682VIDEO EQUIPMENT

FL · 2024 Standard Specifications✓ Full text on BuildSpecBook pages 915–921 Save this section

Ask about Section 682

Get a cited answer from the section text. Click the citation to check it.

One cited answer a day is free. Start a 14-day trial for unlimited, no card required.

682-1CCTV Camera

682-1.1Description : Furnish and install a closed -circuit television (CCTV) camera at the

locations shown in the Plans. The installed equipment must provide video images of the roadway, traffic, and other current conditions around a roadside CCTV field site; respond to camera control signals from the operator; and transmit video images to remote locations for observation.

682-1.2Materials : All equipment shall be permanently marked with manufacturer name

or trademark, part number, and date of manufacture or serial number. Meet the requirements of indicated in the Contract Documents. Cameras are classified by camer a type and video type. Provide the appropriate type for the locations shown in the Plans. Use only equipment and components that meet the requirements of Section 996 and are listed on the Department’s Approved Product List (APL). All CCTV cameras must su pport the communication links shown in the Plans. Unshielded twisted pair/shielded twisted pair network cables must be compliant with the TIA-568 Standard.

682-1.3Installation : Install the CCTV camera on a pole in accordance with Standard

Plans, Indexes 641-020, 649-020, and 659 -020, and as shown in the Plans. Furnish and install the power supplies and any other camera -related field electronic equipment and transient voltage surge suppressors within a pole - or base-mounted lockable cabinet. The cabinet must meet the requirements of Section 676. Furnish and install all power, video, and data cables necessary to provide connection points for camera video and PTZ control signals within the cabinet. Furnish and install any and all ancillary equipment requ ired to provide a complete and fully operational CCTV camera. Verify that all wiring meets National Electric Code (NEC) requirements where applicable. Route the data and video cables from the pole or support structure to the camera inside the mounting ha rdware and protect from exposure to the outside environment. Coat the exterior of the dome -type enclosure’s lower half with a clear, rain repellant product prior to final acceptance.

682-1.4Field Acceptance Testing: Conduct field acceptance testing in accordance with

Section 611. Perform local field inspection at each local CCTV field site to verify and confirm the following:

1.Physical construction has been completed as specified in the Plans and

all existing and proposed lanes are cle arly visible with no line of site obstructions.

2.The quality and tightness of ground and surge protector connections.
3.Proper voltages for all power supplies and related power circuits.
4.All connections, including correct installation of com munication and

power cables.

682-2Video Display Equipment

682-2.1Description : Furnish and install video display equipment as shown in the Plans

907 FY 2023-24 Return to Table of Contents

682-2.2Materials : Video display equipment must have the capability to display analog,

