict compliance with grout

manufacturer’s recommendations.

2.In the presence of the Engineer, perform a test to confirm

accuracy of grouting equipment volume-measuring components each day of use before

performing any grouting operations. Testing in a warehouse or similar condition is acceptable.

Use either water or grout for testing using standard testing devices with volumes of 0.5 gallon

and 6.5 gallon and an accuracy of equal to or less than four ounces. Perform one test with each

device. Results must verify accuracy of grouting equipment void volume-measuring component

within 5% of test device volume and must verify accuracy of grouting equipment grout volume

component within 10% of test device volume for the 0.5 gallon test device. When testing the

6.5 gallon device, ensure an accuracy of 3% (test device volume) and 6% (grout volume).

3.Do not use grout that tests outside allowable flow rates.
4.Perform grouting in accordance with procedures set forth in

approved Grouting Operations Plan.

5.Grout all ducts.

462-7.4.1.5.1 Temperature:

1.At inlet end of grout hose, the maximum limit for grout

temperature is 90°F for normal grouting procedures and 85°F when performing repair operations

with vacuum grouting.

2.Condition grout material to maintain mixed grout

temperature below maximum limit.

3.Grouting operations are not permitted when ambient

temperature is below 40°F or is expected to fall below 40°F within one day subsequent to

grouting.

4.Postpone grouting operations if freezing temperatures are

forecasted within two days subsequent to grouting.

462-7.4.1.5.2 Mixing and Pumping:

1.Mix grout with a metered amount of water.
2.Mix materials to produce a homogeneous grout.
3.Continuously agitate grout until grouting operations are

complete.

4.Reject bags of grout containing clumps.

462-7.4.1.5.3 Production Test:

1.Test grout fluidity to verify it is within limits established

by grout manufacturer during grouting operations. Target fluidity rate is established by

manufacturer’s representative based on ambient weather conditions.

2.Determine grout fluidity in accordance with Section 938.
a.Perform a fluidity test using flow cone on grout

discharged from anchorage cap outlet immediately after uncontaminated uniform consistency

discharge begins for each tendon greater than 50 feet in length. For tendons 50 feet or less,

perform a fluidity test on a per batch basis. For fluidity tests done on a per batch basis, perform 680FY 2023-24Return to Table of Contents

test after new batch has been transferred from mixing tank to holding tank and thoroughly mixed

with remains of the previous batch to produce a new homogenous mixture. During mixing

process, continually re-circulate grout from hose into holding tank. Ensure measured grout efflux

time is not less than efflux time measured at injection end of grout hose.

b.Additionally, check grout fluidity using Wet

Density method contained in Section 938. Density at discharge outlet must not be less than grout

density at inlet. Continuously discharge grout until density requirements are met. Discard grout

used for testing fluidity.

3.Perform fluidity test for each tendon to be grouted

without modifying water-cement ratio.

4.Check temperature of grout at inlet end of grout hose

hourly to verify conformance to this Section.

5.Obtain a sample from first production batch of grout and

perform a wick induced bleed test on this sample in accordance with Section 938 at beginning of

each day’s grouting operation. Begin grouting operations after sample is obtained.

6.Once grouting has begun, if zero bleed requirement is

found to not have been achieved in the wick induced bleed test at any time during required test

time period, complete grouting of any partially grouted tendons currently being grouted but do

not begin grouting any new or additional tendons. Immediately inform the Engineer when

grouting operations have ceased due to non-compliance of the wick induced bleed test.

7.Do not re-start grouting operations until such time that

testing shows grout meets specified requirements.

462-7.4.1.5.4 Grout Injection Operations:

1.Briefly open low point drains to allow for drainage of

any water that may be present within the duct. If water is present:

a.Capture and measure the water removed from the

duct and retain for further testing as directed by the Engineer; blow the duct with oil free dry

compressed air meeting the ASTM D4285 with the end vent port open.

b.Obtain written authorization from the Engineer to

proceed with grouting injection operations.

2.Open all grout outlets before starting grouting operation.
3.Inject grout into duct in accordance with approved

Grouting Operations Plan.

4.Pump grout at the lowest possible pressure practical.
5.Conduct normal grouting operations at a pressure range

of 10 psi to 50 psi measured at grout inlet.

6.Do not exceed a pumping pressure of 145 psi anywhere

within the system. Do not exceed a pumping pressure of 75 psi at the grout inlet for flat ducts.

7.Use grout pumping methods that ensure complete filling

of ducts and complete encasement of steel.

8.Grout must flow from first and subsequent outlets until

any residual water or entrapped air has been removed prior to closing outlet.

9.Pump grout through duct and continuously discharge it at

anchorage and anchorage cap outlets until all free water and air are discharged and consistency

of grout is equivalent to that of grout being pumped into inlet. Close anchorage outlet and 681FY 2023-24Return to Table of Contents

discharge a minimum of two gallons of grout from anchorage cap into a clean receptacle. Close

anchorage cap outlet.

10.Elevate grout pressure to the equivalent realized

pumping pressure while grouting the duct, seal inlet valve, and wait two minutes to determine if

any leaks exist after all outlets have been bled and sealed. If leaks are present repair all identified

leaks using methods pre-approved by the Engineer and repeat steps until no leaks are present.

Bleed pressure to 5 psi and wait a minimum of ten minutes for any entrapped air to flow to high

points if no leaks are present. Increase pumping pressure not to exceed actual realized pumping

pressure of duct and discharge grout at each high point outlet to eliminate any entrapped air or

water after specified ten minute period has expired. Complete process by locking a pressure of

30 psi into tendon duct.

