Section 22 2—Aggregate Drainage Courses
222.1General Description
This work includes installing aggregate drainage courses. The drainage courses shall conform to the Specifications and to the lines, grades, and dimensions shown on the Plans or directed by the Engineer. 222.1.01 Defi nitions General Provisions 101 through 150. 222.1.02 Related References
General Provisions 101 through 150. 222.1.03 Submittals General Provisions 101 through 150.
222.2Materials
Ensure that materials meet the requirements of the following Specifications: Material Subsection Type I Aggregate Drainage Course 806.2.01 Type II Aggregate Drainage Course 806.2.02 Type III Drainage Blanket Material 806.2.03
222.2.01 Delivery, Storage, and Handling General Provisions 101 through 150.
222.3Construction Requirements
222.3.01 Personnel General Provisions 101 through 150.
255 255 255 255 255 255 255 255 255 255
222.3.02 Equipmen t
To spread a uniform layer of coarse or fine aggregate without segregation and compact it to the specified requirements, use hauling and spreading equipment approved by the Engineer.
On any other surface, including wet and unstable areas, use trucks for end -dumping, and bulldozers and road machines for spreading. 222.3.03 Preparation General Provisions 101 through 150. 222.3.04 Fabrication General Provisions 101 through 150. 222.3.05 Construction Construct the roadbed according to the lines, grades, and typical cross -sections shown on the Plans and according to Section 208 and Section 209. Use coarse aggregate, drainage course, and drainage blanket material as follows: Type I Aggregate Drainage Course Use in a trench around pipe or in the shoulder in conjunction with a trench. Type II Aggregat e Drainage Course Use as a drainage blanket under sidewalks, curbs and gutter, and beneath the pavement system or shoulders. Type III Drainage Blanket Material Use on parts of the roadway shown on the Plans as requiring a drainage blanket.
Spread the material uniformly to obtain the compacted depth required on the Plans and as follows:
222.3.02.B, Other Surfaces.
connect the drainage course directly to the underdrain system.
Compact the material according to the following procedures, and have the Engineer approve it.
progress toward the center. On super -elevated curves or shoulders, begin rolling on the lower edge and progress toward the higher edge.
256 256 256 256 256 256 256 256 256 256
optimum moisture.
approved by the Engineer.
material to the thin area. Compact again according to the Specifications.
Engineer.
Drain unstable or wet areas when the area is in the subgrade or the original ground surface is an embankment area or a trench. Spread drainage material to the requirements on the Plans or as directed by the Engineer.
Compact drainage material until stable. 222.3.06 Quality Assurance General Provisions 101 through 150. 222.3.07 Contractor Warranty and Maintenance General Provisions 101 through 150.
222.4Measurement
Aggregate drainage course is measured by the ton (megagram) or cubic yard (meter). When measured by the ton (megagram), the weight is determined by approved truck scales at the job site, or by other scales approved in advance. When measured by the cubic yard (meter), the loose volume is determined as specified in Section 109. 222.4.01 Limits General Provisions 101 through 150.
222.5Payment
Aggregate drainage course of the type specified will be paid for at the Contract Unit Price per ton (megagram) or per cubic yard (meter). Payment will be made under: Item No. 222 Aggregate Drainage Course, Type____ Per ton (megagram) Item No. 222 Aggregate Drainage Course, Type ____ Per cubic yard (meter). Item No. 573 Underdrain Pipe including Drainage Aggregate ____ in(mm) Per linear foot (meter)
257 257 257 257 257 257 257 257 257 257
222.5.01 Adjustments If the average thickness for any 1- mile (1600 m) increment exceeds the specified thickness by more than 1 in. (25 mm), the Department will reduce the Contractor’s payment for the excess material. The Department will calculate the excess material by multiplying how much average thickness exceeded the allowable 1 in. (25 mm) tolerance by the surface area of the course.