digital, and other images associated with the operation of the transportation management center (TMC). Provide equipment, mounting hardware, cabling, and other video display components that are compatible with each other. All equipment and materials furnished and installed must be reviewed and approved by the Engineer. 682-2.2.1 Video Display Control System: Furnish a video display control system that meets the requirements of Section 996. Provide the video display control system with a minimum configuration of 4 composite video inputs, 4 component (red, green, and blue (RGB)) video inputs, and 4 DVI inputs as well as network connections, decoders, and associated hardware and software required to display 32 inputs simultaneously at a minimum resolution of 720 pixels x 480 pixels and a frame rate of 30 fps, or as shown in the Plans. Provide the video display control system with a minimum configuration of 4 composite video outputs, 2 component (RGB video outputs), and 4 DVI outputs, or as shown in the Plans. If the projection device requires an analog signal, then breakout cables may be used to convert the DVI output connector to a HD15 analog RGB connector. 682-2.2.2 Video Wall Display: Furnish and install a video wall display consisting of display devices described below arranged in a wall, as shown in the Plans, together with a video display control system. The video wall display must produce, at a minimum, a large -scale, high - resolution video image having accurate color rendition, sufficient image brightness, an d a high contrast ratio, as described in 682 -2.2.8. The display system must provide access to serviceable components for repair and replacement of electronics, lamps, and optical components without removing the device from service for a period longer than 30 minutes. Integrate the individual display units in a single, seamless display that provides a continuous image across the entire active display area provided, under the complete control of the TMC operators from their individual shared workstations. Source all major wall display components from a single provider or manufacturer to ensure that the various devices are compatible with each other and able to function together as an integrated display. The individual video images must exhibit a uniformity of color quality across the multiple displays. Colors must be displayed evenly across the video wall and the video wall must maintain uniform brightness characteristics from one video display unit to the next in the tiled display, with no degrad ation in color or brightness uniformity over time. The video wall display must provide features that allow physical and electronic alignment of the separate high - resolution display units that comprise the wall. 682-2.2.3 Video Wall Support Structure: Furnish and install an aluminum or steel-frame structure that supports the video display units as mounted and stacked to form the matrix for the video wall display. The support structure must consist of stackable display units that maintain a consistent maxim um horizontal and vertical spacing of 0.04 inches between adjacent display units in the video wall matrix. Fabricate the support structure specifically to ensure that a continuous, accurate image is provided on the screens without any distortion or unused screen space and that no observable distortions are present in the installed video wall display due to normal building 908 FY 2023-24 Return to Table of Contents vibration. Each completed structure must be enclosed such that there is no ambient light effect on the screen from behind the display. Ensure that the components of the individual video displays can be serviced without disturbing the integrity of the entire video wall display. 682-2.2.4 Rear Projection Video Display: Use rear projection video displays that are suitable for digital v ideo wall applications in mission -critical TMCs where video wall image quality, operational reliability, and serviceability objectives as stated in this Specification can be achieved. Use rear projection video displays that display a minimum of a single or quad-split, four -paned CCTV camera video image. Each video display must be able to be independently controlled from any of the central operator or shift supervisor workstations, and that each video display can be integrated with additional video units to form a single video display, or a virtual desktop where video windows can be positioned and resized by the operator. Ensure that the rear projection video display facilitates lamp replacement without the need to readjust the image being projected on the screen. The rear projection video display intensity must be sufficient for effective and comfortable viewing by TMC operations personnel under normal lighting conditions, subject to approval by the Department. The unit’s display engine must produce a minimum light output of 550 ANSI lumens. The rear projection video units must have the following minimum features and characteristics:

1.Screen brightness achieved by a combination of projection

techniques and screen materials, so that the video display has a minimum brightness measurement of 130 candelas per square meter (cd/m2) across the outside viewing surface of the projection screen.

2.Brightness uniformity that meets or exceeds 80 percent across

the display unit, as measured using a ph otometer.

3.A multi -lamp optical engine must be provided for rear

projection video units that do not use light -emitting diodes (LEDs) for illumination. Multi -lamp optical engines must provide a failover feature whereby a second lamp can be automatically activated when the first lamp fails. Ensure displays with multi -lamp optical engines provide indication of lamp status.

4.Multi-lamp optical engines must include both a “hot standby”

mode in which failover to the second lamp takes no more than two seconds and a “cold standby” mode in which failover and the time for the display to return to full light output does not exceed 30 seconds.

5.A display module that uses modular component architecture to

permit service or replacement of serviceable par ts without removing the projection engine.

6.Each unit must be completely enclosed and light tight, with

fixed panels for access to the lamp, power supply, and projection engine. 682-2.2.5 Flat Panel Display: Furnish and install a flat panel display unit to reproduce video and computer graphics information. The device must display, at a minimum, a high-resolution, distortion -free image and maintain a consistent level of illumination across the entire screen area. Ensure that it has the following mini mum features and characteristics:

1.Dimensions of 24 inches high by 41 inches wide by 4 inches deep, or as

shown in the Plans. 909 FY 2023-24 Return to Table of Contents

2.Ability to be installed on the face of a standard wall or flush mounted

within the wall system. 682-2.2.6 Cabling: Furnish each video display component with all required appurtenances, including all the necessary cables, with proper length and connectors for power and communication, as defined by the manufacturer. Ensure that cabling conforms to applicable EIA/TIA standa rds. Size the power cables to meet NEC requirements. Provide communication cables from each video display component to the network communication devices that are appropriate for and compatible with the technology employed (e.g., fiber optic, twisted pair, or coaxial), and meet the minimum size and bandwidth specifications the manufacturer requires. Provide all cabling of adequate length, along with the compatible connectors and any ancillary equipment necessary to fully interconnect the video components and display control systems needed to achieve the functions required. Label all cables at both ends, as approved by the Engineer. 682-2.2.7 Electrical: Provide equipment that operates on 120 VAC at a frequency of 60 Hz. Furnish a transformer or other nec essary means of power conversion for any device that requires another voltage or frequency. Conduct TMC field reviews to examine the electrical distribution panels allocated for various equipment items and the electrical schedules for each. Make any cha nges, additions, or corrections to the electrical panels, wiring, outlets, and connectors that may be deemed necessary to adequately power all of the equipment proposed for a video display project at the intended location, subject to the approval of the En gineer. Make any changes to the building’s electrical wiring in accordance with applicable codes and permits, and with the NEC.