11.If actual grouting pressure exceeds maximum allowed,

close inlet and pump grout at next outlet which has just been closed or is ready to be closed as

long as a one-way flow is maintained. Do not pump grout into a succeeding outlet from which

grout has not yet flowed. Fit outlet/inlet to be used for pumping with a positive shut-off valve as

shown in the approved system drawings and pressure gauge if this procedure is used.

12.Stop grouting operation if complete grouting of tendon

cannot be achieved by the steps stated and in compliance with the approved Grouting Operations

Plan. After waiting 48 hours, vacuum grout duct in accordance with this Section.

462-7.4.1.5.5 Vertical Grouting:

1.Provide a reservoir, equivalent to a minimum of 2% of

the total anticipated grout volume used on a particular tendon, at upper end of tendon to store

bleed water and grout; maintain grout level above level of prestressing plate and anchorage for

all vertical tendons. Design and size this device to maintain level grout at an elevation that

ensures potential bleed will not drop below the highest point of upper anchorage device. Design

reservoir to allow all bleed water, if any, to rise into reservoir.

2.Discharge grout and check grout fluidity as described in

this Section. Immediately add grout if level of grout begins to drop, potentially allowing bleed

water into the upper anchorage device and tendon duct. Remove reservoir after grout has

hardened. Visually inspect for voids using a borescope or probe in presence of the Engineer. Fill

all voids found in duct using volumetric measuring vacuum grouting process in accordance with

this Section.

3.Allow grout to flow from each outlet until all air and

water have been purged prior to using a higher elevation outlet for pumping. Pump grout at

increasingly higher outlets which have been or are ready to be closed, as long as one-way grout

flow is maintained for vertical tendons within allowable grouting pressures.

462-7.4.1.5.6 Grouting Operations Report:

1.Submit grouting report signed by the grouting Contractor

within five days of each grouting operation for review by the Engineer.

2.Record theoretical quantity of grout anticipated as

compared to actual quantity of grout used to fill duct. Notify the Engineer immediately of

shortages or overages.

3.Information to be noted in this report must include at a

minimum, but not necessarily be limited to:

a.identification of tendon;
b.date grouted;

682FY 2023-24Return to Table of Contents

c.number of days from tendon installation to

grouting;

d.type of grout;
e.injection end;
f.verification that water or moisture is not present

within the duct;

g.daily duct humidity readings if applicable;
h.Pressure gauge readings at the pump and at the

inlet;

i.Ratio of actual to theoretical grout quantity;
j.Number of grout bags mixed;
k.Total quantity of water used to mix grout;
l.Summary of any problems encountered; and,
m.corrective action taken,
n.description and results of the post grouting

operations and inspection.

462-7.4.2 Flexible Filler Operations:

1.Inject flexible filler with or without using vacuum assistance for

tendons with vertical or predominately vertical profiles as shown on Standard Plans, Index 462-

001.

2.Inject flexible filler using vacuum assistance for all other tendon

profiles shown on Standard Plans, Index 462-001.

462-7.4.2.1 Microcrystalline Wax: Conduct all wax injection operations,

repairs, and inspections in the presence of the Filler Injection Foreman, Filler Injection QC

Inspector and the Engineer.

462-7.4.2.1.1 Wax Injection Operations Plan:

1.Prepare a Wax Injection Operations Plan in cooperation

with the PT system vendor and the PT wax manufacturer.

2.Submit the Wax Injection Operations Plan to the

Engineer for approval at least six weeks in advance of any scheduled injection operation.

3.Written approval of the Wax Injection Operations Plan

by the Engineer is required before any injection of permanent structure can begin.

4.At a minimum, the Wax Injection Operations Plan will

address and provide the following:

a.Names and qualifications for wax injection crew

and crew supervisor in conformance with this Specification;

b.Type, quantity, and brand of materials to be used

in wax injection including all required certifications;

c.Type of equipment to be used, including capacity

in relation to demand and working conditions, as well as, standby equipment and spare parts;

d.Personal Protective Equipment (PPE);
e.Communication equipment to be used during

injection;

f.Location and sequence of ducts to be injected;
g.Calculation of temporary elongation of tendons

due to wax injection temperature; 683FY 2023-24Return to Table of Contents

h.Procedures for checking the presence of water or

moisture in the duct, blowing oil-free dry compressed air, and measuring humidity of air within

the duct;

i.If applicable, procedures for monitoring and

continuously maintaining less than 40% humidity of air within the duct;

j.General wax injection procedure for all duct geometries and types;
k.Duct pressure test and repair procedures;
l.Method to be used to control rate of flow within

ducts and anchorage assembly;

m.Theoretical wax volume calculations;
n.Injection rate;
o.Maximum injection pressure during injection and

locking pressure;

p.Vacuum (gauge) pressure requirements, vacuum

tests and repair procedures;

q.Heating, mixing and pumping procedures in

accordance with the manufacturer’s recommendations;

r.Direction of wax injection accounting for grade

and/or slope of tendon;

s.Location of all high points and all low points

accounting for grade and/or slope of tendon;

t.Sequence of valve operations at PT system inlets

and outlets, including minimum wax discharge quantities;

u.Procedures for handling blockages;
v.Procedure for sealing duct after wax injection;
w.Procedure for inspecting the PT system after wax

injection, filling voids created by inspection procedures, and sealing duct after PT system

inspection;

x.Procedures for possible post injection repair;
y.Method(s) and material(s) that will be used to

protect concrete surfaces from wax spills, leaks, etc. during wax injection, post injection

inspection and post injection repair;

z.Safety and clean-up procedures;
5.Conduct a joint meeting of the Contractor, wax injection

crew, and the Engineer before wax injection operations begin. Discuss Wax Injection Operations

Plan, required testing, corrective procedures, and any other relevant issues at the meeting.

6.Prior to production wax injection, demonstrate to the

Engineer’s satisfaction successful wax injection by injecting full-scale mockups that are

constructed with all associated PT system components using the mockup tendon profiles shown

in the Plans and the proposed Wax Injection Operations Plan. Utilize smooth duct and associated

couplers and fittings meeting the requirements of Section 960 for all mockups. Utilize smooth

duct for the mockups which has an inside diameter required for a given mockup tendon size. If

the mockup is also being used to perform PT system acceptance testing, use the duct type

appropriate for the PT system location. Place the mockup tendons specified in the Plans inside

the ducts to simulate the in-place PT tendons. Stress mockup tendons to the minimum values

shown in the Plans by using jacks or other methods approved by the Engineer. Perform pressure 684FY 2023-24Return to Table of Contents

tests on the mockups in accordance with 462-8.2.1 prior to wax injection. If vacuum assisted wax

injection is required to be used, perform vacuum tests on the mockups in accordance with 462-

8.2.1 prior to wax injection. For the wax injection operations, utilize the same wax material and

types and sizes of wax injection equipment that will be used on the project including but not

limited to heaters, pumps, hoses, valves and pressure gauges. Inject wax into the mockups using

the proposed Wax Injection Operations Plan. Allow the wax to cool a minimum of 24 hours after

injection before inspecting the mockup. Inspect the mockup in accordance with the requirements

of 462-8.3.2.2.1 and then carefully cut open the duct at all high points and other locations as

directed by the Engineer to check for voids. Prepare a report documenting the findings and

submit it to the Engineer. If voids are found, determine the cause and revise the proposed Wax

Injection Operations Plan accordingly. If directed by the Engineer, construct additional mockups

and repeat the wax injection operation using the revised Wax Injection Operations Plan as many

times as are required until the results are acceptable.

462-7.4.2.1.2 Inlets and Outlets:

1.Ensure connections from wax pump hose to inlets are

free of dirt and are air-tight.

2.Inspect valves to ensure they can open and close

properly.

3.Provide clear hose and connections to outlet valves

compatible with heated wax injection for discharging excess wax. Kinks and clogs in the vent

hoses are not permitted during pumping operations.

462-7.4.2.1.3 Supplies:

1.Provide an adequate supply of compressed air for

clearing and testing ducts before wax injection operations start.

2.Provide clean receptacles for collecting excess wax at

outlet locations.

3.Provide supplies for stopping wax leaks including rags

and buckets of cold water.

462-7.4.2.1.4 Equipment:

1.Provide equipment consisting of measuring devices for

wax, wax melting unit(s), wax mixer for maintaining uniform temperature, a storage holding

reservoir, pump, and volumetric flow rate and displacement volumetric meters with all necessary

connecting hoses, valves, pressure gauges, timer, and temperature gauge.

2.Provide pumping equipment with sufficient capacity to

ensure PT ducts can be filled and vented in not more than time specified by the wax

manufacturer and this Specification.

3.Provide an air compressor and hoses with sufficient

output to perform required functions.

4.For filling of air voids in an incomplete wax injection,

have the required equipment and personnel as stated in the approved Wax Injection Operations

plan available to meet the timeframe requirements of 462-8.3.2.2.1-6.

5.For vacuum assisted injection, provide vacuum pump

equipmentable to measure and have sufficient capacity to ensure a minimum of 90% vacuum in

the PT system prior to filler injection. Provide a continuously running vacuum pump or vacuum

reservoir capable of maintaining vacuum during the wax injection process. 685FY 2023-24Return to Table of Contents

6.Ensure that all injection and inspection equipment is

maintained in accordance with equipment manufacturer’s instructions and is calibrated and in

good working condition.

7.Provide equipment for dislodging congealed wax

blockages.

8.Provide standby pumping and vacuum equipment on the

project site during injection operations.

462-7.4.2.1.4.1 Storage Reservoir and Mixing:

1.Provide heated holding tanks for wax injection.
a.Holding tanks must be equipped with a

heating system capable of producing a melted wax free of lumps within the temperature limits

specified by the manufacturer.

b.Holding tanks must be kept at least 10%

full at all times during pumping operations to prevent clogs and air from being drawn into duct

c.Holding tanks must have at time of

injection a quantity of heated wax required to inject the PT system. The quantity of heated wax

required to inject the PT system is calculated as 25% more than the total quantity to fill the duct

and anchorages, to discharge wax at outlets, to fill pumping equipment and hoses, and to

maintain the minimum amount of wax in the holding tanks during pumping operations.

2.Provide equipment to ensure uniform temperature

of heated wax, either by mixing or other methods.

462-7.4.2.1.4.2 Pumps:

1.Provide pumping equipment capable of the

following:

a.continuous operation which includes a

system for heating pump components when wax injection is not in progress;

b.maintaining pressure on wax injected

ducts;

c.fitted with a valve that can be closed off

without loss of pressure in duct.

2.Wax pumps will:
a.be positive displacement type;
b.provide a continuous wax flow;
c.be able to maintain a discharge pressure

of at least 75 psi;

d.provide an injection of filler into duct in a

velocity range of 40-70 ft/min.

3.Use pumps constructed with seals to prevent oil,

air, or other foreign substances from contaminating wax and prevent loss of wax.

4.Pumps with hoppers are not permitted.
5.Specify pump capacity adequate to maintain the

wax injection rate.

6.Place pressure gauge with full scale reading of no

more than 300 psi at pump and duct inlets.