Modifications to an existing building’s wiring or the video wall electrical wiring plans must be

signed and sealed by a Specialty Engineer, and submitted for approval.

682-2.2.8 Performance: Use only display devices meeting the following

minimum requirements. 910FY 2023-24Return to Table of Contents

Table 682-1

Minimum Requirements for Display Devices

Flat Panel Display

Rear Projection

Video Display

Type Direct View LCD DLP or LCD

Size (dependent on TMC design, as shown in the Plans)

Aspect Ratio (dependent on TMC design, as shown in the Plans)

Resolution 1600 x 1200 / 1280 x 768 pixels; 16.7

million colors

1024 x 768

pixels

Viewing Angle

170 degrees

horizontally and

vertically

160 degrees

horizontally

and vertically

160 degrees

horizontally

and vertically

Half Gain Angle — —

±40 degrees

horizontally

and vertically

Contrast Ratio 500:1 600:1 600:1

Screen Brightness * 250 cd/m2 450 cd/m2 130 cd/m2

Lamp Life — — 8,000 hrs.

(avg.)

Video Inputs

Analog/digital via 15-

pin D-sub (HD-15)

connector; DVI-D

connector.

Composite

video (NTSC)

on RCA

connector;

analog/digital

via 15-pin D-

sub (HD-15)

connector;

DVI-I

connector;

HDMI.

Composite

video (NTSC)

on BNC; RGB

via 15-pin D-

sub (HD-15)

connector;

DVI-D

connector.

Operating Temperature

and Humidity

32° to 95°F.

20 to 80%.

32° to 95°F. 20

to 80%.

32° to 95°F. 20

to 80%.

Power Requirements 120 VAC at 60 Hz 120 VAC at 60

Hz

120 VAC at 60

Hz

* Measured using a photometer.

682-2.3Installation: Do not proceed with any part of the procurement, construction, or

installation of the video display equipment until the construction plans and materials are

approved by the Engineer. Submit to the Engineer documentation, including the manufacturers’

product specification sheets and a detailed description of each item’s function as well as a

compliance matrix that confirms all equipment meets or exceeds the requirements of these

Specifications.

Configure each video display unit to provide individual, independent control from

each operator workstation. 911FY 2023-24Return to Table of Contents

Create the video wall display by arranging individual video display units in a

framework or apparatus that creates the video wall configuration as shown in the Plans. The

finished video wall must provide a single, apparently seamless display area. The adjacent

individual display units must be aligned physically and electronically so that image content

stretched across multiple monitors align within plus or minus 2 lines of horizontal and vertical

resolution.

All rear projection video unit controls must be accessible at all times when the

devices are permanently installed. Ensure that installation and positioning does not conceal or

limit access to any display unit controls at any time during active use.

Follow proper ventilation and cooling procedures for the equipment installed, as

determined by the equipment manufacturers. Provide electrical requirements and power

distribution units and power supplies for the video display components as-needed.

682-2.4Testing: Submit a detailed system acceptance test plan to the Engineer for

review and approval. Prepare a test plan that covers all areas of system function described in this

Section, and that is developed according to the various equipment manufacturers’

recommendations.

Check and test the satisfactory operation of all video display components upon

completion of the equipment’s installation. At minimum, include in the video display system test

the testing of each color video monitor type, each secondary display output at workstations, each

rear projection video display unit, and the video wall display’s image alignment and control

functions.

Subject the video wall display to a 90 day operational observation period. During

this time, perform any and all maintenance, recalibration, system checking, and display

modifications required by the Engineer. The Engineer has the option to require a restart of the

observation period if a major system flaw or failure occurs.

682-3Warranty

Ensure that CCTV cameras and video display equipment have a manufacturer’s warranty

covering defects for a minimum of three years from the date of final acceptance by the Engineer

in accordance with 5-11 and Section 608. Ensure that the warranty requires the manufacturer to

furnish replacements for any part or equipment found to be defective during the warranty period

at no cost to the Department or the maintaining agency within 10 calendar days of notification.