7.Wax injection hoses to be compatible with pump

output (diameter, pressure rating and temperature). 686FY 2023-24Return to Table of Contents

462-7.4.2.1.4.3 Vacuum Wax Injection:

1.If vacuum wax injection is to be used for filling

voids in incomplete wax filling operations, provide vacuum wax injection equipment meeting

these minimum requirements:

a.Volumeter for measurement of void

volume;

b.Vacuum pump with a minimum capacity

of ten cubic feet of air per minute and equipped with a flow-meter, graduated reservoir, or other

acceptable means approved by the Engineer capable of measuring the amount of wax being

injected.

c.Mixers and heaters, or other mixing and

heating methods recommended and approved by the wax manufacturer, in writing, for the

specific project covered by this Section.

2.For vacuum assisted injection, provide vacuum

wax injection equipment meeting these minimum requirements:

a.Vacuum pump with a minimum capacity

of ten cubic feet of air per minute (free air) with the capability of removing 90% of standard

atmospheric pressure within the PT system and equipped with a vacuum pressure gauge;

b.Hoses, vacuum reservoirs, and

connections required for attachment to the PT system.

462-7.4.2.1.4.4 Heaters: Use a heater and temperature

monitoring system capable of liquefying the entire mass of PT wax to be used for a given

injection operation within the temperature limits specified by the PT wax manufacturer. The

heater systems must apply a uniform heat to the PT wax and avoid locally high temperatures that

may damage the PT wax or container. Use a heater and temperature monitoring system which

complies with the recommendations of the PT wax manufacturer.

462-7.4.2.1.5 Wax Injection:

1.Maintain wax temperature in strict compliance

with the wax manufacturer’s published product data sheet and within the limits of this Section.

2.Perform wax injection in accordance with

procedures set forth in approved Wax Injection Operations Plan.

3.Inject hot wax into specified duct inlet.

462-7.4.2.1.5.1 Temperature:

1.Condition wax to maintain its temperature during

injection between 212°F and 240°F.

2.Wax injection operations are not permitted when

ambient temperature is below minimum temperatures specified by the wax manufacturer.

462-7.4.2.1.5.2 Production Test:

1.Check wax temperature to verify it is within

established limits during operations.

2.Do not start operations until such time that testing

shows wax meets specified requirements.

462-7.4.2.1.5.3 Wax Injection Operations:

1.Briefly open low point drains to allow for

drainage of any water that may be present within the duct. If water is present: 687FY 2023-24Return to Table of Contents

a.Capture and measure the water removed

from the duct and retain for further testing as directed by the Engineer;

b.Obtain written authorization from the

Engineer to proceed with blowing of compressed air.

2.Just prior to wax injection, close all low point

drains and ports except the inlet and outlet ports at the anchorage caps. Blow oil-free dry

compressed air meeting ASTM D4285 through one of the anchorage cap ports until the humidity

measured at the inlet and outlet ends are less than 40% and continuing blowing for an additional

30 minutes. Stop blowing, wait a minimum of 15 minutes, and take humidity measurements at

the inlet and outlet ends of blowing. Further blowing is not required if both humidity readings

are less than 40%. If the humidity readings are 40% or greater, then repeat the process of

blowing and waiting for 15 minutes until the humidity measurements at the inlet and outlet end

of blowing are less than 40%. Take humidity measurements of air within the duct at the inlet end

and outlet end of blowing using separate humidity meters. Use humidity meters approved by the

Engineer.

4.Provide visual confirmation that the duct and

tendon are free of water, moisture and debris at the anchorages and low points of the tendon

profile.

5.Protect concrete surfaces from wax spills, leaks,

etc.

6.Inject wax in accordance with approved Wax

Injection Operations Plan.

7.Use pumping methods that ensure complete

filling of ducts and anchorage assembly with wax.

8.Ensure the entire mass of wax is fully liquefied

prior to and throughout injection operations. Establish a non-turbulent, laminar system

circulation by continuously recirculating the wax between the pump and the storage container

prior to injecting the wax into the duct. Pump components must be at wax injection temperature

prior to wax injection into duct. Do not allow wax to free fall during recirculation or injection

operations. Maintain a positive head of liquid wax above all withdrawal and recirculation ports

and do not allow air intrusion into the pumping system. Do not pour liquid wax into an open

pump or hopper.

9.Inject PT wax at a continuous and steady rate in

accordance with the approved Wax Injection Operations Plan at a flow rate through duct at a

velocity between 40 and 70 feet per minute and pressure limited to 75 psi at the duct inlet and

145 psi at the pump.

10.For tendons in which vacuum assisted injection

is used, provide a minimum of 90% vacuum in the duct prior to injection. Connect both the

anchorage outlet and the cap outlet to the vacuum system. After the vacuum is established, lock

off the air supply to the duct and monitor the vacuum for 1 minute. If the loss of vacuum after

1 minute exceeds 10%, repair leaks as directed by the Engineer and retest the duct. If the results

are acceptable, reestablish and maintain a minimum 90% vacuum using the outlets at the higher

end anchorage shown on Standard Plans, Index 462-001 while injecting wax using the inlet at the

lower end anchorage shown on the same Standard. Close all outlets, inlets, and ports other than

at injection and vacuum locations during injection procedure. Pump wax into inlet and

continuously vacuum air at the outlet. After the duct is fully injected with wax and the wax 688FY 2023-24Return to Table of Contents

reaches the vacuum end, close the outlet valve, turn off the vacuum pump and continue the

injection pump. Bleed all outlets starting at the anchorage cap at the injection end and proceed to

bleed every valve thereafter from injection end to vacuum end, ending with the anchorage cap at

the vacuum end. When bleeding each valve, collect a minimum of two gallons of continuously

flowing wax free from air before closing the valve. After all outlet valves are closed, close inlet

valve with locking pressure between 30 psi and 45 psi. Do not reuse discharged wax.

11.For tendons in which vacuum assisted injection

is not used, inject wax under pressure at locations shown on Standard Plans, Index 462-001.

Allow wax to flow from duct and anchorage discharge points until a steady flow of wax free

from air is continuously discharged. Collect a minimum of two gallons of continuously flowing

wax free from air at discharge point before closing outlet valve. Do not reuse discharged wax.

After all outlets are closed, close the inlet valve at locking pressure between 30 and 45 psi.

12.Record the total volume of wax injected into the

system.

13.Upon completion of wax injection, seal the duct

in accordance with the approved PT system drawings. Remove all excess wax from exposed

surfaces.

462-7.4.2.1.5.4 Wax Injection Operations Report:

1.Submit the wax injection report signed by the

wax injection Contractor within five days of each wax injection operation for review by the

Engineer.

2.Record theoretical quantity of wax anticipated as

compared to actual quantity of wax used to fill duct. Notify the Engineer immediately of

shortages or overages.

3.Information to be noted in this report must

include at a minimum, but not necessarily be limited to:

a.Identification of duct;
b.Date of duct pressure test;
c.Date wax injected;
d.Number of days from tendon installation

to wax injection;

e.Wax product identification;
f.Daily duct humidity readings if

applicable;

g.Humidity readings from blowing

compressed air through duct; h. Verification that water or moisture is not

present within the duct prior to wax injection;

i.Pressure gauge readings at the pump and

at the inlet;

j.Final locking pressure of wax in PT

system;

k.Reservoir temperature at time of initiation

of wax injection;

l.Theoretical volume of wax required to

completely fill the duct;

m.Volume of wax injected into duct;

689FY 2023-24Return to Table of Contents

n.Volume of wax collected at discharge

points;

o.Injection rate including timing of duct

inlet opening and closing;

p.Ambient temperature;
q.Summary of any problems encountered

and any deviations from the Wax Injection Operations Plan;

r.Corrective action taken;
s.Description and results of the post wax

injection operations and inspection;

t.Vacuum gauge pressure and percent

vacuum in duct prior to injection;

4.Maintain daily wax injection operations reports at

the job site for review by the Engineer. Submit all daily reports to the Engineer on a weekly basis

or as directed by the Engineer.

462-7.4.2.1.6 Manufacturer’s Installation Technician:

Provide for a PT system vendor installation technician, certified by the vendor as having

sufficient knowledge and expertise to oversee the wax injection personnel. The vendor’s

technician shall be under the direct employ of the vendor and shall be present for all wax

injection activities for a minimum of the first two days of wax injection for each of the

Contractor’s wax injection crews. The vendor’s technician shall submit written certification to

the Engineer that the Contractor’s installation process is in conformance with the approved Wax

Injection Operations Plan.

462-7.5Repair: Perform no remedial or repair work without the Engineer’s approval in

writing.

462-7.5.1 Lifting and Access Holes:

1.Repair all holes with magnesium ammonium phosphate concrete

meeting requirements of Section 930 or Type Q epoxy grout meeting requirements of

Section 926. Immediately before casting concrete (i.e., within 24 hours), mechanically clean and

roughen the mating concrete surfaces to remove any laitance and expose small aggregate. Use

grit blasting or water blasting using a minimum 10,000 psi nozzle pressure. Flush surface with

water and blow dry. Form, mix, place, and cure material in strict compliance with manufacturer’s

recommendations.

2.Upon completion of deck grooving, coat repaired holes, block-outs, and

an area extending six inches outside perimeter of repair with a high molecular weight

methacrylate (HMWM) meeting the requirements of Section 413. Prepare surface to be coated

and apply HMWM in accordance with Section 413. Friction (skid) tests per Section 413 are not

required.

462-7.5.2 Inlets, Outlets, Drains and Ports:

1.Place threaded plastic plugs in all inlet, outlet, drain and port locations

required in the Contract Documents.

2.Fill inlet, outlet, drain and port recesses as shown in the Contract

Documents using a Type Q epoxy compound, Type E epoxy compound, or Type F-1 epoxy

compound meeting requirements of Section 926.

3.Prepare surface to receive epoxy compounds in compliance with

manufacturer’s recommendations. 690FY 2023-24Return to Table of Contents

462-7.5.3 Duct:

1.Repair the following ducts using heat-shrink wrap material designed for

duct repair:

a.Smooth plastic ducts that will be encased in concrete;
b.Corrugated plastic ducts;
c.External smooth plastic ducts after the flexible filler injection

procedure has been completed.

Install heat-shrink wrap in accordance with manufacturer’s

instructions.

2.Repair external smooth plastic ducts before the flexible filler injection

procedure has been completed using elastomer sleeves and stainless steel band clamps.

462-8Acceptance and Testing

462-8.1Contractor Material Testing:

1.The following tests are not required on post-tensioned, precast flat slab bridges,

and double-tee bridges, but are required on all other PT applications.

2.Include cost for Contractor Tendon Modulus of Elasticity Test and In-Place

Wobble and Friction Test in price of PT system.

462-8.1.1 Tendon Modulus of Elasticity Test:

Perform a tendon modulus of elasticity test in accordance with the

following procedure if required in the Contract Documents or ordered by the Engineer.

1.Bench test two samples of each size tendon prior to stressing

tendons to determine modulus of elasticity for purpose of accurately determining tendon

elongations while stressing.