Warranty repairs of the video display control system and related TMC display

equipment must commence within 24 hours after notification by the Department.

682-4Method of Measurement

The Contract unit price for each CCTV camera or video display device or system,

furnished and installed, will include furnishing, placement, and testing of all equipment and

materials, and for all tools, labor, operational software packages and firmware, supplies, support,

personnel training, shop drawings, documentation, and incidentals necessary to complete the

work. The cabinet will be paid for in accordance with Section 676.

The video display equipment will be measured as each major system component is

furnished, installed, made fully operational, and tested in accordance with this Specification or as

directed by the Engineer.

682-5Basis of Payment

Price and payment will be full compensation for all work specified in this Section. 912FY 2023-24Return to Table of Contents

Payment will be made under:

Item No. 682- 1- CCTV Camera - each.

Item No. 682- 2- Video Display Equipment - each. 913FY 2023-24Return to Table of Contents NETWORK DEVICES

684-1Managed Field Ethernet Switch

684-1.1Description: Furnish and install a hardened, device -level managed field Ethernet

switch (MFES) for intelligent transportation system (ITS) projects. Ensure that the MFES provides wire -speed fast Ethernet connectivity at transmission rates of 100 megabits per second from the remote ITS device installation location to the ITS network trunk interconnection point.

684-1.2Materials: All equipment shall be permanentl y marked with manufacturer name

or trademark, part number, and date of manufacture or serial number. Meet the requirements of Section 603. Use only equipment and components that meet the requirements of Section 996 and are listed on the Department’s Approved Product List (APL). Ensure that the ITS network administrator will be able to manage each MFES individually and as a group for switch configuration, performance monitoring, and troubleshooting. Ensure that the furnished MFES is fully compatible and interoperable with the ITS trunk Ethernet network interface. Provide a switched Ethernet connection for each remote ITS field device. 684-1.2.1 Optical Ports: Ensure that all fiber optic link ports operate at 1,310 or 1,550 nanometers in single mode. Ensure that the optical ports are Type ST, SC, LC, or FC only, as specified in the Plans or by the Engineer. Do not use mechanical transfer registered jack

(MTRJ)type connectors.

Provide an MFES having a minimum of two optical 100 Base FX ports capable of transmitting data at 100 megabits per second unless otherwise shown in the Plans . Ensure the MFES is configured with the number and type of ports detailed in the Contract Documents. Provide optical ports designed for use with a pair of fibers; one fiber will transmit

(TX)data and one fiber will receive (RX) data. The optical ports must have an optical power

budget of at least 15 dB, or as detailed in the Contract Documents . 684-1.2.2 Copper Ports: Provide an MFES that includes a minimum of four copper ports unless otherwise shown in the Plans . Ethernet over very high speed digital subscriber line (EoVDSL) ports are permitted for use in applications where fiber optic cable is not available.

684-1.3Installation : Mount the MFES inside a field site cabinet. Ensure that the MFES

is resistant to all electromagnetic interference (EMI). Ensure that the MFES is mounted securely and is fully accessible by field technicians. Ensure that all unshielded twisted pair/shielded twisted pair Ethernet network cables are compliant with the EIA/TIA -568-B standard.

684-1.4Field Acceptance Testing: Conduct field acceptance testing in accordance

Section 611. Once the MFES has been installed, conduct local field inspection at the MFES field site according to the approved test plan. Perform the following:

1.Verify that physical construction has been completed as detailed in the

Plans.

2.Inspect the quality and tightness of ground and surge protector

connections.

3.Verify proper voltages for all power supplies and related power circuits.
4.Connect devices to the power sources.

914 FY 2023-24 Return to Table of Contents

Get an email when 682 changes

Florida revises spec sections through supplementals and new editions. We check this one every week and email you the day it changes. Free, no account.

Source: Florida Standard Specifications for Road and Bridge Construction, 2024 Edition. Pages 915–921 of 1,299. View official source ↗

Ask about this section

Scoped to Florida Standard Specifications for Road and Bridge Construction, Section 682 — VIDEO EQUIPMENT. Every answer cites the section it came from, with a verification date — don’t trust a percentage, click the citation.