2.Bench length between anchorages must be at least 40 feet and

tendon duct at least two inches clear of tendon all around for purpose of this test.

3.Test procedure must consist of stressing tendon at an anchorage

assembly with a load cell at dead end.

4.Tension test specimen 80% of GUTS in ten increments and then

detention from 80% of GUTS to zero in ten decrements.

5.Record gauge pressure, elongations, and load cell forces for

each increment and decrement.

6.Note elongations of tendon for both ends and the central 30 feet,

measured to an accuracy of plus or minus 1/32 inches.

7.Correct elongations for actual anchor set of dead end.
8.Calculate modulus of elasticity as follows:

E = PL/Adl

where,

P = force in tendon

L = distance between pulling wedges and dead end wedges

or exact length in the center 30 feet of tendon

A = cross sectional area of tendon

dl = tendon elongation within length, L, for load, P

9.Submit revisions to theoretical elongations to the Engineer for

approval if bench test varies from modulus of elasticity used for shop or working drawings by

more than 1%. 691FY 2023-24Return to Table of Contents

10.Additional Tendon Modulus of Elasticity Tests may be

required when observed tendon elongations in erected structure fall outside acceptable tolerances

or to otherwise settle disputes to the satisfaction of the Engineer.

11.Additional test series of substantiation from previous projects,

not to exceed two per source, will be required if source of prestressing steel changes during

project.

12.Apparatus and methods used to perform the test must be

submitted to the Engineer for approval in writing.

13.Tests must be conducted in the Engineer’s presence.

462-8.1.2 In-Place Wobble and Friction Test:

1.Test in-place a minimum of one tendon per tendon group performing

the same function for tendons in excess of 100 feet long.

2.Functional tendon groups are cantilever tendons, continuity tendons,

draped external tendons, or continuous profiled tendons passing through one or more spans.

3.Selected tendon will represent the size and length of tendon group being

tested.

4.In-place test is not required on projects with straight tendons used in flat

slabs or precast voided slabs.

5.Test procedure consists of stressing tendon at an anchorage assembly

with a load cell or a second certified jack at dead end.

6.Stress test specimen to 80% of GUTS in eight equal increments.
7.For each increment, record gauge pressure, elongations, and load cell

force (if a load cell is used).

8.Take into account any wedge seating in both live end (i.e., back of jack)

and dead end (i.e., back of load cell) and any friction within anchorages, wedge plates, and jack

as a result of slight deviations of strands or wires through these assemblies.

9.Keep an accurate account of elongation at jacking end allowing for

intermediate wedge seating and slip of the jack’s wedges for long tendons requiring multiple jack

pulls with intermediate temporary anchoring.

10.If elongations fall outside the plus or minus 7% range compared to

anticipated elongations, investigate reason and make detailed calculations confirming final

tendon forces are in agreement with requirements of the approved Contract Documents.

11.Do not vary value of expected friction and wobble coefficients by

more than plus or minus 10% in reconciling theoretical and actual elongations.

12.Submit for written approval by the Engineer a plan to correct or

compensate for elongation discrepancies if necessary.

13.The Engineer will require one successful test for each tendon group for

the project.

14.The Engineer may require additional in-place tests if there are

irreconcilable differences between forces and elongations or other difficulties during the course

of routine stressing operations.

15.Submit apparatus and methods used to perform test to the Engineer for

approval in writing.

16.Conduct all in-place tests in the Engineer’s presence.

462-8.1.3 Required Reports: 692FY 2023-24Return to Table of Contents

1.Submit the test report for “Tendon Modulus of Elasticity Test” to the

Engineer at least 30 days before installing tendon.

2.Submit the test report for “In-Place Wobble and Friction Test” to the

Engineer within two weeks after successful installation of tested tendon.

462-8.1.4 Test Results Application:

1.Reevaluate theoretical elongations shown on PT shop or working

drawings using results of “Tendon Modulus of Elasticity Test” and “In-Place Wobble and

Friction Test,” as appropriate, and correct calculations as necessary.

2.Submit revisions to theoretical elongations to the Engineer for approval

in writing.

462-8.2Contractor Field Tests:

462-8.2.1 Prior to Concrete Placement:

462-8.2.1.1 All Tendons Except as Noted:

1.Test all PT system components utilized on the project, except

those used for internal longitudinal tendons in precast box-girder segments in the casting cell

(e.g., cantilever tendons).

2.In the formwork, pressure test each duct with all assemblies

used in a single structural component (e.g. segment, beam, etc.).

3.Test assemblies in their final position just prior to concrete

placement by sealing them at their anchorages or construction joint termini and then applying

compressed air in accordance with this Section to determine if assembly connections are pressure

tight.

4.In presence of the Engineer, pressurize duct to 7.5 psi and lock-

off outside air source. Record pressure loss for one minute. If pressure loss exceeds 0.75 psi, or

10%, find and repair leaks in duct assembly using repair methods approved by the Engineer and

retest.

462-8.2.1.2 Tendons for Which Vacuum Assisted Filler Injection Will

Be Used:

1.Test all PT system components utilized on the project except

those used for internal longitudinal tendons in box-girder segments.

2.In the formwork, perform a vacuum test for each duct with all

assemblies used in a single structural component (e.g. segment, beam, etc.).

3.Test assemblies in their final position just prior to concrete

placement by sealing them at their anchorages or construction joint termini and then applying a

vacuum in accordance with this Section to determine if assembly connections are pressure tight.

4.In presence of the Engineer, apply a 90% vacuum and lock-off

outside air source. Record vacuum loss for five minutes. If vacuum loss exceeds 10%, find and

repair leaks in duct assembly using repair methods approved by the Engineer and retest.

462-8.2.2 Post Concrete Placement:

1.After stressing and before injecting filler into duct, install all anchorage

caps, inlets and outlets and test the duct with compressed air in accordance with this Section to

determine if duct connections require repair.

2.In the presence of the Engineer, pressurize duct to 50 psi and lock-off

outside air source. Record pressure loss for one minute. A pressure loss less than 25 psi, or 50%,

is acceptable for ducts with a length of equal to or less than 150 feet and a pressure loss less than

15 psi is acceptable for ducts longer than 150 feet. 693FY 2023-24Return to Table of Contents

3.If the pressure loss exceeds allowable, repair leaking connections using

methods approved by the Engineer and retest.

462-8.3Contractor Inspections:

462-8.3.1 Post Concrete Placement/Prior to Filler Injection Operations:

1.Upon completion of concrete placement and except as otherwise

described, prove PT ducts are free and clear of any obstructions or damage and are able to accept

intended PT tendons by passing a torpedo through ducts.

2.Use a torpedo having same cross-sectional shape as duct that is

1/4 inches smaller all around than clear, nominal inside dimensions of duct. Make no deductions

to torpedo section dimensions for tolerances allowed in manufacture or fixing of ducts. For

straight ducts, use a torpedo at least two feet long. For curved ducts, determine length so that

when both ends touch outermost wall of duct, torpedo is 1/4 inches clear of innermost wall. The

Engineer will reject member if torpedo will not travel completely through duct and workable

repair cannot be made to clear duct. Torpedo must pass through duct easily when pushed through

by hand, without resorting to excessive effort or mechanical assistance.

3.Alternatively, four strand tendons in flat ducts used for transverse PT of

segmental box-girders may be preplaced prior to concrete casting. Prove PT ducts are free and

clear of any obstructions or damage by moving the group of strands back and forth in duct for a

minimum distance of one foot in each direction. Move strands easily, by hand, without resorting

to excessive effort or mechanical assistance.

462-8.3.2 Post Filler Injection Operations:

462-8.3.2.1 Post Grouting Operations:

1.Inspect all tendons. Complete the inspection of a given tendon

within 96 hours after grouting of that tendon.

2.Do not open or remove inlets, outlets, drains or ports until grout

has cured for a minimum of 24 hours.

3.Perform inspections within one hour after removal of all inlets

and outlets and drains located at anchorages and points along the tendon.

4.Drill into grout ports at all high points along tendon as well as

inlets or outlets located at anchorages for inspection. Drill through hardened grout to penetrate

full-length of grout port access piping to top of trumpet or duct. If drilling of inlets or outlets is

not feasible with conventional equipment, propose an alternative method of tendon inspection for

approval by the Engineer in writing. Use drilling equipment that will automatically shut-off

when steel is encountered. Do not drill into anchorage cap unless anchorage caps are determined

to have voids by sounding.

5.Perform all inspections using borescopes or probes and in

presence of the Engineer.

6.Fill voids using volumetric measuring vacuum grouting process

within 4 days from grouting.

7.Seal and repair all anchorage and inlet/outlet voids that are

produced by drilling for inspection purposes as specified within four hours of completion of

inspections if no additional voids are detected in tendon ducts or anchorages.

8.Remove inlet/outlet to a minimum depth of two inches below

face of concrete and seal the surface as specified within 4 hours of inlet/outlet removal. Use an

injection tube to extend to bottom of holes for backfilling with epoxy grout. 694FY 2023-24Return to Table of Contents

9.Drill into duct and explore voided areas with a borescope if

grouting operations were prematurely terminated prior to completely filling duct. Probing is not

allowed. Determine location and extent of all voided areas. Fill voids using volumetric

measuring vacuum grouting equipment in accordance with this Section.

462-8.3.2.2 Post Flexible Filler Injection Operations:

462-8.3.2.2.1 Microcrystalline Wax:

1.Inspect all tendons. Complete the inspection of a given

tendon within 96 hours after injecting that tendon with wax.

2.Do not open or remove inlets, outlets, drains or ports

until wax has cooled for a minimum of 24 hours.

3.Perform inspections within one hour after removal of all

inlets/outlets located at anchorages and high points along the tendon.

4.Visually inspect existing ports at all high and low points

along tendon as well as all ports located at anchorages. Repair wax leaks according to the Wax

Injection Operations Plan.

5.Between 24 and 48 hours following wax injection,

perform the following inspection operations for each tendon:

a.Sound external ducts with a rubber mallet to

ensure the system is free from voids,

b.Remove all inspection port caps and visually

inspect to ensure the system is free from voids,

c.If a void is detected and the void is deeper than

1/2 inch or if the strands are exposed and uncoated, address the void using this section and

methods described in the approved Wax Injection Operations Plan;

d.Fill voids created by inspection procedures and

replace all inspection port caps and seal in accordance with the approved Wax Injection

Operations Plan.

6.Fill voids using the methods described in the approved

Wax Injection Operations Plan within 4 days from filler injection.

7.Seal and repair all anchorage and inlet, outlet and port

voids that are produced for inspection purposes as described in the approved Wax Injection

Operations Plan within four hours of completion of inspections if no additional voids are

detected in tendon ducts or anchorages.

8.Inspect duct and explore voided areas with a borescope if

wax injection operation was prematurely terminated prior to completely filling duct. Determine

location and extent of all voided areas. Fill voids using gravity feed or injection, do not use

vacuum repair injection unless proven by a mockup and approved by the Engineer.

462-9Method of Measurement

1.Quantity of PT tendons to be paid for under this Section will be computed weight, in

pounds, of permanent PT steel tendons installed in the completed structure and accepted.

2.Quantity is determined by theoretical plan length measured from anchorage to

anchorage (measured from front face of bearing plate) with no allowance made for waste or

extension past bearing faces.

3.No measurement will be made for temporary PT which is considered incidental to Pay

Item 462-2, Post Tensioning Tendons.

4.Use these unit weights for quantity determination:

695FY 2023-24Return to Table of Contents

Table 462-2 PT

Strand and Bar Weight per Unit Length

Prestressing System Weight per Unit Length, Lb/Ft

1/2 inch diameter 7-wire strand 0.52

0.6 inch diameter 7-wire strand 0.74

5/8 inch high strength deformed bar 0.98

3/4 inch high strength deformed bar 1.49

1 inch high strength deformed bar 3.01

1-1/4 inch high strength deformed bar 4.39

1-3/8 inch high strength deformed bar 5.56

1-3/4 inch high strength deformed bar 9.10

2-1/2 inch high strength deformed bar 18.20

3 inch high strength deformed bar 24.09

Note: Weight per unit length of high strength deformed bars is based on values given in ASTM A722.

462-10Basis of Payment

462-10.1General:

1.PT tendons will be paid for at the Contract unit price per pound of steel tendon,

completed and accepted.

2.Payment will be full compensation for furnishing, installing, stressing, and

filler injection of all temporary and permanent, internal and external ducts. Payment also

includes anchorage assemblies and associated supplemental reinforcing steel required by

supplier, PT system hardware not embedded in concrete, ducts, grout and grouting operations,

flexible filler and filler injection operations, all testing, including construction of and filler

injection into mockups, Tendon Modulus of Elasticity Test and In-Place Wobble and Friction

Test, protection of PT anchorages, inlets, outlets, drains, and all labor, materials, tools,

equipment, and incidentals necessary for completing the work in accordance with the Contract

Documents. This payment also includes lubricants in tendon ducts for friction control and

flushing lubricants or contaminants from ducts.

3.Anchorage components, ducts, and similar items of PT system hardware

embedded within precast components or cast-in-place concrete will be deemed to be included in

cost of precast component or cast-in-place concrete in which it is embedded.

4.Payment is based on unit price bid extended by either quantities shown in the

Contract Documents or actual quantities used and accepted, whichever is less, if the Contractor

constructs structure with an accepted alternate not detailed in the Contract Documents.

5.Permanent PT strand, wire, or bar tendons which are an integral part of

individual precast concrete segments or units will be measured and paid for under this item and

will not be considered incidental to cost of those precast concrete segments or units.

6.Payment for PT will be made following successful placement, stressing, filler

injection, inspection, repair, protection, and written approval by the Engineer.

7.Full payment for PT tendons within precast segmental concrete structure units

may occur prior to erection of segments into final position when ducts have been injected and

anchorage protection system applied and the segmental unit otherwise approved in writing for

placement by the Engineer.

462-10.2Pay Items:

696FY 2023-24Return to Table of Contents

Payment will be made under:

Item No. 462- 2- Post-Tensioning Tendons - per pound. 697FY 2023-24Return to Table of Contents TIMBER STRUCTURES

470-1Description

Furnish and erect treated timber into various structures.

470-2Materials

Meet the following requirements: Timber ................................ ................................ .Section 952 Preservative ................................ ......................... Section 955 Use timber as specified in the Plans.

470-3Timber Handling

Handle treated timber with rope slings, without sudden dropping, breaking of outer fibers, bruising, or penetration of the surface with tools. Do not use cant dogs, hooks, or pike poles.

470-4Cutting and Framing

Before treatment, cut and frame all timbers which are shown by the Plans to be furnished in special lengths or framed to detailed dimensions. Limit the cutting of treated timber to minor fitting which might be necessary and that is authorized by the Engineer. For all places where the surface is broken, by cutting or otherwise, thoroughly coat with the preservatives and by the methods specified in AWPA M4.

470-5Bolt Holes

The Contractor may drill holes in the field. For timbers originally treated with pentachlorophenol, creosote, creosote solutions, or waterborne preservatives, field treat all cuts, abrasions, bolt holes, and recesses that occur after treatment with two liberal applications of a compatible preservative in accordance with the requirements specified in AWPA Standard M4, Standard for the Care of Pressure -Treated Wood Products.

470-6Pile Caps

Ensure that pile caps have full even bearing on all piles in the bent, and secure them to each pile by a 3/4 inch diameter drift bolt extending at least 9 inches into the pile. Where so shown in the Plans, cover the tops and ends of pile caps with 10 ounce, minimum weight, copper sheet meeting the requirements of ASTM B370.

470-7Floors

Attach the planks to each joist or nai ling strip with at least two 8 inch nails for 3 inch planks, or two 10 inch nails for 4 inch planks. Use nails that are at least 1/4 inch in diameter. For treated timber floors where a bituminous wearing surface is to be applied, lay the planks with the best side up and with adjacent edges in contact. Grade the planks as to thickness before laying, and lay the planks so that no two adjacent planks vary in thickness more than 1/8 inch. Cut the floor to straight lines along the side of the roadway and walkway . 698 FY 2023-24 Return to Table of Contents

Get an email when 462 changes

Florida revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Florida Standard Specifications for Road and Bridge Construction, 2024 Edition. Pages 672–705 of 1,299. View official source ↗

Ask about this section

Scoped to Florida Standard Specifications for Road and Bridge Construction, Section 462 — POST-TENSIONING. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.